NPIC DATA SYSTEM DATA AND CONTROL SEGMENT ACQUISITION PHASE APPENDIX B1 STATEMENT OF WORK
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP84T00037R000500040001-2
Release Decision:
RIPPUB
Original Classification:
U
Document Page Count:
458
Document Creation Date:
December 28, 2016
Document Release Date:
September 6, 2007
Sequence Number:
1
Case Number:
Publication Date:
February 24, 1982
Content Type:
REPORT
File:
Attachment | Size |
---|---|
![]() | 14.26 MB |
Body:
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
UNCLASSIFIED
NPIC DATA SYSTEM
DATA AND CONTROL SEGMENT
ACQUISITION PHASE
APPENDIX B1
STATEMENT OF WORK*
Proposal in Response to
RFP 82-B-015
UNCLASSIFIED
STAT
STAT
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
UNCLASSIFIED
NPIC DATA SYSTEM
DATA AND CONTROL SEGMENT
ACQUISITION PHASE
APPENDIX 131
STATEMENT OF WORK*
Proposal in Response to
RFP 82-B-015
?
This data, furnished in connection with Request for Proposal 82-B-015 as amended, shall not be dis-
closed outside the Government and shall not be duplicated, used, or disclosed in whole or in part for
any purpose other than to evaluate the proposal. If a contract is awarded to this offeror as a result of
or in connection with the submission of this data, the Government shall have the right to duplicate,
use, or disclose the data to the extent provided in the contract. This restriction does not limit the
Government's right to use information contained in the data if it is obtained from another source
without restriction.
* Includes Subcontractor SOWs
UNCLASSIFIED
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
STAT
STAT
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
UNCLASSIFIED
?
The D/C Segment Acquisition Phase Statements of Work (S.O.W.s) are contained in this
volume. The four S.O.W.s are:
1. Contract S.O.W.
2. 3.0.W. for the
3. 3.0.W. for the
4. 3.0.W. for the
subcontract. STAT
STATT
STAT
The Contract S.O.W. was prepared in accordance with the Government Work Breakdown
Structure (GWBS) as shown in Section 3.3 of the RFP and the Contract Deliverables
Requirements List (CDRL) as shown in Section 3.4 of the RFP. The S.O.W. specifically
references the GWBS and explicitly allocates the preparation of the CDRL items to
specific S.O.W. tasks. The Contract S.O.W. defines the program structure in suf-
ficient scope and depth to meet the requirements stated in Section 3.2 (Applicable
Documents) of the RFP in accordance with the milestones stated in those documents.
Also included in this volume are an updated Contract Work Breakdown Structure and an
updated CDRL.
UNCLASSIFIED
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
UNCLASSIFIED
DATA AND CONTROL (D/C)
SEGMENT ACQUISITION PHASE
STATEMENT OF WORK
?
UNCLASSIFIED
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
UNCLASSIFIIED
10
SECTION
TITLE
1
INTRODUCTION
1-1
1.1
OBJECTIVE
1-1
1.2
SCOPE
1-1
1.3
BACKGROUND
1-1
1.4
GOVERNMENT D/C SEGMENT MANAGEMENT
1-2
1.5
CONTRACT WORK BREAKDOWN STRUCTURE
1-2
1.6
CONTRACT DATA REQUIREMENTS LIST
1-2
2
APPLICABLE DOCUMENTS
4
DESCRIPTION OF ITEMS
4-1
4.1
PROJECT MANAGEMEN7
4-1
4.1.1
Project Management
4-1
4.1.2
4.1.3
Project Control
Quality Assurance
4-1
4-2 ?
4.1.4
Configuration Management
4-2
4.1.5
Security
4-2
4.1.6
Status Reviews
4-2
4.1.7
Subcontractor Management
4-2
4.1.8
Document Publication and Control
4-2
4.2
SYSTEM ENGINEERING
4-3
4.2.1
System Engineering Management
4-3
4.2.2
Analysis
4-3
4.2.3
Operations Engineering and
4-3
4.2.4
Development
Design
4-4
4.2.5
Transition and Integration Planning
4-4
4.2.6
and Support
Test Support
4-4
4.2.7
Configuration Management Support
4-4
4.2.8
Technical Reviews
4-4
4.3
SOFTWARE DEVELOPMENT - BOC
4-5
4.3.1
Software Development Management-BOC
4-5
4.3.2
Computer Program Configuration
4-5
Items (CPCI) - BOC
?
UNCLASSI FI IED
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
UNCLASSIFIED
0
4.3.2.1
CPCI Preliminary Design-BOC
4-5
4.3.2.2
CPCI Critical Design-BOC
4-5
4.3.2.3
CPCI Development-BOC
4-5
4.3.2.4
CPCI Test-BOC
4-5
4.3.2.5
CPCI Documentation-BOC
4-5
4.4
SOFTWARE DEVELOPMENT - IOC
4-6
4.4.1
Software Development Management-IOC
4-6
4.4.2
CPCIs-IOC
4-6
4.4.2.1
CPCI Preliminary Design-IOC
4-6
4.4.2.2
CPCI Critical Design-IOC
4-6
4.4.2.3
CPCI Development-IOC
4-6
4.4.2.4
CPCI Test-IOC
4-6
4.4.2.5
CPCI Documentation-IOC
4-6
4.5
SOFTWARE DEVELOPMENT - FOC
4-6
4.5.1
Software Development Management-FOC
4-6
4.5.2
CPCIs-FOC
4-7
4.5.2.1
CPCI Preliminary Design-FOC
4-7
4.5.2.2
CPCI Critical Design-FOC
4-7
4.5.2.3
CPCI Development-FOC
4-7
?
4.5.2.4
CPCI Test-FOC
4-7
4.5.2.5
CPCI Documentation-FOC
4-7
4.6
HARDWARE DEVELOPMENT - BOC
4-7
4.6.1
Hardware Development Management-BOC
4-7
4.6.2
Configuration Items (CI)-BOC
4-7
4.6.2.1
CI Preliminary Design-BOC
4-7
4.6.2.2
CI Critical Design-BOC
4-8
4.6.2.3
CI Development-BOC
4-8
4.6.2.4
CI Test-BOC
4-8
4.6.2.5
CI Documentation-BOC
4-8
4.7
HARDWARE DEVELOPMENT-IOC
4-8
4.7.1
Hardware Development Management-IOC
4-8
4.7.2
Cis-IOC
4-8
4.7.2.1
CI Preliminary Design-IOC
4-8
4.7.2.2
CI Critical Design-IOC
4-8
4.7.2.3
CI Development-IOC
4-9
4.7.2.4
CI Test-IOC
4-9
4.7.2.5
CI Documentation-IOC
4-9
4.8
HARDWARE DEVELOPMENT - FOC
4-9
4.8.1
Hardware Development Management-FOC
4-9
4.8.2
CIs-FOC
4-9
4.8.2.1
CI Preliminary Design-FOC
4-9
4.8.2.2
CI Critical Design-FOC
4-9
4.8.2.3
CI Development-FOC
4-9
?
