ARRIVAL OF SS-20 EQUIPMENT LUTSK AND KIVERTSY SSM COMPLEXES (SANITIZED)

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP82T00709R000101260001-7
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
5
Document Creation Date: 
December 28, 2016
Document Release Date: 
January 11, 2011
Sequence Number: 
1
Case Number: 
Publication Date: 
May 16, 1982
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP82T00709R000101260001-7.pdf146.82 KB
Body: 
Sanitized Copy Approved for Release 2011/01/11: CIA-RDP82T00709R000101260001-7 Sanitized Copy Approved for Release 2011/01/11: CIA-RDP82T00709R000101260001-7 Sanitized Copy Approved for Release 2011/01/11: CIA-RDP82T00709R000101260001-7 Warning Notice Intelligence Sources and Methods Involved (WNINTEL) or (D) NATIONAL SECURITY INFORMATION Unauthorized Disclosure Subject to Criminal Sanctions NOFORN- Not Releasable to Foreign Nationals NOCONTRACT- Not Releasable to Contractors or Contractor/Consultants PROPIN- Caution-Proprietary Information Involved ORCON- Dissemination and Extraction of Information Controlled by Originator REL ... This Information has been Authorized for Release to .. . Sanitized Copy Approved for Release 2011/01/11: CIA-RDP82T00709R000101260001-7 Sanitized Copy Approved for Release 2011/01/11: CIA-RDP82T00709R000101260001-7 SECRET (c) NATIONAL PHOTOGRAPHIC INTERPRETATION CENTER Page 1 of 2 Copy 1. (S/D) SIGNIFICANCE: SS-20'EQUIPMENT HAS BEEN DELIVERED TO THE LUTSK AND K ER S SSM COMPLEXES. THE EQUIPMENT PROBABLY WILL BE INCORPORATED INTO THE SS-20 REGIMENTS AT THE TWO MOBILE MISSILE BASES IN THESE COMPLEXES WHICH ARE IN THE LATE STAGES OF CONSTRUCTION. 2. (S/D) REMARKS: SS-20 EQUIPMENT IS OBSERVED FOR THE FIRST TIME AT LUTSK MOB LE IRBM BASE 1 (GRAPHIC 1 OF 2). AN EMPTY SS-20 TRANSPORTER-ERECTOR-LAUNCHER (TEL) AND A MAZ-543 CARGO TRUCK ARE IN THE DRIVER TRAINING AREA OF THE SUPPORT FACILITY. THE PRESENCE OF THE MISSILE EQUIPMENT INDICATES THAT THE SITE IS OPERATIONAL NEARING OPERATIONAL STATUS.' THE TEL WAS NOT HOWEVER THE DRIVER TRAINING AREA HAS SHOWN SIGNS OF USE FOR SEVERAL WEEKS. CONSTRUCTION IN THE OPERATIONS ARFA nP TAF CTTF, WHICH HAS BEEN IN PROGRESS SINCE AT LEAST IS NEARING COMPLETION. THE VEHICLE MAINTENANCE STORAGE AREA IS ALSO IN THE LATE STAGES OF CONSTRUCTION. (S/D) THIS FORMER SS-4 MRBM LAUNCH SITE IS ONE OF FOUR MOBILE IRBM MOBILE BASES CURRENTLY UNDER CONSTRUCTION IN THE WESTERN SOVIET UNION. THIRTY-THREE OF THE 38 SS-20 BASES IDENTIFIED TO DATE ARE CONSIDERED OPERATIONAL. LEBEDIN MOBILE IRBM BASE 1 Attachment to Z-10741/82 NPIC/PEG (5/82) (2 PART GRAPHIC) ARRIVAL OF SS-20 EQUIPMENT LUTSK AND KIVERTSY SSM 0 EXES IS ALSO AT OR NEARING OPERATIONAL STATUS. SS-20-EQUIPMENT WAS OBSERVED IN THE SUPPORT AREA FOR THE FIRST TIME (S/D) SS-20 EQUIPMENT IS ALSO