RUMANIAN OFFICERS SCHOOL IN INEU
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP82-00457R016200030010-2
Release Decision:
RIPPUB
Original Classification:
C
Document Page Count:
1
Document Creation Date:
December 14, 2016
Document Release Date:
May 23, 2003
Sequence Number:
10
Case Number:
Publication Date:
December 9, 1952
Content Type:
REPORT
File:
Attachment | Size |
---|---|
![]() | 84.95 KB |
Body:
COUNTRY
R==`
Vf1-,:1F7kL-111T' n th
200...~...REP RT NO, 0030010-2
TOPIC Rlimani p (Zf'f l -In;- rhool '* n
EVALUATION,
DATE OF CONTENT
25X1
PLACE OBTAINED-- -1
late ! over.:t-er 1951
DATE OBTAINED 25X1 DATE PREPARED
REFERENCES
PAGES 1 ENCLOSURES (NO. & TYPE)
REMARKS
25X1
25X1
la Prior to November i951, a military school,, generally called an officers' school,
was located in a barracks installation near the Ineu (R 26/U 58) railroad station,
The installation consisted of 6 brick buildings occupied by the cadre personnel,
the officer instructors with their dependents and the trainees. The school was
attended by captains,, lieutenants and NCOs, the latter apparently officer
candidates from 23 to 25 years old.
-2. The school was assigned to the t Tar Ministry in Bucharest. Commandant of the
installation,, which was periodic-ally inspected by officers of the Liar Ministry,
was a Rumanian colonel, right to 10 field grade officers were assigned to the
installation as instructors, No Soviet soldiers were seen there.
The trainees of this school did not bear arms while they were in the area of
the installation, When units werc marched out, half of 25X1
them were, armed with rifles, the other half with sumac ne guns, I~3o motor
vehicles were seen except for some sedans. Detachments of up to 200 men 25X1
25X1
25X1
target ran es and a trainin,? area were ava' a 25X1
Ithe courses or officer
a es lasted one year,, w .e captains and lieutenants staved for 8 to
10 weeks at the school. In 1950, one trainin,,: course was completed in the, fall
Another barracks installation was under construction on the northern bank of
the Crisul Alb Rivera The payments for this construction work here made
through a military office in Bucharost~, The new barracks installation
consisted of 6 to 8 three.story quartering buildin;s9 In Jvember 1951, it was
not yet occupiedA the installation was to
be attached to the o icere school
CLASSIFICATION C0 IDEN 'T..^ q
CLASSIFICATION
proved For Releas~
25X1
25X1
Approved For Release 2003/08/12 : CIA-RDP82-00457RO16200030010-2