REINFORCEMENT OF THE ELBE RIVER BRIDGE NEAR WITTENBERGE

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP83-00415R003900100007-0
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
5
Document Creation Date: 
December 14, 2016
Document Release Date: 
January 28, 2002
Sequence Number: 
7
Case Number: 
Publication Date: 
December 13, 1949
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP83-00415R003900100007-0.pdf452.77 KB
Body: 
Approved For Release 2002/08/15 : CIA-RDP83-00415R003900100007-0 CLASSIFICATION a;;G~:;,`'/COJTnOl, ?? U.S. Ui''r'IGL L,:; CENTRAL INTELLIGENCE AGENCY REPORT NO. INFORMATION REPORT CD NO. COUNTRY Germany (Russian Zone) SUBJECT Reinforcement of the Elbe River Bridge near :.ittenberge 25X1 A PLACE ACQUIRED DATE OF 10 25X1X 25X1A DATE DISTR. 13 Dec. 1949 NO. OF PAGES 2 NO.Oe ENCLS. 1 (3 blueprin- SUPPLEMENT TO REPORT NO- 1 . Geis Genzaaior SHAROV, chief of the S MA of the State of Brandenburg, by Order No 2714 of 11 October 1949 ordered the reconstruction of the Elbe River bridge near WITTENBERGE (M 53/? 69) .. 2. Bridge data (for both railroad and road sections of bridge) : a. Pin oint location; (5259 N/1145 E) 800 meters south of 1tiI ? k no-me ter s tat ion 51.1}0 on the STENDAL - VvITTENBERv, railroad line). 25X1X b. 4, hen located in a city, street names leading to bridges: c. Length: About 1,000 meters d. VVidth: About 12 meters e. Ile ight above river 8 to 12 meters f. Type. of construction: Steel bridge, VVarren truss gir- der . -Stone piers and a utments. 13 piers, 14 spans (1 x 41.1 11 x 55.2 m, 1 x 84.0 m, 1 x 37.26 m) . State of rep air: Kind of eiestruetions See Annex 1. Span -No 13 rbe ween, piers XII and XIii over nav1 _ able channe of the Elbe River demolished in the ,iaule. Pier No XTII heavily damaiged. Superstructure of span No 14 almost completely demolished. Pier No XIII was reconstructed, the destroyed bridge section was replaced by military bridge equipment (the improved Roth (R) system with spans of 86 and 37 :peters. (so-called per- manent emer;reicy bridge) . h. Conspicuo s adjacent landmarks: None. i. Load capacity: of southern bridge lane: X or heaviest tanks. CLASSIFICATION S ~'C ET CONTROI, - U..S OFFICL L S 0141,Y STATE NAVY NSRB DISTRIBUTION ARMY Approved For Release 2002/08/15 : CIA-RDP83-00415R003900100007-0 Approved For Release 2002/08/15 : CIA-RDP83-00415R003900100007-0 SECRET/CONTROL -- U. S . OFFICIALS ONLY CENTRAL ITN ELLIGENCI:; A.GJNCY -2~ SSA to the German Economic Commission (DWK) that, for the time being, only the roadway but not the railroad track of the bride is to be reconstructed. The ordered ednstruc- tion work is to fake the bridge serviceable for heaviest tanks and Is scheduled to be co:.Lpleted by a becember 1999 at the latest. 25X1A 3e 0onunent The bridge is a two-lane railrca d bride over the Elbe River on the STENB1L- L-1TfENBERGE line (one track on each lane). The bride section over the navigable charmel of the River was demolished in 1945. The tvi lanes of the bridle were reconstructed in a makeshift may at the end of 1948. Rail- road operations were resu.ned on the track of the northern bridge 1 ane, the southern lane, which had a plank floor, was released to road traffic. (see A.-nex 2). In the ordered reconstruction work this plank road, now three meters wide, is to be widened cnd increased to make it serviceable for heaviest tanks (sne Annex 3). 3 Annexes: 1. Sketch of the ce:.ic'lished bridge section 2. iteconstructr'd brid;,e sections 3. Dial!ran of the planned reinforce lent of the roar way. SEC1 ET-CONT COL/U O TC1E.L5 ON.,Y 25X1A Approved For Release 2002/08/15 : CIA-RDP83-00415R003900100007-0 Approved For Release 2002/08/15 : CIA-RDP83-00415R003900100007-0 Q) r-4 4' r1 ! 4-) C+ m o) 4- 5+ d' t3 u~~ U i `t ~ r-1 N H Ds J Z' o cu 4 X., Ij 0 in r-1^0 0 Vj Q i) .~i co FHA Approved For Release 2002/08/15 : CIA-RDP83-00415R003900100007-0 10 Approved For Release 2002/08/15 : CIA-RDP83-00415R003900100007-0 a/e's 04 ON Approved For Release 2002/08/15 : CIA-RDP83-00415R003900100007-0 Approved For Release 2002/08/15 : CIA-RDP83-00415R003900100007-0 :C,R - ,v D aIRI UTIO i"LneX 3 to 25X1A Diagram of the planned-reinforcement of the roadway -1.72m -..~~ .-135 --f-- 182 -u.-134 -- .I 13-.0 }.f- -3.00 --- " +--1,700 reinforcement of the section of the roadway previously covered with planking Scale 1:100 Approved For Release 2002/08/15 : CIA-RDP83-00415R003900100007-0