GERMANY (SOVIET ZONE) AIRFIELD
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP82-00457R013400070008-2
Release Decision:
RIPPUB
Original Classification:
S
Document Page Count:
1
Document Creation Date:
December 20, 2016
Document Release Date:
March 17, 2006
Sequence Number:
8
Case Number:
Publication Date:
July 22, 1952
Content Type:
REPORT
File:
Attachment | Size |
---|---|
![]() | 79.24 KB |
Body:
CLASS:FICACCON ~'i:r} r~?/1!1 r ~ltl'P ~7F i rr? r
_.'.? I ~IVTP r'~ .,??t,Al~#1~Pv Fgf Release 2006/04/1$ - tiKElkbFi$,
25X1
ATE PREPARED_
:_~T,
Pi G ES ...4_. _._.
25X1
or.Tnents,
t;rrcra . ea` re '?39 or i'?-)_i .sere probably flcwn.
The arrival of 15 jet fighters
on 12 June 192 was previously reported,
ENCLOSURES (No. &J'NPE),
? 3etween 1 and 11 June 1952, indivicual flights, mostly aerobatics, were made
over e:enenuende.
No formation ilirif was observed. (1) Pilots. allegedly stated
that they looked forward to the first attacks on American boi;bers, From, these
rema.rks0 inferred that the pilots were probably assigned to a f ighte-r unit,
Other -.wilots believed that only thc I:.ic 15 Was an effective weapon against
American aircraft and that the aircraft available at the field were too slow, (2)
2, Every morning up to late ':'ay, about 500 man were hauled to the field. fif.i:ter
the arrival of the new unit, 700 men ware observed daily. This number was con-
700
by the chief of is F-ara ;e who had to dispatch vehicles to haul 700 men.,
Previou.'T1y, the new unit had no vehicles of its oven in ,1arlsha;;en. (3)
3 A locksmith s' o. , an o::yr'en station and a cone ressor installation -:ore to be
constructed at eene ,luende 3irfiel0. Construction work on the barracks huilc.T.in^s
for the sea police unit at the forr ar h^r- or of t eene:,,ue.nde was acce 4.erated,
4.
(4)
CLASSIFICATION c r;-srr /rrT".-Ir)T /TT