COORDINATED EXPRESS COMMUNICATIONS NETWORK IN THE DANUBE VALLEY
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP82-00457R011700390005-9
Release Decision:
RIPPUB
Original Classification:
S
Document Page Count:
3
Document Creation Date:
December 19, 2016
Document Release Date:
March 7, 2006
Sequence Number:
5
Case Number:
Publication Date:
May 5, 1952
Content Type:
REPORT
File:
Attachment | Size |
---|---|
![]() | 163.28 KB |
Body:
Approved For Release 2006/08/08 : CIA-RDP82-00457R011700390005-9
X1090.52 51 -4"
X
CENTRAL INTELLIGENCE AGENCY
CLASSIFICATION SECRET/CONTROL - U.S`OFFICIALS ONLY
SECURITY INFORMATION
CD NO.
SUPPLEMENT TO 25X1
REPORT NO.
COUNTRY Hungary
SUBJECT Coordinated Express Communications Network in
the Danube Valley
DATE OF
25X1 INFO.
PLACE
ACQUIRED
Do NOT CIRCULATE
THIS DOCUMENT CONTAINS INFORMATION AFFECTING THE NATIONAL DEFENSE
OF THE UNITED STATES, WITHIN TOE MEANING OF TITLE 18, SECTIONS 793
AND 794. OF THE U.S. CODE, AS AMENDED. ITS TRANSMISSION OR REYE-
2 5X 1 LATION OF ITS CONTENTS TO OR RECEIPT BY AM UNAUTHORIZED PERSON IS
PRONISITED?BYLAW. THE REPRODUCTION OF THIS FORM 15 PROHIBITED.
THIS IS UNEVALUATED INFORMATION
1. A coordinated express commtud cations system is to be built up this year in
the Danube valley, between Budapest and the Yugoslav frontier.
2. This was decided at a recent conference held between MESZHART (Hungarian-
Soviet Navigation, Inc.) communications experts, Soviet military communications
specialists, and representatives of the Hungarian State Railways and of the
Hungarian Ministry of Public Transport ("P6sta-es KSzlekedes-dgyi")?
The scheduled project consists of integrating closely the roads, railways,
and waterways in such a manner that transshipment from one channel of communi-
cation to another can be effected rapidly. To this end, new harbors of :t
large transloading capacity and new transloaders are to be constructed, in
addition to the improvements and. new sections for the actual communications
lines.
4. The backbone of the planned. traffic system is the Danube valley express-tratfiC
rail . line. which is already under construction.
5. Harbors; At points where this railway line lies close to the Danube, new
harbors will be built, or existing ones extended. These harbors are:
a: Sztalinv ros (Dunapenteie). This is to be one of the largest Danube
harbors in Hungary. New constructions are already in progress.
b. Dunaf8ldvar - the existing harbor will be extended.
c. Paks - the existing harbor will be extended.
d. RE La the existing harbor will be extended.
CLASSIFICATION SECRET/CON`VJ OL - U.S. OFFICIALS ONLY
INFORMATION REPORT
ARMY x AIR X FBI ORR Ev X
DATE DISTR.
5 May 1952.
NO. OF PAGES 2
um-NNENCLS. 1
(LISTED BELOW)
Approved For Release 2006/08/08 : CIA-RDP82-00457R011700390005-9
Approved For Release 2006/08/08 : CIA-RDP82-00457R011700390005-9 25X1
SECRET/CONTROL - U.S. OFFICIALS ONLY
the existing harbor will be extended.
e. Szekszdrd - a new harbor is to be built near the town.
6? Railway.
a.
The former secondary line branching off the main Budapest - Dombov&.r
line at Pusztaszabolocs and leading to SztalinvAros and Paks has already
been rebuilt to a double-track primary line nearly to Paks.
b.
The BAtaszek SzekszArd line is to be converted to double-track
.
c.
A new line is to be u2t,connecting Paks with SzekszArd. The sur
of the bed of this proposed line is already in progress.
veying
d.
Solt will be connected to Fll8psz,llas across the Dunafbldvsr Da
bridge.
nube
Roads, A new concrete primary road linking DunafSldvdr - Paks - Szeksz ;rd
is approaching completion; it is built next to the old second-class road
(on the west side of it). The new road is 8 meters wide and has a 1-meter
pavement on each side of it.* At its northern end, the road by-passes Dunaf8ldvAr
and joins the primary concrete.road from SztalinvAros (Dunapentele); at its
southern end, it links up with the SzekszArd - BAtaszek primary road.
Comment: The one-meter pavement refers
rob
bl
t
i
p
a
y
o s
dewalks for
bicycle riders and pedestrians, a customary feature of some highways in Hungary.
SECRET/CO MOL - U.S. OFFICIALS ONLY
Approved For Release 2006/08/08 : CIA-RDP82-00457R011700390005-9
Approved For Release 2006/08/08 : CIA-RDP82-00457R011700390005-9
SE,C;RET/CONTROl, - U.S. OFFICIALS ONLY
1;1.250.000
to Kapc vAr
Coordinated Communications Network in the Danube `Valley
Sz6ke sfeherv ,;,,;,
pusztaszab
:unszentmikl6s
Yugoslavia
Key,
,,.,-r? old primary R6.'-line
- --- old secondary IM-line
.-f- new primary R -line
old primary road
new primary concrete road
new primary RR under plarn.ifg
a, b, c, d, parts of the iew raii#ay ayst-
under lined towns: near harbor construction works
SECRET/CON ROL - U .S. OFFICIIALS ONLY
Approved For Release 2006/08/08 : CIA-RDP82-00457R011700390005-9