REFINED STEELWORKS IN THE METALLURGICAL PLANT AT ZAPOROZHE
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP82-00457R010700020010-4
Release Decision:
RIPPUB
Original Classification:
C
Document Page Count:
10
Document Creation Date:
December 14, 2016
Document Release Date:
February 25, 2002
Sequence Number:
10
Case Number:
Publication Date:
February 25, 1952
Content Type:
REPORT
File:
Attachment | Size |
---|---|
![]() | 680.21 KB |
Body:
Approwpi'R2*01-, 1CEN LL G N AGENCY REPORT NO.
INFORMATION REPORT CD NO.
COUNTRY USSR (Ukrainian SSR)
SUBJECT Refined Steelworks in tie Metallurgical
Plant at Zaporozhe
PLACE
ACQUIRED
DATE OF
INFO.
beside the chill casting department,
h;. The Bessemer shop is 'located between the bl
1. a. ,Test of the b- st furnace installation, the so-called
;130-ton shop" housing three open-hearth fu~rna cas, achof
which produced 30 totes of steel per casting, located
st fur
25X1X
25X1A
25X1 C
25X1A
DATE DISTR. 25 February 1952
NO, OF PAGES
NO. OF ENCLS. 6(Annexes 2
(LISTED BELOW)
SUPPLEMENT TO
REPORT NO.
loea' ign and eou ij~me o e -
flro ie (3, 11'E/47 'I9'N) metallurgical plant s
~
th
~
e
-------- Ukrainian SSrt. Such vcrks were mentioned in most of
these reports either in the test or in the Annex,
Approved For Release 2002/08/08 : CIA-RDP82-00457RO10700020010-4
Approved For Release 2002/08/08 : CIA-RDP82-00457RO10700020010-4
BEST COPY
Available
Approved For Release 2002/08/08 : CIA-RDP82-00457RO10700020010-4
Approved FW(Z#/p$,I'C.Ci;,$8Q0147Q.PZ010-4
MA?' INTELLIG CE AGnI NCY
a The, molten irorl ce s from the bl t Ir
to the mixing plant by- special bucket car
liquid pig iron is red into the Thomas
25X1A
LLEGIB
and is once L;-ore cleOned by air blasts. further-
ahi, m nt to ..he open--hearth furnaces is done by other
bucket cars,
b. Special chro. ie nickel is produced in a special
work st.op soutrea^?t of the mtxin` p 1ant See _ nnex l.,
sketch 2,
The 30-tpn del)a.rtment i nort east of the blast
fur .ade irstallat,ion. it is 60x20
meters and has
two e.lec~ric open--ne firth furn, aes for chrome nickel
zto,el making. The so-4elled TETS" building, where
the air blast for the blast furnaces was heated,,
bordened on the 30-ton. department, The blast
/housed
three turbines, biiing
a, A so-called mixer was close to th3 blast furnace
installation. it sezvbd as a r eservo it for the
molten gig iron to b e poured into the o pen.he arth
furnaces,
b} About 200 to 300 nete s from the open-hearth de=
partrtent rand ,;parallel to it was a workshop generally
called "30-ton shhop" as it housed the open-hearth
furnaces, which had a capacity of 30 tons. Source
:LQarned from skilled Aiorkerls among the fellow P s
ILLEGIB
that th lion. served. for the production of
-Me?t
e
as For ig, the molten pig iron goes, at
a r--ate it , from the blast furnaces to
the ope -nacres by special bucket cars,
The res small foundry, there iron inp,ots
150 x 20. . Nine open}hearth furnaces are
complet is under c?nstructIon and the
excavation for the 11th and 12th furngees are ready..
b, A workshop, 120 x 60 meters, serves for making
chrome nickel steel, Two electric Siemens furnaces
are installed there and two more furnaces are to
be set ul . The steel is frefined there by chrome, and
nickel, and ingots ift the shape and the size of
breechioc_ks are produced there,
See Annex 1, sketch 3.,
25X1A
25X1A
JCoaruasnt
s., This report has special value as the la7out of
the southern and most essential section of the Zapo
roue mettllurgica1 plant is definitely clarified
by the da-ta.