UNCLASSI FI ED
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
UNCLASSI RED
SECTION
TITLE
4.8.2.4
CI Test-FOC
4-9
4.8.4.5
CI Documentation-FOC
4-9
4.9
AUTOMATED DATA PROCESSING EQUIPMENT (ADPE)
4-9
4.9.1
(HARDWARE AND SOFTWARE)
Procurement
4-9
4.9.2
ADPE Test
4-10
4.9.3
Government Furnished Equipment
4-10
4.10
TEST AND VERIFICATION - BOC
4-10
4.10.1
Test Management-BOC
4-10
4.10.2
Test Support-BOC
4-10
4.10.3
Integration Test-BOC
4-10
4.10.4
Factory Pre-Ship Test-BOC
4-10
4.11
TEST AND VERIFICATION - IOC
4-10
4.11.1
Test Management-IOC
4-11
4.11.2
Test Support-IOC
4-11
4.11.3
Integration Test-IOC
4-11
4.11.4
Factory Pre-Ship Test-IOC
4-11
4.12
TEST AND VERIFICATION-FOC
4-11
4.12.1
Test Management-FOC
4-11
4.12.2
Test Support-FOC
4-11
4.12.3
Integration Test-FOC
4-11
4.12.4
Factory Pre-Ship Test - FOC
4-11
4.13
INSTALLATION, CHECKOUT AND TEST - BOC
4-11
4.13.1
Installation, Checkout and Test
4-11
4.13.2
Management-BOC
Facility Planning-BOC
4-11
4.13.3
Installation and Checkout-BOC
4-12
4.13.4
Site Segment Test-BOC
4-12
4.13.5
Site Inter-Segment Demonstration-BOC
4-12
4.13.6
Inter-Program Demonstrations-BOC
4-12
4.14
INSTALLATION, CHECKOUT AND TEST - IOC
4-12
4.14.1
Installation, Checkout and Test
4-12
4.14.2
Management-IOC
Facility Planning-IOC
4-12
4.14.3
Installation and Checkout-IOC
4-12
4.14.4
Site Segment rest-IOC
4-13
4.14.5
Site Inter-Segment Demonstration-IOC
4-13
4.14.6
Inter-Program-Demonstration-IOC
4-13
4.15
INSTALLATION, CHECKOUT AND TEST - FOC
4-13
4.15.1
Installation, Checkout and Test
4-13
4.15.2
Management-FOC
Facility Planning-FOC
4-13
?
0
UNCLASSI FI ED
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
UNCLASSIFIED
0
?
SECTION
TITLE
4.15.3
Installation and Checkout-FOC
4-13
4.15.4
Site Segment Test-FOC
4-13
4.15.5
Site Inter-Segment Demonstration-FOC
4-13
4.15.6
Inter-Program Demonstations-FOC
4-13
4.16
DEVELOPMENT AND TEST FACILITY
4-13
4.16.1
Management
4-13
4.16.2
Services
4-14
4.16.3
Equipment
4-14
4.16.4
Operations and Maintenance
4-14
4.16.5
Subcontractor Development and
4-14
4.17
Test Facilities
TRAINING
4-14
4.17.1
Training Management
4-14
4.17.2
User Training
4-14
4.17.3
Operator Training
4-15
4.17.4
Maintenance Training
4-15
4.18
OPERATIONS AND MAINTENANCE (O&M)
4-15
4.18.1
O&M Management
4-15
4.18.2
Spares
4-15
4.18.3
Software Maintenance
4-15
4.18.4
Hardware Maintenance
4-15
4.18.5
Configuration Control
4-15
4.18.6
Administrative Support
4-16
4.18.7
Travel and Living
4-16
5
PRESERVATION, PACKAGING, PACKING, AND MARKING
5-1
5.1
DATA ITEMS
5-1
5.2
HARDWARE
5-1
5.3
SOFTWARE
5-2
5.4
IDENTIFICATION AND MARKING OF SHIPMENTS
5-2
5.5
PROTECTED SHIPMENTS
5-3
6
PERIOD OF PERFORMANCE AND DELIVERIES
6-1
6.1
PERIOD OF PERFORMANCE
6-1
6.2
DELIVERIES
6-1
7
INSPECTION AND ACCEPTANCE
7-1
7.1
POINT OF INSPECTION AND ACCEPTANCE
7-1
7.2
DESTINATION
7-1
7.3
ACCEPTANCE CRITERIA
7-1
7.3.1
Hardware/Software Acceptance
7-1
7.3.1.1
Preliminary Qualification Test
7-4
7.3.1.2
(PQT)
Formal Qualification Test (FQT)
7-4
UNCLASSIFIED
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
UNCLASSIFIED
SECTION TITLE PAGE
7.3.1.3 Hardware:/Software Subsystem 7-4
Integration and Test
7.3.1.3 Hardware/Software Subsystem 7-4
Integration and Test
7.3.1.5 Factory Pre-Ship Test 7-5
7.3.1.6 Site Installation and Checkout 7-5
7.3.1.7 D/C Segment Test 7-5
7.3.1.8 Inter-Segment/System Test 7-5
7.3.1.9 Inter-Program Demonstrations 7-5
7.3.2 Data Acceptance 7-6
7.3.3 Commercial Equipment Acceptance 7-6
8 GOVERNMENT FURNISHED ITEMS 8-1
8.1 GOVERNMENT FURNISHED EQUIPMENT (GFE) 8-1
8.2 GOVERNMENT FURNISHED INFORMATION (GFI) 8-1
8.3 DELIVERY CRITERIA 8-1
UNCLASSIFIED
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
?
STAT
?
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
UNCLASSIFIED
S
?
The objective of the NPIC Development Program's Data and Control
(D/C) Segment is on schedule and within cost procurement of a replace-
ment system for the existing NPIC Data System.
This Statement of Work (SOW) is for the analysis, design, develop-
ment, testing, integration, transition, and maintenance of the D/C
Segment portion of the NPIC Development Program. This SOW is prepared
in accordance with the Government Work Breakdown Structure (GWBS) and
the Contract Data Requirements List (CDRL). The SOW references specifically
the GWBS and allocates specifically the preparation of CDRL items to
specific SOW tasks.
The NDP Program Implementation Directive (PID) (S7001) shall serve
as specific definition of the development process within the NPIC
Development Program Office (NDPO) to which the SOW is responsive,
including general scope of development documentation.
Key milestones are:
1. Interprogram Demonstration
2. Interface Changes
3. Basic Operational Capability (BOC)
Transition
April 1984
May 1984
October 1984
4. Initial Operational Capability (IOC) July 1985
?
5. Full Operational Capability (FOC) July 1987 (TBR)
BOC is defined to be the conclusion of the FY84 upgrade. IOC is
defined to be that capability which will meet the.FY85 requirements.
FOC is defined to be that capability which will meet the FY87 requirements.
UNCLASSIFIED
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
UNCLASSIFIED
Government responsibility for the development and integration of
the D/C Segment rests with the Associate Director of NPIC. The Con-
tracting Officer's Technical Representative is the D/C Segment Manager.
The operation and maintenance of the operational capability delivered
by the D/C Segment shall be the responsibility of the NPIC operational
components.
The System Integration (SI) Contractor will assist the NDPO in
monitoring and evaluating contractor progress and results and shall be
responsible for integrating the D/C Segment into the NDP System. The
SI will not have the right of technical direction, nor will they have
access to contractor cost and accounting data. The SI will participate
in technical inter-changes and will assist the NDPO in monitoring
contractor tests and will therefore require access to all technical
information made available to the government.
1.5 CONTRACT WORK BREAKDOWN STRUCTURE (CWBS)
1.6 CONTRACT DATA REQUIREMENTS LIST (CDRL)
The updated CDRL is attached to this SOW as Annex B.
?
UNCLASSIFIED
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
UNCLASSIFIED
The following documents are those program documents that the
D/C Segment contractor is specifically responsible for in their entirety:
?
Document No.
