NPIC DATA SYSTEM DATA AND CONTROL SEGMENT ACQUISITION PHASE VOLUME III MANAGEMENT PROPOSAL

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP84T00037R000400060001-1
Release Decision: 
RIPPUB
Original Classification: 
U
Document Page Count: 
163
Document Creation Date: 
December 28, 2016
Document Release Date: 
September 7, 2007
Sequence Number: 
1
Case Number: 
Publication Date: 
February 24, 1982
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP84T00037R000400060001-1.pdf7.54 MB
Body: 
NPIC DATA 1S EGMENT' DATA AND ACQUISI PHASE VOLUME Nl. MANAGEMENT PROPOSAL STAT 24 Fsbru y 1Y62 UNCLASSIFIED ? K Approved For Release 2007/09/07: CIA-RDP84T00037R000400060001-1 Approved For Release 2007/09/07: CIA-RDP84T00037R000400060001-1 UNCLASSIFIED ? NPIC DATA SYSTEM DATA AND CONTROL SEGMENT ACQUISITION PHASE VOLUME III MANAGEMENT PROPOSAL STAT ? This data, furnished in connection with Request for Proposal 82-B-015 as amended, shall not be dis- closed outside the Government and shall not be duplicated, used, or disclosed in whole or in part for any purpose other than to evaluate the proposal. If a contract is awarded to this offeror as a result of or in connection with the submission of this data, the Government shall have the right to duplicate, use, or disclose the data to the extent provided in the contract. This restriction does not limit the Government's right to use information contained in the data if it is obtained from another source without restriction. STAT ? UNCLASSI FI ED Approved For Release 2007/09/07: CIA-RDP84T00037R000400060001-1 Approved For Release 2007/09/07: CIA-RDP84T00037R000400060001-1 UNCLASSI FI ED S Section Page 2.0 CORPORATE COMMITMENT 111-2-1 2.1 Corporate Structure 111-2-4 2.2 Corporate Support 111-2-8 2.3 Facilities 111-2-12 3.0 PROJECT MANAGEMENT 111-3-1 3.1 Organization 111-3-1 3.1.1 Subcontractor Organization 111-3-6 3.1.2 Organizational Responsibilities 111-3-8 3.2 Project Management 111-3-10 3.2.1 Project Management Plan Overview 111-3-12 3.2.2 Government Visibility 111-3-14 3.3 Subcontractor Management 111-3-15 3.4 Security 111-3-18 3.4.1 Security Procedures 111-3-20 3.4.2 Secure Facilities 111-3-22 3.5 Issues 111-3-24 ? 4.0 PROGRAM CONTROL 111-4-1 4.1 Plans and Methodology 111-4-1 4.2 Cost and Schedule Control 111-4-4 4.2.1 Program Control Management System (PCMS) 111-4-4 4.2.2 Schedule Management 111-4-8 4.3 Quality Assurance 111-4-12 4.4 Configuration Management 111-4-16 4.5 Logistics Management 111-4-22 5.0 PROJECT PLANS 111-5-1 5.1 Master Schedule 111-5-1 5.2 Systems Engineering Management Plan 111-5-6 5.2.1 Organization and Relationship 111-5-6 5.2.2 Methodology 111-5-10 5.2.3 Activity Plan 111-5-14 5.3 Software Development Plan 111-5-16 5.3.1 S/W Organization and Responsibilities 111-5-18 5.3.2 S/W Products Control and Methodology 111-5-20 5.3.3 Activity Plan 111-5-24 5.4 IWS Hardware Development Plan 111-5-28 5.4.1 Organization and Responsibilities 111-5-28 5.4.2 Methodology (Plans & Controls) 111-5-32 5.4.3 Activity Plan 111-5-34 ? UNCLASSIFIED Approved For Release 2007/09/07: CIA-RDP84T00037R000400060001-1 Approved For Release 2007/09/07: CIA-RDP84T00037R000400060001-1 UNCLASSIFIED Section Contents (Continued) ? Page 5.5 Verification and Test Plan 111-5-36 5.5.1 Organization and Relationships 111-5-36 5.5.2 Methodology 111-5-38 5.5.3 Activity Plan 111-5-42 5.6 Operations and Maintenance Plan 111-5-46 5.6.1 Organization and Relationships 111-5-48 5.6.2 0 & M Methodology 111-5-50 5.7 Training Plan 111-5-52 5.7.1 Organization and Relationships 111-5-53 5.7.2 Methodology 111-5-54 5.7.3 Activity Plan 111-5-57 6.0 PERSONNEL 111-6-1 6.1 Key Personnel 111-6-1 6.2 Staffing and Clearance Plan 111-6-4 7.0 EXPERIENCE AND PAST PERFORMANCE 111-7-1 7.1 Launch Processing System (LPS) 111-7-3 7.2 Shuttle Data Processing Complex (SDPC) 111-7-4 7.3 Applications Development & CAMS 111-7-5 7.4 Star/All Star/Doric 111-7-6 7.5 ASG 111-7-7 7.6 Battlefield Exploitation/Target Acquisition (BETA) ? Test Bed 111-7-8 7.7 AFSCF/Computer Program Integration Contractor (CPIC) 111-7-9 8.0 ALTERNATIVE MANAGEMENT APPROCHES 111-8-1 Appendix B1 D/C Segment Statements of Work 1 B2 Personnel Resumes 1 B3 Schedules 1 ? I Inln1 AC`C`! CI CI"1 Approved For Release 2007/09/07: CIA-RDP84T00037R000400060001-1 Approved For Release 2007/09/07: CIA-RDP84TOO037ROO0400060001-1 UNCLASSI FI ED Figure Page 2.0-1 Corporate Actions to Assure NDS Commitments 111-2-1 2.0-2 Subcontractors' Letter of Commitment 111-2-3 2.1-1 D/C Segment Project Within 111-2-4 STAT 2.1-2 D/C Segment Project Within FSD 111-2-5 2.1-3 Subcontractor Organizations 111-2-6 2.1-4 Membership of Advisory Councils 111-2-7 2.2-1 Work Station Investment Pilot Model 111-2-9 2.3-1 =Facility 111-2-13 STAT 2.3-2 D/C Segment SCIF 111-2-13 2.3-3 Large Conference Room 111-2-13 2.3-4 Simplified Layout of the Development and Test Laboratory 111-2-13 3.1-1 NDS D/C Segment Development Organization 111-3-3 3.1-2 Key Managers and Consultants 111-3-4 3.1-3 Operational Support Organization 111-3-5 3.1.1-1 Development Organization 111-3-6 STAT 3.1.1-2 ( Development Organization 111-3-7 STAT 3.1.1-3 Development Organization 111-3-7 3.1.2-1 SOW to WBS Correlation 111-3-9 3.2-1 Integrated Management 111-3-11 3.2.1-1 Project Plans, Control, and Visibility 111-3-13 ? UNCLASSIFIED Approved For Release 2007/09/07: CIA-RDP84TOO037ROO0400060001-1 Approved For Release 2007/09/07: CIA-RDP84T00037R000400060001-1 UNCLASSIFIED Illustrations Figure Page is 3.3-1 Subcontractor's Responsibilities 111-3-16 3.3-2 Team Interactions 111-3-17 STAT 3.4-1 Security Organization and Functions 111-3-18 3.4.1-1 Security Standard Practice Procedures 111-3-21 3.5-1 Issues for Continuing Analysis 111-3-25 4.1-1 Features of Management Control Concepts 111-4-1 4.2.1-1 El Programs That Use PCMS 111-4-4 STAT 4.2.1-2 PCMS Documentation Flow and Responsibilities 111-4-7 4.2.2-1 Sections of the Project Master Control Plan (PMCP) 111-4-9 4.3-1 HQA Process 111-4-13 4.3-2 SQA Process 111-4-15 4.4-1 D/C Segment Project Configuration Management Organization 111-4-17 ? 4.4-2 Preliminary Listing of CM Controlled Documentation to be Prepared by ISM 111-4-19 4.4-3 D/C Segment Change Control Boards 111-4-19 4.4-4 Change Processing Flow 111-4-19 4.5-1 Elements of the Maintenance and Logistics Plan 111-4-23 5.1-1 NPIC D/C Segment Master Schedule 111-5-2 5.1-2 Development and Test Laboratory Schedule 111-5-4 5.2.1-1 System Engineering Organization and Responsibilities 111-5-7 5.2.2-1 SE Methodology Overview 111-5-11 5.2.2-2 Example of Trade Study Methodology 111-5-13 5.2.3-1 SE Activity Summary 111-5-15 5.2.3-2 SE Activity Schedule 111-5-15 is UNCLASSIFIED Approved For Release 2007/09/07: CIA-RDP84T00037R000400060001-1 Approved For Release 2007/09/07: CIA-RDP84T00037R000400060001-1 UNCLASSIFIED Illustrations (Continued) Figure Page 5.3.1-1 S/W Development Organization and Responsibilities 111-5-19 5.3.2-1 The Emerging Products of Software Development 111-5-21 5.3.2-2 FSD S/W Standards and Practices 111-5-21 5.3.2-3 CPCI Source Line Estimates 111-5-22 5.3.3-1 S/W Risk Containment 111-5-24 5.3.3-2 Software Activity Schedule 111-5-26 5.3.3-3 Detail CPCI Development Plan 111-5-27 5.4.1-1 Hardware Development and Acquisition Organization and Responsibilities 111-5-31 5.4.2-1 Hardware Development Methodology & Plan 111-5-33 ? 5.4.2-2 Hardware Development Activity Overview 111-5-33 5.4.3-1 Hardware Activity Schedule 111-5-35 5.5.1-1 Integration Test and Transition Organization and Responsibilities 111-5-37 5.5.2-1 Test and Verification Methodology Overview 111-5-39 5.5.2-2 Segment Verification Plan 111-5-40 5.5.2-3 Test Documentation Tree 111-5-41 5.5.3-1 Source Lines of Code (X103) Integrated/Tested per Quarter 111-5-42 5.5.3-2 Major Milestones 111-5-43 5.5.3-3 IT&T Activity Schedule 111-5-45 5.6.1-1 Phase 1 0&M Organization and Responsibilities 111-5-49 5.6.1-2 Phase 2 O&M Organization and Responsibilities 111-5-49 5.6.2-1 Discrepancy Report Process Flow 111-5-51 ? UNCLASSIFIED Approved For Release 2007/09/07: CIA-RDP84T00037R000400060001-1 Approved For Release 2007/09/07: CIA-RDP84T00037R000400060001-1 UNCLASSIFIED Illustrations (Continued) Figure Page 5.7-1 Training Challenges 111-5-52 5.7.1-1 Training Organization and Responsibilities 111-5-53 5.7.2-1 System User Categories 111-5-55 5.7.2-2 Training Courses 111-5-56 5.7.3-1 Training Activity Schedule 111-5-57 6.1-1 Key Personnel Committed to D/C Segment Project 111-6-3 6.2-1 Staffing Profile 111-6-5 6.2-2 Project Management Staffing Plan 111-6-6 6.2-3 Systems Engineering Staffing Plan 111-6-7 6.2-4 Development Staffing Plan (3 Sheets) 111-6-8 6.2-5 Support Staffing Plan 111-6-10 6.2-6 Staffing Plan by Skill and Level III-6-11 7-1. Experiment & Past Performance 111-7-2 8.0-1 Alternative Development & Staffing Impact 111-8-3 8.0-2 Alternative IWS Configuration Impact 111-8-4 8.0-3 Alternative Facility Impact 111-8-5 is is UNCLASSIFIED Approved For Release 2007/09/07: CIA-RDP84T00037R000400060001-1 Approved For Release 2007/09/07: CIA-RDP84T00037R000400060001-1 Approved For Release 2007/09/07: CIA-RDP84T00037R000400060001-1 Approved For Release 2007/09/07: CIA-RDP84T00037R000400060001-1 UNCLASSIFIED 0 is ? The NPIC Data System will undergo significant changes during the 1980s to meet the new requirements of its users. understands the critical importance of this sy:STAT to the nation's security. Two key o jectives must be achieved to be successful. First, the new capabilities to support additional data sources must be delivered on time for the BOC within tight funding constraints; and second, a system concept must be provided for FOC which significantly improves the capabilities of the image analyst to perform their job easier and with greater productivity. The Team has the project management abilities, techniques and experience to meISTAT these objectives. We have managed large complex data processing systems for other Government programs, such as Apollo, Shuttle, LAMPS and our current Data System, Modernization (DSM) and Global Positioning System (GPS) programs, and have developed the management expertise required to deliver systems within cost and on schedule. 