CHINESE ROAD CONSTRUCTION NORTHERN LAOS

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP83-01074R000300010010-6
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
3
Document Creation Date: 
December 28, 2016
Document Release Date: 
May 10, 2010
Sequence Number: 
10
Case Number: 
Publication Date: 
January 1, 1971
Content Type: 
MISC
File: 
AttachmentSize
PDF icon CIA-RDP83-01074R000300010010-6.pdf364.46 KB
Body: 
Sanitized Copy Approved for Release 2010/05/10: CIA-RDP83-01074R000300010010-6 CHINESE ROAD CONSTRUCTION NATIONAL PHOTOGRAPHIC INTERPRETATION CENTER NORTHERN LAOS m Sanitized Copy Approved for Release 2010/05/10: CIA-RDP83-01074R000300010010-6 Sanitized Copy Approved for Release 2010/05/10: CIA-RDP83-01074R000300010010-6 SECRET (c) NATIONAL PHOTOGRAPHIC INTERPRETATION CENTER ATTACHMENT TO: N8144/71 PAGE 1 OF 2 COPY 1. SIGNIFICANCE: 2. BACKGROUND: THE CHINESE BEGAN CONSTRUCTING THIS ROAD SYSTEM IN LAOS IN CROSSING THE BORDER NEAR 25X1 BAN BOTENE, THE ROAD PROCEEDED SOUTHEAST TOWARD MUONG SAI. BY SPRING 1969, THE ROAD WAS SERVICEABLE THROUGH MUONG SAI TO MUONG LA. THE ROAD SYSTEM INCLUDES FIVE ROUTES: ROUTES 4, 19, 45, 46, AND 412. 3. REMARKS: CHINESE ROAD CONSTRUCTION NORTHERN LAOS ROAD CONSTRUCTION BY THE CHINESE IS CONTINUING IN THE CHINESE CONSTRUCTION FORCE IN NORTHERN LAOS IS ESTIMATED TO INCLUDE BETWEEN 4,500 AND 6,000 PERSONNEL. AN ADDITIONAL 2,200 CHINESE PERSONNEL ARE BELIEVED ASSIGNED TO ANTIAIRCRAFT DEFENSE. ENGINEERING ACTIVITY, IN ADDITION TO CONSTRUCTION OF THE ROAD AND ITS ASSOCIATED CONSTRUCTION CAMPS, INCLUDES ASSISTING IN THE CONSTRUCTION OF TWO HOSPITALS AND AN ELEMENTARY SCHOOL. These notes have been prepared for briefing purposes only and should not be used for detailed analytical work. Their use should be restricted to the particular briefing boards (s) they were prepared for and must be considered valid only for the re- porting period as indicated by the date of issue. For information concerning these notes contact Chief, Imagery Exploitation Group NPIC. GROUP I: EXCLUDED FROM AUTOMATIC DOWNGRADING AND DECLASSIFICATION SECRET Sanitized Copy Approved for Release 2010/05/10: CIA-RDP83-01074R000300010010-6 Sanitized Copy Approved for Release 2010/05/10: CIA-RDP83-01074R000300010010-6 SECRET (c) NATIONAL PHOTOGRAPHIC INTERPRETATION CENTER ATTACHMENT TO: N8144/71 PAGE 2 OF 2 4. MISSION READOUT: SINCE SPRING 1969, ROUTE 46 HAS BEEN CONSTRUCTED SOUTH- SOUTHWEST FROM MUONG SAI TO MUONG HOUN. NORTH-NORTHEAST FROM MUONG LA, THE ROAD DESIGNATED ROUTE 45, FOLLOWS THE NORTH BANK OF THE NAM PHAK (RIVER) PAST THE SITE OF SOP KAI, WHERE IT BECOMES ROUTE 19, TO THE PRESENT CONSTRUCTION TERMINUS NEAR THE CONFLUENCE OF THE NAM PHAK AND NAM OU. THE CONFLUENCE ITSELF MARKS THE WESTERN LIMIT OF MOTORABLE ROUTE 19 WHICH EXTENDS SOUTHWEST FROM DIEN BIEN PHU IN NORTH VIETNAM. THE TWO PORTIONS OF ROUTE 19 WERE NOT YET CONNECTED. NUMEROUS CONSTRUCTION CAMPS AND ANTIAIRCRAFT EMPLACEMENTS WERE LOCATED ALONG THE ROADS. A SEGMENT OF ROUTE 45 WITH ITS MANY CONSTRUCTION CAMPS IS SHOWN IN INSET. IN THE PAST, MANY OF THE CAMPS HAVE BEEN DISMANTLED WHEN CONSTRUCTION WAS COMPLETE. MAP REFERENCE: PC 1:500,000 PC J-10B, PC J-10C, TPC J-11A, TPC J-11C These notes have been prepared for briefing purposes only and should not be used for detailed analytical work. Their use should be restricted to the particular briefing boards (s) they were prepared for and must be considered valid only for the re- porting period as indicated by the date of issue. For information concerning these notes contact Chief, Imagery Exploitation Group NPIC. SECRET 25X1 Sanitized Copy Approved for Release 2010/05/10: CIA-RDP83-01074R000300010010-6