Identification
Date Current
NDP Master Schedule
19 Oct 81
NDPO Security Guide
1 Apr 81
S7001
NPIC Program Implementation
Directive (Draft)
30 Mar 81
UNC-133-81
Data Requirements Description
Forms Appendix 10.1, S7001
S7002
Systems Operations Concept
Data and Control (D/C)
Segment Preliminary
Specification
ICD IF70304
Preliminary C/I To D/C ICD
20 Nov 81
ICD IF70405
20 Nov 81
ICD IF70204
Preliminary D/C To C/S ICD
20 Nov 81
UNCLASSIFIED
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
UNCLASSIFIED
0
SUPPLIES/SERVICES
The Contractor shall furnish the necessary personnel, materials,
equipment, and services required to accomplish the development of the
D/C Segment in accordance with the requirements of this SOW. The
Supplies/Services to be provided shall be as follows:
SUPPLIES/SERVICES
0007
Project Management
System Engineering
Software Development - BOC
Software Development - IOC
Software Development - FOC
Hardware Development - BOC
Hardware Development - IOC
Hardware Development - FOC
Automated Data Processing
Equipment (ADPE)
(Hardware and Software)
Test and Verification - BOC
Test and Verification - IOC
Test and Verification - FOC
3-1
UNCLASSIFIED
As specified in
Section 4.1
As specified in
Section 4.2
As specified in
Section 4.3
As specified in
Section 4.4
As specified in
Section 4.5
As specified in
Section 4.6
As specified in
Section 4.7
As specified in
Section 4.8
As specified in
Section 4.9
As specified in
Section 4.10
As specified in
Section 4.11
As specified in
Section 4.12
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84TOO037ROO0500040001-2
UNCLASSI FI ED
0
SUPPLIES/SERVICES
0013
Installation, Checkout and
As specified in
Test - BOC
Section 4.13
0014
Installation, Checkout and
As specified in
Test - IOC
Section 4.14
0015
Installation, Checkout and
As specified in
Test - FOC
Section 4.15
0016
Development and Test Facility
As specified in
Section 4.16
0017
Training
As specified in
Section 4.17
0018
Operations and Maintenance
As specified in
Section 4.18
U-N C L ASS I F1 ED
Approved For Release 2007/09/06: CIA-RDP84TOO037ROO0500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
UNCLASSIFIED
?
t
This section describes the items specified in Section 3 of this
SOW. The GWBS numbers follow each task title. Deliverable data which
will be generated during compliance with the SOW are identified by
Contract Data Requirements List (CDRL) reference number as contained in
the Government's RFP 82-B-015 dated January 4, 1982.
4.1.1 Project Management (GWBS 4.1.1)
The Contractor shall provide the project organization and manage-
ment to satisfy the requirements of this SOW. The management function
shall include project planning, project staffing, interface with NDPO,
personnel and property management. A Contract Work Breakdown Structure
(CWBS), CDRL No. 101, shall be prepared by the Contractor.
A Financial Plan, CDRL No. 102, shall be prepared by the Contractor
to depict the negotiated contract and subsequent negotiated changes
thereto. When and if a major revision of the Plan is required, the
Contractor shall revise the Plan and the new Plan shall be approved by
the Government.
A Master Schedule, CDRL No. 103, shall be prepared and updated as
required by the Contractor.
?
4.1.2 Project Control (GWBS 4.1.2)
The Contractor shall provide a project control function to monitor,
control and report project cost and schedule status.
A mechanism shall be provided for early detection and resolution of
cost, schedule or technical problems. The contractor shall provide
status data to the NDPO schedule system. Action item status shall be
provided to the NDP action item system.
The Contractor shall prepare Monthly Financial Reports, CDRL No.
109. The Contractor shall also prepare Milestone Updates, CDRL No. 110,
Milestone Reports, CDRL No. 111, and Quarterly Progress and Status
Reports, CDRL No. 113.
UNCLASSIFIED
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
UNCLASSI FI ED
The-Contractor shall provide a D/C Segment Quality Assurance Plan,
CDRL No. 108, and shall implement the Quality Assurance Plan for the
contractor line items of Section 3 of this Statement of Work. The
Contractor shall ensure subcontractor quality assurance. The Contractor
shall provide Quality Assurance Audit reports, CDRL No. 149.
The Contractor shall provide configuration management of hardware,
software, procedures and documentation in accordance with NDPO and
Contractor configuration management plans. The Contractor shall prepare
and maintain the D/C Segment Configuration Management Plan, CDRL No.
106, and related CM procedures. The Contractor shall administer the
Contractor Configuration Control Board. The Contractor shall prepare
Engineering Change Proposals, Requests for Change, and other CM related
documents. The Contractor shall provide master product and document
control. The Contractor shall prepare the Software Version Description
Document, CDRL No. 152.
The Contractor shall prepare the project Security Plan and Security
Procedures, CDRL No. 105. The Contractor shall implement the security
procedures on the D/C Segment project.
The Contractor shall provide monthly status reviews, CDRL No. 112.
The monthly status reviews shall address cost and status, progress,
plans and other issues as necessary. Each third review shall include an
in-depth financial review. The Contractor shall provide an Action Item
List, CDRL No. 114, after each review.
The Contractor shall provide management and control of subcon-
tractors. The Contractor shall provide sponsor visibility into subcon-
tractor status and progress.
The Contractor shall provide publication and maintenance of D/C
Segment project documentation developed by the Contractor in accordance
with the Contract Data Requirements List (CDRL) Annex A herein. The
Contractor shall provide the Accession List, CDRL No. 156.
?
S
?
UNCLASSIFIED
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
UNCLASSIFIED
?
The Contractor shall provide technical management of the project and
shall provide and enforce Software-Operations-Hardware Interface Standards,
CDRL No. 118. The Contractor shall prepare the Segment Development
Plan, CDRL No. 104, which shall address system engineering, software
development and hardware development.
4,2.2 Analysis (GWBS 4.2.2)
The Contractor shall perform the following tasks:
a. Provide requirements analysis and traceability
b. Prepare the Requirements Traceability and Verification Matrix,
CDRL No. 119.
?
c. Provide performance analysis
d. Provide RMA analysis
e. Prepare the Segment Design Analysis Report, CDRL No. 122.
f. Accomplish trade studies
g. Provide engineering specialties as required
h. Provide support to intersegment interface definition and
requirements determination
i. Prepare engineering Technical Notes, CDRL No. 120
j. Perform Technical Performance Measurements, CDRL No. 15~.
4.2.3 Operations Engineering and Development (GWBS 4.2.3)
The Contractor shall develop Segment Operations Concepts, CDRL No.
116, procedures and specifications. The Contractor shall provide the
Segment Operations Specification, CDRL No. 133. The Contractor shall
develop User Manuals, CDRL No. 135, and Segment/System Operators Manuals,
CDRL No. 136. The Contractor shall conduct productivity enhancement
studies and incorporate concepts and design. The Contractor shall
prepare an Operations and Maintenance Plan, CDRL No. 123, anda Maintenance
and Logistics Plan, CDRL No. 124.
4-3
UNCLASSIFIED
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
UNCLASSI FI !ED
The Contractor shall provide requirements allocation and shall
prepare the Segment Design Specification, CDRL No. 117. The Contractor
shall provide the Data Base Specification, CDRL No. 125. The Contractor
shall develop the following Interface Specifications:
a. Operations/Software Interface Specification, CDRL No. 126
b. Operations/Hardware Interface Specification, CDRL No. 127
c. Hardware/Software Interface Specification, CDRL No. 128
d. Software/Software Interface: Specification, CDRL No. 129
4.2.5 Transition and Integration Planning and Support (GWBS 4.2.5)
The Contractor shall develop the. Segment Transition and Integration
Plan, CDRL No. 115.