7is highly committed to the success of the NDS program. Our project will repor STAT directly to an focus and quick access successful managers - Vice President to provide proper execu STAT - to be the Program Manager. He has extensive STAT through out F] We have assigned one of our m STAT experience in the Intelligence Community and has managed the development of other large complex systems. We have developed a detailed plan to staff the NDS program. All of the 166 people required at contract start have been identified and 72% either have NDS clearances or only require crossover. Also, we have identified 59 key personnel who will be included under the key personnel clause. The required secure facilities are already under construction so that we will be ready to initiate full program activities the day of contract award. has teamed with three other companies which complement the kills and brinSTAT key experience to the program. brin s ind76 STAT knowledge and experience with NDS operations. The IAI currently under contract to provide integrated work stations for the Navy and Army intelligence activities; they bring unique Integrated Work Station concepts to NPIC which will provide more function to the analysts thereby significantly improving their productivity. The has performed a wide range of system concSTAT studies with Intelligence Community Staff, the DIA and other government agencies and have excellent insight into NDS requirements. techniques for management of large complex systems will be key to the succesSTAT of the NDS D/C Segment implementation. These techniques are formulated around four concepts: (1) firm baseline points throughout the program lifecycle; (2) rigorous techniques to control changes to these baselines; (3) tracking and evaluating detailed technical status frequently; and (4) providing an on-going evaluation of the cost and schedule status of the program. Our day to day management of the program is tracked through the Program Management Control Plan (PMCP) which collects, at a detailed level, a description and schedule all project tasks and permits tracking of target and actual completion dates. Program costs are tracked through the Program UNCLASSIFIED Approved For Release 2007/09/07: CIA-RDP84T00037R000400060001-1 Approved For Release 2007/09/07: CIA-RDP84T00037R000400060001-1 UNCLASSIFIED Control Management System (PCMS) which incorporates management estimates of cost to complete individual technical milestones, and provides comparison of this to the ? actual cost incurred. These two management tools provide key insight into pro- gram status and permit both= and Government executive management good understand- STAT ing of program status and direction. The key challenge of the D/C Segment schedule is the development of the BOC software. During the DCP, the 0 team performed a comprehensive code audit of the existing STAT system to ensure thorough understanding of the job to be performed. As a result of this audit, we have maximized retention of existing code at BOC and partitioned the CPCIs in a manner which permits parallel development without incurring risk. We have also developed ways to utilize commercially available software products to reduce the amount of software to be developed. This is the basis for our confidence that we can achieve the BOC milestone. has developed comprehensive software development methodologies and software engineering practices which have been proven successful on other large software development programs. These techniques focus on intensive reviews of individual pro- gram design and code which enables early detection of problems and significantly reduces the cost of their correction. In addition, these techniques enable the inte- gration and testing of the software to proceed in a controlled and predictable manner. We feel our demonstrated ability in this area is the best in the industry. To facilitate the review of this proposal, a cross-referenced compliancy matrix is provided in Appendix B-4. This matrix correlates the RFP's Instructions to specific Sections in this Proposal. STAT ? ? UNCLASSIFIED Approved For Release 2007/09/07: CIA-RDP84T00037R000400060001-1 Approved For Release 2007/09/07: CIA-RDP84T00037R000400060001-1 Approved For Release 2007/09/07: CIA-RDP84T00037R000400060001-1 Approved For Release 2007/09/07: CIA-RDP84T00037R000400060001-1 UNCLASSI FI ED 0 ? ? The a team recognizes the national importance of the NDS program to the Nation's STAT security. We have committed the people, facilities and resources to assure successful implementation of the D/C Segment. Success of the NPIC Data System (NDS) requires that the D/C Segment contractor under- stand the system's requirements and be fully prepared to assign the people, facili- ties, financial resources and management attention needed to achieve the program's objectives. ( ~ T A T wants to participate in the NDS program. The D/C Segment matche charte:STAT to undertake challenging, nationally important programs. It ties to other proSTAT grams and objectives, and allows us to apply our skills in data base managemen and high speed transactions technology to the NDS problem. We believe our record of performance on DCP has demonstrated our technical expertise, management commitment and customer responsiveness. We made all our deliveries on schedule and we showed flexibility and open-mindedness in responding to NDPO direction. Our Corporate managements are resolved to see that this dedicated commitment continues throughout SAP. Figure 2.0-1 highlights the commitments we have made to the SAP. Figure 2.0-2 makes clear the all-out support of our subcontractors. PROJECT MANAGEMENT ORGANIZATION REPORTING EXECUTIVE ATTENTION STAFFING CONSULTANTS CONTINUITY INVESTMENTS FACILITIES Two Advisory Councils, Management and Technical, To Review/Advise Project; Composed Of SenioiPlAnd Subcontractor Executives. 380 Positions, Corresponding to Full Peak Load Requirements, Identified and Filled, By Name. Imagery Analysis Authorities Advise Staff, Particularly On Operational Issues. Project Team Will Continue Activities Through To Contract Award, To Assure Fast, Effective Start-Up. And Subcontractors Have Invested More Tharl Preparing For D/C Segment Project. Figure 2.0-1. Corporate Actions to Assure NDS Commitments STAT STAT STAT STAT STAT UNCLASSIFIED Approved For Release 2007/09/07: CIA-RDP84T00037R000400060001-1 Approved For Release 2007/09/07: CIA-RDP84T00037R000400060001-1 UNCLASSIFIED February 24, 1982 Mr. R. P. Hazzard Director, National Photographic Interpretation Center Washington, D. C. 20023 Dear Mr. Hazzard: I am pleased to commi resources to the successful development of the NPIC Data System. We have worked for nearly a year with your NPIC Development Program team, and we realize the critical nature of the NPIC Data System to the nation's security, We are also sensitive to the need for a cost-effective system solution to your requirements. The Data and Control Segment development activity is consistent with the mission and experience of I have followed the development of our approach during the Study Phase and the Design Competition Phase and I assure you that I will continue to give the NPIC Data System Program the highest= priority throughout the System Acquisition Phase. I have personally selected the senior managers for the program and have positioned the program reporting to the Vice President, Defense and Space Systems rovidin us with maximum visibility of the program performance. our program director, is uniquely qualified to lead our effort. He has extensive experience within the Intelligence community. He has successfully managed the large scale software devel- opment effort for the NASA Space Shuttle, and he is recognized widely throughout industry for his knowledge of large on-line systems imple- mentation. I am completely confident that the resources of th~Cor i nunled with the skills and experience of our team members, rovide NPIC with the capability to meet your technical, schedule and cost objectives. Our Corporations are committed to your program and eagerly anticipate performing on it. UNCLASSIFIED Approved For Release 2007/09/07: