FISCAL YEAR 1981 DDA COMMUNICATIONS REQUIREMENTS (Sanitized)
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP83-00156R000200030041-8
Release Decision:
RIPPUB
Original Classification:
S
Document Page Count:
9
Document Creation Date:
December 15, 2016
Document Release Date:
November 17, 2003
Sequence Number:
41
Case Number:
Publication Date:
September 25, 1979
Content Type:
MF
File:
Attachment | Size |
---|---|
![]() | 514.23 KB |
Body:
Approved Fo lease 2 4C~/ 2: CIA-RDP83-0015,00;20O300.4'1ra
II
.G 5 SEP 1979
25X1
25X1
MEMORANDUM FOR: Director of Data Processing
Director of Finance.:.
Director of Logistics
Director of Medical Services ?.
,Director of Security
Director of Personnel
:DDA Communications Requirements Coordinator
Requirements 0
Fiscal Year 1981 DDA:.Communications
1. The attachment to this memorandum provides the most
current information available concerning the Office of
Communications (OC) programming for FY 1981 communications
requirements submitted to OC. All Directorate requirements
were consolidated in accordance with the criteria established
by in DDA 79-0112 dated 9 January 1979. E
2. Immediately following each requirement--see attached--
is a brief description of the communications services and
hardware required to satisfy the customer need together with
the ZBB level at which appropriate resources were programmed.
Unless otherwise noted, Directorate requirements were pro-
grammed.in the "Other Communications Activities" decision
unit.
3. As a result of Comptroller and Resource Management
Staff reviews conducted to date, all enhanced funding levels
for "Other Communications Activities" have been excluded from
the OMB budget. Said another way, if your requirement was
programmed within the current level, OC may yet receive
funding. If your requirement was programmed at an enhanced
level, OC will not receive funding. In the latter case, you
Downgrade to CONFIDENTIAL
When Separated from Attachments
25
25
WARNING NOTICE
INTELLIGE'N'CE SOURCES
AND t %PVW* ` ~~R ease 2004/05/12: CIA-RDP83-0015
' G 11 ET
I~DA 7 9 --0112 / 4
~pn
Approved For Release 200W/O tL bIA-RDP83-00156R000200030041-8
SUBJECT: Fiscal Year 1981 DDA Communications Requirements 0 25
will need to resubmit the requirement for FY 1982 if it is still
valid and has not otherwise been satisfied.
7
25
...mob.... .~. ... ~.
:Integration Staff, Engineering Division, OC, on secure
.4. The results of future FY 1981 budgetary actions which
impact the'requirements remaining in the OC FY 1981 program
will be - forwarded to you as they become available. Should
additional_.information concerning this memorandum or the attach-
ment be required, please have members of your staff contact the
Attachment:
Consolidated Listing of FY 1981 DDA
Communications Requirements
Distribution:
Orig - D/ODP w/att
1
- ea other. Off. Dir. except OC w/att
1
- OC-ED/SIS w/o att
1
- DDA Chrono w/o att
1
- MS/DDA subj w/att
1
- MS/DDA Chrono w/o att
MS/DDA
(25 Sept 7
Approved FcRPelease 2004/ /1 ? CIA-RDP83-0011
Approved Fo
lease 2004/0 E P83-001500200030041-8
DDA FY 1981 CONSOLIDATED COMMUNICATIONS REQUIREMENTS
PLANNING AND PROGRAMMING
PRIORITY-1
Assistant for Information
.Requirement:,. Provide data communications between four Delta
Ruffing Center.