4.2.6 Test Support (GWBS 4.2.6)
The Contractor shall prepare the Segment Verification Plan, CDRL
No. 121, and the Segment Test Plan, CDRL No. 130. The Contractor shall
support preparation of Government test plans and procedures and shall
support the execution and evaluation of tests.
The Contractor shall evaluate proposed changes and shall provide
change request impact analysis. The Contractor shall provide interface
control.
4.2.8 Technical Reviews (GWBS 4.2.8)
The Contractor shall provide segment technical reviews (SDR, PDR,
CDR) and shall provide an Action Item List, CDRL No. 114, after each
review and shall provide action item follow-up.
?
?
UNCLASSIFIED
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
UNCLASSI FI ED
4.3 SOFTWARE DEVELOPMENT - BOC (GWBS 4.3)
4.3.1 Software Development Management-BOC (GWBS 4.3.1)
The Contractor shall manage all software development activities.
The Contractor shall provide the Segment Programming Practices, Standards
and Conventions, CDRL No. 132, and shall enforce program design, coding
and test practices, standards, and conventions. The Contractor
shall provide the software development inputs to the Segment Development
Plan, CDRL No. 104.
4.3.2 Computer Program Configuration Items-BOC (GWBS 4.3.2)
The Contractor shall design, develop, test and document the Computer
Program Configuration Items identified in the Segment Design Specifica-
tion. At least one CPCI must be identified to contain exclusively that
software which will support the Integrated Work Station.
?
4.3.2.1 CPCI Preliminary Design-BOC (GWBS 4.3.2.1)
The Contractor shall accomplish preliminary CPCI design and shall
prepare Part I Specifications, CDRL No. 141, and Preliminary Design
Part II Specifications, CDRL No. 142, for each CPCI. The Contractor
shall prepare the Data Dictionary, CDRL No. 145. The Contractor shall
conduct internal design reviews.
4.3.2.2 CPCI Critical Design-BOC (GWBS 4.3.2.2)
The Contractor shall accomplish detailed CPCI design and shall prepare
"build to" detailed Part II Specifications, CDRL No. 142, and shall
conduct internal design reviews.
4.3.2.3 CPCI Development-BOC (GWBS 4.3.2.3)
The Contractor shall code and unit test and shall prepare "as
built" detailed Part II Specifications, CDRL No. 142.
4.3.2.4 CPCI Test-BOC (GWBS 4.3.2.4)
The Contractor shall conduct qualification tests at the CPC and
CPCI levels from Contractor developed software test procedures. The
Contractor shall prepare CPCI test reports.
0 4-5
UNCLASSIFIED
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
UNCLASSI FI ED
4.3.2.5 CPCI Documentation-BOC (GWBS 4.3.2.5)
The Contractor shall prepare CPCI inputs to User Manuals, CDRL No.
135, Operator Manuals, CDRL No. 136, the Data Base Administration Manual,
CDRL No. 137, and Training Manuals, CDRL No. 146. The Contractor shall
prepare Programmers' Manuals, CDRL No. 138. The Contractor shall
provide CPCI Listings (as built), CDRL No. 150. The Contractor shall
provide Data Base Packages, CDRL No. 151.
4.4 SOFTWARE DEVELOPMENT - IOC (GWBS 4.4)
The Contractor shall develop software for IOC and shall perform
software development tasks as defined in Section 4.3 of this SOW. In
IOC, the software development tasks are:
4.4.1 Software Development Management-IOC (GWBS 4.4.1)
4.4.2 CPCIs-IOC (GWBS 4.4.2)
4.4.2.1 CPCI Preliminary Design-IOC (GWBS 4.4.2.1)
4.4.2.2 CPCI Critical Design-IOC (GWBS 4.4.2.2)
4.4.2.3 CPCI Development-IOC (GWBS 4.4.2.3)
4.4.2.4 CPCI Test-IOC (GWBS 4.4.2.4)
4.4.2.5 CPCI Documentation-IOC (GWBS 4.4.2.5)
4.5 SOFTWARE DEVELOPMENT-FOC (GWBS 4.5)
The Contractor shall develop software for FOC and shall perform
software development tasks as defined in Section 4.3 of this SOW. For
FOC, the software development tasks are:
4.5.1 Software Development Management-FOC (GWBS 4.5.1)
?
?
?
UNCLASSIFIED
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
UNCLASSIFIED
?
4.5.2 CPCIs-FOC (GWBS 4.5.2)
4.5.2.1 CPCI Preliminary Design-FOC (GWBS 4.5.2.1)
4.5.2.2 CPCI Critical Design-FOC (GWBS 4.5.2.2)
4.5.2.3 CPCI Development-FOC (GWBS 4.5.2.3)
4.5.2.4 CPCI Test-FOC (GWBS 4.5.2.4)
4.5.2.5 CPCI Documentation-FOC (GWBS 4.5.2.5)
4.6 HARDWARE DEVELOPMENT-BOC (GWBS 4.6)
4.6.1 Hardware Development Management-BOC (GWBS 4.6.1)
?
The Contractor shall manage all hardware development and shall set
and maintain hardware design, fabrication, and test practices, standards,
inputs to the Segment Development Plan, CDRL No. 104..
4.6.2 Configuration Items (CI)-BOC (GWBS 4.6.2)
The Contractor shall design, develop, test and document the Con-
figuration Items identified in the Segment Design Specification.
At least one CI must be the Integrated Work Station. Commercial user
terminals procured and subsequently modified shall be considered a
unique CI with all modifications to that terminal reflected within this
CI element.
4.6.2.1 CI Preliminary Design-BOC (GWBS 4.6.2.1)
The Contractor shall accomplish preliminary configuration item
design and prepare a CI Specification, CDRL No. 143, and a Preliminary
Component Specification, CDRL No 144. The Contractor shall conduct
internal design reviews and accomplish preliminary design of commercial
product modifications.
?
UNCLASSIFIED
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
UNCLASSI FI ED
4.6.2.2 CI Critical Design-BOC (GWBS 4.6.2.2)
The Contractor shall accomplish detailed design of configuration
items and prepare "build to" Component Specifications, CDRL No. 144.
The Contractor shall conduct internal design reviews and shall accomplish
critical design of commercial product: modifications.
4.6.2.3 CI Development-BOC (GWBS 4.6.2.3)
The Contractor shall accomplish fabrication of all manufactured
hardware and modification of commercial products. The Contractor shall
prepare "as built" Component Specifications, CDRL No. 144.
4.6.2.4 CI Test-BOC (GWBS 4.6.2.4)
The Contractor shall prepare hardware test procedures and test all
hardware at component and CI levels prior to integration.
4.6.2.5 CI Documentation-BOC (GWBS 4.6.2.5)
The Contractor shall prepare Equipment Operation and Maintenance
Manuals, CDRL No. 148. The Contractor shall prepare CI inputs to Segment/Syst
Operations Manuals, CDRL No. 136, and User Manuals, CDRL No. 135, and
prepare CI inputs to Training Manuals, CDRL No. 146.
