POL PIPELINE NORTH VIETNAM/LAOS

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP83-01074R000300570001-5
Release Decision: 
RIPPUB
Original Classification: 
C
Document Page Count: 
4
Document Creation Date: 
December 28, 2016
Document Release Date: 
September 14, 2011
Sequence Number: 
1
Case Number: 
Publication Date: 
June 16, 1969
Content Type: 
PHOTO
File: 
AttachmentSize
PDF icon CIA-RDP83-01074R000300570001-5.pdf420.29 KB
Body: 
Sanitized Copy Approved for Release 2011/09/14 :CIA-RDP83-010748000300570001-5 Sanitized Copy Approved for Release 2011/09/14 :CIA-RDP83-010748000300570001-5 t NORTH VIETNAM/LAOS Sanitized Copy Approved for Release 2011/09/14 :CIA-RDP83-010748000300570001-5 CONFIDENTIAL (c) NATIONAL PHOTOGRAPHIC INTERPRETATION CENTER ATTACHMENT TO M-6886 25X1 16 JUNE lg6g PAGE 1 OF 3 POL PIPELINE NORTH VIETNAM~LAOS 1. SIGNIFICANCE: THIS BRIEFING BOARD DEPICTS RECENT DEVELOPMENTS IN THE OPERATIONAL PETROLEUM PIPELINE IN NORTH VIETNAM AND LAOS. 2. LOCATION: 3. BACKGROUND: APPROXIMATELY 161 NM OF 4 INCH (10 CM.) PETROLEUM PIPELINE IS NOW IN USE IN THE PANHANDLE AREA OF NORTH VIETNAM AND LAOS. IlVTERMITTENT SECTIONS OF THIS PIPELINE HAS BEEN OBSERVED UNDER CONSTRUCTION SIlVCE JULY 1868. THE MEASURED DISTANCE INCLUDES PHCII'0 CONFIRMED MAINLINE AND SERVICE L1NES AND APPROXIMATELY 17 NM OF NON-PHOTO CONFIRMED BUT NECESSARY OPERATIONAL GAPS (MEASURED IN STRAIGHT LIlVE DISTANCES). EIGHT MAJOR OPERATIONAL STORAGE AREAS SERVED BY THE PIPELINE HAVE BEEN CONFIRMED, THESE HAVE A TOTAL ESTIMATED CAPACITY OF 10,000 MT. IT IS POSSIBLE THAT ONLY THAT PORTION OF THE SYSTEM BETWEEN THE WATER AND RAIL IlVPUT POINTS AT VIN'H AND THE PRESENT TERMINUS IN LAOS IS NOW IlV USE . These notes have been prepared for briefirg purposes only and should not be used for detailed analytical work. Their use should be restricted to the particular briefing boards (s) they were prepared for and must be considered valid only for the re- portirg period as indicated by the date of issue. For information concerning these notes contact Chief, Imagery Exploitation Group NPIC. GROUP I EXCLUDED FROM AUTOMATIC DOWNGRADING AND DECLASSIFICATION CONFIDENTIAL r ; --; - Sanitized Copy Approved for Release 2011/09/14 :CIA-RDP83-010748000300570001-5 Sanitized Copy Approved for Release 2011/09/14 :CIA-RDP83-010748000300570001-5 CONFIDENTIAL (c) NATIONAL PHOTOGRAPHIC INTERPRETATION CENTER REFERENCE: ATTACHMENT TO M-6886 25X1 16 JUNE 1969 PAGE 2 OF 3 4. MISSION READOUT: RECENT DEVELOPMENTS IN THE PIPE SYSTEM INCLUDE THE CONSTRUCTION OF ASSOCIATED PRESSURE PUMPS AND IlVTERDICTIONS IN THE LAOTIAN PORTION OF THE LINE. THE SECOND EAST-WEST PIPE LINE WAS OBSERVED, FOR THE FIRST TIME ON PHOTOGRAPHY RUNNING WEST FROM THE VIIVH PETROLEUM PRODUCTS STORAGE FACILI'T'Y TO A POINT WHERE IT JOIlVS THE NORTH-SOUTH LINE TWO NM NORTH OF THE SONG CA RIVER CROSSING. THIS LIlVE HAS BEEN CONSTRUCTED AND GENERALLY PARALLELS THE FIRST EAST-WEST LINE. ANEW UNDERGROUND PETROLEUM STORAGE AREA IS ALSO UNDER CONSTRUCTION ON THE NEW LINE IN THE VINH AREA. THE STORAGE AREA WILL BE SERVED BY THE PIPELINE. THE AREA IS ALSO SERVED BY A RAIL SPUR OFF THE MAIN RAILLII~TE NEAR THE VINH RAILYARD. RAIL TANK CARS HAVE BEEN OBSERVED ON THIS SPUR FROM WHICH DIRECT POL TRANSFER INTO THE PIPELINE AND INTO THE STORAGE AREA CAN BE ACCOMPLISHED. SINCE EARLY FEBRUARY 1969 A SERIES OF PUMPING STATIONS HAS BEEN OBSERVED IN THE OPEN LEVEL AREAS NORTH OF BAI DUC THUN AND HARDER TO IDENTIFY IN THE HEAVILY VEGETATED AND UNEVEN TERRAIIVT TO THE SOUTH. FOURTEEN STATIONS AND F PTE PROBABLE STATIONS ARE PRESENTLY CONFIRMED BY NPIC. A TOTAL OF THIRTY- TWO STATIONS HAVE BEEN REPORTED. TYPICALLY, THESE PUMPING STATIONS CONSIST OF ONE PUMP SITUATED IN A SMALL RE VETTED HUT ADJACENT TO THE PIPE LINE. THE PUMPS ARE CONNECTED TO THE MAINLINE BY DUAL (EFFLUENT AND AFFLUENT) LINES. IN ADDITIOiJ These notes have been prepared for briefing purposes only and should not be used for detailed analytical work. Their use should be restricted to the particular briefing boards (s) they were prepared for and must be considered valid only for the re- porting period as indicated by the date of issue. For information concerning these notes contact Chief, Imagery Exploitation Group NPIC. CONFIDENTIAL Sanitized Copy Approved for Release 2011/09/14 :CIA-RDP83-010748000300570001-5 Sanitized Copy Approved for Release 2011/09/14 :CIA-RDP83-010748000300570001-5 CONFIDENTIAL (c) NATIONAL PHOTOGRAPHIC INTERPRETATION CENTER ATTACHMEN'T' TO M-6886 16 JUNE 1869 PAGE30F3 TO PRESSURE PUMPS SEVERAL TRANSFER PUMP STATIONS HAVE BEEN LOCATED. THESE ARE USED TO FILL POL TANK TRUCKS, OTHER VEHICLE TANKS, OR POL DRUMS. SEVERAL IlVTERDICTIONS IlV THE LAOTIAN PORTION OF THE LTNE HAVE BEEN OBSERVED. THE NATURE OF THE LINE PROBABLY FACILITATES EASY REPAIR OF LINE PETROLEUM AT THE POIlVTS OF BREAK. THIS AREA IS LOCATED APPROXIMATELY 2 NM These notes have been prepared for briefing purposes only and should not be used for detailed analytical work. Their use should be restricted to the particular briefing boards (s) they were prepared for and must be considered valid only for the re? porting period as indicated by the date of issue. For information concerning these notes contact Chief, Imagery Exploitation Group NPIC. CONFIDENTIAL 25X1 Sanitized Copy Approved for Release 2011/09/14 :CIA-RDP83-010748000300570001-5