POLISH AND EAST GERMAN COMMAND STAFF

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP83-00415R010100030009-6
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
3
Document Creation Date: 
December 22, 2016
Document Release Date: 
May 14, 2002
Sequence Number: 
9
Case Number: 
Publication Date: 
December 19, 1951
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP83-00415R010100030009-6.pdf102.72 KB
Body: 
25X1 Approved Fo 2002/08/15: CIA-RDP83-00415R01 100030009-6 SECURITY INFORMATION 5X1A German Demooratic Republic 25X1A CONSTRUCTION OF 4k RAIL LINK NEAR WOSTERRMARK (20 pp, 1 sketch; German; August 1951) 25X1A Comments The order for the construction of the rail link was given by the BCC. The document consists of photostat copies of typewritten information regarding the construction of a connecting rail curve at Wustermark. The information-was compiled by the Central Designing Office of the German Reiohsbahn and forwarded to the Reiohsbahn Directorate Berlin on 31 August 1951. The document reveals the following particulars about the projects The purpose of the project is to provide a rail link which will make it possible to direct trains from the German Democratic Republic going in westerly direction to the northern outer beltline around Berlin, thereby bypassing Berlin, and vice versa` The curve will connect the Berlin-Stendal railroad line with the Wildpark-Nauen line, It will branch off the Wustermark-Nauen sector at km 82.4, z will run parallel to it in southerly direction for about 500 meters, will then turn westward with a radius of 500 meters, will reach the Berlin-Stendal line approximately at km 31.47 and will join it at km 32. The cost of the project will be 600,000 Deutsche marks. The project has a high priority and is to be completed by 31 December 1951. It will require 1.8 kilometers of track, type 8 49 or 8d or 151, which will have to be dismantled from a still unspecified less important line.. There follow detailed cost estimates. A sketch of the projected ourvd, soils 111,000, dated 17 August 1951, and a profile diagram are appended. Foreign language document or a miorofilm of it (C 4747) may be obtained rom CIA, Library, 25X1 A RETURN TO Cd Lh A 25X1 25X1 o.y 19 January 1952 SECRET Approved For Release 2002/08/15 : CIA-RDP83-00415RO10100030009-6 25X1A Approved For Release 2002/08/15 : CIA-RDP83-00415RO10100030009-6 Approved For Release 2002/08/15 : CIA-RDP83-00415RO10100030009-6 FORM NO. 51.61 ' $ LIVAI 21, INFORMATION REPORT Appro(yI 1 j 2002/0044 A-RDP83-00415R0j100030009-6 SECURITY INFORMATION CENTRAL INTELLIGENCE AGENCY REPORT ND COUNTRY Poland/East Germany SUBJECT Polish and East German Command Staff PLACE ACQUIRED DATE OF ACQUIRED 25X1A CD NO. DATE DISTR. 19 Dec.1951 NO. OF PAGES NO. OF ENCLS. (LISTED BELOW) SUPPLEMENT TO 25X1 X REPORT NO. On the basis of the request I I a source was queried as 25X1 to the existence or planned creation of an East German - Polish command staff. His answer, translated, is as follows: "During my membership in the HVA, nothing was known to me up to the middle of October 1951 concerning the selection, or planned selection, of Polish-speaking officers from the HVA." DISTRIBUTION Approved For Release 2002/08/15 : CIA-RDP83-00415RO10100030009-6