ODP REPORT FOR WEEK ENDING 28 OCTOBER 1977

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP83T00573R000600130011-3
Release Decision: 
RIPPUB
Original Classification: 
C
Document Page Count: 
3
Document Creation Date: 
December 9, 2016
Document Release Date: 
August 6, 2001
Sequence Number: 
11
Case Number: 
Publication Date: 
October 28, 1977
Content Type: 
MF
File: 
AttachmentSize
PDF icon CIA-RDP83T00573R000600130011-3.pdf237.81 KB
Body: 
Approved For Release?2OOtmffm i&3T00573R00060000130011-3 OUP 3050-77 23 October 1977 gave a final briefing on their study o _ ata processing requirements and alternatives to satisfy require nnnts . The key results are that MIT. (a ,roe ra r1E 4ORANDU M FOR: Acting Deputy A rector for Administration FROM . Clifford D. nay, Jr. Director of rata Processing SUBJECT ODP Report for leek 7 nding 28 October 1977 (i1) Offers l Received on Replacement of IM 360/195 Computer (U) (AIUO) Best and final offers on the replacement for the IB'.i 360/195 computer were received from three vendors. %a iagc merit Staff and engineering =ivision are performing the pre- liminary cost evaluation. Final cost evaluation will be done by tine Office of Logistics. 25X1A merit; for our z ajor projects, 25X1A FAG Prof ect `-view -'.'eeting rescheduled (U) (AItlo) The initial 'EAG meeting on ABP Project Review has been postponed until 6 December. This postponement was re- quired because one Office submission had not been received and the capacities for ODP major corn.-,uter services have not been cleterminad. This meeting will be an overview of the total requirements surfaced by the projected FY-78 require- c I~t'' CIA Buildings Studer (AIUO) (AIUO) as part of the CI.A/riZA Building Study for the DCI, is scheduled to meet with DIAL regarding their ?3P structure to evaluate the consequence of combining CIA/ )IA ADP in the Headquarters compound. Stud Completed on OER Requirements (U) n F I rig language) is the correct language for GLR to use , analysts are undertrained in the use of PL, and improved machine resources for APL are needed. T ,e recommendations were for training O^T? analysts and providing incr~ aase d a )DP resources to produce= acceptable APL service to OER. Approved For Release 2 8 MURMFf 25X1A 25X1A CONFIDENTIAL an official O P Is complying with the request. 25X1A Approved For Releasw2001/09/04: CIA-RDP83T00573R0006UO130011-3 OS /SDP Working Group (U) (AIUO) The Working Group met on 26 October. items discussed were destruction of surplus disk platters, and forming of an auditing and access control sub-group to define security requirements policy and audit procedures. Also discussed were the risk analysis study that OS is undertaking on the 25X1A Ruffing and Special Centers, guidelines for computer output distribution point security, and on-going efforts in implement,- ing software pac'.agd?,s to enhance system security. Requests for 13riefinc Four of Computer Center (U) 25X1A (C) ODP has been requested by DDO to arrange a briefing and tour of the Rtuffinq Computer Center on 1 ~Yoyez er for `%ior Su rt to office of Personnel (U) (U) PERSIGN- "DINT - Integrated Personnel Information system. We are ready to produce the 5x8 cards for the pay raise riotics to employees next week. The salary table for the wage schedule pay raise was rec.ived 25 October 1977. Coding of the salary tables is underway. 25X1A Heavy Budget Processing Fxpected (U) (AIUO) Inputting of data for the FY-79 Congressional Ludget 25X1A is scheduled during the period 7 4ovember through 19 December. W expect this high volume of activity on the GIM Production System to cause some degradation of system response. .A Minicomputer Bardwa Problems (U) (AIUO) The :CSC PDP minicomputers that collect cable ssage traffic for Machine Assisted Dissemination (MAD) have experi- enced several tape drive problems in the last week. T?1145 required massages to be retransmitted from office of o imu..ica- tions. The cause of the problems is :eing investigated and remedial action started at once. The maintenance vendor has been told to improve his service because it has degraded over the last two months following a change in vendor personnel. Replacing some of the equipment is being studied to see if it would result in improved reliability. Approved For Release 2001/09 NIjOO573ROOO6OOl3OOl 1-3 Approved For Release,2001/0g/PIFc 00573R000600130011-3 E (U) (U) The Agency's SAFE Design Competition Phase Co tractors' orientation !riefings were completed on 28 October. ',::hey concluded with separate sessions with each of the contractors The briefings were praised by the contractors` project leaders for answering many questions and providing a better understanding of the SAFE environment. (U) CIA and 3IA SAFE Project 'lanagement Officers presented a review of the consolidated SAFE Project to 0MB examiners and IC Staff representatives on 28 October 1977. ADSTAR (U) (U) we are preparing planning data for the Office of :gistics which will make it possible to calculate power, cooling, and space requirements for the Stand-Alone Input Processing, Retrieval, and Conversion Sub Systems of ADSTAR. 25X1A RAPID (U) (AIUO) At the 21 October 1977 Steering Committee eeting, the Project office recommended termination of the PJ PID con- tract. -fir. D Arks requested office of General Counsel and office of Logistics to provide him with a procedure by which this may be accomplished. Both nd ODP will be providS TSPEC input and other support. MW 25X1A Training (U) (U) Basic Program Design, a two day course, was complet by 7 students. interactive Systems Concepts, a one day course, was completed by 19 students. Distribution: trig + 2 - arise 1 - as Div/Staff/ODP 1 - ODP Registry 4"" O/D/ODP O/D/ODP ee/19928-77 IN 25X1A 25X1A PP83T00573R000600130011-3