CIA-RDP84T00037R000400060001-1 ? STAT STAT STAT S STAT STAT STAT STAT STAT STAT Approved For Release 2007/09/07: CIA-RDP84T00037R000400060001-1 UNCLASSIFIED 0 ? is pleased to be teamed with on the NPIC Data Systems program. Our professional association with N VIC xtends back over the last decade and our commitment to the team has been demonstratedPst year in the Study an Design Competition phases. has proposed a team of highly qualified technical, management and support personnel capable of ensuring that we meet our tasked commitments on schedule and within cost. President of our Government Sector, and Senior Vice President and Managing Officer of our Co-cations, Electronics and Intelligence Division, have been designated to be members or the Program Manage- ment Advisory Comvni tree and Program Technical Advisory Committee, respectively. These two senior officers, in addition to approving and auditing our quality assurance program and management controls, will meet each month with Vice President and Manager of our Intelligence Systems Practice and our NPIC Program Manager, to review the technical, cost, staffing, and schedule status. These reviews will also exc ine all potential areas of risk and plans for their reduction or elimination. These senior managers possess the resources and authority necessary to provide whatever is required by our program team to ensure a successful accomplishment of the critical program milestones. looks forward to a s ccessful relationship ith as well as the NPIC on this program of extreme importance to the security of the United States. You have ocr commitment. er [r emel, pleased to br a ember So c teas for line National Jbotograon)c Interpretation Tenter data Control legman' ,stem Pcquisiti on Program. Orecogni:rt that Ints program 's cr ti,:.i1 e National date nhr and is pleased to commit any and al', corporate e.~urces 'eilu'. red td enSU rr its unqualified success. -his orogra is an extremely cnalienginq ne ewpo ant o' o entraordinar, m nagr ned?lC and .ecnnical requtrenpnts, and it e ol -Z, r*nt a,ten[ion ?n~cn w ledge to provide. Because "I Iate i. rot t'-ogram n priority enfort,O na ies the fdl'i owing ccrc eon co rCd'a to ommi:,,ents ]11 iey oar sonnet aentifted a r -v-! will oe a ref ',ll- ti.me at program initiation for the duration Of the - ontraC[ ce President and :hier Opera tins J to rnsare roar to nds parr to the total resources of the ~., r, oration. eveered our proposal a , Ie[[rr. and ~as I I? Imo 1 ts, Ae are 1-11, drd to ,. ,iq t On the uatalpntrp Droq ram rhichn rill enhance on,inuinq r. wUr,i nq rela[pnanip a salrc:Pd md; or command, .antral' "ummun.cat' on s?and intelligence programs e pleased Sc be teamed it a su be ant rector for the NPIC Z. INDP1 program. W. fully appreciate the importance of this program endOi f omitted vi th highly qualified technical personnel .od ma na gseent Ise in providing a system which will be affordable, timely, and in accordance with the user ? requirement. The NDP program manager has been positioned rithen]en alloy the Corporate office lull v sibility into the program to ensue ee to project perfomance, poet and schedule. e look !area rd c very s cce saful r o1TTNU tarb> t 'wa' Tw>' -~ ---sc Ma. ITS' Kw . II.N I psi stain I nl' .ti ---IK lKI rot KN n.b Mlwll )Cola!, nl' ' ------a ---rK .I1 t nit Kw Il.w l I .M1. MAN51 nl I l I LICK sell" t sail - I + t - A --a vat it me M.bl a s) i : )as 1 1) , i M __In Pa 11 me$ ---.< rNT 1 >K s ___sC IKlls MCTSSSI .NI ll.w ri.w MaaMl IINTN MKUI ; > , Mswi~ M' ~ ~y ___IK Islls law ---rK IKIw M assn N.N w n~ MKLI }01[615 ) 'M. IIKC MaY4sNI 'I fl. --.K IIaK i[fr RN . M.b Ta,ll.>I M Ia[ )1'I l I l I I this ___IK Iisl 7511 ft. a.N `T1 {I MAn i i aleMSj Ill'I i t ` T ~y tMl ---1K C: M T[SI I ; .N I.bl I MMNt 1 - I McMt l M](Te(lf asl I a1KTN} T } KT I + ? A ---sC la L 9 ---IK nl I 'IS' an . 15.20 ll aw! I SI MaKeL ~ y ---IK MT L TEST ? [K )S.K IalTallaa MANN 1--~ as rcs, T fT o.N N M } te[Nf t MAN e 11 NIT 1[fl :7K . ri.W tI(tN MKIN --?IK .11 nsr sal nfT meals s. >.N N S. .1 -ft MKIt> 6!0.[.) MAN I---y .K . I ---,K all list M[WKS K all 1ES1 -Iftl[s s,.N II.N + I MN l of ARn u NI l IOitPtS + yI .-~ rc ... in IWPST t a t M.N I MT[M) Meawl __-IK slat t t ? __.rte Wallis, , t ? ss.n t.N j Ma1aN MARn MAR, MMalaSI ~. _..s0. Pava salve's M.N Ma s.3 ,60,06,4 I. ---I0. Pepa salwls 75.15 Mlssl.s MsIN, TTT . a.C __ Mltalals KoKtf all. )O I Ma11L.5 -a. is.lsliw a.n l AfXM) I Mary) l s ---a0. t"Is ,t ostis 75.75 1 MMM) { IoaaTTNI 751 l an tests as oMn 1!.50 1 f IIKCN I oIeNSTT t nI ---rK le-111.0!115 S.>O I ARn I MAanl i 75, I ~~ all ---a0. CKt 1111161 I.N , WElls 1 IaITITISwI TM' sue. src ?--IK [KI IISIIKS in.N MOSS MKIn TM' ~y --l0. CKl Llsn6! w.>0 I ,00,0.75 t MK[n Mensal ~ MA'i T TM' TM ~.y ___tK MINSfa 0a1.K ___I0. MssaKS slalsl .N M.ia I MAn Ollr TM .----ti Is ___IK MaaTSS5 alas, s.)a ]sa s., MYaltS TM ~' ___.K In sss le5TS 11.20 lIK rc! >e(lls nt ___i0. llai awl 1ei15 >a.N I1KCN a ___an 75111 11 was M.>s MS[nl t7ti5 ; Meaa(I T W aat ---I0. Ill II e] II.N Waal. Mn,S Ka !-i is --'K a is waoo Figure 5.3.3-2. Software Activity Schedule ? STAT ? IIMMPPI ACCI I n Approved For Release 2007/09/07: CIA-RDP84T00037R000400060001-1 ? ? ? Approved For Release 2007/09/07: CIA-RDP84T00037R000400060001-1 UNCLASSIFIED Team Rest, D/C Segment CPCI R Pre Exploitation BOC DES PAR DESCD CTI sus PEAC BOC PEAC (O&MI IOC DES CDR DES PAR DES CDR CTI PJ~T PEAC BA PEAC (O&M) Exploitation Mgmt. BOC IOC Exploitation BOC Support Exploitation Results BOC IOC Statistics Reporting BOC IOC IOC Materials Mgmt. BOC IOC FOC IOC BOC PDR Host System S/W BOC A Note 3 Host Appl. Support BOC IOC Work Sta System S/W BOC SDR PDR CDR (BOC) CDR (fOC) BOC CDR (FOC) ~-----1982 mik 1983 44 1984 4I 1985 - M J JASON D J F M A M J J A S O N D J F M A M J JASON D J F M A M J J A DESPAR DES CACTI Pc , A PEAC BOAC PEAC (0&M) PDR CDF DES A DES A CTI PDR A Note 3 80C - Basic Operational Canahdlly CDR Critical Design Review CTI Code, Test, Integrate Activity DES Design Activity FOC Fnal Operahnnal Capa11d11y erahoual Cenahility PEAC Pruhlem Evaluation and Cor-eclion Activity PEAC lO&MI - PEAC durinr, O&M S ~ ort PDR - Preliminary Design Rcview POT Preliminary ouabhcation Test ICFC Lcv,,,l SDR Segment Design Renew PQT CTI. DES PDRCDRCTI~ POT A C, DES DES CDR POT ICT DES CAD R POT CTI. Data Manipulation BOC DES P"D R DES CDR POT CTI A PEAC AC PEAC(O&M) DES CDR P1 DES P,DsR Note 2 POT PEAC POT DES CDR CTI PQT Command BOC DES PDR DES CDR CTI POT PEAC BOC PEAC(D&M) & Control .,.., ..~.. .._. POT POP CDR POT BBC Query Support BOC DES PDR DES CDR CTI POT PEAC BOC A PEAC BOC PEAC IO&MI IOC PEAC BA PEAC(O&M) IOC DES PA DES CDR CTI P07 PEAC BOAC IOC A PEAC10&NI Work Sta. Appl S/W BOC IOC Front End Sys BOC Legend POT C71 PEAC rno IDDC FOC 1986 --P S O N D J F M A M J J A S IOC IOC IOC IOC IOC IOC IOC IOC PEAC (O&M) IOC IOC A PEAC IOC PEAC (O&M) FOC IOC .d -A- IOC IOC Note 1 - No Functional Change for IOC, Only Conversion to New Host. Note 2 - No Change to Existing Code for BOC. Note 3 - CPCI Consists of Commercially Supplied Software FOC FOC FOC FOC FOC .d FOC FOC FCC 740C FOC FOC PEAC IO&MI FOC IOC PEAC (O&M) FOC PEAC (O&M) FOC IOC PEAC10&NI FAC Figure 5.3.3-3. Detail CPCI Development Plan UNCLASSIFIED Approved For Release 2007/09/07: CIA-RDP84T00037R000400060001-1 Approved For Release 2007/09/07: CIA-RDP84T00037R000400060001-1 UNCLASSIFIED 5.4 IWS Hardware Development Plan An IWS hardware configuration responsive to NPIC functional and operational require- ments will be fabricated using commercially available components. This approach to the IWS hardware development activity is low risk and cost effective. The concept of the intelligent IWS evolved through the NPIC study and design phase activities. After extensive analysis and breadboarding of available components the following configurations were selected: ? a. B-20 alpha-numeric terminal to provide full interactive alpha- STAT numeric capabilities and limited local processing to support the adminis- b. B-20 alpha-numeric terminal integrated with an 5216 high STAT reso ution, Tempest approved graphics display to provide the full A/N and imagery capabilities to support the analysts. The remainder of the hardware required by the D/C Segment does not require any develop- ment or specification since they are commercially available. Commercial ADPE is not discussed in this plan. This section presents an overview of the IWS Development Plan including organization and responsibilities, methodology and activity plan. 5.4.1 Organization and Responsibilities The IWS H/W Development and Acquisition (HD&A) Organization is defined and tailored to accommodate the acquisition, integration, verification and test of commercially available components to develop the IWS. development of the IWS, ? IWS -- While a retains overall responsibility for the STAT has been selected to perform the hardware engineering, STAT development and installation. 