RELEASE 1 COST AND SCHEDULE CONSIDERATIONS

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP83T00573R000500040009-7
Release Decision: 
RIPPUB
Original Classification: 
K
Document Page Count: 
23
Document Creation Date: 
December 9, 2016
Document Release Date: 
August 15, 2001
Sequence Number: 
9
Case Number: 
Publication Date: 
August 19, 1974
Content Type: 
MF
File: 
AttachmentSize
PDF icon CIA-RDP83T00573R000500040009-7.pdf644.98 KB
Body: 
Approved For- Release,-2001/09/04: CIA-RDP83T00573R000500040009-~ L'` ~... 1/ STATINTL STATINTL STATINTL STATINTL 19 August 1974 MEMORANDUM FOR: All Participants in 29th ORACLE Management Meeting SUBJECT Release 1 Cost and Schedule Considerations 1. During the 29 August meeting, scheduled for 1000 in 2E23, with I feel that OJCS should have an Office position on ow to implement the Release 1 ORACLE System. Included in this memorandum are items that I feel should be considered. 2. VM Implementation Schedule - Very little work on the VM design has been accomplished during the past four or five months. Most all effort has gone into the batch interface. During my last visit to - they felt that the earliest they could start VM implementation was March 75 with current manpower. I told them this was unsatisfactory. who did all of the design, is employed by and is out in nail the Initial System is shipped. He is doing the main imp ementation of the batch interface now and wants to wait until that is complete before they start on VM. My position is that can not add new people at this time who will be able to get the VM interface accomplished much faster, and there is no real requirement for the VM interface in April. If we have to decide, I think we should allow - to start when they want and with whom they want and insure us of the schedule impact. If we force them to speed up the VM interface now, it will just slip the batch interface - there is a limited amount of work that can be accomplished by a limited number of people. 3. Personnel - - is currently three under what they think they should be and possibly four or five under what they really should be. They are interviewing many people, but are much like SED in that they are not finding the exact types they want. The people they have are excellent. SED currently has working almost full time on the project. Most of the OS/MVT interface is delivered. The rest, mods to OPEN and CLOSE, will be delivered in September. It appears that ASP 3.1 is going to slip enough so that we won't want to test it in November. STATI NTH i Approved For Release 2001/09/04: CIA-RDP83T00573R000500040009-7 Approved Fo4&elease 2001/09/04: CIA-RDP83T005W000500040009-7 This will mean that work will continue lonqer than expected, but probably not at the same intensity. and the VM interface will depend on the - schedules. If - does not start.the interface until March, it is probably unwise to have Eric continue his portion of the VM interface until starts up again. 4. Hardware Schedules - - may feel that they can not get the hardware finished in time to ship in December. The tape dubbing feature, (required for dispersal and tape to tape copy) can not be tested until two data channels are com lete and this is in September sometime. I have informed that any further delays in the shipment schedule must result in a program slip, i.e., if shipment slips into late January, the program slips into May. I feel that the real schedule problem is and always will be software, but may not want to admit this. STATINTL STATINTL STATINTL STATINTL STATINTL STATINTL 5. Software Problems -- will claim that the current STATINTL software in Release 1 is much larger than any of us ever STATINTL realized. I think that it is not. - might not have realized the size, but I think some of us did. The current-design does not have anything that the proposal or RFP did not call for. The