CURRENT DIRECTORATE OF ADMINISTRATION ACTIVITIES (SANITIZED)

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP84B00890R000400060008-2
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
3
Document Creation Date: 
December 19, 2016
Document Release Date: 
November 21, 2006
Sequence Number: 
8
Case Number: 
Publication Date: 
November 6, 1981
Content Type: 
MF
File: 
AttachmentSize
PDF icon CIA-RDP84B00890R000400060008-2.pdf114.8 KB
Body: 
Approved For Release 2006/11/21: CIA-RDP84B00890R000400060008-2 ROUTING AND RECORD SHEET SUBJECT: (Optional) Current Directorate of Administration Activities (U) FROM: Harry E. Fitzwater EXTENSION NO. DDA 81-1497/17 Deputy Director for Administration DATE 6 November 1981 TO: (Officer designation, room number, and building) DATE OFFICER'S COMMENTS (Number each comment to show from whom RECEIVED FORWARDED INITIA to whom. Draw a line across column after each comment.) 1. Deputy Director of Central Intelligence 2. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. ,~MOPItCDF Pages 2 15. FORM 61 0 USE PREVIOUS I-79 61 EDITIONS I A/ Approved For Release 2006/11/21: CIA-RDP84B0089OR000400060008-2 E c-R, EL, ~ DD/A Registry A 81-1497/177 MEMORANDUM FOR: Deputy Director of Central Intelligence FROM: Harry E. Fitzwater Depeuty Director for Administration 1. Following the replacement of a defective printer, acceptance tests for the Burroughs B6900 computer, located in the Northside Computer Center, began on ember. The acceptance testing is expected to last a minimum of 30 days. I 25x1 3. The communication relay station Isuffered an extensive fire 25X1 in its transmitter site generator room on 28 October which left the transmitter site without an operable emergency power source. One generator is reportedly not field repairable and the undamaged accessories are being used to effect repairs to the second unit. Alternate Routing Plans will be implemented during any commercial power outa es at the transmitter site until its emergency power capability is restored. A9c4.1 25X1 A F newly installed SKYLINK (SC-3) terminal was formally activated in n 30 October. Q A9c4.1 Z). ilie CU11ll11UU1UdL1U11s raClliLy 1 lost all or its leasea- line service on 28 October due to flood eavy rains. All leased- 6. The Director of Finance initiated a cable to a field station on 25x1 30 October a roving the impl mentation of a modified accounting system using procedures. A9c5.2 25X 1 7. During 18 - 21 October, representatives of the Offices of Logistics and Communications, as he Central Cover Staff, DDO, visited several 25x1 installations to locate areas for an operations base, a communications receive 1 nd a communications transmitter site in support 25x1 of a staybehind program. A9c2.3 8. The contracting for the final phase of a four-year project with for work in the renovation of the Ruffing 25x1 Computer Center. WARNING NOTICE--INTELLIGENCE SOURCES AND METHODS INVOLVED SECRET) Approved For Release 2006/11/21: CIA-RDP84B00890R000400060008-2 9. The Office of Security completed surveys certifying three facilities for receipt and storage of Sensitive Compartmented Information (Department of Labor, the White House Communications Agency, and the11ffice of Policy Development in the Executive Office of the President). 10. The A enc hosted a luncheon of the Washington/Houston Roundtable on 5 November. 25x1 11. Forwarded herewith is the third Working Group Memorandum prepared by the staff of the Information Handling Systems Architect regarding technical and scientific facilities. 0 25x1 a i, eater