0 is uniquely qualified for this role because of STAT their experience in the NDS program designing an IWS responsive to the needs of NPIC. =is also involved in other projects, such as the Navy IAIPS program, which STAT includes the design and development of work stations to support intelligence analysts. currently has an operational IWS Development Laboratory, an operational Hardware STAT a rication Facility and a prototype IWS. HARDWARE DEVELOPMENT AND ACQUISITION ORGANIZATION -- The HD&A organization consists of four departments. Figure 5.4.1-1 is a summary of the HD&A organization and each department's SOW and CDRL responsibilities. The HD&A manage responsible for the qualified IWS configurations. He reports directly to th D/C Segment Project Manager. Should additional resources or STAT areas of expertise be required, the Project Manager has ready access to obtain these resources. The four departments report directly to the HD&A manager. The Vendor Management Department will place on-site managers at each of the two vendor facili- ties, to insure their adherence to the development schedule, STAT compliance with relevant specifications and to enforce Project Quality Assurance ? UNCLASSIFIED Approved For Release 2007/09/07: CIA-RDP84T00037R000400060001-1 Approved For Release 2007/09/07: CIA-RDP84T00037R000400060001-1 UNCLASSIFIED Standards. In addition, after the initial delivery of IWS units, the Vendor Manage- 40 ment Department will monitor the repair cycle of returned items. The Hardware Engineering Department will support System Engineering in development of the CI and Component Specifications, support PDR and CDR of the IWS hardware, including the alpha-numeric terminal to graphics display interface, conduct Mean Time Between Failure (MTBF) and Mean Time to Repair (MTR) analysis, and provide the technical inter- face between the hardware and software development activities. The Installation and Checkout Department will develop the IWS facility requirements for inclusion in the Transition and Integration Plan, assemble the components into an IWS configuration, perform all tests prior to PQT, and install the IWS units at all locations. The Integrated Logistics Support Department will develop the IWS Maintenance Manual, inputs for the Segment Training Plan, and an IWS Operator's Manual. They will also develop the IWS maintenance concept, and provide for provisioning of spares and maintenance technicians at each Government site. RELATIONSHIP TO OTHER ORGANIZATIONS -- The HD&A manager will coordinate with all counterparts to ensure integrity of the IWS with the total D/C Segment. Each of the four departments of the HD&A organization are closely linked into other project organizations to insure that the hardware development is fully integrated into the total development effort. The Vendor Management Department will enforce Configuration Management and Quality Assurance standards promulgated by the Project's CM and QA organizations on the two vendors. The Hardware Engineering Department will receive the CI specification from the System Engineering Department and will function as the interface to insure that the evolving software and hardware remain compatible, and that the hardware and software portions of the Segment Development Plan remain compli- mentary. The Installation and Checkout Department will provide facility requirements, ? delivery schedules and installation schedules for the Segment Transition and Integration Plan. They will also provide installation technicians to the Project's Installation and Checkout Team and assist in tests and demonstrations at the NPIC installation sites. As installation begins, the Integrated Logistics Support Department will sup- port the Segment O&M organization and become an integral part of the on-site O&M sup- port organization. Details of the O&M Plan are contained in Paragraph 5.6 of this section. The HD&A organization will participate in all project PDR's both internal and external, all CDR's of software and products that have IWS implications, all internal configuration control boards, and all status overviews. All IWS hardware will be subjected to testing by the Project's independent Integration, Test and Transition organization as described in paragraph 5.5. ? UNCLASSIFIED Approved For Release 2007/09/07: CIA-RDP84T00037R000400060001-1 Approved For Release 2007/09/07: CIA-RDP84T00037R000400060001-1 UNCLASSI FI ED UNCLASSIFIED Approved For Release 2007/09/07: CIA-RDP84T00037R000400060001-1 ? ? is Approved For Release 2007/09/07: CIA-RDP84T00037R000400060001-1 UNCLASSI FI ED 0 ? ? Vendor Management ? SOW Primary Responsibility' - 4.6.2.3 Mod of Commercial Products ? CDRL Primary Responsibility - None as Support Activities - Monitor Vendor Performance - Coordinate Changes with Vendors - Obtain Vendor Supplied Software - Obtain Vendor Supplied Hardware - Enforce OA Requirements on Vendor - Monitor Repair Cycle for Returned Items 'Same responsibilities for corresponding IOC and FOC SOW paragraphs Hardware Engineering DiC Segment Protect Manager Hardware Development and Acquisition ? SOW Primary Responsibility' - 4.6.1 Management (11 - 4.6.2 Design - 4.6.2.1 Cl Specification - 4.6.2.2 Component Specification - 4.6.2.3 Component Specification ? CDRL Primary Responsibility 104 Inputs to Segment Development Plan - 131 Test Plans (11 ? Support Activities - Design Hardware - Conduct PDRs and CDRs - Perform MTBF &MTR Analysis - Input to Cl Specification - Input to Component Specification Product Assuranc. Installation and Checkout ? SOW Primary Responsibility' - 4.6.2.4 Test ? CDRL Primary Responsibility - None ? Support Activities - Provide Facility Requirements - Assemble Hardware - Install IWS - Perform Site Acceptance Tests - Test All Hardware at Component and Cl Level Integrated Logistics Support ? SOW Primary Responsibility' - 4.6.2.5 O&M ? CDRL Primary Responsibility - 136 Operations Manual (1) - 146 Training Manual (1) ? Support Activities - Prepare Hardware - Maintenance Concept - Develop Spares List - Provide IWS Maintenance - Input to O&M Manual NOTE: (1) IWS Input towho has CDRL Responsibl My Figure 5.4.1-1. Hardware Development and Acquisition Organization and Responsibilities UNCLASSIFIED Approved For Release 2007/09/07: CIA-RDP84T00037R000400060001-1 Approved For Release 2007/09/07: CIA-RDP84T00037R000400060001-1 UNCLASSIFIED 5.4.2 Methodology (Plans & Controls) The NPIC 1-WS will be fabricated from commercially available components, without modi- An interface cable to be used between the alpha-numeric terminal and the fications. ? graphics display will be developed. The entire IWS will be modified to comply with Tempest requirements. H/W DEVELOPMENT METHODOLOGY BASED ON USING COMMERCIALLY AVAILABLE COMPONENTS -- Figure 5.4.2-1 provides an overview of our Hardware Development Plan. Even though the IWS hardware will be fabricated from unmodified, commercially available components, com- prehensive hardware development management techniques will be used. The hardware will undergo PDR, CDR, PQT, FQT and integration testing. Figure 5.4.2-2 is an expan- sion of our hardware development plan activities and their relationship to both IWS and segment software development. The core of the hardware development activity will take place in the =Hardware Fabrication Facility (HFF). The HFF is cur- rently operational and includes all equipment, such as Factory Automatic Test Equip- ment (ATE) and Factory Special Test Equipment, necessary to fabricate the IWS. A prototype IWS is also available. This prototype will be delivered to the L__]Develop- ment and Test Laboratory for use by the Segment system engineers to support their human factors analysis. The development methodology is quite simple. The two com- ponent vendors will deliver five (5) 5216's and ten (10) B-20 alpha-numeric terminals to the HFF. Here the grap ics o alpha-numeric interface cable will be designed, fabricated and installed. The resulting five prototype alpha-numeric IWS units and the five IWS units W/CID will be tested at the CI and component level to ensure the proper functioning of all hardware and system software. STAT STAT STAT Test and Development Software developed in the Development Lab will be delivered STAT to the HFF to support the hardware verification effort. The modifications necessary for Tempest qualifications of the B-20 will be determined and implemented. The ten IWS units in the HFF will then be delivered to the = Development and Test Laboratory STAT to support Segment development. By this point, the B-20 vendor will have begun pro- duction and delivery to the HFF of 280 B-20 terminals to be prepared for BOC instal- lation and to support reliability and maintainability analysis and testing. STAT will begin production of the 500 graphics displays and begin delivery to the or assembly in IWS units, test and installation for FOC. All remaining hardware activ- ities are in support of O&M. ? UNCLASSIFIED Approved For Release 2007/09/07: CIA-RDP84T00037R000400060001-1 Approved For Release 2007/09/07: CIA-RDP84T00037R000400060001-1 UNCLASSIFIED 0 System Ragmt'f Preliminary System Spec I Analyses Trade-Offs Study Report IWS Functional Description Other Program E.perience puaom.. Aoo~o n Itt rvl Figure 5.4.2-1. Hardware Development Methodology and Plan ? ? Prototype IWS Deli vetetl 111821 Gov'ISne Delve 101WE TemR41 Owl t ed Figure 5.4.2-2. Hardware Development Activity Overview Test Development Software ? Emulators ? -11 D-aup System and ? Diagnostics Application Software D, D Vendo Iwerv Del vee Test Development Delwet Application ? 