(SANITIZED)INFORMATION ON EAST GERMAN SHIPYARDS(SANITIZED)
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP83-00415R009800010008-4
Release Decision:
RIPPUB
Original Classification:
S
Document Page Count:
2
Document Creation Date:
December 22, 2016
Document Release Date:
June 18, 2012
Sequence Number:
8
Case Number:
Publication Date:
December 18, 1951
Content Type:
REPORT
File:
Attachment | Size |
---|---|
![]() | 87.4 KB |
Body:
Declassified in Part - Sanitized Copy Approved for Release 2012/06/18: CIA-RDP83-00415R009800010008-4
8ECRET/CONTROL - US OFFICIALS ONLY
SECURITY II 'O MA' I a
German Democratjo Republic
INFORMATLON ON EAST GERMAN SHIPYARDS
the yard formerly known as"Schiffsbergung Stral-
sun re Ship Salvage Company) or "Stadtwerft" (Municipal Shipyard) is now
called the "Schiffsbau and Reparaturwerft Stralsund" (Stralsund Shipbuilding and
Repair Yard). The yard employs about 300 workers, but for about four weeks has
not had a single naval construction engineer. It is rumored that the plant is to
work in the future exclusively on the shipbuilding program for the Naval Police.
the Elbewerft (Elbe Shipyard) in Boizenbur
50X1-HUM
g
isbrae%10ally Inactive because of a shortage of materials. It is reported that
the 1951 program, calls for the construction of 20 tuggers which will be equipped
as refrigerator ships, The refrigeration installations are to be furnished by
Kaelterichter in Berlind,
the 20 meter launch "Luuune" was seen at the 50X1-HUM
Peenewer (Feene Shipyard) in Woigast with Naval. Police personnel aboard; It could
not be determined whether they were crew or simply a guard detail. Two cutters
built by the "Yachtwerft" (Yacht Shipyard) in Berlin were at the yard for repair,
and four seiners and four luggers were being outfitted. Two hundred workers from
the Boizenburg shipyard were loaned to the Peenewerft in order to complete the work
on these last eight vessels by the deadline set,
"Vo werft" people's shipyard) in Stralsund. Three welded-hull loggers are vv v
standing partly finished in t. Construction Shop I waiting for deliveries of
sheet and sections promised a month ago, and three more are standing in the open
air outside the shop. There are six Tuggers at the quay on which work has also
stopped because of lack of various materials. Recent trials in Stralsund impli-
cating,varioustengineers and employees of the shipyard have had a depressing
effect on``b'i~ipyard personnel.
the "Staatswertt" in Stralsund employs about 50X1-HUM
50L-. ers. IT, Is engaged in making repairs on the GDR's first freighter, the
"Vorwaorts", which suffered damage on its trial run. Also at the yard are a
former Danish buoy boat or coast guard vessel about 60 meters long, which was
raised, and a 50-meter vessel on which repair work has not yet started. Plans
are being made to build a lateral slip 60 meters long to increase eonet,'n 4?n
facilities.
Declassified in Part - Sanitized Copy Approved for Release 2012/06/18: CIA-RDP83-00415R009800010008-4
50X1-HUM
Declassified in Part - Sanitized Copy Approved for Release 2012/06/18: CIA-RDP83-00415R009800010008-4
Next 5 Page(s) In Document Denied
Iq
Declassified in Part - Sanitized Copy Approved for Release 2012/06/18: CIA-RDP83-00415R009800010008-4