COAL REFINERY [ ] CONSTRUCTION

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP82-00457R010600430002-9
Release Decision: 
RIPPUB
Original Classification: 
C
Document Page Count: 
11
Document Creation Date: 
December 14, 2016
Document Release Date: 
July 18, 2002
Sequence Number: 
2
Case Number: 
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP82-00457R010600430002-9.pdf551.43 KB
Body: 
25X1A' 3. A hydro-power plant was under construction east of the town. Water for the turbines will be supplied through a tunnel from a neighboring valley, plentiful in water. 4. The construction of the c6al dressing plant started in Octo- ber 1948 under the supervision of chief engineer Makiakelichi prof pleted in filMW six years. tadOr NO. OF P NO. OF ENCLS. (LISTED BELOW) SUPPLEMENT TO REPORT NO, tion onstructi d i rika' proxim 2. Tie dell that production will start in late 1950. 'onstruction App WdP#QI CENTRAL INTELLIGENCE AGENCY REPORT NO. SECURITY~- F ORMATTO f INFORMATION REPORT CD NO. COUNTRY USSR (Georg SUBJECT Coal Refine Constructio PLACE ACQUIRED DATE OF INFO. 25X1A 1 .;25X1 25X1X ..Approved For Release 2002/08/14: CIA-RDP82-00457R010600430002-9 25X1A L 5. A new hydro-power plant, under construction some distance from Tkvibuli, was about 1,200 me the last straight road section before t oviets said that, at first, a water tunnel ed, -As no German -..gs...m .~. -the- -eon s are available. 6. The construction of ng plant started in the Spring of 1948. ensions could not be identified as addition sites were being surveyed east and west of the'. buildings un onstruction. Director '- Gabi Sonya, chief engineer MaklakeUche and several other Ger- man PW engineers supervised the construction.. 7. The chief engineer believed production would start in late 1950. Source assured that the installation would be a hydro- genation plant. Coal to be processed here was already arriv- ing at the freight station from the nearby Stalin, Lenin and Molotov mines. (Two plant locomotives, each with five 60-ton railroad cars,per hour. ) 8. Access roads in a poor condition were partially renewed. A railroad connection was available and being extended. 9. Construction work force: 350 civilian laborers and 350 PWs. (For plant layout see Annex 3) 10. The construction started in the Spring of 1948, and the ad- ministration, a. machine shop, and the laboratory were the first buildings to be completed. 11. The main plant building of the hydrogenation plant, under con- struction since the Fall of 1948, was to be completed by 1950, a target date which, according to source, could not be meta. Soviet engineers said, that the coal will be processed by the Fischer-T'ropsch-method but no technical installations for this type of process were obserfed. 12. Construction work force: Several hundred civilian laborers and PWs. (See Annexe 4) This repo construdti a hydroge PWs will w can hardly the various sources in correct. Differences as to by the fact that thi stage of constructio ormation on the plants under unption that it is to be It is doubted that and further information nt of the statements by that the information might;be n are explained the early Approved For Release 2002/08/14 :CIA-RDP82-0,0457RA1960A430002-9 Approved For Release 2002/08/14: CIA-RDP82-00457RO10600430002-9 2 Municipal 3 Brickyard under construction 4 Three centonment buildings for laborers 5 Railroad bridge, 20 meters long, iron structure 6 R bad bridge 7 Main magazine 8 MVD Building 9 Mining school with apartment house 10 Four-story mining school 11 -t'W camp No 7518/2 12 Railroad bridge, iron structure 13 Church 14 Molotiv mine, with modern equipment, being exploited since 15 July 1948 15 I nin mine, old installation, dates back from before World War I. 16 PW camp No 7518/1 17 Stalin mine, new installation and most productive mine of the area 18 New power plant a Pipe lines b Tunnel under construction (for cross section A - B see small sketch) 25X1A Approved For Release 2002/08/14: CIA-RDP82-00457RO10600430002-9 Approved For Release 2002/08/14: CIA-RDP82-00457RO10600430002-9 Legend to Annex 2 Foal refinery 1 Main building under construction, 60 x 40 x 48 meters, foundations completed with basement under half of the building, td be equipped with railroad siding in the southern part of the building. 