ODP REPORT FOR WEEK ENDING 11 NOVEMBER 1977
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP83T00573R000600130009-6
Release Decision:
RIPPUB
Original Classification:
K
Document Page Count:
2
Document Creation Date:
December 9, 2016
Document Release Date:
August 6, 2001
Sequence Number:
9
Case Number:
Publication Date:
November 11, 1977
Content Type:
MF
File:
Attachment | Size |
---|---|
![]() | 184.69 KB |
Body:
Approved For Reiee iWA9AUlVQIA-A"J9Rf 0130009-6
0DF 4060-77
11 =ovember 1977
? MORANDU i FORS. Acting Deputy Director for Administration
M Acting D, rector o . Data Processing
01W Report for ??cek Ending 11 toverber 1977
F,1-78 Unfunded !-'nsAi-Steea!A
Our r; ucst for additional funds in the amount of
$167,700 to meet CJ.M upgrade requirements has been approved
by the Comptroller. The additional funds will bS included in ..,.,.,
e
en
dj s
en
a
llo
~.+si~a
ua
?~ i.?.ra. 4..a
M 6{
%-Ll
iWi...i.4.Ais 4
Completed Coordinationin NP IC RFP
01W has concurred in an NPIC ree uest for proposal for a
Mensuration Minicomputer System. STATINTL
Support to Office of Finance
S -- General accounting system. ox, met with office of
Finance personnel to finalize the raquir-~:ments and procedur~ s
to recover the GAS in case of a disaster in the I DP tape li arary.
The basic agreement was as follows, with the details to be
worked out between ODP's Prod-action :.ivision and Tape T.ibrary=
a) we would utilize a conbination of on-site (Headquarters)
STATI TL and off-site - storage facilities; .)) if something hap ; nt,-
in the "'ape Library, we would recover by running no more than
five daily updates - no rekeying required; and c) if something
happened in both storage sites, we could recover by running
no more th 20 daily updates - a maximum of 5 days rekeying
STATI TL required.
RS - Financial Resource Oyster. ODP' s support of the
Agency's FY--79 Congressional Budget :k~ rci o beg an with tine
production of worksheets for each Directorate on 7 Hover=ber,
a: Planned. ^nline FRS updates by Agency budget officers began
this week and will continue through
budget summary reports are scheduled for production the- last
week in November, final budget spread sheet reports for tihzo
office of the =Yc,,rsptrol.ler are scheduled for the first week in
STATI TL Dece d,er .
Approved For Release 2MI1/ff 14 oC~A I ePrnar 3~RQ~p~g16.00130009-6
Aft
)ort to Office of 'training
Approved For Re LaammeR15109 3 : CI NV
T
30000600130009-6
FRVMAIN - A system for preventive maintenance
for QTR. The IBM 2741 hard copy terminal has been
e scheduled for 11 November-to correct the problems STATINTL
Problems have been encountered in attempts to use
the Delta :rata and IB4 terminals. meeting with the customer
SAFE
A draft of the Memorandum of Understanding for the Joint
Management of a consolidated CIN/DIA SAFE Project has been
distributed to appropriate officials of both agencies for
review and co xents. This memorandum, along with a Project
Management Plan, must be ready and L/VIA's
natures by 1 December 1977. STATINTL
personnel With re T-5 MR-It 771,jauncy`3
Coordination of information is continuing between ODP'- ATINTL
have 12--iC years experience) and are looking to hire six more.
They are proceeding with the design and expect to have the
ied the Agency that they have hired six a of whiczl
xt contractual action. In the meantime, has noti--
critical design review in march 1978.
A meeting was held with representatives from the Jffices
of Logistics and Communications and the facility toSTATINTL
discuss the possibility of including the requ rements for the
The CAMS production system was unavailable to users for
approximately 18 hours on 9 A tovember due to problems with the
integrity of the data base. The program which is used to copy
the data from disk to tape each day was creating erroneous STATINTL
records. This prevented .es from being able to backup each
day's transactions. A correction has been made in this program
and will be installed on the CANS system immediately.
CAMS computer center in their requirements for Block--II cxpan--
sion. since our initial space and resource requirements were
predicated on obtaining Headquarters space, it was agreed
that we rev requirements to address a non -? lleadquarte9TATINTL
location. A ff
Die tribution -
Orig + -2 - adse
I ea riv/Staff/ODP
Approve For
?6610104 : CIA-RDP83T00573R000600130009-6
O/D/ODP
e/11--11-77Aamitrativ - Innai lien ni