OBSERVED FOR THE FIRST TIME AT KIVERTSY MOBILE IRBM BASE 1 (GRAPHIC 2 OF 2), A PAYLOAD HANDLING FACILITY FOR KIVERTSY f 4OBILE IRBM BASE 2 (NOT ON GRAPHIC). THIS EQUIPMENT MAY ONLY BE IN TEMPORARY STORAGE AT THIS SITE UNTIL KIVERTSY 2 (WHICH IS IN THE LATE STAGE OF CONSTRUCTION) IS COMPLETED. NINE PROBABLE SS-20 MISSILE CANISTERS ARE ON THE GROUND NEAR THE SS-4 PROPELLANT STORAGE TANKS. THE CANISTERS, THREE OF WHICH ARE PARTIALLY CANVAS COVERED. WERE NOT PRESENT WHEN THE FACILITY WAS LAST IMAGED ON LAUNCH ASSIST DEVICE EXTENSIONS, WHICH USUALLY DISTINGUISH GENUINE SS-20 CANISTERS FROM MOCK-UP These notes have been prepared for briefing purposes only and should not be used for detailed ana- lytical work. Their use should be restricted to the particular briefing board(s) they were prepared for and must be considered valid only for the reporting period as indicated by the date of issue. WARNING NOTICE Intelligence Sources and Methods Involved SECRET Sanitized Copy Approved for Release 2011/01/11: CIA-RDP82T00709R000101260001-7 Sanitized Copy Approved for Release 2011/01/11: CIA-RDP82T00709R000101260001-7 Iq Next 1 Page(s) In Document Denied Sanitized Copy Approved for Release 2011/01/11: CIA-RDP82T00709R000101260001-7 (c) NATIONAL PHOTOGRAPHIC INTERPRETATION CENTER Sanitized Copy Approved for Release 2011/01/11: CIA-RDP82TOO709ROO0101260001-7 SECRET Page 2 of 2 Copy Attachment to Z-10741/82 NPIC/PEG (5/82) (2 PART GRAPHIC) CANISTERS, ARE VISIBLE ON AT LEAST SIX OF THE CANISTERS. HOWEVER, IT CANNOT BE EXPLAINED WHY SS-20 CANISTERS ARE LYING ON THE GROUND IN OPEN STORAGE AT A PAYLOAD HANDLING FACILITY. (S/D) LARGE NET-COVERED FRAMEWORKS HAVE BEEN ERECTED IN FRONT OF TWO OF THE OLD SS-4 MISSILE READY BUNKERS. NET-COVERED OBJECTS/EQUIPMENT ARE PRESENT AT THE SOUTH END OF THE CLERESTORY BUILDING. THE NET COVERING WAS NOT PRESENT ON (S/D) KIVERTSY MOBILE IRBM BASE 1 IS AN SS-20 NUCLEAR PAYLOAD HANDLING FACILITY WHICH IS BEING CONSTRUCTED AT A FORMER SS-4 MRBM LAUNCH SITE. FOUNDATIONS FOR SINGLE-BAY GARAGES OR FOR THREE/FOUR-BAY GARAGES HAVE NOT BEEN IDENTIFIED AT THIS FACILITY SINCE IT WAS FIRST OBSERVED UNDER CONSTRUCTION IN FEBRUARY 1981. 3.I I COORDINATES 50-50-05N 025-04-OOE COORDINATES'50-53-09N 025-30-48E COMMENTS AND QUERIES REGARDING THIS BRIEFING BOARD MAY BE DIRECTED TO THE NPIC/PEG OPERATIONS OFFICER. These notes have been prepared for briefing purposes only and should not be used for detailed ana- lytical work. Their use should be restricted to the particular briefing board(s) they were prepared for and must be considered valid only for the reporting period as indicated by the date of issue. WARNING NOTICE Intelligence Sources and Methods Involved SECRET Sanitized Copy Approved for Release 2011/01/11: CIA-RDP82TOO709ROO0101260001-7