LIGNITE REFINING AT "SCHWARZE PUMPE"

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP83-00418R003700140001-4
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
2
Document Creation Date: 
December 20, 2016
Document Release Date: 
November 13, 2007
Sequence Number: 
1
Case Number: 
Publication Date: 
January 1, 1956
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP83-00418R003700140001-4.pdf123.05 KB
Body: 
Approved For Release 2007/11/13: CIA-RDP83-00418R003700140001-4 CENTRAL INTELLIGENCE AGENCY S-F,-C.R-E-T NOFORN COUNTRY East Germany SUBJECT Lignite Refining at "ISchwarze Ponipe" DATE OF INFO. PLACE ACQUIRED DATE ACQUIRED REPORT DATE DISTR. NO. OF PAGES 2 REQUIREMENT NO. RD REFERENCES SOURCE EVALUATIONS ARE DEFINITIVE. APPRAISAL OF CONTENT IS TENTATIVE. 1. A settlement for the 16,000 workers and administrative employees of 9BSch .rze Pumpe" is to be built near the plant in proximity of HIoyersaerda. A trolley will operate between.., Hoyer saver da and the plant. 2. About 4,000,000,000 cubic meters of gas under 25 at{- and a speed. of 10 meters per second are to be piped through two welded steel pipes with a 3-meter diam- eter each. As a buffer, a storage unit (gasometer) will be placed between the gas production plant and the pressure pipeline. The problem of setting this up has not yet been solved, since this will mean the stor?a.ge of enormous quan tities of gas. Neither has the problem been: solved concerning an explosion. proof flow of gas through two preset re pipes measuring 3 cubic meters in diam~ eter. Since no gas-air mixture must develops the pipelines should receive a charge of nitrogen of which, however, great quantities would' be needed. 3. Production of the planned 2,500,000 tons of metallurgical coke per year, would require the coking of 1000 tons of high grade lignite per hots.. 4. It is planned -to fire the boilers of the 3 planned power plan-Its with the, lignite of inferior quality. 5. Preparations for the construction of lignite mines are underway. 6. The problem of 'the disposal of the waste water bearing traces of phencl remains unresolved. Cosmients East Germany cannot fill the requirements for the large quern.-- tities of steel for the completion of this project from its orn resources. Neither can East Germany produce the seamless pipe capeable Of resistirxg tem- peratures above 2500 C and pressures above 259 at,, For these products East Germany will be dependent on imports from the West NOFORN STATE I I R ARMY ][ NAVY AIR x j FBI AEC (Note: Washington distribution indicated by "X"; I IIII 25X1 I]11 25IX1 Approved For Release 2007/11/13: CIA-RDP83-00418R003700140001-4 Approved For Release 2007/11/13: CIA-RDP83-00418R003700140001-4 S-Es-C R-&-T NOFORA Comment: Atmospha.renuberdruck, S-E-C-R-E-T NOFORN Approved For Release 2007/11/13: CIA-RDP83-00418R003700140001-4