4.7 HARDWARE DEVELOPMENT-IOC (GWBS 4.7)
The Contractor shall develop hardware for IOC and shall perform
hardware development tasks as defined in Section 4.6 of this SOW. For
IOC, the hardware development tasks are:
4.7.1 Hardware Development Management-IOC (GWBS 4.7.1)
4.7.2 CIs-IOC (GWBS 4.7.2)
4.7.2.1 CI Preliminary Design-IOC (GWBS 4.7.2.1)
4.7.2.2 CI Critical Design-IOC (GWBS 4.7.2.2)
?
?
UNCLASSI FI IED
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
UNCLASSIFIED
?
4.7.2.3 CI Development - IOC (GWBS 4.7.2.3)
4.7.2.4 CI Test-IOC (GWBS 4.7.2.4)
4.7.2.5 CI Documentation-IOC (GWBS 4.7.2.5)
4.8 HARDWARE DEVELOPMENT-FOC (GWBS 4.8)
The Contractor shall develop hardware for FOC and shall perform
hardware development tasks as defined in Section 4.6 of this SOW. For
FOC, the hardware development tasks are:
?
4.8.1 Hardware Development Management-FOC (GWBS 4.8.1)
4.8.2 CIs-FOC (GWBS 4.8.2)
4.8.2.1 CI Preliminary Design-FOC (GWBS 4.8.2.1)
4.8.2.2 CI Critical Design-FOC (GWBS 4.8.2.2)
4.8.2.3 CI Development-FOC (GWBS 4.8.2.3)
4.8.2.4 CI Test-FOC (GWBS 4.8.2.4)
4.8.2.5 CI Documentation-FOC (GWBS 4.8.2.5)
4.9 AUTOMATED DATA PROCESSING EQUIPMENT (ADPE) (HARDWARE AND SOFTWARE)
(GWBS 4.9)
4.9.1 Procurement (GWBS 4.9.1)
The Contractor shall prepare acquisition specifications for com-
merically available ADPE and shall procure ADPE including all commercial
user terminals.
UNCLASSIFIED
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
UNCLASSI Fl ED
The Contractor shall receive, modify if required (except terminals),
install and checkout GFE. The Contractor shall accomplish unit testing
of GFE and prepare a GFE test report, CDRL No. 154. The Contractor
shall provide GFE maintenance.
4.10 TEST AND VERIFICATION-BOC (GW13S 4.10)
4.10.1 Test Management-BOC (GWBS 4?10.1)
The Contractor shall provide management of segment test activities.
The Contractor shall prepare Test Plans, CDRL No. 131, as required by
the Segment Test Plan, CDRL No. 130. The Contractor shall prepare test
procedures as required. The Contractor shall prepare a test plan for
GFE equipment, CDRL No. 131.
The Contractor shall provide the necessary software, hardware and
data to support integrated testing.
4.10.3 Integration Test-BOC (GWBS 4.10.3)
The Contractor shall accomplish inter-CPCI and inter-CI testing.
The Contractor shall accomplish integrated CPIC/CI testing and shall
provide Integration Test Reports, CDRL No. 154.
The Contractor shall perform formal pre-ship test and shall provide
a Pre-ship Test Report, CDRL No. 154.
4.11 TEST AND VERIFICATION-IOC (GWBS 4.11)
The Contractor shall conduct test and verification for IOC and
shall perform test and verification tasks as defined in Section 4.10 of
this SOW.
?
?
UNCLASSIFIED
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
UNCLASSIFIED
0
For IOC, the test and verification tasks are:
4.11.1 Test Management - IOC (GWBS 4.11.1)
4.11.2 Test Support - IOC (GWBS 4.11.2)
4.11.3 Integration Test - IOC (GWBS 4.11.3)
4.11.4 Factory Pre-Ship Test - IOC (GWBS 4.11.4)
4.12 TEST AND VERIFICATION - FOC (GWBS 4.12)
The Contractor shall conduct test and verification for FOC and
shall perform test and verification tasks as defined in Section 4.10 of
this SOW. For FOC, the test and verification tasks are:
?
4.12.1 Test Management - FOC (GWBS 4.12.1)
4.12.2 Test Support - FOC (GWBS 4.12.2)
4.12.3 Integration Test - FOC (GWBS 4.12.3)
4.12.4 Factory Pre-ship Test - FOC (GWBS 4.12.4)
4.13 INSTALLATION, CHECKOUT AND TEST - BOC (GWBS 4.13)
4.13.1 Installation, Checkout and Test Management - BOC (GWBS 4.13.1)
The Contractor shall provide management of installation and check-
out activities.
4.13.2 Facility Planning - BOC (GWBS 4.13.2)
The Contractor shall provide facility planning and Facility Inter-
face Drawings (IDRs), CDRL No. 139.
. 4-11
UNCLASSIFIED
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
UNCLASSI FI IED
4.13.3 Installation and Checkout - BOC (GWBS 4.13.3)
The Contractor shall prepare a Shipping Plan, CDRL No. 147, and the
D/C Segment Installation Plan, CDRL No. 134. The Contractor shall pro-
vide for shipment, installation, and checkout of all segment items. The
Contractor shall accomplish segment integration and transition to opera-
tional status.
The Contractor shall perform a formal Site Segment Test and shall
provide the Site Segment Test Report, CDRL No. 154.
4.13.5 Site Inter-Segment Demonstrations - BOC (GWBS 4.13.5)
The Contractor shall contribute to the system test plan to be
prepared by the System Integrator (SI). The Contractor shall partici-
pate in on-site system testing. The Contractor shall prepare inputs for
the system test report to be prepared by the SI. The System Test/Demo
Inputs are CDRL No. 153.
The Contractor shall provide input. to the inter-program demonstration
to be prepared by the SI. The Contractor shall support program demon-
strations. The Contractor shall provide inputs to the demonstration test
report to be prepared by the SI. The Demonstration and report inputs are
CDRL No. 153.
The Contractor shall conduct installation, checkout and test for
IOC and shall perform installation, checkout and test tasks as defined
in Section 4.13 of this SOW. For IOC, the installation, checkout and
test tasks are:
4.14.1 Installation, Checkout and Test Management - IOC (GWBS 4.14.1)
4.14.2 Facility Planning - IOC (GWBS 4.14.2)
4.14.3 Installation and Checkout - IOC (GWBS 4.14.3)
?
?
UNCLASSIFIED
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
UNCLASSI FI ED
4.14.4 Site Segment Test - IOC (GWBS 4.14.4)
4.14.5 Site Inter-Segment Demonstrations - IOC (GWBS 4.14.5)
4.14.6 Inter-Program Demonstrations - IOC (GWBS 4.14.6)
4.15 INSTALLATION, CHECKOUT AND TEST - FOC (GWBS 4.15)
The Contractor shall conduct installation, checkout and test for
FOC and shall perform installation, checkout and test tasks as defined
in Section 4.13 of this SOW. For FOC, the installation, checkout and
test tasks are:
4.15.1 Installation, Checkout and Test Management - FOC (GWBS 4.15.1)
4.15.2 Facility Planning - FOC (GWBS 4.15.2)
4.15.3 Installation and Checkout - FOC (GWBS 4.15.3)
4.15.4 Site Segment Test - FOC (GWBS 4.15.4)
4.15.5 Site Inter-Segment Demonstration - FOC (GWBS 4.15.5)
4.15.6 Inter-Program Demonstrations -FOC (GWBS 4.15.6)
4.16 DEVELOPMENT AND TEST FACILITY (GWBS 4.16)
4.16.1 Management (GWBS 4.16.1)
The Contractor shall provide management, planning and control of
facilities required for analysis, human engineering, development, test
and integration of all Segment software and hardware.
