NOTICE: In the event of a lapse in funding of the Federal government after 14 March 2025, CIA will be unable to process any public request submissions until the government re-opens.

REPORT OF TDY TRIP(Sanitized)

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP84-00499R000800080039-9
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
5
Document Creation Date: 
December 12, 2016
Document Release Date: 
June 14, 2002
Sequence Number: 
39
Case Number: 
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP84-00499R000800080039-9.pdf226.02 KB
Body: 
25X1A Approved For Relegate 2002/08/21 : CIA-RDP84-00499R008680080039-9 REPORT OF TDY TRIP BY MR. A TO / Approved For Release 2002/08/21 : CIA-RDP84-00499M0080,0080039-9 25X1A 25X1A 25X1A 25X1A 25X1A 25X1A 25X1A 25X1A 25X1A 25X1A koz.,EJ1414. Approved For ReAte 2002/08/21 ? CIA-RDP84-00499R0014060080039-9 25X1A 55. ,fter a general discussicn of business with i shown the receiver nnd transmitter sites. The ...transmitter site, which 1.3 about four miles._ koirlin-:. to the routheast and off i8 a very impressiveninstallation._ 1 - Thc. ZitC 15 S-.-:111.1-Al-or- uo eaSfo. Of hand -iii7a -iviieded area. Ab out 100 _ _ _1 acres of ten sve'been-cle:ir-ed-for the antenna farti.?A-high.fonci enclosen about 20 ncres in thecenter of the plot, within vhich in-th-e-tranemitter build. snn the antenna feed lines plus part of the antennae. Two indigenous nuards cover the gate and fence area constantly. A specially constructed po,-er line about 1-1/2 miles long services the site with high voltage poter. Moro in one building, which is a permanent one-story structure and houses the trnnsnitters, power transformers, emergency generators, and the living quarters. Tho posor or generator room in on one end of the building and is thoroughly venti. late d nnn seesrated from the main part of the building by a brick partition. The troinsmitter room is in the center of the building and has adequate space for about a n(in,:, espansion over the present Installation of transmitters. A workshop is adjscent to this room. On the other end of this building are the living quarters, inn-oratory and wash room facilities, a small kitchen, and a day room. Under this section of the building is a partial basement, which contains the heating plant. The entire building ia very clean, in excellent condition, and presents an im. pressive anpearance. The entire installation is a credit to the organization and the,gen responsible for its operation and upkeep are also. 56. The receiver site is located in a rapidly expanding area within the buildin area of Buildings have been constructed all around the site leavinn abqolutely no room for further expansion. In addition the 'shops have been placed directly adjacent to this site. This is a _Larne round, glass-enclosed building, which mnkes much Use of such noise developing machines an electric welders, in addition to the contribution of ignition noise from the vehicles operated around the building. No more space is now aveils1)10 at this site for antennae. The receiver building is of permanent construction but it presently in need of considerable repairs. Recently the entire buildinn wan rewired as the original wiring installed did not satisfy the 25X1A 14ase fire regulations. The building houses quarters for a few of the men, the re calving room, the crypto center, the base station orrice, the entire supply function for thel 'Operation, plus thel 'equipment (vehicles are25X1A per'red outside). several thousand pounds of crated communications equipment is pre:ently stored outside in the veather for lack of inside storage space. Tho building, in spite of the crowded conditions and need for repairs, is kept in very clean, neat condition. It is evident that a large efrort must be and is exerted to maintain this appearance. a to be commended for his excellentad- ministration of the entire site.25X1A 57. On 19 Uarch a car was sent don from nd transported II 25X1A headquart,ixs. Uere met nnd discussed u nos* in general with Mr. to lArea Cciino Chief. The discussion centered around signal plans and base scheduling and various ideas were exchanged and discussed on these objects. I shown the headquarters offices and signal center. An agenda was worked out whereby was to return to the following day and discuss base scheduling with and his chief operator, ; Fs' Approved For Release 2002/08/21 :RAIVIIIN4-00499R000;800080039-9. c , 25X1A 25X1A 25X1A 2?MA 0111'0; 25X1A 25X1A 25X1A 25X1A 25X1A 25X1A 25X1A **, Approved For Rele*J6 2002/08/21 : e1kIRDP84-00499R000800080039-9 ,.as to proceed to darch 22 , nu talk on 3,1arc to on business and return for ware to go tol [to iccided to depart A on tha bra of this agenda. On Uareh tna eadquartors of thel out of for the next three weeks. It was decided .to cancel any further . 25X1A atta,.apt to Investigate sites at until after return to the home , office* th visit from 20 25X1A for tteraptod to contact I at L5X1A and found thzitl I was 25X1P.k 58. On March 21 a thorough discussion of base scheduling was had with and I It Vja3 pointed out to that base scheduling here was 25X1A extrenely difficult due to t'v many miscellaneous and. non?standard signal plans as I and others which they were required to work. None of those plans have compatible schedules and must be fitted into an already full soils ciulo whenever they eall0 up. Lack of a transmitter attendant also complicated schodulirc and required that all ba.se frequencies used in the plane worked from be sot up ahead of time on the Collins autotune transmitters at I scheduling involved the following features which are new to headquarters' eaa of scheduling; 25X1A 25X1C " 4 82 Approved For Release 2002/0i DP84-004444008100080039-9 25X1A 25X1A 25X1A Approved For Relesele 2002/08/21 : CIA-RDP84-00499R001880080039-9 ?16- 25X1A 25X1A 60, and his deputyyl I discussed with I Ithe crowdab)(1A and undolrabie conditions at the present receivinz site mmtioned in Para. 56). The possibility of a new- site was biought up and talked ever. A map of thel indicatod about 50 acres would be availablo at the west end of the I It, was decided to discuss thia with base autheri... ties to obtain more accurate details on future plans for the base pluz25X1A infonmation concerning availability of land in the deuired area. 25X1A Approved For Release 2002/08/21 : CIA-RDP84-00499R000800080039-9 YL U ?'1?' SECRET Approved For Re!Gale 2002/08/21 : 9.RDP84-00499R006900080039-9 25X1A Approved For Release 2002/08/21 39N4ROP84-00494R000800080039-9 ' C. 34