security profile system is somewhat more work than the original proposal, but security was the number one item in the RFP. The original proposal called for the directory to be much like the OS catalog, and we requested a change to a directory using a hashing technique. I do not believe that the amount of work to implement either one is much different, but I am sure that feels there is more work involved. STATINTL I feel that we are developing a very large system and as such there is a lot of work that has to be accomplished. Most of what we are doing is essential to install an operational system, and is not very exotic. 6. Summary - OJCS needs to decide on the impact of a one to two month slip in the program due to VM, or hardware slips at the end. OJCS needs to make trade-offs involving personnel in SED between now and July 75. OJCS needs to con- vince itself that is where they say they are and that they can get to where they sa the are going. The 29 August meeting is the time to do that. responds much better to manage- ment than they do to members of the MSSB. If proposes Approved For Release 2001/09/04: CIA-RDP83T00573R000500040009-7 STATINTL STATINTL Approved Fo%Release 2001/09/04: CIA-RDP83T0057&000500040009-7 any cost or schedule changes, OJCS management must satisfy themselves that the changes are valid and what to do if they are not. Any suggestions for the meeting format or content should be sent or phoned to me as soon as possible. STATINTL Mass Storage System Branch Copy to: DD/OJCS C/PS/OJCS C/SED/OJCS DC/SED/OJCS EO/SED/OJCS C SP&MS SED/OJCS /USD STATINTL C OD/OJCS M D/OJCS /SED/OJCS STATINTL ED/OJCS ORACLE Notebook Approved For Release 2001/09/04: CIA-RDP83T00573R000500040009-7 TATINTL L Approved For Release 2001/09/04: CIA-RDP83T00573R000500040009-7 Next 1 Page(s) In Document Exempt Approved For Release 2001/09/04: CIA-RDP83T00573R000500040009-7 's''? Document is for use under Government Cans t only. Approved Fgelease 2001/4rfl~-RDP83T00000500040009-7 at TMS 2 NINTH TECHNICAL PROGRESS REPORT August 15, 1974 Approved For Release 2001/09/04: CIA-RDP83T00573R000500040009-7 Th' Document Is for use under Government Contr- '. only, Approved FQRelease 2001/09/04: CIA-RDP83T005 8000500040009-7 STATI NTL TMS 2 TECHNICAL PROGRESS REPORT FOR Director, OJCS Central Intelligence Agency Washington, D.C. 20505 August 15, 1974 Prepared by: .Approved by: Approved For Release 2001/09/04: CIA-RDP83T00573R000500040009-7 STATINTI Approved 8fffsb lld8~Y6/BV?r6X- P93CM65L-ON500040009-7 I. INTRODUCTION/SUMMARY This is the TMS 2 Monthly Technical Progress Report for July 1974. Four (4) customer review meetings were held at in July, as follows: 1) Completion of Annual Review carryover from June 29 through July 5, 1974. Major events and action items of the review are discussed further in Section II below"and Attachment 1 respectively. 2) Deputy Chief OJCS for a TMS 2 Project Review, July 10, 1974. 3) Installation/Facilities Conference TMS 2, Room 1D1605, Air Compressor and Vacuum Blower System, July 25, 1974. System Specification, Pre-Shipment Acceptance Test Document and Open Contract Changes Review, July 30 through August 6, 1974. The installation of the prototype TMS System at STATINTL Corporate Computer Center has been rescheduled from the week of August 5th to the week of August 26th, based on: 1) Best current information on completion of facilities preparation in , and 2) Hardware and software integration of the first half of the TMS 2 Initial System at STATINTL II. SOFTWARE The annual review was held June 29th through July 3rd at STATINTL the facility. The status of the software development was presen e anc the Release 1 software requirements were discussed with the Agency representatives. It was agreed among all parties that a TMS 2 System Specification in addition to a Release 1 Software Specification was needed. The content of the System Specification was agreed upon during the meeting and work was started on a draft of the System Specification during July for review with Agency repre- sentatives during the last week in July. Since the annual review, JOBEXEC, DMS, and SCPOS have been integrated and are ready for the August 5th integration with SCP2. SCP2 (DFT) and EDCP have encountered some problems and are behind schedule for the August 5th integration. 