25X1
Requirement:
Comment The DDCI has approved the allocation
25
25
Approved For Release 2004/05/12 : CIA-RDP83-0015q
Resources Data circuit between modem,
multiplexer, and cryptographic equipment; RFI
racks and installation hardware. (Other
Communications Activities/New Support.-
Austere-2 level)
2. Office of Logistics
Requirement:
Data terminals and a hetra printer at the
25
Archives and Records;Center and the Headquarters
Provide data communications between the Head-
quarters Ruffing Center and minicomputers to be
installed at the
I
25
Resources Statistical multiplexers and installation hard-
ware to support the Headquarters 25
minicomputer link, and installation hardware
to support the Headquarters mini- 25
computer link. (Other Communications Activities/
New Support - Enhanced-1 level)
3. Office of Logistics
Headquarters
25
Approved Fo.lease 200S/9`F:E--RDP83-00100200030041-8
y
PRIORITY-2
4. Office of Finance
Requirement: Provide communications circuits for anticipated
data terminal and minicomputer installations at
Resources Data terminal installation hardware. (Staff
Communications - Austere-1 level)
Approved For Release 2004/05112 : CJA-R3P83-00156R000200030041-8
Requirement: Provide communications support for the installa-
outlying buildings..
Data concentrators for Ames, Chamber of Commerce
and Key Buildings.. (Other Communications
Activities/New Support - Austere-1 and 2 levels)
Office of Personnel
tion of three data terminals at Headquarters.
Data terminal installation hardware. (Staff
Communications - Austere-1 level)
Office of Personnel
Requirement: Provide support to upgrade communications
between Ames Building and Headquarters.
Resources Data concentrator for the Ames Building.
(Other Communications Activities/New Support -
Austere-2 level)
7. Office of Data Processing
Requirement: Provide data communications at 9.6Kb between
Headquarters and outlying buildings to support
installation of SAFE and new standard ODP
terminals. Also to improve the communications
transmission network to achieve a goal of .995%
average reliability and one uncorrected error
per week per circuit.
Resources Data concentrators for Ames, Chamber of Commerce,
and Key Buildings. (Other Communications
Activities/New Support - Austere-1 and 2 levels)
8. Office of Data Processing
Requirement: Provide communications support for installation
of 140 new standard ODP terminals.
Approved Fo.lease 2004/05o-2g1'83-00100200030041-8
9. Office of Security
Requirement: Provide communications support for installation
Headquarters for data. terminal access
11.
Resources Data terminal installation hardware. (Staff
Communications - Austere-1 level)
Requirement: Provide data communications between the fifth
and eighth floors in the Ames Building for
interconnection of the Correspondence Branch
Vydec machines and the Reality minicomputer.
.Provide data communications from
..Agency's VM system.'
Data circuit (19.2Kb) from
cryptographic, multiplexer, and modem equipment;
and RFI.racks and installation hardware.. (Other
,Communications Activities/New Support
.Enhanced-1 level)
Office of Personnel
Resources Data terminal and line installation hardware.
(Staff Communications - Minimum level)
12. Office of Personnel
Requirement: Provide a data communications circuit on the
fifth floor of the Ames Building for connecting
the bar stripe reader to the Reality mini-
computer.
Resources Data terminal and line installation hardware.
(Staff Communications - Minimum level)
13. Office of Security
Requirement: Provide communications at 1800 baud between
Headquarters and several outlying buildings to
support installation of remote terminals for
the Security Access Control System (SACS).
Approved For Release 2004/05/ CIA D 83-00156R000200030041-8
25
25
Approved Fo lease 2004/CSIC- DP83-0015 00200030041-8
Comment Secure circuits can be provided for the SACS
terminals to satisfy secure voice requirements
at 25
15. Office of Logistics
Requirement: Provide communications support for the possible
.installation of a minicomputer and terminal in
the Building Services Branch, Logistics Services
Division at Headquarters.
Resources Computer and data terminal installation hardware.
(Staff Communications - Minimum and Austere-1
levels)
16.. Office of Logistics
Requirement: Provide data communications between an ODP
terminal at the Headquarters North Loading Dock
and the Ruffing Center.
