Body:
?.~ -HUM
Declassified in Part -Sanitized Copy Approved for Release 2012/06/26: CIA-RDP83-00415R010000150004_-9.:1
rORMIO.
~', _v,.r ?TsU
. OF'~ICIAIA 0 IJ
CLASSIFICATION
MG
3
r~p
~
C
y
CENTRAL 1NT~GECE fCY + REPORT
INFORMATION REPORT CD NO.
COUNTRY Yugoslavia
PLACE
ACQUIRED
DATE OF
lpp- __ ED
THIS DOCUMENT CONTAINS INFORMATION AFFECTING THE NATIONAL DEFENSE
OF THE UNITED STATES WITHIN THE MEANING OF THE ESPIONAGE ACT 50
U. S. C.. 31 AND 32. AS AMENDED. ITS TRANSMISSION OR THE REVELATION
OF ITS CONTENTS IN ANY MANNER TO AN UNAUTHORIZED PERSON IS PRO-
HIBITED BY LAW. REPRODUCTION OF THIS FORM IS PROHIBITED
DATE DISTR. 17 D eiuher? 1951
ATTACHO. OF ENCLS.
SUPPLEMENT TO
REPORT NO.
50X1-HUM
Declassified in Part - Sanitized Copy Approved for Release 2012/06/26: CIA-RDP83-00415R010000150004-9
Declassified in Part - Sanitized Copy Approved for Release 2012/06/26: CIA-RDP83-00415R010000150004-9
AT': ACHP4ENTS:none
A) ECONOMIC INFORMATION
1) INDUSTRIES
- Cement facto 50X1-HUM
77-78
Located between the Arsenal and t:-..e 'IED STAR Shipyard. It is composed of 4 POLA
1-h
mills, 3 for grinding and one for preparing the mixture. The machines are
those which fel-te3_, The raw material for the cement tomes from
SRLLATO ~77-78/15-N) on the "TU2 A" and. 1IBOJANA" it 4000-ton (approximately)
steamboats, while the material for making artificial cements is dug from
MAX cave about 500 meters from the factory 1 the clay from PON R, 6 kit from
The paper bags in which the cement is put are from a factory in ZAGREB (77-78/13-e),
50X1-HUM
QUANTITY PRODUCED
- 300 tons every 24 hours.
L41- iol Lm7 A re@*I~ar'g4p xx** siding connects the factory to th*ailroad.
production has been reduced to about one half because of the poor condition
of the machinery)
Organization_ -
- Manager: Giovanni PAVICAIE"VAZ, aformer worker, secretary of the Warty.
He recently replaced Ivan L_4COTA who was recalled to the
army to complete his term.
- Political commissar: Attilio DRUSETTA, president of the Citizens Trade Union.
a crane operator.
- Personnel chief: Ljubo SYGRGO, &?te -operater
Factory chief: Carlo LUSETICH
Worker 3 : about 550
Work shifts: 3
Declassified in Part - Sanitized Copy Approved for Release 2012/06/26: CIA-RDP83-00415R010000150004-9
Declassified in Part - Sanitized Copy Approved for Release 2012/06/26: CIA-RDP83-00415R010000150004-9
pleted toward 10 June. Its dimensions are 25 x 15 x 20 in.
5 ert -lamb #'ri t... IT-70
Located nea Fie anent factory. The construction of the building was cor- POL
2) MOTIVE POTTER 50X1-HUM
electric Lower plant of the cement factor
r._
It is composed of:
800-KW tgLue turbine . Due to its poor condition it can
now deliver only 450 kw.
- 2 oil transformers, with Ipower of 1,340 kw an hour, which transform current froir:.
10,000 volts to 500 volts.
These 2 transformers were mounted in 1949, replacing those which were there before.
- 1 750-K~i ampere transformer which transforms current fro 10,000 to 5,000 volts.
1 coal dust boiler, with two burners
capacity, with pressuretatmospheresper square cm.
Volume of boiler: 500 cubic meters
The power plant is ai+b ~ 4; Cc r r ro en outside line
The results obtained were satisfactory. This change will take place on 13 September
Three tests have been made for the change of frequency from 42 cycles to 50. 50X1-HUM
700 -Kira
Miscellaneous economic infonnation
when the new, hydroelectric power plant at NOVI
with power of 27,000 K14 an hour.
begins operation
it is planned to install two more turbine-
50X1-HUM
of 27,000 kw an hour in this place.
L. So OFTF#611ALS ONLY
Declassified in Part - Sanitized Copy Approved for Release 2012/06/26: CIA-RDP83-00415R010000150004-9