1 Approved For Release 2001/09/04: CIA-RDP83T00573R000500040009-7 ~T TINfiL T` Document is for use under Government Cool ' only. Approved FQr?Release 2001/09/04: CIA-RDP83T00R000500040009-7 TDIO, TDIF, DFT, JOBEXEC, DMS, SCPOS Coding Conventions, SAVREQ, RESREQ, ENQ/DEQ, EDV, Core Management, WDP, WTD/WTDR, SCPOS Error Processing and.Dumps, I/O and EDIF Handlers, and IPL design have been documented and edited and are in for typing. JOBEXEC, DMS, and SCPOS Error Processing and Dumps documentation will be distributed next month. III. HARDWARE Hardware completion and Initial System is as follows: STATINTL development progress for the 1) First Half Stand-alone and integrated checkout of the Dual Transport Module, Transport Driver and Data Channel are complete except for the Data Interface Buffer of the Data Channel which is scheduled for early August completion. Subassembly shortages are down to about 10 items which are not expected to impact checkout activities. Second Half TMS Department checkout of Dual Transport Module #2 and Transport Driver #2 are approximately 50% and 60% complete respectively. Final assembly of Data Channel #2 is in process in Manufacturing. The equipment was delayed due to a shortage of several PC cards and:in process manufacturing rework to correct errors discovered by TMS Dept. in checkout of Data Channel #l. Completion and delivery of the Data Channel,#2? TMS is scheduled for mid-August 1974 with no impact on final delivery schedule. 1) First Half a) EDCP - DEC equipment, less the DA11B interface units and the TCIF has been checked out complete with'-an interim configuration CHSIM. Completion of the deliverable TCIF has been delayed for numerous backplane wiring errors which are cur- rently being debugged. This is the pacing item in completion of the first half of the Initial System which is targeted for completion prior to the prototype equipment move to 2 Approved For Release 2001/09/04: CIA-RDP83T00573R000500040009-7 Approved FarwRelease 2001/09/04: CIA-RDP83T005 0 500040009-7 SCP - DEC equipment, less the DA11B interface units, prototype TDIF (less display panel) and interim configuration channel simulator are checked out complete. The TDIF LED manual control panel design has been completed and will be backfitted in completed units. STATINTL 2) Second Half a) EDCP - TCIF wire wrap cards in rework scheduled for completion and testing in September. A final configuration CHSIM for this unit is scheduled for delivery to during the week of August 26th. SCP - TDIF cards are built and checked out and fitting with display panel is under way. CHSIM for this equipment is scheduled for early September. STATINTL STATINTL IV. MANUFACTURING Second Increment Hardware and Initial System Spares Purchase Orders have been placed for approximately 90% of the required hardware. Balance of orders are in process. Of the four (4) long lead items previously discussed as returned for engineering review, one (1) has been redesigned and released for procurement. The remaining three (3) items are in process of redesign to specify an item with better delivery. V. SCHEDULES Based on the discussion in Item III above, it is apparent that progress on the first half of the Initial System is well along and should be functionally complete by mid-August. This will enable hardware and software development to continue in when the Prototype System is installed in the -STATINTL during the