CONSTRUCTION ACTIVITY PLESETSK MISSILE HANDLING FACILITY, USSR (SANITIZED)
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP82T00709R000101020001-3
Release Decision:
RIPPUB
Original Classification:
S
Document Page Count:
5
Document Creation Date:
December 28, 2016
Document Release Date:
June 9, 2010
Sequence Number:
1
Case Number:
Publication Date:
May 11, 1982
Content Type:
REPORT
File:
Attachment | Size |
---|---|
![]() | 152.86 KB |
Body:
Sanitized Copy Approved for Release 2010/06/09: CIA-RDP82T00709R000101020001-3
Sanitized Copy Approved for Release 2010/06/09: CIA-RDP82T00709R000101020001-3
Sanitized Copy Approved for Release 2010/06/09: CIA-RDP82T00709R000101020001-3
Warning Notice
Intelligence Sources and Methods Involved
(WNINTEL) or (D)
NATIONAL SECURITY INFORMATION
Unauthorized Disclosure Subject to Criminal Sanctions
NOFORN- Not Releasable to Foreign Nationals
NOCONTRACT- Not Releasable to Contractors or
Contractor/Consultants
PROPIN- Caution-Proprietary Information Involved
ORCON- Dissemination and Extraction of Information
Controlled by Originator
REL. . . This Information has been Authorized for
Release to .. .
Sanitized Copy Approved for Release 2010/06/09: CIA-RDP82T00709R000101020001-3
Sanitized Copy Approved for Release 2010/06/09: CIA-RDP82T00709R000101020001-3
Iq
Next 3 Page(s) In Document Denied
Sanitized Copy Approved for Release 2010/06/09: CIA-RDP82T00709R000101020001-3
Sanitized Copy Approved for Release 2010/06/09: CIA-RDP82T00709R000101020001-3
SECRET
(c) NATIONAL PHOTOGRAPHIC INTERPRETATION CENTER
of
Page
Copy
2 Attachment to Z-15220/82
1
CONSTRUCTION ACTIVITY
PLESETSK MISSILE HANDLING FACILITY, USSR
NPIC/IEG (05/82)
1? (S/D) SIGNIFICANCE: PLESETSK-MISSILE HANDLING FACILITY IS
BEING EXPANDED TO SUPPORT NEW SOLID-.PROPELLANT ICBM FLIGHT
TEST PROGRAMS.
2? (S/D) REMARKS: THREE AREAS AT PLESETSK MISSILE HANDLING
FACILITY ARE BEING MODIFIED/CONSTRUCTED IN SUPPORT OF NEW
SOLID-PROPELLANT ICBM FLIGHT TEST PROGRAMS (GRAPHIC 1). A
MISSILE RECEIVING AND CHECKOUT AREA (MRACA) FOR A MEDITJM-SIZED
SOLID-PROPELLANT (MEDITJM-SOLID) ICBM IS NEARING COMPLETION
(GRAPHIC 2). NEW CONSTRUCTION AND MODIFICATION TO EXISTING
BUILDINGS IN THE SS-16 RECEIVING/INSPECTION/CHECKOUT (RIC)
FACILITY INDICATE THAT IT WILL SUPPORT THE FLIGHT TEST PROGRAM
OF THE FOLLOW-ON TO THE SS-16 MOBILE-ICBM (GRAPHIC 3).
RECENTLY A NEW POSSIBLE MRACA WAS IDENTIFIED IN THE EARLY
STAGES OF CONSTRUCTION (GRAPHIC 4).
(S/D) THE MEDIUM-SOLID MRACA HAS BEEN UNDER CONSTRUCTION FOR
NEARLY FOUR YEARS (GRAPHIC 2). NEW BUILDINGS CONSTRUCTED
INCLUDE A 102-METER CLERESTORY-TYPE MISSILE RECEIVING AND
CHECKOUT BUILDING WITH A RAIL TRANSLOADING-DOCK, A REVETTED
FOUR-BAY INTERIM MISSILE STORAGE BUILDING, TWO PROBABLE
TELEMETRY/CHECKOUT BUILDINGS CONNECTED BY AN ABOVE GROUND
PERSONNEL PASSAGEWAY, A HIGH TWO-BAY DRIVE-THROUGH BUILDING, A
TWO-BAY RAIL TRANSLOADING SHED, AND ONE UNIDENTIFIED
BUILDING. THIS FACILITY WILL PROBABLY BE COMPLETED DURING THE
THIRD QUARTER OF 1982, AFTER WHICH THE FLIGHT TEST PROGRAM OF
THE MEDIUM-SOLID ICBM WILL PROBABLY BEGIN.
