DD/A/ODP WEEKLY REPORT WEEK OF 21-28 OCTOBER 1981

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP84-00933R000400210045-8
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
2
Document Creation Date: 
December 15, 2016
Document Release Date: 
September 26, 2003
Sequence Number: 
45
Case Number: 
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP84-00933R000400210045-8.pdf71.42 KB
Body: 
Approved For-4elease 260S/19/66 E GTIARDP 4~i ' Rtl b4 2'f0045-8 fwl Week of 21-28 October 1981 0.~+ 4 1. Major Activities During the Past Week: PEGASUS (Minicomputer Database on Terrorist Events). We met with representatives of the DDO and NFAC to discuss approaches for improving support of the Agency's terrorism bases. Our discussion centered on the need to improve PEGASUS response time and the long range prospects of combining PEGASUS and FITE into one "central- ized" database system. MPS (Message Processing System). An enhanced version of skeleton MPS was installed in Production Control Branch (PCB) on 19 October. This version constitutes the "baseline", and is con- sidered the prerequisite of Bulk Data Services (BDS) being accepted PCB. I GRAPHICS. AUI Data Graphics has submitted the Extendable Charting Option (ECO) draft user's manual for agency review. Included in the manual is a sample ECO session-and examples of all of the ECO chart types. CAMS (COMIREX Automated Management System) . briefed the CAMS2 P/S schedule to the T/S Configuration Control Board. Particular emphasis was on the ICT (Installation, Check- out, and Test) portions of the CAMS2 Phase I to Phase II trans- ition plans. The CAMSTACK (CAMS Color Graphics capability) planning and development responsibilities were shifted this week to the CAMS1 Group. We received notice also that there is increased interest in this capability on the part of operations. 25X1 25X1 25X1 Approved For Release 2003/11/06 : CIA-RDP84-00933R000400210045-8 Approved Foy lease 20 /1 Ii/O ! dA-RDP84-00933'R400400210045-8 OTRTEST (Evaluation of Achievement and Proficiency Tests) The OTE mark sense reader used as an input device to OTRTEST will be interfaced with VM through a Tektronix graphics terminal. OTE will have the mark sense reader modified under their maintenance contract. D. Support to OF: ACTS (Automated Compensation and Information System) The General Functional Requirements Document for the ACIS system has been accepted b the Office of Finance as a baseline document. 25X1 for a briefing on the physics underlaying the TRACE program. Dave agreed to modify the OSWR contract with TASC for a portion of Dave time for a TRACE support task. 0 PERHOSP, CAPER. The Ames building air handler chiller devel- oped a coil leak over the weekend of 17-18 October. As a result, the Microdata 8000 and the 6000 had to be powered down overnight. Office of Personnel was not able to produce their CAPER reports on schedule; a subsequent computer room power problems caused one day to be lost on PERINSUR development. 0 25X1 25X1 Approved For Release 2003/11/06 : CIA-RDP84-00933R000400210045-8