CONSTRUCTION OF SLIPS AT WISMAR AND WARNEMUENDE SHIPYARDS

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP83-00415R012600050005-1
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
1
Document Creation Date: 
December 19, 2016
Document Release Date: 
April 4, 2006
Sequence Number: 
5
Case Number: 
Publication Date: 
September 24, 1952
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP83-00415R012600050005-1.pdf62.17 KB
Body: 
Approved For Release 2006/05/25 : CIA-RDP83-00415RO12600050005-1 SECRET/CONTROL - US OFFICIALS ONLY SECURTTY INFORvIATION German Democratic Republic CONSTRUCTION OF SLIPS AT WISMAR AND WARNEMUENDE SHIPYARDS ?I 25X1 In accordance with negotiations conducted at the beginning of 1951 by the inistry for HeavXMachine Building, the Office of Reparations, the SAG(Soviet Corporation)Bleichert, in Leipzig, and the officials connected with the Five-Year Plan, it was determined that the construction of two slips, one at the Wismar Shipyard and one at the Warnow Shipyard in Stralsund [apparently a mistake; the location should be Warnemuendej, is to be started as soon as possible. The dimensions of the slips were also established, The Bleichert Firm undertook the task of technical designing. Because of the shortage of qualified designing engineers, the firm had to procure additional technical designers from other firms, including Grohmann and Frosch,, in Leipzig, Pfeffer, in Gispersleben, and Stahlbau (Steel-Construction Firm), in Wismar. The technical designs for the first stage of construction have already been completed, and construction is under-ay in the workshops of the various steel-construction firms, II Because the required steel sections and wide-flanged steel I-beams are not available in the GDR, smaller sections must be combined for use in construction work. Other material shortages, especially of rivets, are causing further construction problems, Installation of the first construction stage is expected to be completed sometime this year(19%1?). A slip of such large,. dimensions has not yet been built in Germany; the slip at the German Shipyard in Hamburg will be small in comparison with the ones under 25X1 construction at Wismar and Warnemuende, SECRET CONTROL - US OFFICIALS ONLY Approved For Release 2006/05/25 : CIA-RDP83-00415RO12600050005-1