OBJECT 6 OF SDAG WISMUT
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP83-00418R003500090002-1
Release Decision:
RIPPUB
Original Classification:
S
Document Page Count:
3
Document Creation Date:
December 20, 2016
Document Release Date:
December 4, 2007
Sequence Number:
2
Case Number:
Publication Date:
March 21, 1956
Content Type:
REPORT
File:
Attachment | Size |
---|---|
CIA-RDP83-00418R003500090002-1.pdf | 225.66 KB |
Body:
COJNTRY
PL. LE
ADIAJIRED
WE OF
INFO.
[
ILE 3 Docesmit commas smallitTIOM amanislas pumatm. DEPOWS
OF UK 1111Wew $ta i a am= not MITAMUMI OV IMO sepoonms ACT BO
LP- :.LIL.. SI Nip MAO W010060. WS TaISMNIMMMON OM TTIM 1/014.ATIOM
OF rATCOMTWITA In ART IllAWOOR 110 AM IMINVIMORCLED 111110m IS VIO,
int WED irt LAW CILVOODOCITOM or Illis POMO 0 WIONIMMITI
,
Approved For Release 2007/12/04: CIA-RDP83-00418R003500090002-1
CLASSIFICATION
CENTRAL INTELLIGENCE AGENCY
INFORMATION REPORT
East Germany
Object 6 of SDAG Wismut
REPOR
CD NO.
DATE DISTR. 21 Mard21956
NO.OF PAGES 3
NO. OF ENCLS.
SUPPLEMENT TO
REPORT NO.
THIS IS UNEVALUATED INFORMATION
25X1
25X1
25X1
,AgIn Ore Bunkar
The entire output of grade-II contaY6 or of Cibeet 6 vGt
piled at the FriaEon ore bunker, Ths vas delivered by tuck
end shipped out by rail: to the Lengefold concentration plant at a rate of
he to 45 railroad osr loads a day?
wen, riktrig_.
2, In early ;July 1955, the mina vorkfome is suddenly reduced from
5.0 to 160 men The dismissed workers were transferred for work et
Zobeel The plan targets were reduced from 600 Deters mine ndvance
par mcnth to 150 meters, and from 2,000 boxes of' grado-III contact ore
per month to 300 - 400 boxes, These medifiestichs we: belleved to
have teen ranee because of the low yield of the Fergen mine,
But on advancing working area 109, a mall minter of ;ligh-yield ore
pockets were struck end, it was hoped to strike Eore abundant patches,
oossibly even litchblendo, by further advancing the mi:le into the slate
region. These findings reviTed the eAivities 'at Bergen, .After
fulfilmont of the reduced plan targets for July 1955, new 1.atrere
were hired in early August. The target figure were raised. to 8 month-
ly.advance rate of 350 meters, and un output e o00 - 300 torsa of
grade-III contact ore. At present, mining neUvitlea are predominantly
beinr carried out at ore lode 7 (working area 9!:, 366-meter level.) 4
, 0
ore lode 146 working area 203, 420-meter level, abovto working area 146)
end ore loth 151 (working area 158, '06-tater icvol, at stopet 15,8 B
and 4, in search for oitohblende) , Working frea 109 on the :16&
meter level im being advanced in seertin for swal pockets of 'rdgh
quality ore.
In July 1555, ths yield of high-a-ads Ion-tact oye was as foilcws:
1_3TATE T FIAVY
t
' ARMY
,1?.},=-15,11k1R
greae-III contact ore
graos-11 cont-ct ore
graCe-T contact ore
400 boxea
nbovt 40 tona
pbout. 250 -
CLASSIFICATION
NSR8[ DISTRIBUTION
FM 1
25X1
25X1
25X1
25X1
Approved For Release 2007/12/04: CIA-RDP83-00418R003500090002-1
Approved For Release 2007/12/04: CIA-RDP83-00418R003500090002-1
?
nininry Arc,
??,%T;n1rEfr
l'us to cont uirw transfer of workers frorr. other in (Borno
chneokonotoin) and the hiring of new workers, tn4 work
the. to Zobeo mina combines increasiA to ellJtt 7CCpo:c,lonn.
'Lo'co is the ,anter of the West-8A*01Y mining area tncI,
Cambinos fi?d 362 . Combine 277 includes Hines 294, 277, 32C cAd
The du:pest level of Mine 320 is lontod at 83 rA above 3fai 1.tMFUlp
mouth of tile mine et 480 m above sea level, thus the litho ham 41
6cpth of 56:, ters (sic). rano 277 is equipped with e hoisting shafl;
serviced by 4. Yas chges. Combine 362 conaints of Mine 362 icing
c,hnft) and 364 Oline "German-anviet Friendshipl), The lattr
wnssuke EvabeAtute for drowned ccploration. shaft No) 19,
n peek ,t7f 70 victors achance per monthp a depth 250 mlit4 hag
prnt,Iy skon. ra;atheli. Taking into account e pogr,Abli devlAtiyo. of
le y,I?.tare thg followfalg positions were determined: Eeic,11,sLclo
425 metero, coordinates 18,500 and 97,150 (sic) (1)
procent raction 7o1une could not be dv;Kirmined Zobss ia
cub,(livided Into 10 working nmail predominantly yialding gradq-IV,
conze'f,; ore of all glmdeo? As regards grado-U contact or, tbu
ttionIt7t10 1::tAween Bergen end Zobes was estimated to bD
1t8 - 10,
thlo arev tho,workforce was aiao cut down althou.gh.to .
eyftent then that in tho Bergen area. Geologically, the situution 10 ?
lat'3n fevoratle than at r40bes an Be2:.gen- Some 20 or lodes ;:-An iA P
40 ? 90 dogroa annt in north-south direction? he aintoftirt
itorspeiced with pitchblende pockets. Output figures ww7o no4
tveJableo The ouput during the first half of 1955 sertia1 to
Equni that cf the Zobes operation,
Tnnnenberg3thal0 ore mining activities have besn :Lethle,ed
1Joiking exTT, And the former 354:)-men iforkforc has deoresed t,o
porvono. 1..)5oltAiwad workers ware trensferrod to Zobas, The Tonne:A-
borgo,thel mine, designnted Ko 181.,? yielded low a tnt of urandus-2
rilea The eparatim is expected to be elosod down aa az indopvild,Avt,
entox-prigo rhortly,
SERET
Approved For Release 2007/12/04: CIA-RDP83-00418R003500090002-1
25X1
25X1
25X1
25X1
Approved For Release 2007/12/04: CIA-RDP83-00418R003500090002-1
Approved For Release 2007/12/04: CIA-RDP83-00418R003500090002-1