b, The annexed three sketches, which cover~~, the same
Approved For Release 2002/08/08 : CIA-RDP82-00457RO10700020010-4
part of this plant, conform to each other except
for trifles. Sketches 2 and 3 especially bear great
:resemblaAce to each other and presumably show the
`GN l+It?%~ _ L, GOITTRC`L/r*S I'FICTAZS CINLY
Approved. For Release 2002/08/08 : CIA-RDP82-00457R010700020010-4
25X1A
CONFIDEI' TI AL/C0i`NThGL/tJS 0FFIOIAIS ONLY
3
dE- WnL INTELLIGENCE .AGENCY
correct picture o_t tht; layout of this main. part of
this p lane. T' e same layout is given in Sketch 11 which l,
however, is more sbhematic,.
c. It may be assures d that the most important refined
steel department-the so-called "30-ton shop" - which
is the crucial point of this report;, is north of the
blast furnace installation,. It is a building of a
presumable size of 120x60 meters and vary probably
houses tvk electric steel :furnaces, each of 30-ton capa-
city (only one source indicated three furnaces). The
capacity of 30 tons is remarkable but thought pos sable
d// TLi'8)repott furn.Xsli.ee ic va_lu-e e contribution to
ciarifyin the t.sux vey ont t e'impar anteaetor whiC
4'e the subject -of several previoix Lysub:nitte rep rt ,
7eVeral pictures, recently published in `3oviet
newspapers, are enclosed as Annexes 2 through 6.
Blast furnace No. 3 and the back wall of the " IT6"
thereto-power plant are shown in Annet 2.
The front side cf the "TE`L ' the rmo-power plant is shown
furndos No. 3 is shown at a S -oO, t
in Annex 3. Blast
distance in Annex 4. Blast furnace No. 4 is shown in
Annexe s 5 and
nnexes: 1. Refined Steel Works in the ?aparoZhe
Matallunical Plant.
2. through fi
Ie to 11ux,~~ea 1 Plant, in 'vapor ozhe
(5 photostats).
ON ILi%'1` I' IAI /O 'NTROL J Ohi'IIC I.AL ONLY
Approved For Release 2002/08/08 : CIA-RDP82-00457RO10700020010-4
Approved For Release 2002/08/08 : CIA-RDP82-00457RO10700020010-4
GONFILLNTI z~L/C ON11'ROLf J u OFFIC I.~-~IS OTJI2
1
CENTRAL INTELLIGENCE AG,, CY
25X1A
Legend to Annex l :
Sketch 1:
1 Blast furnace iristallati.o? with four blast furnaces
2 Chill casting. depart ent
3 30.-ton shop with three olen-hearth furnaces 3 rceters
high
4 Boiler house with compressors and transformer station,
sand blast and h.aetine in_stallt tion
5 Bessemer shop
6 ?Frtartin department with nine smokestacks
7 7.7arehouses with loading platforms
8 Watchtowers
sketch
1 Coke-chemical plant installations
2 Four blast furnaces
3 Benno 1. station
If Cooling tower
5 Form r P 'ill camp
6 .mall foundry
7 Demolished shop, former forge
8 Forge
9 Sao-called "TETS" compressor installation for the blast
furn.ees, with four turbines
10 Chro_ nickel steel dc.. artmant, 1O x 60 meters, with two
openahearth fern;-tees, each of 30-ton capacity. The in-
stallation of two more furnaces is finned
11 Mixer shop, 60 x 30 x 35 neters, with one Thomas convorter,,
in which the sla is separated from the iron by, air blast
12 Open earth department with nine furnaces in operation,,
three under construction
1, Dressing plant for the open-hearth department
kr'V t'r-,.C.v F,eivT rfL/Vl 31ZR L/US y. IC 1..1-A~. ,PA` ONLY
25X1A'
Approved For Release 2002/08/08 : CIA-RDP82-00457RO10700020010-4
Approved For Release 2002/08/08 : CIA-RDP82-00457RO10700020010-4
25X1A
COI FDENTIAL/CON'1 '3
Le ,en4 to Annex 1 c on t' d :
IT, 1 /orlcohop under bbnstrudtion, the molds and the
,steel ingot su ports will be cleaned there
1.5 S yard: fcr dismaftled German machines
1,6 Transformer station with two high tension pylons
Setcb 3:
