PORT OF SZCZECIN: PERSONNEL CHANGES; NEW INSTALLATIONS

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP82-00457R013800390009-2
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
2
Document Creation Date: 
December 22, 2016
Document Release Date: 
May 4, 2011
Sequence Number: 
9
Case Number: 
Publication Date: 
October 10, 1952
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP82-00457R013800390009-2.pdf120.39 KB
Body: 
Sanitized Copy Approved for Release 2011/05/04: CIA-RDP82-00457RO13800390009-2 `~EB 1952 ~~-~ CLASSIFICATION SECRET/CONTROL - U. S.. OFFICIALS ONLY SECURITY INFORMATION INFORMATION REPORT REPORT . CD NO. COUNTRY Poland DATE DISTR. 10 October 1952 SUBJECT Port of Szczecin(; Personnel Changes; New NO. OF PAGES 2 Ihstallat ions ' DATE OF INFO. PLACE ACQUIRED OF ENCLS. 1 ISTED BELOW) ~0 NOT CIRCULATE SS UPPLE ME NT TO NO. PHIS DOCUMENT CONTAINS INFORMATION AFFECTING THE NATIONAL DEFENSE' OF THE UNITED STATES, WITHIN THE MEANING OF TITLE 18, SECTIONS 795 AND 794, OF THE U.S. CODE, AS AMENDED. ITS TRANSMISSION OR REVE- LATION OF ITS CONTENTS TO OR RECEIPT BY AN UNAUTHORIZED PERSON IS PROHIBITED BY LAW. THE, REPRODUCTION OF THIS FORM IS PROHIBITED. Madziar, a Party member, is now technical director of the Port Administration.2 50X1-HUM 50X1-HUM 4. 1. Bilinski, Jan,the general director of the Szczecin (Stettin) Port Administration was transferred to the State Deep Sea .Fisheries at Szczecin in the capacity of director. His successor is unknown,- 50X1-HUM 2. Kuprynski, director of finance, was transferred to the Ministry of Shipping in Warsaw His successor it unknown. 50X1-HUM Gawronski, Feliks, a.Party member, is Director of Administration. 50X1-HUM 5. A floating dock is being built on a provisional slip located in the northern part of the area belongirgg to the Technical Base of the Szczecin Port Administration (Golnow).: The construction work is being carried out in his area as a result of the shortage of space in the Szczecin Shipyard. The floating dock-""-] 50X1 -HUM 6. Threefloatina prangs destined for the Port of ?S.zczecin arrived The jibs were assembled in the Golnow repair s no , s 50X1-HUM .7- Th.ixty-twocranes for the Port.of Szo'zecin were ordered from. Hungary within the framework of .the Six Year Plan. These cranes are destined for lckding of small goods, and -are to be set .up along the Pwa Peninsula by the Parnica and Starowka basins. Three of these cranes.are to be delivered and are to be mounted on the PolishQuay of the Ewa.Peninsula. 50X1-HUM and are to.be used for loading coal and scrap. 'belonging to. the Port.. Administration. The cranes have an eight ton ?pacity CLASSIFICATION SEC] /CONTROL - U0S..OFFICIA,LS ONLY THIS IS UNEVALUATED INFORMATION Sanitized Copy Approved for Release 2011/05/04: CIA-RDP82-00457RO13800390009-2 Sanitized Copy Approved for Release 2011/05/04: CIA-RDP82-00457RO13800390009-2 S.SC'l T/C011 OL - U.S. OFFICIALS ONLY A dry dock was built bUAI-hUIVI y in the northern part of Szczecin Shipyard. It is ,120 meters in .Length. The keel for balding the fit vessel on this dock was laid. Diesel engines were to be installed in the ship. 50X1-HUM The coal conveying belt put into service with much sere and, propaganda at the ,oa,l Basin (former Reiherwerder Basin) functioned only in the beginning. ~t had, not been repaired. The 50X1-HUM electrical installer .ion s faulty. As aresult, many leading construction engineers were arrested. on the grounds o4` sabotage. 50X1-HUM ilinski was ,r. ep.laced. by Kostrzewa who was previousl employed at the Gdynia-.Gdansk. Administration. Bi.linski was made chief of the 50X1-HUM w noudsci.e Swinemu.end.e. branch of the State Deep Sea .Fisheries. jComment. the Technical Department. Wagner was the former chief of SBCRE2/CONTROL pos..OFFiCI.ALS :ONLY Sanitized Copy Approved for Release 2011/05/04: CIA-RDP82-00457RO13800390009-2