0 4-13
UNCLASSIFIED
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
UNCLASSIFIIED
4.16.2 Services (GWBS 4.16.2)
The Contractor shall provide the necessary services, including
software tools and library support test tools, for the development and
test facility.
4.16.3 Equipment (GWBS 4.16.3)
The Contractor shall procure ADPE capable of supporting the develop-
ment and test facility.
4.16.4 Operations and Maintenance (GWBS 4.16.4)
The Contractor shall operate and maintain the development and test
4.16.5 Subcontractor Development and Test Facilities (GWBS 4.16.5)
The Contractor shall provide management, necessary services, equipment
and operations and maintenance for Subcontractor Development and Test
Facilities that may be authorized by the Contractor.
4.17 TRAINING (GWBS 4.17)
4.17.1 Training Management (GWBS 4.17.1)
The Contractor shall manage all. training activities and shall
provide a Segment Training Plan, CDF:L No. 140.
4.17.2 User Training (GWBS 4.17.2)
The Contractor shall prepare user training materials, CDRL No. 146.
The Contractor shall accept inputs from other segments and shall inte-
grate these inputs into user training materials. Inputs from other
segments shall be provided to the Contractor as Government Furnished
Information (GFI) at a mutually agreed date. The Contractor shall train
a mutually agreed number of government instructors.
UNCLASSIFIED
?
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
UNCLASSI FI ED
s
4.17.3 Operator Training (GWBS 4.17.3)
The Contractor shall prepare and deliver operator training materials,
CDRL No. 146. The Contractor shall train a mutually agreed number of
government instructors.
The Contractor shall prepare and deliver maintenance training
materials, CDRL No. 146. The Contractor shall provide segment maintenance
training for a mutually agreed number of government instructors.
4.18 OPERATIONS AND MAINTENANCE (O&M) (GWBS 4.18)
4.18.1 O&M Management (GWBS 4.18.1)
The Contractor shall provide O&M management.
?
The Contractor shall provide sparing of segment equipment and
expendables. Spares shall be provided under a supplemental agreement.
4.18.3 Software Maintenance (GWBS 4.18.3)
The Contractor shall provide software problem resolution support
and shall provide segment software maintenance. The Contractor shall
update software documentation when required by software maintenance.
4.18.4 Hardware Maintenance (GWBS 4.18.4)
The Contractor shall provide hardware problem resolution support
and shall provide segment hardware maintenance. The Contractor shall
update hardware documentation when required by hardware maintenance.
4.18.5 Configuration Control (GWBS 4.18.5)
The Contractor shall support configuration control for operational
software/hardware. The configuration control support shall be a mutually
agreed level of effort.
is 4-15
i iniri # IFIFf
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
UNCLASSIFIED
4.18.6 Administrative Support (GWBS 4.18.6)
The Contractor shall provide administrative support and document
control for contractor operations and maintenance tasks.
4.18.7 Travel and Living (GWBS 4.18.7)
The Contractor shall provide travel and living arrangements and
expenses, as required, for O&M personnel.
?
UNCLASSIFIED
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
UNCLASSIFIED
The Contractor shall deliver all unclassified data items packaged
in a protective container in accordance with best commercial practice.
The data items shall be wrapped in a protective wrapper within the
container, and this wrapper shall be marked with the following
information:
is
a. Document Title;
b. CDRL Identification;
c. Contract Number;
d. Contractor Identification
The CDRL identification shall be the CDRL number followed by a -1 to
indicate BOC applicability, -2 for IOC, and -3 for FOC.
Classified data shall be packaged in a protective container in
accordance with best commercial practice meeting NPIC security require-
ments for classified shipment. Data identification, as specified above,
shall be shown on inner wrappers within the container.
Delivered hardware, including the return of any GFE furnished
by the Government, shall be packaged in a thermal-sealed plastic
bag for moisture protection, and packed in heavy cardboard or wood
containers in accordance with best commercial practice such that
operational performance shall not be degraded, and mechanical damage
shall not be incurred, as a result of transportation and handling
required for delivery from point of manufacture or last installation
to the NPIC destination, including truck shipment and lift truck
operations. Heavy cardboard or wood containers shall be determined
based upon size and weight of the hardware to be packed. The sealed
plastic bag shall bear the following information applied by pressure-
sensitive label:
b. Hardware part number and manufacturer;
? 5-1
UNCLASSIFIED
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
UNCLASSIFOED
c. Contract Line Item Identification;
d. Contract Number; and
e. Contractor Identification?
Magnetic tapes shall be packaged in protective tape cans, sealed
and marked with the following information:
a. Tape Identification;
b. Capability Phase (BOC, IOC, FOC);
c. Contract Line Item Identification;
d. Contract Number; and
e. Contractor Identification.
Security classification shall also be shown, if the tape contents are
classified.
The tape cans shall be packed in an outer container for shipment,
meeting best commercial practice, and with internal wrappers in accordance
with NPIC security requirements for classified shipment. Documentation
associated with the magnetic tapes, other than CDRL items, shall be
packaged and packed in the same outer container and must be identified on
internal protective wrappers as specified above for the tapes. In
addition, the identification of the documentation must be shown. If
classified, the internal wrappers for the documentation must satisfy
NPIC security requirements.
No stenciling shall be applied to the shipping containers except for
the following:
b. Caution markings for handling purposes, such as "DELICATE
INSTRUMENT", "THIS SIDE UP", "FRAGILE", etc.
UNCLASSIFIED
is
?
?
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
UNCLASSI FI ED
?
The consignee address shall be marked on a shipping tag or label that
shall be securely fixed to the container by use of waterproof adhesive
or stapled to the container. Such markings shall be protected by a
coat of transparent water-repellant material. The contract and CLIN
numbers, and the name of the consignor, must be shown.
The exterior of each container within a shipment shall bear a
number relative to the total number of containers in the shipment,
e.g. PKG 1 OF 5. This numbering shall not be stenciled on the container,
but shall be applied by tag or label as described for the consignee
address.
Where an equipment item is shipped in two or more pieces, each
container shall be marked with the set or assembly number, the
number of the container relative to the number of containers comprising
the complete set or assembly, and a brief title description of the set
or assembly component contained therein. This marking shall be applied
by tag or label as previously described.
?
A packing list, referencing the container numbers and contents,
must accompany each shipment. All shipments must be F.O.B. Destination.
Any shipment containing Government-classified material shall be
made only in accordance with instructions furnished the Contractor by
the Contracting Officer upon notification that the material is ready
for shipment. The Contractor shall identify the following information
for the Contracting Officer:
a. Date material is required at destination;
b. The destination; and
c. The approximate size, weight, and number of cartons.
?
[ INCLASSI FI ED
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
UNCLASSI FI ED
?
?
The period of performance of the Statement of Work begins on the
effective date of the Government Contract and continues until
15 July 1988.
The Contractor shall deliver to, or complete for, the Government
the supplies and services listed below in accordance with the criteria
set forth in Sections 3, 4, and 5 herein and in accordance with the
following schedule:
Reference
Item No. Description Section Date
0001 Project Management 4.,1 As required
0002 System Engineering 4.2 As required
0003 Software Development - BOC 4.3 15 October 1984
CPCIs as identified in the
Segment Design Specification
0004 Software Development - IOC 4.4 15 July 1985
CPCIs as identified in the
Segment Design Specification
0005 Software Development - FOC 4.5 15 September 1985
CPCIs as identified in the
Segment Design Specification
CIs as identified in the
Segment Design Specification
UNCLASSIFIED
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
UNCLASSIFIED
0
Reference
Item No. Description Section
CIs as identified in the
Segment Design Specification
CIs as identified in the
Segment Design Specification
Hardware and Software as
identified in the Contractor
prepared acquisition
specifications
15 July 1985
15 September 1985
15 July 1985
1 January 1984
0011
Test and Verification - IOC
4.11
1 March 1985
1 March 1985 ?
0013
Installation, Checkout and
Test - BOC
15 October 1984
0014
Installation, Checkout and
Test - IOC
15 July 1985
0015
Installation, Checkout and
15 July 1987
Test - FOC
1 March 1985
a.