1 Coke-chemical department
3
4+
your blast furnaces
Smeil foundry
Demlolished work shop
Workshop, 200 x 4..0 meters, equipped with steam-operated
harp. rs and hardening furnaces
6 Emer ncy power plant any compressor station serving
the blast furnaces, with four turbines installed,
so cal le d STS" department
7 Former FV"/ cam!)
8 Chrome nickel stool manufacturing shop With two electric
open-hearth furnaces installed, two more furnaces are
to be constructidi 120 x 60 meters,
Transformer station
9
10 Dressing shop for the c;yen-hearth department, 200 x 10
meters
11. 0 en.-hearth de ;ertr~errt
12 projected rolling mill, where dis.antled German machines
were stored.
OTIFTL 1~~L CO P T '0L/US o n cIrL CND(
25X1A
Approved For Release 2002/08/08 : CIA-RDP82-00457RO10700020010-4
Approved For Release 2002/08/08 : CIA-RDP82-00457R010700020010-4
? - CONFIDENT IAL/CONM.OL-IJS 2L BRITISH OFFICIALS ONLY 25X1A
1-1
.efined Steelworks in the Zaporozhe
Metallurgical Plant
nnex 1
/Va
...s' etch Ho 3
CO'\iF7 ,NTIAL/ X)1 Tr rC L-US OFFICIALS ONLY
Approved For Release 2002/08/08 : CIA-RDP82-00457R010700020010-4
ouc For Release 2002/08/08 : CI - - F010700020010-094
rout Vie cf' ic o?? o? r iant.
e t811 ur;< i c el i in 'al orozhe.
B/cs st- Furndc'e No. 4
Mehl//urgiC&/ font ire Zc porozhe .
Approved For Release 2002/08/08 : CIA-RDP82-00457RO10700020010-4
25X1A
25X1 A I Approved For Release 20 RDP82-00457R010700020010-4
-
CONTROL .ED DI.STR/BUT/ON nn&x 4L
X~4AN USSR UKRAINIAN SSR ZAPOROZHYE 47 49 N 35 II E
2 5X METALLURGICAL PLANT. BLAST FURNACE NO. 3. SEE REPORT FOR SKETCH AND
2 5XIADDITIONAL INFORMATION. L_ I
I
CONTROLLED DISTRIBUTION
4 N 11 E
35
2
nnex
25X1A
25X1
r JSSR TJKRAINIAN SSR ZAPOR07HYE 1 9
plant "TEZ". See re-
BM tallurgical Plant. Blast furnace No. 3 and back front of heating power
25X1
F -'I
..wt for sketch and additional information.
Approved For Release 2002/08/08 : CIA-RDP82-00457RO10700020010-44
conrlaen-ciaj-/u.0. Vlij\ ~fJ.iV v---y :111 %1 dfik
25X1 A 4 N USSR UKRAINIAN SSR ZAPOROZflYE 47 49 N 35 11 E 25X1 A
Metallurgica.jp.PlgM,@j F eC TW/WD8 t.:.ClS nROdBgDCD2Wd.0atditional informa-
25X1 lion.
o e tial/U.S. Officials Only
25X1
Approved For Release 2002/08/08 : CIA-RDP82-00457R010700020010-4