Resources Data terminal installation hardware. (Staff
Communications - Austere-1 level)
17. Office of Logistics
Requirement: Provide a communications link for exchange of
- data between the OL minicomputer system to be
installed at
Approved For Release 2004/05/12;,CJA-,RQPJ .3-001568000200030041-8
the requirement are identified.
requirement, if necessary. The capability to
provide such service at most of the Headquarters
area outbuildings currently exists. An OC
representative will contact OS in the near
future to ensure that all technical details of
STU-IIs-for :(Other 25
Communications Activities/Secure Voice
Enhanced-2 level)
Comment The DDCI has approved the allocation of-KY-70
Approved Fo lease 2004/0 P83-0015 00200030041-8
Comment The requested service can be provided through
established communications networks. The
Requirement:. ,Provide for. relocation of telephones,: secure
already has
an AUTODIN data interface and, when installed,
the OL minicomputer will have access to AUTODIN
via.DATEX. Preliminary planning for the OL
minicomputer-DATEX link has been completed.
Office of Logistics
terminals at. the
.Resources'.,:..Telephone and data terminal installation hard-
ware. (Staff Communications - Minimum. level)
Office of Logistics
Requirement:
Provide secure voice service between the
and Headquarters.
Comment The DDCI has approved allocation of a KY-70
secure voice terminal for the
PRIORITY-4
'20. Office of Logistics
Requirement: Provide total communications support for the
new office space (approximately 85,000 square
feet) that the Office of Logistics is in the
process of identifying for future occupancy.
Resources Microwave transmission system, leased telephone
service, modems and multiplexers, bulk
encryption equipment, communications grids,
telephone switch and phones, CER equipment and
shielded enclosure, emergency generator, and
installation contract services and hardware.
(Other Communications Activities/New Support -
Current level)
Approved For Release 2004/05/12 : CIA-RDP83-00156R000200030041-8
J:L^w u ~.v3
Approved FoOlease 2004 1 RDP83-00100200030041-8
21. Office of Data Processing
Requirement: Provide communications support for installation
Resources
of five new ODP front-end processors.
Installation equipment including patch panels
and RFI racks, and miscellaneous hardware.
(Other Communications Activities/New Support -
Offices of Finance, Logistics,.and'Medical Services
Provide continued. OC 'participation in the `CRAFT
project so as to program communications
resources as the system develops.:
As you are aware, OC has been an active
participant in the long-range planning and
development of the CRAFT system. OC has a
representative on the CRAFT Working Group, has
a commitment':to provide system maintenance in
the field, and is currently assisting with the
installation of two CRAFT testbed systems.
Furthermore, OC initiatives such as SKYLINK,
AFT, and a new project to develop an advanced
communications information switching system
play an important part in achieving CRAFT
objectives. Through efforts such as these, OC
plans continued support for full implementation
and utilization of the CRAFT system to meet
future user requirements.
,.PRIORITY-5
23. Office of Medical Services
Requirement: Provide secure voice service between OMS Head-
auarters and four overseas stations -
25,
In view of current SKYLINK installation
scheduling, will be the only one of 25
the above cited stations capable of supporting
Agency controlled secure voice within the
required time frame. However OC records
indicate. that both 25
currently have access to secure voice via the
Approved For Release 2004/05/1x `?Ixl'A;'RPR.83-00156R000200030041-8
LL
Approved Folease 2004/1F...:?CDP83-0015,00200030041-8
military AUTOSEVOCOM network. An OC
representative will contact the OMS Communica-
tions Coordinator to discuss the latter and
provide contact instructions if it is determined'
.to be!a satisfactory alternative.
of Data Processing
Requirement: .'.Provide communications support for installation
of=;data equipment for the CAMS system including
_
15_CRT terminals, three read-only printers, and
Resources Terminal installation hardware. (Other
:Communications Activities/New Support -
Enhanced-l level)
Requirement: Provide communications support for the installa-
tion of a new CAMS computer system.
,25. Office of Data Processing
Installation hardware. (Other Communications
Activities/New Support - Enhanced-2 level)
Approved For Release 2004/05/11AF83-001568000200030041-8