BOC
15 October 1984
b.
IOC
15 July 1985
c.
FOC
15 September 1985
UNCLASSIFIED
is
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
UNCLASSIFIED
0
Reference
Item No.
Description Section
Date
a.
BOC
15
July 1985
b.
IOC
30
September 1986
c.
FOC
15
July 1988
?
? 6-3
UNCLASSIFIED
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
UNCLASSIFIED
0
?
7.1 POINT OF INSPECTION AND ACCEPTANCE
Hardware and software furnished under this Statement of Work shall
be inspected and accepted at the NPIC site. This acceptance will be
conditioned by the successful completion of tests specified in
Section 7 herein, and successful integration of the hardware and software
into the NPIC system.
Data furnished under this Statement of Work shall be inspected
and accepted at the NPIC Development Program Office (NDPO). All data
shall be considered accepted thirty calendar days after receipt by the
NDPO unless specifically accepted and rejected within that time. Data
rejected shall be resubmitted by the Contractor.
The hardware, software, and data to be furnished under this
Statement of Work shall be delivered to the following locations unless
otherwise specified by the NDPO at the time of delivery:
HDW/SFW: (Site and address to be specified separately)
Data: (NDPO address to be specified separately)
7.3 ACCEPTANCE CRITERIA
7.3.1 Hardware/Software Acceptance
Acceptance of the hardware and software developed for the D/C
Segment shall be on an incremental basis, using test and verification
starting with qualification tests and ending with inter-program
demonstrations. Test and verification provides for:
0 7-1
UNCLASSI FI ED
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
UNCLASSIFIED
Inspection
Analysis
throughout the acceptance process, at the following levels:
Intra-Segment
Computer Program Component (CPC)
Computer Program Configuration Item (CPCI)
Inter-CPCI
Configuration Item (CI)
Inter-CPCI/CI
Inter-Segment
Inter-System
Test and verification is a formal process, based upon the Segment
Verification Plan, and uses test plans, procedures, and reports to
plan and document the process. The NDPO shall approve all test plans
and review all test procedures to assure that the acceptance process is
complete. The acceptance process is diagrammed in Figure 7-1 herein.
Sections 4.10 through 4.15 herein provide task descriptions for these
activities.
CPCI acceptance occurs when Formal Qualification Tests (FQTs) have
been satisfactorily completed. CI acceptance occurs when Hardware/
Software Subsystem integration and test has been satisfactorily completed.
Factory acceptance occurs when the factory preship test is completed
and a configuration audit has been accomplished. The hardware and
software is then shipped to the NPIC site.
Site preliminary acceptance occurs upon successful completion of
the D/C Segment test, following installation and checkout of the
hardware/software at the NPIC site. Final site acceptance occurs upon
satisfactory completion of all inter-program demonstrations. Final
site acceptance for each capability (ROC, IOC, FOC) shall be documented
by a Government Certificate of Completion.
UNCLASSIFIED
?
?
s
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
?
?
0
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
UNCLASSIFIED
PQT is an incremental process which provides visibility and
control of computer program development during the time period between
Critical Design Review (CDR) and Formal Qualification Test (FQT). A
PQT shall be conducted on all Computer Program Components (CPCs). It
shall verify that the CPCs fulfill the requirements of the Part I
development specifications.
FQT is a complete and comprehensive test of each individual
Computer Program Configuration Item (CPCI) in a continuous test
period subsequent to completing computer program test and evaluation.
FQT shall verify that the CPCIs fulfill the requirements of the Part I
development specifications. Each function/task of the CPCIs, including
inter-CPCI control and data flow, data base operation, and human
operator interfaces shall be verified/tested regardless of prior PQT
testing. All functions which are unable to. be verified in the FQT shall
be deferred and verified in the higher levels of test.
Hardware qualification test shall be performed on the first IWS
of each configuration, and periodically during IWS production. Unit
tests applied to subsequent IWS units shall be a subset of the
qualification tests. These tests verify hardware performance as
required by the component specification.
7.3.1.4 Hardware/Software Subsystem Integration and Test
Hardware/software subsystem test are formal tests executed with
qualified hardware and qualified software to verify all functions,
including human operator functions, as specified in the segment design
specification. Inter-CPCI functions which could not be verified in
lower level tests shall be verified here. A subset of hardware/software
subsystem test concern the IWS and its system and application software.
These shall be integrated and tested prior to being included in the
overall hardware/software subsystem tests.
UNCLASSIFIED
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
UNCLASSI FI ED
This test shall be an overall test of the D/C Segment, performed
with a representative number of IWS units for proper segment performance,
to verify that the requirements of the Segment Design Specification
have been satisifed prior to shipment by the Contractor to the NPIC
site.
The Contractor shall install the segment hardware and software,
and verify that installation has been s)
SMAGD I~
PIAGL ZOIAAL
(3/n) (!/19)
?
?
A/N_~ fliAl I(3 ado
.-tea. -.-3 WASP 0505150
(11/13) * /N A/A3 A/N
"AGS
I (/PS)(+) (tt/ra)
80C Foe
-~--~~~ 1 /7a6
s fs)
Sao
IN
i56
IM
AY D
lullD
(9h9) ('hs)
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
UNCLASSIFIED
STAT
Statement of Work
0
[ODE IDENT. NO.
23892
?
SPECIFICATION NO. REV.
7935495 A
The design will be fully disclosed on engineering drawings, lists
and processes, SDRL Item C210, prepared in accordance with level 3 of
DOD-D-1000B and with DOD-STD-1000.
Subcontractor shall be prepared to conduct a Preliminary Design
Review (PDR) and Critical Design Review (CDR) prior to a commitment to
production. These design reviews will be conducted at a mutually acceptable
location. At the time of the design reviews copies of the then available
drawings will be delivered to Buyer in accordance with SDRL Item C210.
Following the CDR the configuration will be established and configuration
control in accordance with DOD-STD-480 will be established.
The design of the equipment will include marking of components in
accordance with MIL-STD-1285 and of the equipments in accordance with
MIL-P-150240.
Fabrication of the units will be under'a Quality Control program in
accordance with MIL-Q-9858A. Sufficient documentation describing the
Subcontractors Quality program will be made available to the Buyer's
Quality Control personnel to demonstrate compliance with specification.
A Maintainability program will be established in accordance with MIL-
STD-470 and the Subcontractor's Maintenance and Logistics Plan (MLP),
SDRL item C124, as approved by Buyer. A Reliability program will be
established in accordance with MIL-STD-785A and the MLP.
Equipment Operation and Maintenance Manuals (EOM) for each configuration
will be provided in accordance with SDRL No. C148. These manuals will
be subject to Configuration Control prior to delivery.
The workstation, in any configuration, shall meet the EMC, TEMPEST
and grounding requirements of S7012, NPIC Facility Equipment EMC Specification.
IWS configurations common to both NPIC facilities shall be operable
at either facility without modification.