(S/D) THE SS-16 RIC FACILITY HAS BEEN UNDERGOING MODIFICATION
TO SUPPORT THE FOLLOW-ON TO THE SS-16 MOBILE-ICBM SINCE
SEPTEMBER 1980 (GRAPHIC 3). A CLERESTORY-TYPE BUILDING, A
TWO-BAY SHED, AND AN UNIDENTIFIED BUILDING ARE IN VARIOUS
STAGES OF CONSTRUCTION. THE SS-16 RIC AND THE FOUR-BAY RAIL-
SERVED INTERIM MISSILE STORAGE BUILDINGS WERE MODIFIED. TWO
PROBABLE MISSILE CANISTER DOLLIES HAVE BEEN IN THIS FACILITY
SINCE AT LEAST MARCH 1982. MODIFICATION/CONSTRUCTION OF THIS
FACILITY WILL PROBABLY NOT BE COMPLETED BEFORE THE FALL OF
1982.
These notes have been prepared for briefing purposes only and should not be used for detailed ana-
lytical work. Their use should be restricted to the particular briefing board(s) they were prepared for
and must be considered valid only for the reporting period as indicated by the date of issue.
WARNING NOTICE
Intelligence Sources
and Methods Involved
SECRET
-f F-7- I Sanitized Copy Approved for Release 2010/06/09: CIA-RDP82T00709R000101020001-3
Sanitized Copy Approved for Release 2010/06/09: CIA-RDP82T00709R000101020001-3
bE LIit I
(c) NATIONAL PHOTOGRAPHIC INTERPRETATION CENTER
Attachment to Z-.,152.20/82
NPIC/IEG (05/82)
Copy 11 ,..., lnn~
Page 2 of 2
(S/D) A NEW POSSIBLE MRACA IS IN AN EARLY STAGE OF
CONSTRUCTION 300 METERS EAST OF THE SS-16 RIC (GRAPHIC 4). A
PROBABLE HIGH-BAY BUILDING ABOUT 90 METERS LONG AND 42 METERS
WIDE IS UNDER CONSTRUCTION AND TREES HAVE BEEN CLEARED FOR A
RAIL SPUR TO THE MAIN COMPLEX RAIL LINE. THE PROBABLE HIGH-
BAY BUILDING WILL PROBABLY BE A MISSILE RECEIVING AND CHECKOUT
BUILDING. IF THIS NEW FACILITY-IS INTENDED TO BE AS LARGE AS
THE MEDIUM-SOLID MRACA, ADDITIONAL SUPPORT BUILDINGS WILL BE
CONSTRUCTED OVER THE NEXT SEVERAL YEARS. USING THE TIMING AND
SEQUENCE OF CONSTRUCTION OF THE MEDIUM-SOLID MRACA AS A MODEL;
THIS NEW FACILITY MAY. NOT BE COMPLETED BEFORE 1985. THIS
SUGGESTS THAT ANOTHER SOLID-PROPELLANT ICBM MAY BE FLIGHT
TESTED FROM PLESETSK IN THE 1985-1986 TIME FRAME. ANOTHER
POSSIBILITY IS THAT THE CONSTRUCTION MAY BE RELATED TO
MODIFICATION AND CONSTRUCTION PROGRAMS CURRENTLY UNDERWAY IN
THE SS-16 RIC AND THE MEDIUM-SOLID M:RACA. HOWEVER, THIS IS
NOT LIKELY DUE TO THE LENGTH OF TIME REQUIRED TO CONSTRUCT
THIS TYPE OF FACILITY.
3. (S) COORDINATES 62-46-OON 040-23-OOE
These notes have been prepared for briefing purposes only and should not be used for detailed ana-
lytical work. Their use should be restricted to the particular briefing board(s) they were prepared for
and must be considered valid only for the reporting period as indicated by the date of issue.