6 62 ,6 Sottwa~, Sowar z~ ~':~ dwar Fuility o Vendor Delivery X216 Test Development ? 10820 Component S"Itwar~ I? 1-dace 10 and Test Special Regmt Tempest Human Factors Interlace PDRe & CDRs Del Pr"tot IWS2 IT 821 ? In lettuce ? Tempest Mod Prototype IWS Testing ? Tempest Mods ? MTBF ? MTR Software/ Hardware Integration Testing O&M Sulworl Delwer 5 Sorywate~ Delwet IS IWS'. ? 5W CID e Tem?nt M"tl'wl v Inpmenl Te se Lab eAic IWS W'O CID 11v Halt 851 hit Halt 1984 BOCI Iltt Half 1985,1OC1 STAT STA' STA' STA' STA' STA' UNCLASSIFIED Approved For Release 2007/09/07: CIA-RDP84T00037R000400060001-1 Approved For Release 2007/09/07: CIA-RDP84T00037R000400060001-1 UNCLASSIFIED 5.4.3 Activity Plan Since the IWS Hardware consists primarily of commercially available components, delivery schedule is a minimum risk area. The first major milestone in our H/W Development Plan is the delivery to the EIDTL STAT a prototype IWS in July 1982 which will be used for human factors analysis. After interface and tempest modification designs are made and the test/development software is completed, 10 additional IWS will be delivered to the DTL in August 1983. The production versions of the IWS will begin in January 1984 when 280 A/N IWS will be installed at the Government site. Between January and June 1985, 220 A/N IWS and 100 Imagery IWS will be installed. The final shipment of 400 Imagery IWS will be made between June and September 1985. The Activity Plan schedule that correlates with the WBS is found in Figure 5.4.3-1. Tempest testing impact on production will be minimized by the use of the 5216 identified work station which is currently Tempest-certified with a color monitor. Reconfiguration with a monochrome monitor and Tempest-recertification by an experienced testing organization should not adversely affect the production schedule. Risk containment and cost risk reduction efforts include utilizing off-the-shelf components to minimize hardware/software development and reconfiguration of a Tempest-certified display system (using an established testing organization). Technical risks are reduced as a result of using commercially available components and having a prototype work station available. STAT STAT ? UNCLASSIFIED Approved For Release 2007/09/07: CIA-RDP84T00037R000400060001-1 Approved For Release 2007/09/07: CIA-RDP84T00037R000400060001-1 UNCLASSIFIED LaCAT IBM PAGE 1 OF 1 SHEET 1 SYMBOLS OF I EARLY START OR FINISH A ACTUAL START OR FINISH a LATE FINISH V DURATION :NON-C RITICAL) DURATION :CRITI CAL) TOTAL FLOAT - - LY LATE LATE 82 83 84 as 86 07 NODE NODE DESCRIPTION OUR RESP START FINISH START FINISH CDRL EA009 MANAGEMENT 0.00 30APR82 30APR82 A EA039 ---BOC SET 4 MAINT O/F/T 130.40 30APR82 3000T84 EA041 ---IOC SET 4 MAINT 0/F/T 126.20 28FEB83 30JULSS EA042 ---FOC SET A MAINT D/F/T 230.60 28FEB83 30JUL07 ER051 ---BOC INPUTS TO SEG OEV 4.20 30APR82 31MAY02 A--A EB101 PRELIMINARY DESIGN 0.00 30APR82 30APR82 A E8110 ---BOC DES & ROMTS ANAL 13.00 30APR82 30JUL82 AA E8120 --- BBC SPECS 4 INTERNAL DES RE 13.00 30APR82 30JUL82 143 A A EB130 ---IOC SPECS 4 INTERNAL DES RE 12.80 30NOV82 28FEB83 E8140 ---FOC SPECS 4 INTERNAL DES RE 12.80 30NOV82 28FEB83 E8150 ---80C COMM PROD DES MOOS 17.60 30JUN82 01NOV82 a- A E0170 ---IOC COMM PROD DES MOOS 25.80 30SEP82 30MAR63 EB180 ---FOC CORN PROD DES MOOS 25.80 30SEP82 30MAR83 EC246 CRITICAL DESIGN 0.00 31MAY82 31MAY82 A EC2117 --- BBC DETAIL DESIGN 35.00 31MAY82 31JAN63 144 EC250 ---IOC DETAIL DESIGN 39.40 30MAR83 300EC83 EC260 ---FOC DETAIL DESIGN 48.00 30MAY83 30APR84 EC280 ---BOC BUILD TO SPECS 30.20 30JUL82 28FEB83 144 EC299 ---IOC BUILD TO SPECS 35.00 28FEB83 31OCT83 144 EC301 ---FOC BUILD TO SPECS 57.00 30MAY83 02JUL84 EC308 ---BOC COMM PROD MOOS DESIGN 21.80 30JUL82 30DEC82 EC310 ---IOC COMM PROD MOOS DESIGN 43.40 30DEC82 31OCT83 EC320 ---FOC COMM PROD MOOS DESIGN 21.60 30NOV83 30APR84 EC340 ---BBC HARDWARE FABRICATION 30.80 28FEB83 30SEP83 A EC350 ---IOC HARDWARE FABRICATION 35.00 28FEB84 3000T84 A EC360 ---FOC HARDWARE FABRICATION 99.80 30JAN85 30DEC86 EC370 ---BOC COMM HARDWARE MOOS 26.20 28FEB83 30AUG03 A A EC380 ---IOC COMM HARDWARE MOOS 61.00 30AUG83 3000T84 EC390 ---FOC COMM HARDWARE MOOS 104.20 30NOV84 01DEC86 EC392 ---BBC PREPARE AS BUILT SPECS 57.00 30MAY83 02JUL84 144 EC393 ---IOC PREPARE AS BUILT SPECS 52.00 02JUL84 OIJUL85 144 EC394 ---IOC PREPARE AS BUILT SPECS 34.80 01JUL85 28FE886 EE399 TEST 0.00 30JUN82 30JUN82 A EE400 ---BOC PREPARE PROCEDURES 13.20 30JUN82 30SEP82 A A EE420 ---IOC PREPARE PROCEDURES 47.60 30SEP82 30AUG83 EE430 ---FOC PREPARE PROCEDURES 39.20 30RUG83 30MAY84 EE440 ---BOC TEST HARDWARE 13.20 30AUG83 30NOV83 A A EE4SO ---IOC TEST HARDWARE 22.00 30JUL84 31BEC84 EE460 ---FOC TEST HARDWARE 22.00 30JUL84 31DEC84 EE470 ---BOC SUPPORT 14 V 43.60 30MAR83 30JAN84 EE480 ---IOC SUPPORT T 4 V 52.40 30JAN84 30JAN65 ---A EE490 --- BBC SUPPORT T 4 V 21.60 30JAN85 01JUL85 ? EFS29 DOCUMENTATION 0.00 30JUN82 30JUN82 A EFS30 ---BBC EON MANUALS 13.20 30JUN82 30SEP82 148 8 A EFS40 ---IOC EOM MANUALS 52.20 30SEP82 30SEP83 148 EF550 ---FOC EOM MANUALS 39.20 30SEP83 02JUL84 148 EFS60 '---BBC INPUTS TO SEG/SYS OPS 17.60 30JUN82 01NOV82 0-0 EF570 ---IOC INPUTS TO SEG/SYS BPS 52.00 01NOV82 31OCT83 EFS8O ---FOC INPUTS 70 SEG/SYS OPS 39.00 31OCT83 30JUL84 EF590 ---BOC TRAINING MANUALS INPUT 17.60 31MAY82 30SEP82 EF600 ---IOC TRAINING MANUALS INPUT 8.80 OIAUG83 30SEP83 A--A [ -A EF620 ---FOC TRAINING MANUALS INPUT 4.20 30JAN85 28FEB85 r 82 83 84 BS B6 81 Figure 5.4.3-1. Hardware Activity Schedule UNCLASSIFIED STAT Approved For Release 2007/09/07: CIA-RDP84T00037R000400060001-1 Approved For Release 2007/09/07: CIA-RDP84T00037R000400060001-1 UNCLASSIFIED ?STAT Th~~ team's Integration, Test and Transition (IT&T) organization develops segment tests plans and executes comprehensive test to insure that the segment specifications and requirements are satisfied. The test program is designed to proceed in parallel with the development process to achieve the most efficient schedule. The test and verification program will be conducted in two phases. Initial testing will be conducted at the_TL and are directed at incremental build-up of hardware STAT and software components and integration testing between hardware/software subsystems to ensure ship readiness of the segment to the site. Subsequent testing is conducted at the site, starting with installation and checkout and ending with successful com- pletion of operational readiness tests. The aggressive schedule will be satisfied by parallel development of segment hardware and software, and early testing by the IT&T organization on incremental hardware and software capabilities as they become available. 5.5.1 Organization and Relationships The IT&T organization is independent from the Segment Development organization to promote a 1otitty objective and comprehensive verification process. IT&T DIVIDED INTU? FOUR DEPARTMENTS -- The Segment Planning Department is responsible for all test, integration and installation planning. The Verification and Test Department is responsible for the execution of all formal tests and demonstrations. The Training Department is responsible for providing both initial and ongoing training to Segment and System users, Operators and Maintenance personnel. The Operations and Maintenance (O&M) Department is responsible for all post-installation O&M. The manager of the IT&T organization reports to the Project Manager and will provide management of all segment test, installation and checkout, training and )&M activities. The IT&T orgauiz,ition and its SOW and CDRL responsibilities are contained in Figure 5.5.1-1. MAJOA~ ROLE IN IT&T ORGANIZATION -- While____ retains overall responsibility for STAT the IT&T ro ram, will produce all of the CDRL items assigned to the IT&T organi- STAT zation. has been selected for this role to take maximum advantage of their ten STAT years experience with the current NPIC system, includin test and integration of por- tions of the current operational software. By usin in this role has maxi- STAT mized the independence of the software development activity and the tes and verifi- cation program; a technique that has been proven to enhance the quality of systems under development. IT&T ORGANIZATION INTERFACES WITH OTHER ACTIVITIES -- From the Project System Engineer- ing Department, the IT&T organization will receive the Segment Test Plan and the Seg- ment Verification Plan for implementation. In addition, the various specifications that form the basis for test design will be provided, such as the Segment Design Speci- fication, the Data Base Specification, the various interface specifications and the Part I Specifications. Interface with the Software Development Department includes receipt of Computer Program Components (CPCs) upon which to base PQT and FQT tests. Program Trouble Reports for any software that fails a level of testing will be pro- vided to the Software Development Department for analysis and