week of August 26th. Approved For Release 2001/09/0: CIA-RDP83T00573R000500040009-7 Approved FTo MN?L6tl0dgf/d9fffgeCk 31CO0&Z3RW0500040009-7 VI. PROBLEMS Based on preliminary information, it appears that the dual density 3330 disk units to be used by the Agency could have a TMS 2 program impact. The technique for achieving dual density implemented by Control Data appears to be based on two logical disks per physical disk. The technique for achieving dual density in the Control Data disks is not compatible with origina`ITATINTL understandings and cannot be supported without additions develop- ment. VII. ACTION ITEMS Action items change sheets are attached. Approved For Relea$.e 2001/09/044: CIA-RDP83T00573R000500040009-7 .Approved FowRelease 2001/09/04: CIA-RDP83TO05WR000500040009-7 ACTION ITEMS INDEX ITEM TITLE DATE CLOSED Host Messages Format and List 2/25/74 Design Considerations Affecting 4/8 74 Action Item Notebook 5/1/74 Dummy Data. Set Names 7/4/74 Recovery Problem List. 5/1/74 Review of",Des i gn Problems and Requirements 5/16/74 List of MIS Requirements 7/4/74 Software Documentation Plan 5/16/74 Time Plan for Major Software Specifications and 5/16/74 10 Requirements Save/No-Save with Respect to Scratching P-Spaces 8/7/74 11 Work Management Error Transmission to Virtual 8/7/74 12 Machines Hot-file Backup 5/16/74 13. SCP Crash Message Traffic and CP Poll for Backup 3/5/74 14 Startup Parameter and Default Guidelines 7/4/74 15 I/O Operation Timeout 3/5/74 16 Addressability Plan for Application Program Larger 5/16/74 17 than 32K System Overload Plan 7/4/74 18 Action Item List 5/16/74 19 Read-Share and Write-Share Allocation 8/7/74 20 Read-Share vs Write-Share Definition. 8/7/74 21. Timing for Dependent Jobs Generating New Data Sets 5/16/74 22 Restriction on Absolute Referencing of Generations 5/16/74 24 within New Generation Data Groups Data Set Availability after Job Bind but before Job Start ORACLE Allocation Control of New Large Files 7/4/74 25 Rename Large Files and Small Files 26 UNIT=ORACLE, DISP=(NEW,DELETE,DELETE) 6/6/74 27 JOBEXEC Input Validation Prior to Setup Message 3/5/74 28 New Data Set Job Abort 7/4/74 29 Utility Program Definitions 5/16/74 30 Job Startup Message for OS/ASP Executions 3/5/74 31 DMS 5/16/74 32 RBA Function. 5/16/74 33 Data Set, File, Subfile Organization 5/16/74 34 Government Requirements for DMS 5/16/74 35 ASCEND and DESCEND Break-in to Support Performance 7/4/74 36 Expiration Dates on Data Sets 7/4/74 37 Government Requirements for File Management Utilities 5/16/74 38 EDCP IPL 3/5/74 39 EDCP Dump 5/16/74 40 Objectives for DMS, MIS, Recovery, Security, File 41 Management Security-Related Default Non-Sensitive Group 5/17/74 42 Changing of Security Pro-files 5/17/74 43 ASP Operator 44 Archiving Facility in Release 1 7/4/74 45 Recovery from Broken Tape Approved For Release 2001/09/04: CIA-RDP83T00573R000500040009-7 Approved FowRe ITEM TITLE 46 Storing DSDB on TBMTAPE 47 Erase Errors - LOGTAPE 48 LOGTAPE Dispersal 49 Utility for Renaming Datasets 50 CP Backup Procedure are P-Space 51 Read-only Option for Security Profile Parameters 52 Graceful Failure 53 Hardware for Backup 54 Backup - Disk Allocation Tables 55 Verifying "MFD Validity 56 I/O on Private Packs 57 CHECKSUM on TTY Communication Link 58 VM Schedules 59 MIS Contents 60 Performance Monitoring 61 Data Set Activity Requirements 62 Hashing Algorithms 63 GDG Support 64 Expanded Hardware complex 65 Tally 66 GDG's 67 LOGTAPE Performance Approved For Release 2001/09/04: CIA-RDP83T00573R000500040009-7 DATE CLCGED 7/3/74 5/17/74 7/3/74 5/17/74 ACTION ITEM TITI,r : VM Schedules In it i a t ppy5"ed FoowRelea Z( 01 /()&zfM~R[ WITQ00500040009-7 Date Initiated: 6/29-7/3/74 NO, 58 Brief Description: Government requires VM Schedules. Responsibility: -- by Sept. 1, 1974 Action Taken: Date By Description of: Resolution: Approved For Release 