NEW LARGE HANGAR UNDER CONSTRUCTION AKHTUBINSK FLIGHT TEST CENTER, USSR

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP82T00709R000100660001-4
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
3
Document Creation Date: 
December 28, 2016
Document Release Date: 
June 24, 2010
Sequence Number: 
1
Case Number: 
Publication Date: 
April 26, 1982
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP82T00709R000100660001-4.pdf111.24 KB
Body: 
Sanitized Copy Approved for Release 2010/06/24: CIA-RDP82T00709R000100660001-4 ROUTING TO: NAME AND ADDRESS DATE INITIALS 2 3 4 ACTION DIRECT REPLY PREPAR E REPLY APPROVAL DISPATCH RECOMMENDATION COMMENT FILE RETURN CONCURRENCE INFORMATION SIGNATURE REMARKS: FROM: NAME, ADDRESS, AND PHONE NO. DATE ifl ~Cc SECRET (Security Classification) CONTROL NO. COPYO OF 'S_d Warning Notice Intelligence Sources and Methods Involved NATIONAL SECURITY INFORMATION Unauthorized Disclosure Subject to Criminal Sanctions SECRET (Security Classification) Sanitized Copy Approved for Release 2010/06/24: CIA-RDP82T00709R000100660001-4 Sanitized Copy Approved for Release 2010/06/24: CIA-RDP82TOO709R000100660001-4 Iq Next 1 Page(s) In Document Denied Sanitized Copy Approved for Release 2010/06/24: CIA-RDP82TOO709R000100660001-4 Sanitized Copy Approved for Release 2010/06/24: CIA-RDP82TOO709R000100660001-4 gF(RFT (c) NATIONAL PHOTOGRAPHIC INTERPRETATION CENTER Page 1 of 1 Copy Attachment to. Z-15210/82 NPIC/IEG (4/82) 26 APRIL 1982 NEW LARGE HANGAR UNDER CONSTRUCTION AKHTUBINSK FLIGHT TEST CENTER, USSR 1.,(S/D). SIGNIFICANCE: NEW LARGE HANGAR UNDER CONSTRUCTION MAY BE INTENDED TO SUPPORT RAM P DURING WEAPONS-INTERGRATION TESTING.' TAXIWAY. GRADING FOR HANGAR FOOTINGS WAS FIRST OBSERVED ON = ')r-y' 2. (S/D) REMARKS: IMAGERY OF REVEALED THE 25X1 INITIAL CONSTRUCTION OF A NEW LARGE HANGAR AT AKHTUBINSK FLIGHT (TEST CENTER. THE ACTIVITY IS AT AKHTUBINSK/VLADIMIROVKA AREA AIRFIELD NEAR THE EASTERN END OF THE PARALLEL 25X1 SEVERAL OF THE, EXCAVATIONS AND FORMS FOR THE 25X1 APART. THE INNER BEAM SUPPORTS IN THE EAST ROW ARE 59 METERS FROM THOSE.IN THE WEST ROW. PROVISIONS FOR TWO STRUCTURAL BEAM SUPPORTS. THE PROVISIONS ARE APART. THE FORMS IN EACH ROW ARE 25X1 FOUR COMPLETED FORMS .AND ONE PARTIALLY ASSEMBLED FORM WERE OBSERVED WITHIN THESE EXCAVATIONS. ALONG THE WEST SIDE OF THE CONSTRUCTION AREA, A SINGLE ROW OF FIVE EXCAVATIONS HAD BEEN COMPLETED; THREE OF THESE CONTAINED FORMS. EACH FORM HAS FOOTINGS HAD.BEEN COMPLETED. SIX EXCAVATIONS IN A SINGLE ROW HAD BEEN COMPLETED ALONG THE EAST SIDE OF THE CONSTRUCTION AREA THE HANGAR AT RAMENSKOYE,. WHICH HAS TWO CANTILEVER OUTER BAYS AND A CENTRAL CLERESTORY SECTION, CURRENTLY SUPPORTS THE RAM P.. THE RAM P IS THE NEW TUPOLEV-DESIGNED STRATEGIC BOMBER BEING. FLIGHT ,TESTED AT RAMENSKOYE.. TUPOLEV AREA OF RAMENSKOYE FLIGHT TEST CENTER (S/D) THE FORMS AT AKHTUBINSK ARE.IDENTICAL IN SIZE, CONFIGURATION, AND PLACEMENT TO THE FOOTINGS USED IN THE CONSTRUCTION OF THE LARGE UNIQUELY CONFIGURED HANGAR IN THE COMPLETE, IT WILL BE CAPABLE OF HOUSING ANY LARGE AIRCRAFT BEING TESTED THERE. HOWEVER, THE HANGAR IS PROBABLY INTENDED TO SUPPORT THE RAM P WHEN THAT AIRCRAFT REACHES THE WEAPONS INTEGRATION PHASE IN THE FLIGHT TEST PROGRAM. BASED ON THE CONSTRUCTION RATE AT RAMENSKOYE, THE NEW HANGAR AT AK14TU SK COULD BE CQMPLETE BY JUNE 1983. 3.(S/D) ANALYST'S COMMENTS: ONCE THE HANGAR AT AKHTUBINSK IS (S) COORDINATES: 48-17-32N 046-12-15E These notes have been prepared for briefing purposes only and should not be used for detailed ana- lytical work. Their use should be restricted to the particular briefing board(s) they were prepared for and must be considered valid only for the reporting period as indicated by the date of issue. WARNING NOTICE Intelligence Sources and Methods Involved SECRET 25X1 25X1 [T- j Sanitized Copy Approved for Release 2010/06/24: CIA-RDP82T00709R000100660001-4