AUXILIARY PROJECTS OF THE DANUBE RIVER-BLACK SEA CANAL

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP82-00457R013100130001-5
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
1
Document Creation Date: 
December 22, 2016
Document Release Date: 
December 3, 2010
Sequence Number: 
1
Case Number: 
Publication Date: 
July 29, 1952
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP82-00457R013100130001-5.pdf77.5 KB
Body: 
Sanitized Copy Approved for Release 2010/12/03: CIA-RDP82-00457RO13100130001-5 CLASSIFICATION SECRET/CONPROL - U. S. OFFICIALS ONLY SECURITY INFORMATION INFORMATION REPORT REPORT CD NO. :COUNTRY Rumania SUBJECT Auxiliary Projects of the Danube River-Black Sea Canal DATE OF INFO. PLACE ACQUIRED THIS DOCUMENT CONTAINS INFORMATION AFFECTING THE NATIONAL DEFENSE1 OF THE UNITED STATES, WITHIN THE MEANING OF TITLE 18, SECTIONS 793 AND 794, OF THE U.S, CODE, AS AMENDED. ITS TRANSMISSION OR REVE- LATION OF ITS CONTENTS TO OR RECEIPT BY AN UNAUTHORIZED PERSON IS PROHIBITED BY LAW. THE_REPRODUCTION OF.THIS FORM IS PROHIBITED. DATE DISTR. 29 July 1952 NO.OF PAGES 1 SUPPLEMENT TO REPORT NO. THIS IS UNEVALUATED INFORMATION 50X1-HUM la The Ovidiu-Valea Neagra-Navodari Railroad Line is a single track,, inter- national gauge type. Although currently.in use for transporting-workers and material used in the canal building project, it is believed that eventually the line will be for public use0 20 The Poarta Alba-Galesul-Valea Neagra Railroad Linea (Same as paragraph 10) 30 The Poarta Alba-Galesul-ValeaNeagra highway runs parallel to the rail- road line (see para 2), and is asphalt-paved and has two lanes0 The road ends at a point approximately 500 meters south of the intersection of the Constanta-Tulcea.an4 the Constanta Harsova highways. A nail factory (Fabrica de Cuie) was completed in December 1951; the factory is housed in a large two-story building which is located about one kilometer south of Stefan Cel Mare. Production was to have,begun in the spring or summer of 19520 50 A ceramics factory is located in a one-story building,-located about one and a half kilometers north of Cernavoda0 This factory was completed in December 1951, and is believed to have already commenced production0 60 The construction of a cement factory in.Medgidea was completed during the early part of 1951, the factory is known to have begun production in July 1951, Although no details on its output are known, it is reportedly larger than the cement factory at Cernavoda0 The construction of a sulphuric acid factory in Medgidea was to have been started in early 19520 Whether or not the project was initiated or abandon- ed is not known0 CLASSIFICATION SECRET/CONTROL - U. S. OFFICIALS ONLY STATE ARMY NAVY # AIR NSRB FBI D ISTR IBUT IONN I Sanitized Copy Approved for Release 2010/12/03: CIA-RDP82-00457RO13100130001-5