UDARNIK MECHANICAL PLANT AT MINSK

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP83-00415R010500100001-2
Release Decision: 
RIPPUB
Original Classification: 
C
Document Page Count: 
2
Document Creation Date: 
December 14, 2016
Document Release Date: 
January 31, 2002
Sequence Number: 
1
Case Number: 
Publication Date: 
February 7, 1952
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP83-00415R010500100001-2.pdf142.68 KB
Body: 
Approved For Release 2002/08/15 : CIA-RDP83-0041.5 R010500100001-2 ,t-~ CLASSIFICATION .f S7CITRITY rIM' ` ATION T~ 11 CENTRAL INTELLIGENCE AGENCY REPORT NO. INFORMATION REPORT CD NO. COUNTRY -~usnI zn S;r? SUBJECT I;darnik '7echmiica1 i`lant a1; insk 'I PLACE 25X1A ACOUIRED L DATE DISTR d Ice 25X1A cbraax y i 952 NO. OF PAGES _r_ 1 OF ENCLS. ( TED BELOW) 0 NOT CIRCULATE Q??o, r?Ar"n,.r ,.,, 25A1 A REPORT No_ 1P c 1Irt U On the northeastern perimeter of ransk (27o350L/53o50?T0a, bite Russian SS179 near a radio plant and southe"st of a ain street with a streetcar line (see Elnnex) 2v ra?t31iar, According; to a Soviet construction engineers the construction of the plant was begun in the Fall of 1046. German PUUs Were em- ployed as workers since 1943. In raid-October 194.3 building I wa s nearing colnrletion, while the concrete foundations of build in-; 2 which extended 2.4 meters below the ,round were completed,, The steel girders for the building were %lready stored in the factory area. The framework of the boiler-house and transformer stat .on was completed but these buildings were not yet furnished, The smokestack of the boilerhouse was still missing? It was planned -Co expand the factory area toward the Brest so as to include the r-11 road tracks, one of which led to the radio plant. bQ Type of construction: The buildings are to be alike. They are 27 x 90 meters building 1 is 7.5 meters high The steel s`ke1et n of the sidewalls rests on brick pedestals built on the concrete foundations, The side walls are almost completely taken up by the large yrindows, 3,,6 meters squared The arched roof is of wood and rovicled with a. skylight as indicated in sketch` uilding 1 is already furnished; it has an asphalt floor, Cable ducts are covered by cement slabs and steam heating has been in- stilled. -ll types of rreyal-wor'ring machines were observed; pre- sur.^.ably they were dismantled German riachinery, The boilerhouse is 13,, 5 x 13,, 5 x 4.5 meters, the transformer houa e 9 x 9 x 3,,6 metersm The sa::mill southwest of the boilerhou re is 36 x 9 motors. It supplies both the mechanical plant and the r-tdlo plant, STATE WIN iZ One Annex: Two sketches on one page sarcv~ nisRa _~ DISTRIBUTION Approved For Release 2002/08/15 : CIA-RDP83-00415RO10500100001-2 f / .r ~ / Approved .For&"fie JW;fffd%FIA A 00415801050010 G T?;.< a ?~, raf? tYa t! dar % L k' .a3zt W L it "... ~.,~._:~._.... j~ If/C41"" t 4. J N- 25X1A SsQ~ trd..v.. Approved For Release 2002/08/15 : CIA-RDP83-00415R010500100001-2 OF Fx LL.AT S O JY