DEFECT AND REPAIR OF FURNACE AT THE METALLURGICAL COMBINE EAST (1 P; GERMAN; 18 NOV 51)

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP83-00415R010600150001-6
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
1
Document Creation Date: 
December 22, 2016
Document Release Date: 
January 7, 2002
Sequence Number: 
1
Case Number: 
Publication Date: 
March 4, 1952
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP83-00415R010600150001-6.pdf59.02 KB
Body: 
Approved For Release 2002/08/15 : CIA-RDP83-00415RO10600150001-6 SEC_;T/CONT'ROL - U.S. OFFICIALS ONLY y AL ~.. German Democratic Republic twl f ~. FDD Abstract 25X1A DEFECT AND REPAIR OF FURNACE AT THE &L;TALLURGICAL COLBINE EASE (1 p; German; 18 Nov 51) 25X1X This document consists of a typewritten memo, giving the following information on the Metallurgical Combine East. In the last report of the Metallurgical Combine East, the opinion was expressed that the cooled-off charge in furnace Number I would have to be removed by blasting. On the suggestion of a specialist, who was called from the Maxhuette Plant in Thueringen, these blastings were avoided. This was accomplished by drilling a new taphole on the upper level of the blast furnace and letting the upper, still liquid, contents flow out. In the meanwhile the blowers, which had been damaged, were repaired, and with their aid pure oxygen was blown into the furnace, thereby producing a very high temperature. In this manner it was possible to remelt the remainder of the charge. The furnace will beT in regular operation soon, unless other unforeseen difficulties should occur. The lowest temperature of the solidified charge was 250 degrees centigrade. In the course of the reported setbacks, plant manager Ringel (1951 Hero of Labor) had a nervous breakdown. Zimmer, the head of the steel mill department of the Metallurgical Combine East, was arrested at the beginning of November. No details on this matter have become known. Construction of the large inclined elevator to be used for charging the blast-furnace has been completed. However, difficulties have arisen in its electrical control system. this is a complete translation of the document /The forei. lan age document or a microfilm of it (A 7198) is available from CIA Library 25X1 A 25X1 A 4 March 1952 SECRET/CON"Ti7L - U.S. OFFICIALS ONLY Approved For Release 2002/08/15 : CIA-RDP83-00415RO10600150001-6