2001/09/04: CIA-RDP83T00573R000500040009-7 ACTION ITEM TITLE? MIS Contents In i.t i at e p rpyed FawRelea g LggjjgWQ4 zC-IAfLRPQ$ Tq Q$Qflj040009-7 Date Initiated: 6/29-7/3/'-74 STATINTL NO. 59 Brief Description: and Government should agree on MIS contents by July 19th. STATINTL Responsibility: and Govt. - 19 July 74 Action Taken: Date By Description of: Resolution: Approved For kelease 2001/09/04: CIA-RDP83T00573R000500040009-7 ACTION ITEM TITLF Performance Monitoring Approved Fdielease 2001//09104: CIA-RDP83T00 8000500040009-7 initiated by: Govt a ear Review Date Initiated: 6/29-7/3/74 NO, 60 Brief Description: Can a. Delta Data Terminal be used as an output only display for performance monitoring? "STATI NTL Responsibility: - - Sept 1, 1974 Action Taken: Date By Description of: Resolution: Approved For Release 2001/09/04: CIA-RDP83T00573R000500040009-7 ACTION ITEM TITLE: Data Set Activity Requirements I n i t at rip gved F ReI qQ0~1~09 rGkA-R@P8 TtO BO00500040009-7 Date Initiated: 6/29-7/3/74 NO. 61 Brief Description: Supply list of Data Set Activity STATINTL requirements t (Govt) by 31 August 1974. " STATINTL Responsibility: - by 31 Aug 74 Action Taken: Date By Description of: Resolution: Approved For Release 2001'/09/04 : CIA-RDP83T00573R000500040009-7 ACTION ITEM TITL Hashing Algorithms Approved re&Release 2001/09/04: CIA-RDP83T00 R000500040009-7 Initiated by: Govt at Yearly Review Mtg Date Initiated: 6/29-7/3/74 NO. 62 Brief Description: Furnish hashing algorithms'to D. STATINTL ovt), by 31 Aug 74. He will evaluate and report distribution. STATINTL Responsibility: - by 31 Aug 74 Action Taken: Date By Description of: Resolution: Approved For Release 2001/09/04: CIA-RDP83T00573R000500040009-7 ACTION ITEM TITL" GDG Support Approved FbwRelease 2001/09/04: CIA-RDP83T00R000500040009-7 Initiated by: Govt at Yearly Review MGg Date Initiated: 6/29--7/3/74 NO. 63 Brief Description: Define Generation Data Group Support Limitations. STATINTL Responsibility: - - As soon as possible Action Taken: Date By Description of: Resolution: Approved For Release 2001/09/04: CIA-RDP83T00573R000500040009-7 ACTION I'.T17.M TITLr Expanded Hardware Comp' x Approved FawRelease 2001/09/04: #IA-DP83T0~R000500040009-7 Initiated by, Govt at Tear y tcview Date initiated: 6/29-7/3/74 NO. 64 Brief Description: More input lines to System. Govt wants larger hardware complex and would like to know the cost of supporting it on TMS 2 . STATINTL Responsibility: - by 1 Sept 74 Action Taken: Date By Description of: Resolution: Approved For Release 2001/09/04: CIA-RDP83T00573R000500040009-7 ACTION IT-,M TITLT' Tally Approved F elease 2001/09/94: C~A-F P83T00. 5000500040009-7 Initiated hy: Govt at 'Yearly evi.ew Date Initiated: 6/29-7/3/74 NO. 65 Brief Description: Whither Tally? -- - What are contents? - Under tape dubbing STATINTL Responsibility: - by 1 Sept 74 Action Taken: Date By Description of: Resolution: Approved For Release 2001/09/04: CIA-RDP83T00573R000500040009-7 ACTION ITEM TITLE: GDG's M09/04-. I ri it i at eOpgr9Yed Fer+Relea ?001409/04: CIA ffl 3TOR' OR 40009-7 ees a ear y e z Date Initiated: 6/29-7/3/74 NO. 6 Brief Description: Must be able to create GDG's from STATINTL Responsibility: - As soon as possible Action Taken: Date By Description of: Resolution: Approved For Release 2001/09/04: CIA-RDP83T00573R000500040009-7 ACTION ITEM TITLT' LOGTAPE Performance Alp ryved Fo ele s 00109/04 : I~ZRDP> 3T0 ~9OAq 40009-7 initiate' T ees a ear y e i . Date Initiated: 5/29-7/3,/74 NO. 57 Brief Description: tions of LOGTAPE? Responsibility: What are the performance considera STATI NTL - - by 1 Sept 74 Action Taken: Date By Description of: Resolution: Approved For Release 2001/09/04: CIA-RDP83T00573R000500040009-7 STATINTL Approved For Release 2001/09/04: CIA-RDP83T00573R000500040009-7 Approved For Release 2001/09/04: CIA-RDP83T00573R000500040009-7