resolution. Software and hardware will be provided to the IT&T Organization for formal testing through the CM function. All support provided to the SI for customer site tests and demon- strations, including inputs, test execution and reporting will be provided by the IT&T organization. The IT&T will interface with the NDPO while designing the required CDRL items, by participating in PDR's and CDR's and providing test results analysis and test reports. II1-5-36 Approved For Release 2007/09/07: CIA-RDP84T00037R000400060001-1 Approved For Release 2007/09/07: CIA-RDP84T00037R000400060001-1 UNCLASSIFIED 0 ? Is Transition Planning D/C Segment Project Manager Integration Test and Transition Integration and Test ? S OW Prima ry Respon sibility' ? SOW Primary Responsibility' ? SOW Primary Responsibility ? SO W Primary Respons ibility - 4.13.2 Facility Planning - 4.10.1 Test Plans and - 4.17.1 Management - 4.18.1 Manageme nt Procedures - 4.17.2 Materials and User - 4.18.2 Spares - 4.10.2 Support Testing Training - 4.18.3 Software ? C DRL Res ponsibility - 4.10.3 Accomplish Testing, - 4.17.3 Operator Training - 4.18.4 Hardware - 131 Test Plan s, per Reports - 4.17.4 Maint. Training - 4.18.5 CM Segment Test - 4.10.4 Factory Pre-Ship Test, - 4.18.6 Admin. Plan Report - 4.18.7 Living - 139 Facility I nterface - 4.13.3 Installation and ? CD RL Res ponsibility Req's (IR D's) Transition - 140 Training Plan - 147 Segment Shipping - 4.13.4 Site Test and Report - 146 Training Materials ? C DRL Responsibility Plan - 4.13.5 On-Site Testing - 148 O&M Ma nual - 134 Segment tion Plan Installa- - 4.13.6 Support Demos 'Same responsibilities for corresponding IOC and FOC SOW paragraphs ? CDRL Responsibility - 154 Test Reports, each Test - 153 Demo and Report Inputs NOTE: All CDRLs in this Figure are Figure 5.5.1-1. Integration Test and Transition organization and Responsibilities Product Assurance I ? SOW Primary Responsibilities J - 4.10.1 Test Procedures' - 4.13.1 Installation, Checkout & Test Management' UNCLASSIFIED Approved For Release 2007/09/07: CIA-RDP84T00037R000400060001-1 Approved For Release 2007/09/07: CIA-RDP84T00037R000400060001-1 UNCLASSIFIED 5.5.2 Methodology Segment Testing insures that each requirement in the specification is satisfied and the D/C Segment performs in a quaZitive and quantitative manner as originally designed. BUILDING BLOCK APPROACH USED FOR VERIFICATION -- The test program is a multilevel verification sequence, requiring quality conformance check points to be satisfied before proceeding to each higher level of testing. Figure 5.5.2-1 provides an over- view of the complete Test and Verification program. TEST PLANS ARE BASED ON REQUIREMENTS FROM D/C SEGMENT SPECIFICATIONS -- NPIC require- ments and program implementation test directives were allocated to the D/C Segment Design Specification in the DCP Phase. These Design Specifications will be allo- cated to the appropriate CPCI/CI Part I Development Specifications during SAP. The test requirements will be allocated to the specification Quality Assurance sections and also provide inputs to the Test Plans. The Requirements Traceability and Verifi- cation Matrix shown in the Technical Proposal (Appendix A3) will trace these alloca- tions. VERIFICATION PLAN PROVIDES GUIDANCE TO THE TEST PROCESS -- The Segment Verification Plan provides primary guidance as to the verification methods, analysis, inspection, test and demonstration to be used during testing. The plan contains a Verification Status Matrix for each formal test and will be completed at the post-test briefing session following a formal test activity. At pre-ship CM will audits these Verifi- cation Matrices and review them as part of the acceptance process. Figure 5.5.2-2 provides an overview of the Verification Plan including the test categories, docu- mentation, verification method, tools and responsibilities. TEST PROCEDURE -- Each test is planned, performed and documented by the responsible organization using qualified test tools and equipment. Tests are conducted using test plans and procedures prepared by Engineering, System Engineering, Software Develop- ment, or Transition, Integration and Test. The method of specification requirements verification is driven by the Segment Verification Plan. OPERATION READINESS TESTS -- Successful operational readiness tests will be con- cluded with trained operators, users and managers in a simulated real time environ- ment. The Integrated NPIC System will be used to train operations personnel using simulated scenarios, manuals, positional guides and checklists. TOOLS FACILITATE TESTING -- Diagnostic tools provide the capability for integrating the communications network with the host computer and the integrated work stations. The Test and Training CPCI provides the scenario generation capability to conduct formal software tests and serves as an aid in the training activities. The Tele- processing Network Simulation program provides the capability of simulated loading of terminals to verify response timings. Data Reduction tools will support the analysis of the test results. TESTING DOCUMENTATION -- Testing documentation is tailored to specific tests and con- froms to the data requirements. CPCI and CI formal test plans will be developed in accordance with the Segment Verification and Test Plans and will be reviewed in PDR's and CDRs prior to testing. Site planning for equipment layouts and segment shipping will be documented in advance. CPCI test plans will be submitted incre- mentally as appendices to a summary index volume. Test reports will be sumitted at the conclusion of each formal test. An overview of the Test Documentation Tree is presented in Figure 5.5.2-3. ? is 111-5-38 UNCLASSIFIED Approved For Release 2007/09/07: CIA-RDP84T00037R000400060001-1 Approved For Release 2007/09/07: CIA-RDP84T00037R000400060001-1 ? ? ? NP/C Requirements Requirements DC Segment Design ? DC Segment Specs ? Derived Requirements as 4.0 Duality Assurance ? ... m.~wi ow=.. w~, ? Me,uye? Segment Verification Plan ? Verification Status Matrix CPCI Test Cl Test CI/CPCI S Sys. Test - I/C. Seg. Test Ye Deficiency No Accept Reports CPCI Development Specifications DC Segment Test Plan ? CPCI Tests ? Cl Tests ? CI/CPCI ? I/C Seg. Test Software Design Requirements r CPCI Test Plan Cin Hardware Test Guidance CPCI Design Specifications CI/CPCI Subsystem Test Plan Cl Test Plan Installation/Checkout Segment Test Plan Informal CPCI Test Plan Verification Status Matrices Spec Par eq Verification Method Test Case Status ID Comment 3.1 Func. X T I Pass JO None Figure 5.5.2-1. Test and Verification Methodology Overview Approved For Release 2007/09/07: CIA-RDP84T00037R000400060001-1 Approved For Release 2007/09/07: CIA-RDP84T00037R000400060001-1 UNCLASSI FI ED Test Test Documentation Verification Method Test Tools/Equipment Responsibility Algorithm Internal Inspection Test Programs/Utilities System Evaluation Test Analysis Test Engineering Engineering Test Internal Inspection Scopes, Meters/Sig. Generators Hardware and Evaluation Test Comparators, Test Program Engineering Drivers Unit Internal Inspection Static Data, Debug Aids Software Test (Trace, Dumps) Development CPC Internal Inspection Test Drivers, Debug Aids Software Test Development Informal H/S Internal Demo Diagnostics, Scopes, Data IT&T Software Integration Test Generators, Recorders, High Development Speed Dumps Prelim. Qual. Approved Plans/ Test Test Drivers, Scenario Generator, IT&T Reviewed Procedures Data Log, Data Reduction Programs Formal Qual. Approved Plans/ Test Scenario Generator, Data Log, IT&T Reviewed Procedures Data Reduction Programs CI Qual. Approved Plans/ Test Scenario Generator Data Log, IT&T Reviewed Procedures Data Redirector, Operator Inputs H/S Subsystem Approved Plans/ Demo Test Scenario Generator, Data Log, Data IT&T Reviewed Procedures Reduction Program, Teleprocessing Network Simulator, GFE Simulators Installation/ Approved Plans/ Inspection Diagnostics, Scenario Generator, IT&T Checkout Reviewed Procedures Demo Test Data Log, Data Reduction Programs Intrasegment Intersegment System Integration Demo Test Scenario Generator, Data Log, Data SI H/S Test Plan/Procedures Reduction Program, Test Data Base, Prepared by SI Operator Inputs Team Level Training Plans Demo Test Data Base, Scenario Generator, IT&T Training Data Log, Data Reduction Program, Operational Position Procedures System Scenarios/Checklists Demo Simulated Data, Operational Checklists, GOVT. Operation Trained Govt. Personnel Readiness Figure 5.5.2-2. Segment Verification Plan 40 ? is UNCLASSIFIED Approved For Release 2007/09/07: CIA-RDP84T00037R000400060001-1 Approved For Release 2007/09/07: CIA-RDP84T00037R000400060001-1 UNCLASSIFIED 0 Test Documentation Will Be Delivered On Schedule Segment Verification Plan DRD 734 Segment Test Plan DRD 718 PDR30 CDR-30 Requirements Trace ability and Veri- fication Matrix DRD 717 PDR-30 CDR 30 Hw Quay EMC Cl Test Plans CPCI Test Plans POT FQT Reduncy-~ DRD 814 P 0 DRD 814 CI DR r6 CDR 30 PDR 160 CDR-30 CPCI Test Test Procedures Cl Test CPCI Test Procedures Report Report DRD 733 DAD 733 CI/CPCI Subsystem PDR460 CDRL 131 Test