NOTICE: In the event of a lapse in funding of the Federal government after 14 March 2025, CIA will be unable to process any public request submissions until the government re-opens.

MUSLIM WORLD SPECIAL FUNDING (ACTION PLAN)

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP84-00868R000100060029-8
Release Decision: 
RIPPUB
Original Classification: 
C
Document Page Count: 
6
Document Creation Date: 
December 20, 2016
Document Release Date: 
May 8, 2007
Sequence Number: 
29
Case Number: 
Publication Date: 
March 25, 1980
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP84-00868R000100060029-8.pdf303.04 KB
Body: 
Approved, For Release 2007 0868R000100060029-8 MUSLIM WORLD SPECIAL FUNDING (ACTION PLAN) Subj ect 1. Complete Gulf Bureau activation and enhance staff to include coverage of Soviet regional radios Remarks A. MODE approvals (PO/RA) Initial discussion with CCS on rch. CCS advised of draft letter to 25 1 B. on 24 March; copy forwarded. Recruit non-staff monitors (6), Recruitment in London, Ankara, Karachi teletypist (1) (AC/Ops) underway; to be completed by 4 April. EOD's 6-8 weeks later. C. Procure equipment (C/EDSS) Will obligate 4135K by 1 April. D. Remainder ($65K) to be obligated by 1 June. Assign additional staff Targeted for September. editor (AC/OPS) A. Acquire State/host government Draft DDCI letter tol forwarde21.X1 approval (DD/FBIS, AC/Ops) B. C. MODE approvals (PO/RA) ?) Recruit non-staff monitors (6), See I.B. above for monitor recruiting. associate editor (1), Associate editor and teleop to be teletypist (1) for London recruited by C/London in August. Bureau (AC/Ops) D. Site identification and Engineer will TDY to IslamabaE[X1 preparation (AC/Ops) April/May. C>? 9v 25X1 . . r *s1VAT WIDENTIAL Approved For Release 2007/?ONFIDE f JAf 868R000100060029-8 E. Procure equipment (C/EDSS) F. Assign staff engineer to Islamabad (AC/Ops) G. Recruit non-staff techs in Islamabad (2) (AC/Ops) H. Acquire Islamabad/U.K. commercial voice lines (AC/Ops) I. Contract for engineering study for remote monitoring system via USG satellite (C/EDSS) J. Add B&F officer at Hqs (C/E&PS) K. Assign staff editor to London Bureau (AC/Ops) L. Add editor at Hqs (C/DRD) M. Rent office space in U.K. (AC/Ops) CONFIDENTIAL $135K to be obligated by 1 April. Remainder ($65K) after site survey. Recruiting underway. Vacancy notice issued 17 March. will initiate recruitment durii?X1 survey TDY. Upon approval for operation, 25X1 would procure Islamabad tails London tails and iI 5X1 satellite circuits. Contract will concentrate on digitizing. Will be let by 1 July. Scheduled September. Scheduled September. C/London to identify and implement by 30 August. Renting, modifications., trailer are possible options. Approved For Release 2007/05/08: CIA-RDP84-00868R000100060029-8 3. Remote-controlled A. GOC approval (C/Nicosia, AC/Ops) If positive indication not received monitoring facility in by 7 April, implement'alternative plan Cyprus (Alexandria). B. MODE approvals (P0/RA) Contingent on above. C. Procure lines (AC/Ops) Contingent on above. D. Procure equipment (C/EDSS) Contingent on above (c. $100K). E. Recruit additional FN employees Contingent on above. (3) (AC/Ops) or lacking GOC approval Establish remote- A. Acquire State/host government included in draft letter[ monitoring facility in approval (DD/FBIS, AC/Ops) Alexandria, Egypt 15X1 B. Conduct reception survey I itentatively scheduled 125X1 (AC/Ops) conduct survey in mid-April. FCS currently working on data. Results by 15 May. C. Procure commercial voice I ichecking on availability of 5X1 circuit (AC/Ops) leased circuits from Alexandria to Cyprus or London. D. Procure equipment (C/EDSS) Contingent on above ($100K). E. Recruit local contractors Contingent on above. (AC/Ops) 3 rO\jjr-jn1 rr -- I A yi Approved For Release 2007/05/?8Q,4, @C N-TJ#RO001 Approved For Release 2007/05/08: CIA-RDP84-00868R000100060029-8 Approved For Release 2007 wee 4. Technical upgrading of Nicosia, Tel Aviv, Jordan bureaus A. B. C. D. E. Assign project officer (AC/Ops) Procure equipment (C/EDSS) TDY support (C/EDSS) Obtain MODE approval for additional staff position in Tel Aviv:(PO/RA) Assign staff cruising officer to Tel Aviv (AC/Ops) 5. Monitoring of Soviet satellite facsimile and TV broadcasts A. B. C. D. E. Contract engineering support (C/EDSS) MODE approvals (PO/RA) Site survey (C/EDSS) Procure equipment (C/F)SS) (FY 1981) Install system, recruit and assign engineers (2) (AC/Ops) COME IDENTI AL is EDSS project officer. 25X1 $150K to be obligated b 1 April. Remainder, based on obligated TDY and 25X1 ORD survey results, to be obligated by 15 June. Follow-up TDY's to bureaus by regional engineer. See 1.A. above. By September. Telcom under contract, working on system design. Critical design review 15 April; facsimile system design 1 May ($100K). See 1.A. above. 0 FBIS/BBC coordination and site survey selection early April. ~s oX1 project officer. Basic receiving equipment procurement by 15 May ($175K). FAX procurement by 15 July ($125K). Approved For Release X007/05/08: CIA-RDP84-00868RO0'0'1'00060029-8 Approved For Release 2007/05/Oj5 - NjJ3AR000 100060029-8 6. Middle East, Southwest Asia roundup 7. Enhanced media analysis A. MODE approvals (PO/RA) B. Assign editor to London Bureau (AC/Ops) C. Recruit FN associate (C/London) A. Recruit, hire analysts (2), researchers (2) (AC/AG) 8. Coverage of published A. Recruit, hire language officers media of Muslim countries (11) (C/Prod) and Soviet Muslim regions B. Arrange assignment of additional admin support officer (1) (C/Admin) C. Recruit additional contract translators (C/Prod) D. Rent office space (C/Prod, C/Admin) E. Full-time training for two. language-officers. (C/Prod) 5 CONFIDENT! .. ppro ed !Rp Rele s~ 707 05108: CIA-RDPS4-c d86880001 Targeted for July. C/DRD to recruit replacement by third quarter. July 1980. Vacancy notices issued. Discussions with Chief, Recruiting Division on 13 and 21 March. OS has reordered procedures to speed up processing. Clerical being sought. Action by 1 June. 0 Ads to be placed in 12-13 major newspapers by mid-April. Process new translators by mid-July. Space required ASAP, by 1 July at S latest. D/OL requested to provide space. Timing and cost dependent on identification of space. Persons to be selected by 1 May. Training to begin either in summer or fall term as feasible. O(}0oo29-8 Approved For Release 2007/05/00. QN1R@E, 3 9. Automate ComCenter, Wire, ME and USSR DR's ? Memo of Understanding .(ORD/FBIS) ? Prepare RFP ? Release RFP ? Bidders Conference ? Contractor Proposals Due ? Proposal. Evaluation ? Contract Award April May 000100060029-8 June July CONEIDENTIai Approved For Release 2007/05/08: CIA-RDP84-008688000100060029-8 August 0