GERMANY (SOVIET ZONE) ECONOMIC DESCRIPTION OF THE SECTION OF RAILWAY LINE BETWEEN SCHOENA AND OBERVOGELGESANG (24TH MARCH 1956)

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP83-00418R004400080011-2
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
3
Document Creation Date: 
December 20, 2016
Document Release Date: 
November 19, 2007
Sequence Number: 
11
Case Number: 
Publication Date: 
March 24, 1956
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP83-00418R004400080011-2.pdf92.89 KB
Body: 
Approved For Release 2007/11/19: CIA-RDP83-00418R004400080011-2 Description/ of the Section of Rai1ww Line between SCIINA GEPMA1VY SOVIET ZO . Economic. and OBERVO L SANG. (24.t h 'vI reh95 . 1. Permanent Way, al. Rails . ) Normal~uge. 15 metAbs long. Between 13.6 km and 20.6 k'u,the rails are nailed to sleepers remainder of the section the rails are secured with screws, b~, sleepers. ~ Wooden. (~> 80 mm interval between sleepers. 2. Description of Line. af, Track, Double track. by'. Stat ions Distances are given in kms from D 0JN# y (~zecl o~/v~~~t.c i cr ; SQI N"A = 13.3 Inns B&'SC jJYfiAI7 = 22.2 K09N tS3'EIN = 27.1 0BEHVOO,LGES,AXG = 40. ~- al,Loops. There is a loop from KR E EN (20.6 Inn) to BAD SCHJ 1 /.U (22.2 Ian). Br. There is an iron bridge over a road at B W S C I - L I X D : j J 20 me- long, 8 me s _gs wide and 6 metis high. e`, Tunnels. There is a curved tunnel at 27.8 Ian about 150 mekas long. The tunnel. which has natural ventilation passes through an outcrop of the KORVIGST1IN Rock. 17. Cuttings and Embankments. The railway runs along an embarkment about 6 meia~os high throughout this section. g), Gradients and Curves. There is an up-gradient of 1:252 from OBEIVOGEI #SI.NG to ?'1E`1E1IEN. There are sharp curves between KJRORT RITI N and KOENI.GS ' ~N. 4 Junctions. None. EGRET NnFnPN Approved For Release 2007/11/19: CIA-RDP83-00418R004400080011-2 Approved For Release 2007/11/19: CIA-RDP83-00418R004400080011-2 Z it B iSC WLU control is centrali ad and is supervised by the dispatcher and traffic superintendent. The cant is at the LD'g0": signal box. The track maintenance is controlled from B&DWQ7b ";`IDAU. )l` (5~c) 3. System of Signalling, Signals are mechanically operated except at SL SCHLJ\TDAU. 1+. Control, 5. Marshalling Yards. None,, 6. Engine S?kads. None, 7. Breakdown Cranes, None. 8. Railway Workshops None, 9, Electrification. None. (,7 5 k 'y C-le 5cz A, 1-1? e Are- er-+ art 25X1 a//f7 7`~ LPC t #7 Qs?eL ~~Yf7 //7Q}~ a /17 /~?~Q f!E? Approved For Release 2007/11/19: CIA-RDP83-00418R004400080011-2 Approved For Release 2007/11/19: CIA-RDP83-00418R004400080011-2 ) z~e/0sulpe R l ir!~ccr~ .L,,n e SCH.M,1t'A -- CI-,EY'OG'4''T-,GESANG. f To OEPRVO(TLT.t-.Ms wrd 1.0.0 lan. l` BiMtSC?-tOTL U 22.2 lull ? 1 Tun-Lzel t 27.8 km Distances given Pram UL'.'CI1 f Approved For Release 2007/11/19: CIA-RDP83-00418R004400080011-2