C)UNTRY ;I nca
IV , \1`"T)1)T
(I O FICIAL3 ONLY
U
-
.
LCJRM." f:FORfATION
I NTELLIGENCE AGENCY REPOR
UBJECT
i )LACE
.'/(;QUIRE[
la F` AT O REPORT CD NO.
?)J TE OF
N FO.
Sanitized Copy Approved for Release 2011/05/11: CIA-RDP82-00457RO10700030001-3
Wr LWFA LA,S. SIFICATIQ
$ovromcoasti uctia No. 7
~ TIl1D 4000r*ENT CONTAPHS INPORNAYYO11 AFFFCTiN9 THE IATIOP4AL UIEFEHIPE
0'? THE UNITZD 3TATES.fTH17 THE IMMUNE; OF TITLE 18. SECTIONS 788
~' AiID 794, OF THE D. R. CODE, AS AMENDED, ITS TNANS ISEION OR REVEL-
A'1091 OF ITS (tORTENTI, TO 05 RECEIPT By AH UN.W'PNONPZED t'@NSOH
IL PNOHIEITEo Div LAW THE REPRODUCTic11 OF 4HIS FORM IS PROi4IEITED.
.., Mgineers : Nircea Dlw ar
clu Roures.
he Mi 3 t: r of Cans#?ruct on cc ntro11. 25 concerns throughout 1Rumr:an is . The
ksfficiala title of Scnrromconstruct-A, No. 7 is as follows : Intreprinnderea No, 7r
Oe Constrtucift-. Civilee Si Industriale. Ministerul Conatructilor, Galati.
(Civil and, Industrial Construction Concern, No. 7. Niaistry of Construction,
Galati,)
2. The following are the headquarters of some of these concerns:
No, 1 Bucharest
i o. 2 Ploe sti
No. 7 Galati
No. 20 Bucharest,, thich eras almost exclusively engaged an fitting installations
Ir. buildings completed by other concerns.
Organization of Cons?,r ct`ii No. 7, Galati is :
Location, Strada Sfantui Nicolas No. 22, Galati.
a.
la e Organ .zation and Personalities :
,TAO Erf
MV
ngineer f z Military Projects, Soli Brasotesche~
k architect, --a,ngineer Inspector of Works, Compeanu.
I Head of Tec'R:nical Service, Victor Fraisler.
Architect, Spector of Works.- Lorbec Blat
l3rector, Ilichae:l T ndelsoO
(1) F:6adquartera, Galati.
(2) i a1ati, Bra:.ich Offic*.
;Director -?`"_cilao 13esche
]i.ngineer&s. - .;oje Mar cvi.t
(....
50X1-HUM
DATE DISTR. 7 Bch 1.952
NO, OF PACES x}
NO. OF ENCL.
(LISTED BELOW)
SUPPLEMENT TO
REPORT NO..
THIS IS UNEVALUATED INFORMA11O
1oico1.ae G03acu, iaa .inly
`.:ighi. `CHr. ;.nhauser
71.A-=SIRCATIC1
w.n':'r # 1 : e ~zi>
'AIR
res=sibl(.:) for military
, Lt .5. OFFICES JNLY
50X1-HUM
Fircjes- ct ,,
50X1-HUM
Sanitized Copy Approved for Release 2011/05/11: CIA-RDP82-00457RO10700030001-3
Sanitized Copy Approved for Release 2011/05/11: CIA-RDP82-00457RO10700030001-3
SECRET/CO1JTROL-U.S. C I' 'ICIAIS ONLY
CENTRAL IN ELLIGZNCE AGENCY
(3)
(4)
(5)
Braila Branch Office
Director - Tanesescu
Engineers - Nicolaee Bobeica
Redica ConstaninesCu
Sloth'
Buzau Branch Office.
Engineers . Nicola*.Pepescu.
Shor
Foscani Branch Office
Enggineer-Igzsat.
(6) Tecuci Branch Office
Enginear. > Brer..er
(7)
Engineer :- Avram
T'as mi Branch Office
Marc i
(8) Husi Branch Office
Engineer - Lorenzo Colanini
(9)
i3arl.ad Branch Office
Engineer Avram Marcu, In 1950 this office was
Marcu transferred to Vaslui.
closed and
C. . wages
(1) The Director, Mendelson, received 36,000 lei per month.
(2) The engineers and architects at the Headquarters ti and at
the branch offices received between 14,900 and 33~00G lei
(3) All the above received an extra 12 per cent of their monthly wages
as a technical bonus and a living allowance of 600 lei per day when
they were on duty and absent from their base.
( ) Engineers and architects working on the projects received monthly
wages ranging from 22,000 to 30,000 lei and an extra 12 per cent
technical bonus. If they worked ten hours a day instead of eight
they received an extra half day Ds wages. In addition a living
allowance ranging from 15 to 30 per cent of their monthly wage was
paid when they were absent on duty from their base.
