DATA ON NEW RAIL TYPE

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP83-00415R011200090012-4
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
1
Document Creation Date: 
December 22, 2016
Document Release Date: 
March 6, 2002
Sequence Number: 
12
Case Number: 
Publication Date: 
May 19, 1952
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP83-00415R011200090012-4.pdf76.2 KB
Body: 
Approved For Release 2002/08/15 : CIA-RDP83-00415R011200090012-4 SECRET/CONTROL U.S. OFFICIALS ONLY-- SECURITY INFORMATION 25X1A GbifAi Democratic Republic 25X1 C FDD Abstract of DATA ON NEW RAIL TYPE (2 pp;German; 25X1X The document consists of two undated typewritten pages entitled "Rolling and experimental installation of type 49 S rails." The document concerns it- self with the problem of the high wear and tear of rails used by the Berlin intra-urban railroad. Stating that this is not a new problem the document notes that the war prevented a solution of it bXt that research following 1945 seems to have met with success in the production of type 49 S rails. Experimental use of these rails has had success far above expectations. The mild winter did not) however, permit testing of the rail in low temperature, particularly in respect to breaking. The Soviet Union has refused to test the rails in Eastern USSR, where low temperatures prevail Th degree of safety in operation attained by these rails is pesponsible foxpeccision of the Railroad Directorate Berlin to increase train speeds in the very near future, after sections with reduced speed will have been improved by the installation of these rails. In respect to rolling of the rails, which is done in Riesa and Thale, the report notes that the rolling pressure ad to be reduced and a particular calibration of the rolling trains had to be undert ken. While normally 8 rolling passes suffice these rails require 11 such passes. Riesa and Thale are at present delivering approximately 9,000 tons of rails per month to the German Reichsbahn. The Reichsbahn has set very high standards $6r acceptance of these rails in re- spect to w#ght, calibration and length. Rail profile gauges have been set up the Plant eor Locomotives and Electrical Products in Hennigsdorf (LEW). Rails w ich do not measure up to these profile gauges will not be accepted. Rails are not spot-checked, but rather the entire length of the rail is tested with the profile gauge. In the last two month the ratio of rejected rails amounted to 21 respectively 23 percent. 25X1A Loreign 25X1 A Library, 25X1 A 1 1 19 May 1952 SECRET/CONTROL U.S. OFFICIALS ONLY Approved For Release 2002/08/15 : CIA-RDP83-00415R011200090012-4