PORT OF SZCZECIN: PERSONNEL CHANGES; NEW INSTALLATIONS
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP82-00457R013800390009-2
Release Decision:
RIPPUB
Original Classification:
S
Document Page Count:
2
Document Creation Date:
December 22, 2016
Document Release Date:
May 4, 2011
Sequence Number:
9
Case Number:
Publication Date:
October 10, 1952
Content Type:
REPORT
File:
Attachment | Size |
---|---|
![]() | 120.39 KB |
Body:
Sanitized Copy Approved for Release 2011/05/04: CIA-RDP82-00457RO13800390009-2
`~EB 1952 ~~-~
CLASSIFICATION SECRET/CONTROL - U. S.. OFFICIALS ONLY
SECURITY INFORMATION
INFORMATION REPORT REPORT
. CD NO.
COUNTRY Poland
DATE DISTR. 10 October 1952
SUBJECT Port of Szczecin(; Personnel Changes; New NO. OF PAGES 2
Ihstallat ions '
DATE OF
INFO.
PLACE
ACQUIRED
OF ENCLS.
1 ISTED BELOW)
~0 NOT CIRCULATE SS UPPLE ME NT TO NO.
PHIS DOCUMENT CONTAINS INFORMATION AFFECTING THE NATIONAL DEFENSE'
OF THE UNITED STATES, WITHIN THE MEANING OF TITLE 18, SECTIONS 795
AND 794, OF THE U.S. CODE, AS AMENDED. ITS TRANSMISSION OR REVE-
LATION OF ITS CONTENTS TO OR RECEIPT BY AN UNAUTHORIZED PERSON IS
PROHIBITED BY LAW. THE, REPRODUCTION OF THIS FORM IS PROHIBITED.
Madziar, a Party member, is now technical director of the Port Administration.2
50X1-HUM
50X1-HUM
4.
1. Bilinski, Jan,the general director of the Szczecin (Stettin) Port Administration
was transferred to the State Deep Sea .Fisheries at Szczecin
in the capacity of director. His successor is unknown,- 50X1-HUM
2. Kuprynski, director of finance, was transferred to the Ministry of Shipping
in Warsaw His successor it unknown. 50X1-HUM
Gawronski, Feliks, a.Party member, is Director of Administration.
50X1-HUM
5. A floating dock is being built on a provisional slip located in the northern
part of the area belongirgg to the Technical Base of the Szczecin Port Administration
(Golnow).: The construction work is being carried out in his area as a result
of the shortage of space in the Szczecin Shipyard. The floating dock-""-] 50X1 -HUM
6. Threefloatina prangs destined for the Port of ?S.zczecin arrived
The jibs were assembled in the Golnow repair s no , s 50X1-HUM
.7- Th.ixty-twocranes for the Port.of Szo'zecin were ordered from. Hungary within
the framework of .the Six Year Plan. These cranes are destined for lckding of
small goods, and -are to be set .up along the Pwa Peninsula by the Parnica and
Starowka basins. Three of these cranes.are to be delivered and are to
be mounted on the PolishQuay of the Ewa.Peninsula. 50X1-HUM
and are to.be used for loading coal and scrap.
'belonging to. the Port.. Administration. The cranes have an eight ton ?pacity
CLASSIFICATION SEC] /CONTROL - U0S..OFFICIA,LS ONLY
THIS IS UNEVALUATED INFORMATION
Sanitized Copy Approved for Release 2011/05/04: CIA-RDP82-00457RO13800390009-2
Sanitized Copy Approved for Release 2011/05/04: CIA-RDP82-00457RO13800390009-2
S.SC'l T/C011 OL - U.S. OFFICIALS ONLY
A dry dock was built bUAI-hUIVI
y in the northern part of
Szczecin Shipyard. It is ,120 meters in .Length. The keel for balding the
fit vessel on this dock was laid. Diesel engines were to be
installed in the ship. 50X1-HUM
The coal conveying belt put into service with much sere and, propaganda at
the ,oa,l Basin (former Reiherwerder Basin) functioned only
in the beginning. ~t had, not been repaired. The 50X1-HUM
electrical installer .ion s faulty. As aresult, many leading construction
engineers were arrested. on the grounds o4` sabotage. 50X1-HUM
ilinski was ,r. ep.laced.
by Kostrzewa who was previousl employed at the Gdynia-.Gdansk. Administration.
Bi.linski was made chief of the 50X1-HUM
w noudsci.e Swinemu.end.e. branch of the State Deep Sea .Fisheries.
jComment.
the Technical Department.
Wagner was the former chief of
SBCRE2/CONTROL pos..OFFiCI.ALS :ONLY