2 Boiler house, bare structure completed, 40 x 2 0 x 10 meters with 30-meter sheet-metal smoke- stack, machinery arrived in July 1949 from Krupp-Gruson AG in Magdeburg Coal washing installation, called Dora 1 and Dora 2, under constructions being concreted. Each container Was a diameter of 28 meters. A pump plant was under construction among the containers 4 Transformer station. Power with a tension of 6,000 Volt came from Kutaisi 5 Two water tanks, each 17 meters in diameter and 6 meters high, ferro-concrete structures which leaked when first tested. 6 Workshop under construction, 60 x 20 x 28 meters, foundations completed, called dosing bunker, to be coal store. (The reported height was indicated by Soviet laborers) 7 Forge and mechanical department for plant constructions, concrete building, 30 x 10 x 4 meters. 8 Stores with construction materials, iron rods and electric installation materials, 30 x 10 x 4 meters 9 Admi ,x 20 x 10 meters, partially B }ffics o C Depot for mine W41`B_CONFIDENTIAL 25X1 Approved For Release 2002/08/14: CIA-RDP82-00457RO10600430002-9 Approved For Release 2002/08/14: CIA-RDP82-00457RO10600430002-9 D MVD.kommandatura E Three boarding schools, bare structures com- pleted F Mining school, bare structure completed C Transformer station and power transmission line H PW camp No 7518/2 J Three railroad bridges cantilever iron structures K "CRM" frame construction firm, manufacturing all steel structures required in that region. L New samilI with. two sawframes M Former church used as explosive store N New passenger railroad station under construction 0 New railroad line with bridges under construction P Molotov Mine Q Lenin Mine R PW camp No 7518/1 S Power plant under construction T Stalin Mine U Soviet convicts' camp 25X1A Approved For Release 2002/08/14: CIA-RDP82-00457RO10600430002-9 Approved For Release 2002/08/14: CIA-RDP82-00457RO10600430002-9 Legend to Annex 3 1 Iain building under construction, 40 x 25 meters to be 30 to 40 meters sigh. Concrete basement 9 meters deep; no machinery available. 2 Bridgehead of conveyor belts, concrete bare struc- tures completed 3 Bridges for conveyor belts, iron structure under construction 4 Trans-shipping station, concrete structure 10 x 10 x 7 meters, bare structure completed 5 Dosing bunker, 30 x 20 meters, under construction, caner i r structure half of the building has a unnels being inst 6 Two r rs, under construc- tion, 12 to 15 meters in diamet processing and drying installation, 7 Transformer station, concrete structure, 20 x 5 x 7 meters, with Siemens-Schuckert installations from Germany being fitted. $ Two concrete water containers, 7 meters high and 12 meters in diameter 9 Mechanical workshop and forge, quarry-stone struc- ture, 20 x 10 x 5 meters 10 Magazine, 20 x 10 x j meters, for iron rods of various sizes, and clothes 11 Administration, 25 x 10 x 12 meters, four-story quarry-stone building 12 Concrete retaining wall at river C NO AB._( :ONFIDENTIAL 25X1A Approved For Release 2002/08/14: CIA-RDP82-00457RO10600430002-9 Approved For Release 2002/08/14: CIA-RDP82-00457RO10600430002-9 Legend to Annex 4:- 1 Main building under construction, 200 x 100 meters 2 Administration, 150 x 39 meters, completed in early 1949 3 Laboratory, 25 x 10 meters, completed in April 1949 4 Two concrete tanks for water, 10 meters high 15 meters in diameter 5 Machine shop, 50 x 15 meters, completed in March 1949. 1M CoNFIDENTIAL- 25X1A Approved For Release 2002/08/14: CIA-RDP82-00457RO10600430002-9 Approved For Release 200 - - - CONFIDENTIAL- CENTRAL INTEL 25X1 For legend see report CONFIDE,.ITIAL~ 25X1 A Approved For Release 2002/08/14: CIA-RDP82-00457RO10600430002-9 Approved For Release 2002/08/14: CIA-RDP82-00457RO10600430002-9 25X1A O'O m 0Q 25X1 Approved For Release 2002/08/14: CIA-RDP82-00457RO10600430002-9 Approved For Release 2002/08/14: CIA-RDP82-000S3p10600430002-9 CONFIDETTIAL-COT'd TR0 CENTRAL INTELLIGENCE AGEIC$ 25X1 Attaclnt 2 25X1A CONFIDENT 2O Approved For Release 25X1 For legend see. repo G Approved Fo~Fe 08/14: CIA-RDP82-00457RO10600430002-9