Expenditure
a. The following are the amounts spent by Constructii No. 7 on building projects
executed during 1949 and 1950:
(1) 1949: 700,000,000 lei
(2) 1950: 9509000,000 lei
5,. Civil. and 1,11itary Projects Carried Out by Constructii Nod 7 in 1949-50.
a. Vaslui 50X1-HUM
.(I) Extension of the power plant including the laying of a concrete
foundation, capable of carrying 40 tons, to support new generators.
(2) Extension to the Town Council Building.
(3) Extension to the "Prefecture'.
(4) Construction of a wooden warehouse with a capacity of 4,000 tons
(5) Construction of a three.story hospital block within the grounds of
the Spital Draghit.
Sanitized Copy Approved for Release 2011/05/11: CIA-RDP82-00457RO10700030001-3
Sanitized Copy Approved for Release 2011/05/11: CIA-RDP82-00457RO10700030001-3
SECRET/CONTROL-U.S. OFFICI.AIS ONLY
-3
b. Fa-1ciu
(1) Construction of a small power plant.
(2) Construction of a wooden warehouse, capacity 4,000 tons.
c.
Negresti (located northwest of Falciu)
d.
(1) Construction of a wood
Ausi
(1) Construction of an*ele
(2) Construction of a firs
en warehouse, cap
mentary school.
t aid and treatme
acity 4,000 tons.'
nt hospital.
e. Braila
(1) Extension he gresul shipyard and machine factory.
(2) Extension to the town refrigeration plant (Concar), giving it an
additional capacity of 100 tons. The expenses involved were estimated
at 11,000,000 lei.
(3) In December 1950, an urgent order was received and a large building
was hurriedly constructed at the power plant IRG (Intreprinderile
Regionals Galati), This building was to accommodate new boilers for
the power plant. The expenses involved were estimated at 36,000,000
lei. The Braila power plant was administered from Galati.
f"
(1)
(1)
Construction of a Mineral Sorting Station (Statia do Sorters a
Minereului) at a location about seven kilometers east of the town.,
This station was built for mineral ores arriving from the USSR.
The expenses involved amounted to 13 v 0 :Iei?
Construction of three two.-story buildings at the corner of Traian
and Cesar Streets, for the aceammodation of workmaA, The cost was
estimated at 70,000,000 lei.
Conversion of a school in StradaDcmrreaxoa into a Naval Institute.
Construction of concrete foundations for generators at the power plant,
Construction of a semi-underground storage area for ozygen at the
Santier Naval Galati. This store, which had masonry walls and a wooden
roof, was 30 meters long, eight meters wide and two meters high. The
roof was one meter above ground level.
(6) Extension to the textile factory Filatura during- 1949 and 1950.
(7) Construction of a three-story building on Strada Republici. This
building is used as a professional school for builders. (Socala
Profesionala:. de Constructii)? The school could accommodate 240
students, It was controlled and maintained by Conatructii No. 7.
(8) Construction of"new barracks for armored troops (Coserna do Tanour).
Thq expenses involved were estimated at 14,000,000 lei.
(9) Extensions and repairs to the Rumanian barracks. The expeniAS involved
were estimated at 9,900,000 lei,, including the construction of a
garage to hold 40 vehicles.
B4zogu and Surrounding Area
(1) Construction of barracks, an -officer Is achool building and officer's
accommodation at Mistea, 'The expenses involved were estimated at
80, 000, 000 lei. 50X1-HUM
Sanitized Copy Approved for Release 2011/05/11: CIA-RDP82-00457RO10700030001-3
Sanitized Copy Approved for Release 2011/05/11: CIA-RDP82-00457RO10700030001-3
%CONTROL.,U.S. MICILM ONLY
CENTRAL INTELLIGENCE AGENCY
'- 4 -
(2) Construction of a professional school at BurAu The expeses
involved were estimated at 10,0008000 lei.
(3) Construction of barracks and stables at Crane Meraoineni. Each
stable accommodated 52 horses.
(4) Extension to tau barracks. The expenses Involved amounted to
608000,000 lei.
(5) Construction of an oil worker's settlement at Berea.
The expenses involved were estimated at 16,000,000 lei,
h,. Focsani
(1)
50X1-HUM
50X1-HUM
50X1-HUM
Extension and repairs to the barracks including the construction of
stores and about four stables The nses were estimated at
25,0009000 to 3080009000 1e1? 50X1-HUM
(2) Extension to the power plant. The costs involved amounted to
79,000,000 lei.
i, R nrioul Sarat
(1) Extension and repairs to the barracks, costing 60,000,000 lei,
Odobesti
(1) Construction of a militia officer's and NCO's school. The expenses
involved were estimated at 8?000,000 lei.
k,, Te3uci
(1) Extension to the Town Council building.
(2) Construction of three stables accommodating 52 horses each, and a
garage for 40 vehicles in the barracks. The expenses involved
amounted to 10,000,000 lei.
1, Barlad
(1) Extensionof b rracka at an estimated cost of 30,000,000 lei.
(2) Extension to the power plant at an estimated cost of 5,5009000 lei.
50X1-HUM
6~) .
lin 3949 and 1950 an Air Force school we
under construction at M4 tea. It was expected that the school would be
brought into use in ear]- 1951. The building is planned to accommodate
1,000 students, There was no indication as to the future function of the
school,