Plan CDR 30 r Volume I Cl/CPCI DRD 814 CDRL 131 Summary Subsystem C & Index Test Procedures CI/CPCI P CPCI Test Subsystem C Plans ? Test Report Tr15 I PDR 30 Facility DRD 733 Appendix A CDR 30 IDR5 Test Plan Sig T DRD 742 CPCI A Segment Transition and PDR 30 Integration Plan CDR 30 Appendix B DRD 726 H WDEL 90 P Test Plan Shippm9 Pl CDRL L CPCI B an A DRD 824 Installation Check N Appendix "N" out and Segment PDR160 S Test Plan Test Plan CDR 30 L CPCI "N" Segment DRD 814 PDR 30 Installation CPCI Append CDR 30 Plan Shrp 60 DRD 815 Installation Check BEPPRE A out and Segment BEMGMT B Test Report BERESU C In ll tio t DRD 733 BMANIP D s n a a BSTATR E Checkout and ment Test Se stem S BMMGMT F g Procedures y Test, Demo BCCNTR G BOUERY H Plan DRD 826 BAPPLS j CDRL 153 BDMAPS L System BTTDEV M Test/Demo PI OCedU R's System Test/ Demo Report WAPPLS 0 BEXSUP P DRD 733 T r 15 ? Figure 5.5.2-3. Test Documentation Tree UNCLASSIFIED Approved For Release 2007/09/07: CIA-RDP84T00037R000400060001-1 Approved For Release 2007/09/07: CIA-RDP84T00037R000400060001-1 UNCLASSIFIED 5.5.3 Activity Plan Verification and Test Activities are consistent with the master schedule and meet the project milestones by incremental integration and testing in parallel with soft- ware development. Development integration and testing of CPCI and CPCs will be conducted using an incre- mental approach, emphasizing control and visibility of the software products. CPCs will be tested independently then grouped into strings for inter CPCI integration and test. Strings will be integrated one at a time; building on the first string as the baseline. Figure 5.5.3-1 shows CPCI source lines of code integrated and tested per quarter. The major milestones for integration and testing for each CPCI are shown in Figure 5.5.3-2. The test planning, transition documentation and test activi- ties time lines are detailed in Figures 5.5.3-3. CPCI/CPSs Will be Incrementally Integrated and Tested. 1983 1984 198 5 CPCI 1 2 3 4 1 2 3 4 1 2 3 4 BEPPRE 23.8 44.5 47.3 7.2 11.0 - - -- - - BEMGMT 23.3 14.0 -- 20.3 23.3 8.0 -- 54.3 BEXSUP 70.0 93.0 2.5 - - -- BDDMSI' - - - - - - - - - - BMANIP 99.4 - - 85.7 - -- BSTATR - - 13.0 32.0 2.9 - - -- WSYSTM' - - - BMMGMT - - -- - - 8.0 - 13.0 13.0 0.5 - BCCNTR - 4.0 -- 27.0 - - - 4.0 4.0 4.0 - BQUERY - - 24.3 - 38.8 -- - BAPPLS 34.3 32.4 18.5 - - 5.0 - BDMAPS - 6.0 9.0 2.7 - 7.0 29.0 0.5 BTTDEV 13.9 - - 7.2 18.0 - - - -- 5.0 - -- BERESU --37.0 24.2 -- - BSYSM - - - - WAPPLS 25.0 25.0 55.5 55.5 55.5 55.5 - - - -- FE SYS SW" - -- - TOTAL 193.0 123.8 377.9 162.9 173.7 167.2 42.0 54.8 17.0 22.0 4.5 Figure 5.5.3-1. Source Lines of Code (X103) Integrated/Tested per Quarter is ? ? UNCLASSIFIED Approved For Release 2007/09/07: CIA-RDP84T00037R000400060001-1 ? IDC FCC SEGMENT VERIFICATION PLAN SEGMENT TEST PLAN AM. TRACE AVER. MATRIX CPCI TEST PLAN DEPPRE w. BERESU /IINIP SSTATR ameff /CCNTR OQUERY SSYSM CAPPLS BODM6I EOMAPS 8TTOEV WSYSTN ? NAPPLS !E)CSIP INS TEST PLAN I16 TEST REPORT O'CI/IWS SIDSYS. TEST PLAN SEGMENT T I I PLAN FACILITY IONS 91IPPING PLAN SE6IENT INST. PLAN INST/OOOOUT/SEG TEST PLAN SYSTEST/DOO PLAN 115-UTS INS FACTORY TEST I16 INTGMA. TEST IGFEI I?M/SN SUSSYS TEST Ib1/SN SUSSYS TEST APT. INST./DEOOUT SEG. TEST I/C SEGMENT TEST APT. INTER SEGMENT TEST INTER SYS TEST TRAINING SYS OPER READINESS REVIEW SYS TEST DEC REPORT Approved For Release 2007/09/07: CIA-RDP84T00037R000400060001-1 ? ]P 1E M I P I M P I !11 :4, 1 BIC P 14 IJOC F P F p T F P FA A6 I Jac P P mx: F F I T P F T F T F 4__ AW 6 4 F T p F T P F T P I T - P F T [ T 0 E 1111 P F T -A b P F F T I P F I T P P F PA DI A F P F U p F U F so PC JP4 1 U F I F P F I DO ? J F M? M J J A'S O KID A] A I F ? ? ? I I I J F N? N J J 1 S O N D J F N A N J J? 5 O M D J F M? M J J? 5 0 M D J F N A N J ,A S O N D J !JAN J J A S O Figure 5.5.3-2. IT&T Major Milestones Approved For Release 2007/09/07: CIA-RDP84T00037R000400060001-1 Approved For Release 2007/09/07: CIA-RDP84T00037R000400060001-1 UNCLASSIFIED 0 0 ? 111-5-44 UNCLASSIFIED Approved For Release 2007/09/07: CIA-RDP84T00037R000400060001-1 Approved For Release 2007/09/07: CIA-RDP84T00037R000400060001-1 Irk nwe 1 r SKkn I M I tf Em l 11111 03 211111 e M 111103 1 KIN 13 50 LITE lIYIN t .1114 IM1-M111(ILI .MT I0 6111 I(ILl IN,. Rat 1 , AV11a 3.211 I KM ST. INSLLI IIIISY itn1 rIi ( CML f 1, 1. IN I-rl-rs I, To 1, N 7 11 1, Is )III TESL t TEAT!lfela 0.00 311411 ~Oar112 1 I1/l IIMS0K8T 0.00 1042202 61,14 I KID ---r( 3011 MG TEST SET .1. 1Nne, 001(11 Ktl ---IK MT KG TEST 304 .25. 20 rM(1T lames 11 NII ---rot yT MG TEST OCT ---K TIP RIY1 210.20 1110 luaxe 10 ~m erl m/uY1I IOY.IM 111 -ti 0031 --IK TIES" Iles 13.000 1034201 )010360 131 0033 ---IK TEST 21303 11.10 INPM~ 1051,151 131 SI ---K TEST r1K80315 13.00 01101..' 003el' 0011 ---IIC TEST PK0ONf5 ESTATES ! Il 10 f 303ve/ 1000033 l II a-~ M' i[1 2111 ---K LIE x.00 rM[1131 10a11Il I k---ti 1111 TEST su""T 0."1 ]Nam 1031111 e 0013 ---K N N 1 NT 0003 T[ 11K U.20 3MM1U 30NGoI e~ yl } 201 ---IIS N K 1 031 203 TETK S 0 + 1.0 1 1 1034111 30 1mN 1 ~e -Jot N Na 1 031 Ia ITS - 0.34 000(1151 0203(15. l e--e 111(1STI00 TEST 0.00 3003311 3010113 e ---K IITEI-CKI 5.03 3011011 30Kr13 1--e I ---IK IM1ES-1301 1.03 311.. 10011111 1 1"'e Coal ---IK 111[1-CPCI 1.10 3111013 100[(03 I 1 ---K IYI[A CI ---IK IYIII CI 5.03 0.03 3113013 3011055 gKr13 IO1Re5 H 1'-1 ---IK IYIIA (I 5.03 3011113 l000(13 !r ??-K 113EISi[0 32[1/[1 11.00 311181 100!(13 11 ---IK EI TEO 3301I 11.03 rML15 10)0015 ---K KMIS 0.30 3101!13, 3001011 I --- ]at REPORTS 5.k 210015 OIAMI5 1-0 I T T 111[0312 TEST 0.00 l 11KTISI 11KT13 e ro ???K P . 111[0311 I.SO AKIN 3011(11 I ?- IK P . M[NII 1.20 31031151 241115 N 3 ---IK IrIIA. 133111 1.20 3004031 24185 ~ 00 ---K KM IS 5.20 03[(111 10mY15 ly I ---I. KM IS 1.10 Me. OIrNS to 1 ---1. KM'S 1.10 2MIMS 0110305 11 121001-/la CKCIai I TEST 0.03 2111302 IaMN e 30 Killll IL30KIK 0.00 3110112 )0118 e 30 ?--K IKII'll P65IK 1s.20 031082 0111013 1 11 ---lot 13011111 30111130 TE.00 210033 301 . " --IK /KILITI PLMIK - 12.50 "k*11 3130111 ---K INS 15.20 10APN2 01/0031 is --- lot 100?S 11.00 24E301 31031. 113 ---FE Ir?1 12.10 33 03 31KTI T" I I00100LITIa 4 CKC0a1 0.00 1030012 WG02 e ---K 18 NII III 31301. 3011115 TIM M-1 ---100 "S 1x11 P1 5.50 Slot[. N1M5 112 ?--rot "S NIP rya 1.10 )ISMS 305115 111 e--e ???K "S IrTILLITII TIN 11.00 310(0812 21[031 131 ?--130 "S INTALLITIII PL11 1.00 152311 31K113 Ill tti 111 ---rot 01S I"IILLITIa ft. 5.50 1130[. N~s 111 no .--SK NIP. INSTILL 4 (K(1N 0.00 I even 2M1Ns e 111 -?300 NIP. INSTILL L (K(1a 1.31 I 3101(. 2MErs 111 -??K 013 IMES I Tab 11.2 NRCIS 311111 81 --?IK "S '"ES G TIAIS 1.03 2M1MS 015115 I-. ui --Jot "3 IeES l Tall 60.03 o1Nlh 01",30 I III x0318 TEST 0.00 34031 JINNI e ?-r( rpa I.N 1011111 351. a-'ti 76 --IK P 9VAlk 1.03 015111 "11155 ~I ?-Jot PNKI /.N 31)4115 a01M t ... WE Nepal 1.50 3110001 35Th IM e"0 is -?-IK KMl 1.50 3310113 31_18 IM e--1 -?-IK SPOT 5.M IIAK1 31KM IM t. 1 SITE IIIII 013 01301 0.8 300033 30APOI e 11 ---K 103111/ Ti SI 1.14 "1033 1MIRIl t 5 I --- JOE 15YTE 10 11 11.31 hKI. !lot[. 1 --Jot 15011 10 fl 1.03 0100[11 200[301 ---K N SITE 1[1111 11.30 0011. 311115 ~~ ---IK a SIT! 1ESIIK 11.20 100(11. 03304. ~1 --400 a SIZE 1[5IIK 1.20 110(13015 3151/3 a-S - N"", KMI IYNT 5.31 OIK1N 311(1. e-+ ---IK KMI IYN1 0.20 111th 311th H -Jot KMT IYN= IN 111188 310083 a-. INI Sam 5 at-" 0.30 31Kn3 3111303 e p11 ---K INNS Ti SI 1112 180111 1101[13 IN KI ---IK INS 11 SI 8.21 311111 2111" NO KI -Jot I5"S 11 at 1.00 2M[r5 315005 IN ~1 Ilr --K TEST III PNT 21.2 Ilr-r 3000111 3111 ??IK TEST 1113011 1.00 351" 301. Ir --Jot 1111 II/ENT rr . "11011 30?h IK ??K -am 1511 1 .30 113014 3Kla A"1 1130 ??K 1111 15111 0.21 Ili" "x55 1--1 Figure 5.5.3-3. IT&T Activity Schedule UNCLASSIFIED UNCLASSIFIED STAT Approved For Release 2007/09/07: CIA-RDP84T00037R000400060001-1 Approved For Release 2007/09/07: CIA-RDP84T00037R000400060001-1 UNCLASSIFIED 5.6 Operations and Maintenance Plan ^ understands the importance of O&M activity to the success of NDS and will pro- is STAT rode an experienced team for all necessary support to NDS during this critical phase of the project. I The primary objective of the O&M activity for the D/C Segment is to maintain the system and to provide technical support on-site for the BOC, IOC, and FOC O&M periods. Our approach to O&M is cost effective because it is based on a limited number of on-site staff that relies heavily on off-site support to meet system needs as they arise. A summary of the features of this O&M Plan are: a. On-site maintenance support at both b. Field Engineering Division maintains standard software products and commercial hardware under standard GSA contract. c. On-site, depot level repair of Integrated Work Stations with the Govern- ment assuming responsibility for half the IWS maintenance workload. d. Factory Development and Test Laboratory and off-site expertise used for application Software maintenance through IOC Factory Acceptance Testing (FAC). e. All required expertise consolidation on-site 0&M team after IOC-FAC. f. OJT for Government Software Personnel by participating in Applications ? Software problem analysis and resolution. An assumption is made that