CONSTRUCTION OF BLAST FURNACES IN GDR METALLURGICAL PLANTS
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP83-00415R013800070001-0
Release Decision:
RIPPUB
Original Classification:
S
Document Page Count:
1
Document Creation Date:
December 14, 2016
Document Release Date:
February 8, 2002
Sequence Number:
1
Case Number:
Publication Date:
January 15, 1953
Content Type:
TRANS
File:
Attachment | Size |
---|---|
![]() | 41.37 KB |
Body:
Approved For Release 2002/08/19 : CIA-RDP83-00415RO13800070001-0
SECTET/CONTROL = US 01+FICIALS (:NLY
German Democratic Republic
95X1A
25X1A
CONSTRTTr;TTnN Q ?BLAST FITR1\1ACES IN GDR METALLURGICAL PLANTS ( 1 u; German; dated
25X1X 25X1C
25 Jr. This document dated I and prepared
which gives brief data on the construction of blast furnaces in GDR
metallurgical plants, as follows: 1) The Ministry of Metallurgy and Ore-Mining approved the
planned reconstruction of the charcoal blast-furnaces at Weidenbrunn. 2) The same type of
blast furnaces which operate satisfactorily at Unterwellenborn/axhuette Steel Plant]` are to
be installed at the Neuhuette Plant in Schmalldalden. Initially, two blast furnaces, with a
daily maximum capacity of 250 tons each, are to be installed. The Neuhuette Plant is scheduled
to start production by the middle of 1953, and will probably operate as a branch of the Max-
huette Plant,
It is also mentioned that Chief Engineer P. Clemens was arrested as being responsible for
the breakdown of the "West}" Metallurgical Combine,Calbe,
/oreign language document or microfilm of it(No. A-13523)is available from CIA li
ext. n 25X1 A
311
'etv V, it*
25X1A
15 J 1 r 1953
SECRET/CONTROL - US OFFICIALS ONLY
Approved For Release 2002/08/19 : CIA-RDP83-00415RO13800070001-0
25X1A