NOTICE: In the event of a lapse in funding of the Federal government after 14 March 2025, CIA will be unable to process any public request submissions until the government re-opens.

FOUNDRY AT DIOSGYOR

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP82-00457R016300250007-1
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
2
Document Creation Date: 
December 14, 2016
Document Release Date: 
June 18, 2003
Sequence Number: 
7
Case Number: 
Publication Date: 
February 6, 1953
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP82-00457R016300250007-1.pdf154.23 KB
Body: 
FEB ?? 1952 51-Z4AA COUNTRY Hungary; SUBJECT Foundry at Di6sgy6r CLASSIFICATION SECRET INFORMATION REPORT REPORT NO. CD NO. DATE OF 25X1 INFO. 25X1 PLACE ACQUIRED proved For Release 2003/08/13 : CIA-RDP82-00457R0163002500'O* i ` / j ~. CENTRAL INTELLIGENCE: AGENCY THIS DOCUMENT CONTAINS INFORMATION AFFECTING THE NATIONAL DEFENSE. OF THE UNITED STATES, WITHIN THE MEANING OF TITLE 18, SECTIONS 793 AND 794, OF THE U.S. CODE, AS AMENDED. ITS TRANSMISSION OR REVE- LATION OF ITS CONTENTS TO OR RECEIPT BY AN UNAUTHORIZED PERSON IS PROHIBITED BY LAW. THE REPRODUCTION OF THIS FORM IS PROHIBITED. 25X1 1. The present director of the Diosgybr..Foundry is Gera Varga. Alexander Harmati party secretary of Borsod County, is in charge of control for the Communist Par' tje.. From a technical point of view, Alexander Nyilas, head of the Smelting and. Mach t r.! Industry Ministryps smelting division, exercises supreme control. Ladislas KtomJ,?t a deputy of the Minister of Smelting and. Machine Industry, often comes to Di.5sgn"a He usually sharply criticizes the heads of the sections for "lack of technological discipline." Head of the Diasgy'r Foundrys smelting furnaces is Anthony Som+otgyta who admits that in 1952.the plant was constantly lagging behind the prescribed p l;),: for raw iron production with 5,000 to 8,500 tons. 2. The real leaders of the plant are the Soviet Russian "advisers" who hold th n.1eI'v completely in the background, so that almost nobody, except the above mentirjne.I Hungarian directors, know anything about their doings. Informant saw only one of them, Chief Engineer Raktchayev (Thu), whose main task is to control the merc:~la;3~, driving of the workers (now euphemistically called "technological discipline" ), and to make certain that the production ;nc~r;ass., fixed by the Soviet Russian "ad.7- ers," are rigorously followed. He continually insists upon increasing the nmmber t'i5 of portions fed to the furnaces. It should be noted here, that in the fall of a new group of Hungarian workers from D16sgy6r was sent to the USSR to .learn. "technological discipline" in the Soviet smelting works. 3. Head of the Didsgyo"r Foundryvs Martin Furnace section is Stephen Zombori; head engineer is Stephen Farkas; chief engineer is Gerald Repasi; secretary of the Communist Party is Alexander Gergely;.representative of the MEO is Francis Pete. The political (nffi(wr a are responsible for every default, difficulty, lagging;, etc., and therefore these change frequently. CLASSIFICATION SECRET/I ILLEGIB 25X1 25X1 25X1 25X1 DATE DISTR. 6 February J95 NO. OF PAGES 2 NO. OF ENCLS> (LISTED BELOW) SUPPLEMENT TO REPORT NO. THIS IS UNEVALUATED INFORMATION Approved For Release 2003/08/13 : CIA-RDP82-00457RO16300250007-1 25X1 Approved For Release 2003/08/13 : CIA-RDP82-00457RO16300250007-1 25X1 SECRET The importance of the DidsgySr Foundry is very considerable both from the point of war reparations deliveries to the Soviet Union, which still. go on, and war equipment export to the Soviets. This plant furnishes 80 percent of Hungaryes rolled.steel production. -e quality of the present production is poor; the.. quality of-the plates for tanks and-boilers is even worse. The axle steel produced by the Martin Furnaces of Didsgyffr contained 30 percent scrap in 1952. The processing of axles for railway cars is done by the Dimavag Works. The proces- sing of the armored and boiler plates is done by the rolling mills of I,?rinc. As a result of faulty work, a great number of steel plates open up during heating. The Russians are furious. To overcome the many defaults, they ordered that considerabi; .less scrap iron should be fed to the furnaces. Furnace No. 1 makes armor and boile: plates; furnace No. 9 makes axle steel. It has been ordered that slag be removed twice from the furnaces, and less lime added, for allegedly, lime greatly increases slag formation. But the root of the defects is the increased tempo of the work, and the constantly deteriorating quality of the raw materials. The main product of the Didsgynr, Foundry is 50 kilogram rail steel, which is rolled by the same factory. Chief engineer in charge of rail steel production is Reti (fnu), and he has'been made responsible for the very faulty. production. 6. Furnace No. 3 in the Di6sgy6r Martin Furnaces was rebuilt in the fall of 1952. Furnaces No. 5 and 6 are being pulled down, and in. their stead Hdngaryss biggest new Martin Furnace will be erected.. 25X1 SECRET 25X1 Approved For Release 2003/08/13 : CIA-RDP82-00457RO16300250007-1