Govern- ment personnel will be responsible for approximately half of the S/W main- tenance during the O&M time frame. Active participation and cooperation with NDPO, SI and Configuration Control Boards. h. Formal Discrepancy Report Procedures established to monitor all problems and track their timely resolution. This 0&M Plan is related to the other plans in this section by requiring reference material inputs from Systems Engineering (requirements and design), Software Develop- ment (CPCI documentation), Hardware Development (IWS documentation), Verification and Test (diagnostics and acceptance criteria) and Training (user, operations and maintenance procedures). ? STAT STAT Approved For Release 2007/09/07: CIA-RDP84T00037R000400060001-1 Approved For Release 2007/09/07: CIA-RDP84T00037R000400060001-1 UNCLASSIFIED 0 40 111-5-47 (Blank) UNCLASSIFIED Approved For Release 2007/09/07: CIA-RDP84T00037R000400060001-1 Approved For Release 2007/09/07: CIA-RDP84T00037R000400060001-1 UNCLASSI FI ED 5.6.1 Organization and Relationships Two distinct O&M organizations have been structured--the initial organization makes full use of the Factory Development expertise through IOC factory acceptance testing and the latter organization consolidates this expertise on-site after the Develop- ment and Test Laboratory is closed. O&M PHASE 1 ORGANIZATION DESCRIPTION -- The initial organization maintains a close relationship between our on-site O&M staff and our off-site (factory) development expertise. The on-site staff will provide direct contact with system users and the NDS Operations Staff to respond to discrepancy reports (DR) and to provide initial assessments of problem diagnosis, required resources and time frame required to accom- plish corrections. The on-site staff also provides maintenance and depot-level repair of integrated work stations and maintenance of _ hardware and standard software products by the _ Field Engineering Division. Figure 5.6.1-1 delineates the O&M Phase 1 Organization and Responsibilities in rela- tion to SOW tasks and planned activities. The O&M manager will be on-site and will be a single point of contact for all O&M activity. Three groups will also reside at the site. The Technical Support Group will be primarily responsible for analyzing discrepancy reports and assuring the problems are adequately resolved. The Hardware Maintenance Group will be primarily responsible for the repair of the Integrated Work Stations and the commercial hardware. The Software Maintenance Group will be respon- sible for coordinating all software fixes including standard S/W products and applica- tion programs. During the Phase 1 organization time frame, most application software problems will be analyzed and resolved at the Factory rather than at the site. The Project Control Office will maintain configuration control and update all required documentation to assure consistency in the baseline. O&M PHASE 2 ORGANIZATION DESCRIPTION -- The Development and Test Laboratory will be closed after the IOC Factory Acceptance Test and the required expertise to maintain the D/C Segment will be transferred to the on-site location. The Phase 2 organiza- tional structure and responsibilities are shown in Figure 5.6.1-2. Each organiza- tional group will retain their basic responsibilities from the Phase 1 organization with the following exceptions: The Technical Support Gourp will take on the additional responsibility of coordinating computer time and developing procedures at the site for problem isolation and resolution since the Factory computer facilities will no longer be available. The Software Maintenance Group will take on the additional responsibility of correcting all application code problems. However, this group will have on-call backup expertise available at the Factory in the Engineering Support Group if the need does arise. JUSTIFICATION -- The two phase approach to O&M organization is justified based on the availability of the Development and Test Laboratory at the factory. The objec- tive in the Phase 1 organization is to provide a limited number of on-site personnel while supporting the maintenance of the H/W and S/W with the best expertise avail- able. This expertise will be selectively transferred to the site upon the closing of the lab. The structure of the O&M organization is justified based on the following factors: a. An O&M manager is needed to serve as a single point of contact for all O&M activities at the site. b. A Technical Support Group is needed to evaluate Discrepancy Reports to coor- dinate and assign responsibility for resolution, and to assure that the fix adequately resolves the problem. ? STATI STAT ? UNCLASSIFIED Approved For Release 2007/09/07: CIA-RDP84T00037R000400060001-1 Approved For Release 2007/09/07: CIA-RDP84T00037R000400060001-1 UNCLASSIFIED ? ? ? c. A Hardware Maintenance Group is needed to maintain both the IWS and the standard commercial hardware F_ I and to assure a consistent approach to maintenance is o owe . Phase 1 O&M Organization Draws Upon Factory Development Expertise as Required Project Control Office Subcontract Acquisition Management ? SOW Primary Responsibility - 4.18.5 Configuration Control Subcontractor Support and Control - 4.18.3 Update S/VV Documentation - 4.18.4 Update H/W Documentation - 4.18.6 Administrative Support - 4.18.7 Travel and Living ? Support Activities - Maintain Versions/Baselines - S/W Library Updates - Product Assurance I DIC Segment Project Manager Integration Test and Transition Guidance & Test Support For All Site Activities Operations and Maintenance Product Assurance Systems Engineering Problem Analysis Support Segment Development Problem Resolution 4 Support Development and Test Laboratory ? SOW Primary Responsibility - 4.18.1 O&M Management ? Support Activities - Draw Upon Factory Expertise as Required - Schedule Vendor Support - Manage Discrepancy Reports - Assure Problem Resolution - Allocate Resources - Provide Liaison to NDPO & SI - Serve on CM Control Board - Coordinate Project Control Office Activities Technical Support ? SOW Primary Responsibility - 4.18.3 S/W Problem Resolution Support - 4.18.4 H/W Problem Resolution Support ? Support Activities - Analyze Discrepancy Reports - Define Fix Strategy /Responsibility - Follow-up on all Problems - Verify that Fix Resolves Problem - Assist in Conversion to Backup/Backcut Mode - Analyze Engineering Change Proposals - Provide Operational Guidance Hardware Maintenance ? SOW Primary Responsibility - 4.18.4 H/W Maintenance - 4.18.2 Spares ? Support Activities - Provide Maintenance on IWS and Commercial H/W - Maintain Spares lnvensory - Provide Preventative Maintenance - Install Engineering Changes Software Maintenance ? SOW Primary Responsibility - 4.18.3 S/W Maintenance ? Support Activities - Provide S/W Maint. - Execute Diagnostics to Locate Problems - Correct Stnd Product S/W Problems - Coordinate Correction of Application Problems - Install and Test Corrected Versions Figure 5.6.1-1. Phase 1 O&M Organizational Responsibilities d. A Software Maintenance Group is needed to coordinate and resolve all soft- ware fixes--both in standard software products and in application code and to assure that segment and system integrity is maintained throughout O&M. ORGANIZATIONAL RELATIONSHIPS -- Within theuD/C Segment organization, the O&M organization relies heavily on the Project Control Office for configuration and docu- mentation of the baseline. The Subcontract Acquisition Management department manages the subcontractor support needed during O&M. The Systems Engineering and Segment Development groups provide off-site support to O&M in problem analysis and resolution as needed. After the closure of the Development and Test Laboratory, the Project Office will assume Subcontractor Management functions and the systems engineering and development expertise will be consolidated into an Engineering Support function. The O&M organization will support the NDPO and the SI in operational analysis and problem resolution. In addition, the O&M organization will actively participate in the Interface Control Working Group with other Segment contractors and the NDPO Con- figuration Control Board. Following each major delivery (BOC, IOC, FOC), Current Operational Capability (COC) baseline H/S/O items will be conducted to provide the departure point for O&M con- figuration Control. Management of H/S/0 products during O&M periods will take place largely through tracking DRs, Requests for Change, Engineering Change Proposals (ECP), Specification Change Notices (SCN) and MTMs. Through accurate accounting procedures, the status and priority of any change will be followed through to implementation. IBM will provide NPIC on a periodic basis a summary of pertinent change status informa- tion reflecting all active change documents. me SEGYE PROJECT -AGE. ? sawRwpavbrn IS..w Ph.o1O&MI ? Sppon Annum. IS..w n...e 1 O&M) Pia - Skamrna Sawort ..it Grod rL epy1l M tan ? Sn R.Wsw.binr IS- w Pew 1 oeM) ? Spon Ante - P&n Cawaw.. Came.... Tim. .ml Rrwenw n Sm I. Irob.m R.toim- nsa Gmrtmn p No$ op-?b Sye... ? Sow Repowbrtr (Se w P1.t. I O&M) ? mI invw pwt - 0.