CURRENT DIRECTORATE OF ADMINISTRATION ACTIVITIES (SANITIZED)
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP84B00890R000400060008-2
Release Decision:
RIPPUB
Original Classification:
S
Document Page Count:
3
Document Creation Date:
December 19, 2016
Document Release Date:
November 21, 2006
Sequence Number:
8
Case Number:
Publication Date:
November 6, 1981
Content Type:
MF
File:
Attachment | Size |
---|---|
![]() | 114.8 KB |
Body:
Approved For Release 2006/11/21: CIA-RDP84B00890R000400060008-2
ROUTING AND RECORD SHEET
SUBJECT: (Optional)
Current Directorate of Administration Activities (U)
FROM:
Harry E. Fitzwater
EXTENSION
NO.
DDA 81-1497/17
Deputy Director for Administration
DATE
6 November 1981
TO: (Officer designation, room number, and
building)
DATE
OFFICER'S
COMMENTS (Number each comment to show from whom
RECEIVED
FORWARDED
INITIA
to whom. Draw a line across column after each comment.)
1.
Deputy Director of
Central Intelligence
2.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
,~MOPItCDF Pages 2
15.
FORM 61 0 USE PREVIOUS
I-79 61 EDITIONS
I A/
Approved For Release 2006/11/21: CIA-RDP84B0089OR000400060008-2
E c-R, EL,
~
DD/A Registry
A 81-1497/177
MEMORANDUM FOR: Deputy Director of Central Intelligence
FROM: Harry E. Fitzwater
Depeuty Director for Administration
1. Following the replacement of a defective printer, acceptance tests
for the Burroughs B6900 computer, located in the Northside Computer Center,
began on ember. The acceptance testing is expected to last a minimum of
30 days. I 25x1
3. The communication relay station Isuffered an extensive fire 25X1
in its transmitter site generator room on 28 October which left the transmitter
site without an operable emergency power source. One generator is reportedly
not field repairable and the undamaged accessories are being used to effect
repairs to the second unit. Alternate Routing Plans will be implemented during
any commercial power outa es at the transmitter site until its emergency power
capability is restored. A9c4.1 25X1
A F
newly installed SKYLINK (SC-3) terminal was formally activated in
n 30 October. Q A9c4.1
Z). ilie CU11ll11UU1UdL1U11s raClliLy 1 lost all or its leasea-
line service on 28 October due to flood eavy rains. All leased-
6. The Director of Finance initiated a cable to a field station on 25x1
30 October a roving the impl mentation of a modified accounting system using
procedures. A9c5.2 25X
1
7. During 18 - 21 October, representatives of the Offices of Logistics
and Communications, as he Central Cover Staff, DDO, visited several 25x1
installations to locate areas for an operations base, a
communications receive 1 nd a communications transmitter site in support 25x1
of a staybehind program. A9c2.3
8. The contracting for the final phase of a four-year
project with for work in the renovation of the Ruffing 25x1
Computer Center.
WARNING NOTICE--INTELLIGENCE
SOURCES AND METHODS INVOLVED
SECRET)
Approved For Release 2006/11/21: CIA-RDP84B00890R000400060008-2
9. The Office of Security completed surveys certifying three facilities
for receipt and storage of Sensitive Compartmented Information (Department
of Labor, the White House Communications Agency, and the11ffice of Policy
Development in the Executive Office of the President).
10. The A enc hosted a luncheon of the Washington/Houston Roundtable
on 5 November. 25x1
11. Forwarded herewith is the third Working Group Memorandum prepared
by the staff of the Information Handling Systems Architect regarding technical
and scientific facilities. 0 25x1
a i, eater