REINFORCEMENT OF THE ELBE RIVER BRIDGE NEAR WITTENBERGE
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP83-00415R003900100007-0
Release Decision:
RIPPUB
Original Classification:
S
Document Page Count:
5
Document Creation Date:
December 14, 2016
Document Release Date:
January 28, 2002
Sequence Number:
7
Case Number:
Publication Date:
December 13, 1949
Content Type:
REPORT
File:
Attachment | Size |
---|---|
![]() | 452.77 KB |
Body:
Approved For Release 2002/08/15 : CIA-RDP83-00415R003900100007-0
CLASSIFICATION a;;G~:;,`'/COJTnOl, ?? U.S. Ui''r'IGL L,:;
CENTRAL INTELLIGENCE AGENCY REPORT NO.
INFORMATION REPORT CD NO.
COUNTRY Germany (Russian Zone)
SUBJECT Reinforcement of the Elbe River
Bridge near :.ittenberge
25X1 A PLACE
ACQUIRED
DATE OF 10
25X1X
25X1A
DATE DISTR. 13 Dec. 1949
NO. OF PAGES 2
NO.Oe ENCLS. 1 (3 blueprin-
SUPPLEMENT TO
REPORT NO-
1 . Geis Genzaaior SHAROV, chief of the S MA of the State of
Brandenburg, by Order No 2714 of 11 October 1949 ordered
the reconstruction of the Elbe River bridge near WITTENBERGE
(M 53/? 69) ..
2. Bridge data (for both railroad and road sections of bridge) :
a. Pin oint location; (5259 N/1145 E) 800 meters south
of 1tiI ? k no-me ter s tat ion 51.1}0 on the STENDAL -
VvITTENBERv, railroad line).
25X1X
b. 4, hen located in a city, street names leading to bridges:
c. Length: About 1,000 meters
d. VVidth: About 12 meters
e. Ile ight above river 8 to 12 meters
f. Type. of construction: Steel bridge, VVarren truss gir-
der . -Stone piers and a utments. 13 piers, 14 spans (1 x 41.1
11 x 55.2 m, 1 x 84.0 m, 1 x 37.26
m) .
State of rep air: Kind of eiestruetions See Annex 1.
Span -No 13 rbe ween, piers XII and XIii over nav1 _ able channe
of the Elbe River demolished in the ,iaule.
Pier No XTII heavily damaiged.
Superstructure of span No 14 almost completely demolished.
Pier No XIII was reconstructed, the destroyed bridge section
was replaced by military bridge equipment (the improved Roth
(R) system with spans of 86 and 37 :peters. (so-called per-
manent emer;reicy bridge) .
h. Conspicuo s adjacent landmarks: None.
i. Load capacity: of southern bridge lane: X or heaviest
tanks.
CLASSIFICATION S ~'C ET CONTROI, - U..S OFFICL L S 0141,Y
STATE NAVY NSRB DISTRIBUTION
ARMY
Approved For Release 2002/08/15 : CIA-RDP83-00415R003900100007-0
Approved For Release 2002/08/15 : CIA-RDP83-00415R003900100007-0
SECRET/CONTROL -- U. S . OFFICIALS ONLY
CENTRAL ITN ELLIGENCI:; A.GJNCY
-2~
SSA to the German Economic Commission (DWK) that, for the
time being, only the roadway but not the railroad track
of the bride is to be reconstructed. The ordered ednstruc-
tion work is to fake the bridge serviceable for heaviest
tanks and Is scheduled to be co:.Lpleted by a becember 1999
at the latest.
25X1A 3e 0onunent
The bridge is a two-lane railrca d bride over the Elbe
River on the STENB1L- L-1TfENBERGE line (one track on each
lane).
The bride section over the navigable charmel of the River
was demolished in 1945. The tvi lanes of the bridle were
reconstructed in a makeshift may at the end of 1948. Rail-
road operations were resu.ned on the track of the northern
bridge 1 ane, the southern lane, which had a plank floor,
was released to road traffic. (see A.-nex 2). In the ordered
reconstruction work this plank road, now three meters wide,
is to be widened cnd increased to make it serviceable for
heaviest tanks (sne Annex 3).
3 Annexes: 1. Sketch of the ce:.ic'lished bridge section
2. iteconstructr'd brid;,e sections
3. Dial!ran of the planned reinforce lent of the
roar way.
SEC1 ET-CONT COL/U O TC1E.L5 ON.,Y
25X1A
Approved For Release 2002/08/15 : CIA-RDP83-00415R003900100007-0
Approved For Release 2002/08/15 : CIA-RDP83-00415R003900100007-0
Q) r-4
4' r1
!
4-)
C+ m
o)
4- 5+
d'
t3
u~~ U
i
`t
~ r-1 N
H
Ds J
Z' o
cu 4
X., Ij
0
in r-1^0
0 Vj Q i)
.~i co
FHA
Approved For Release 2002/08/15 : CIA-RDP83-00415R003900100007-0
10
Approved For Release 2002/08/15 : CIA-RDP83-00415R003900100007-0
a/e's 04 ON
Approved For Release 2002/08/15 : CIA-RDP83-00415R003900100007-0
Approved For Release 2002/08/15 : CIA-RDP83-00415R003900100007-0
:C,R - ,v D aIRI UTIO i"LneX 3 to
25X1A
Diagram of the planned-reinforcement of the roadway
-1.72m -..~~ .-135 --f-- 182 -u.-134 -- .I 13-.0 }.f-
-3.00 --- " +--1,700
reinforcement of the section
of the roadway previously
covered with planking
Scale 1:100
Approved For Release 2002/08/15 : CIA-RDP83-00415R003900100007-0