The control of electromagnetic emission and susceptability shall be
in accordance with the following requirements and shall cover both the
enviroment in which the item operates as well as that which it generates.
4.8.1.1 Electromagnetic Compatibility (EMC)
The IWS design shall be in accordance with MIL-STD-461B Ground
Facilities (Class A3) requirements.
UNCLASSIFIED
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
UNCLASSIFIED
Statement of Work
CODE, (DENT. NO.
2:3892
SPECIFICATION NO.
7935495
STA
The IWS design shall be in accordance with NACSIM 5100A and installed
in accordance with MIL-HDBK-232 and shall cover all the interfacing
cabling.
Production of the Work Stations, in accordance with Line Items 13
thru 1012, will be delivered to the schedule of Figure 8-1 in Section 4.8
herein. Each unit will receive a minimum of 24 hours of consecutive
operation while being cycled with data to simulate operation.
Acceptance test of each unit will 'be conducted in accordance with
test procedures approved by Buyer. Buyer reserves the right to witness
all acceptance tests. At the completion of acceptance testing a Configuration
Listing for each unit will be prepared and will contain the Part No.,
Revision Level and Serial Number of each subassembly in the unit. This
data will be maintained by Subcontractor and will be made available to
Buyer if requested.
The Subcontractor shall provide initial training support for User
Training, Operator Training, and Maintenance Training. Any training
material prepared by subcontractors for his internal use will be delivered
to buyer, SDRL No. C146.
The Subcontractor shall provide a System Safety Program Plan tailored
to the requirements of the Program and generated utilizing MIL-STD-882A
as a guide.
In the area of personnel safety the Subcontractor shall adhere to the
requirements specified in MIL-STD-454F Req. 1. Personnel Safety will not
be an item for negotiation.
4-20
?
?
I IwI# I A e%C%1 1-1 rrt
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
UNCLASSIFIED
? Statement of Work STAT
I CODE (DENT. NO.
23892
?
is
SPECIFICATION NO.
7935495
REV.
A
All Category I (Catastrophic) or II (Critical) hazards will be eliminated,
Category III hazards will be controlled.
Safety engineering principles shall be applied throughout the design,
development, test, installation, checkout and operation of all equipment.
UNCLASSIFIED
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
UNCLASSIFIED
?
Statement of Work
CODE (DENT. NO.
23892
I SPECIFICATION NO.
7935495
PRESERVATION, PACKAGING, PACKING, AND MARKING
REV.
A
5.1 DATA ITEMS
The Contractor shall deliver all unclassified data items packaged
in a protective container in accordance with best commercial practice.
The data items shall be warpped in a protective wrapper within the container,
and this wrapper shall be marked with the following information:
a. Document Title;
b. CDRL Identification;
c. Contract Number; and
d. Contractor Identification.
?
The CDRL identification shall be the CDRL number followed by a -1 to
indicate BOC applicability, -2 for IOC and -3 for FOC.
Classified data shall be packaged in a protective container in
accordance with best commercial practice meeting NPIC security requirements
for classified shipment. Data identification, as specified above, shall
be shown on inner wrappers within the container.
5.2 HARDWARE
Delivered hardware, including the return of any GFE furnished by
the Government, shall be packaged in a thermal-sealed plastic bag for
moisture protection and packed in heavy cardboard or wood containers
in accordance with best commercial practice such that operational per-
formance shall not be degraded, and mechanical damage shall not be
incurred, as a result of transportation and handling required for delivery
from point of manufacture or last installation to the NPIC destination,
including truck shipment and lift truck operations. Heavy cardboard
or wood containers shall be determined based upon size and weight of the
hardware to be packed. The sealed plastic bag shall bear the following
information applied by pressure-sensitive label:
a.
b.
Hardware
Hardware
name;
part
number and manufacturer;
c.
Contract
Line
Item Identification;.
d.
Contract
Number; and
e.
Contractor Identification.
5-1
UNCLASSIFIED
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
STAT
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
UNCLASSIFIED
Statement of Wort
23892
I SPECIFICATION NO.
7935495
Magnetic tapes shall be packaged in protective tape cans, sealed
and marked with the following information:
a. Tape Identification;
b. Capability Phase (BOC, IOC, ]?OC);
c. Contract Line Item Identification;
d. Contract Number; and
e. Contractor Identification.
Security classification shall also be shown, if the tape contents are
classified.
The tape cans shall be packed in an outer container for shipment,
meeting best commercial practice, and with internal wrappers in accordance
with NPIC security requirements for classified shipment. Documentation
associated with the magnetic tapes, other than CDRL items, shall be
packaged and packed in the same outer container and must be identified
on internal protective wrappers as specified above for the tapes. In
addition, the identification of the documentation must be shown. If
classified, the internal wrappers for the documentation must satisfy
NPIC security requirements.
5.4 IDENTIFICATION AND MARKING OF SHIPMENTS
No stenciling shall be applied to the shipping containers except for
the following:
a. Weight, dimensions and cubic content of container; and
b. Caution markings for handling purposes, such as "DELICATE
INSTRUMENT", "THIS SIDE UP", "FRAGILE", etc.
The consignee address shall be marked on a shipping tag or label that shall
be securely fixed to the container by use of waterproof adhesive or stapled
to. the container. Such markings shall be protected by a cost of transparent
water-repellant material. The contract: and CLIN numbers, and the name
of the consignor must be shown.
The exterior of each container within a shipment shall bear a number
relative to the total number of containers in the shipment, e.g. PKG 1 of
5. This numbering shall not be stenciled on the container, but shall be
applied by tag or label as described for the consignee address.
5-2
STO
?
a 1 R I f I AC`C`I CI CF
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
UNCLASSIFIED
?
Statement of Work
CODE (DENT. NO
23892
SPECIFICATION NO. REV.
7935495, A
Where an equipment item is shipped in two or more pieces, each
container shall be marked with the set or assembly number, the number
of the container relative to the number of containers comprising the
complete set or assembly, and a brief title description of the set or
assembly component contained therein. This marking shall be applied by
tag or label as previously described.
A packing list, referencing the container numbers and contents,
must accompany each shipment. All shipments must be F.O.B. Destination.
5.5 PROTECTED SHIPMENTS
Any shipment containing Government-classified material shall be
made only in accordance with instructions furnished the Contractor by
the Contracting Officer upon notification that the material is ready for
shipment. The Contractor shall identify the following information for
the Contracting Officer:
a. Date material is required at destination;
b. The destination; and
c. The approximate size, weight and number of cartons.
? 5-3
UNCLASSIFIED
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
STAT
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
UNCLASSI FI ED
0
Statement of Work
CODE IDENT. NO.
23892
SPECIFICATION NO.
7935495
PERIOD OF PERFORMANCE AND DELIVERIES
REV.
A
The period of performance of this subcontract including the options,
shall begin on the date of issue of?this subcontract and continue until
30 September 1986.
The Subcontractor shall deliver to, or complete for the benefit of
the Buyer the supplies and services listed below in accordance with
Sections 3, 4, and 5 herein to the following schedule:
ITEM NO. DESCRIPTION DATE
1 Project Management AR
2 Systems Engineering AR
3 Software Development.
PDR
WSAPPLS 11-82
WSYSTM 11-82
IWS 06-82
CDR
WSAPPLS 09-83
WSYSTM 09-83
IWS 09-82
4- Test and Evaluation 5 thru 9-84
See SDRL
. 6-1
UNCLASSIFIED
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
STAT
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
UNCLASSI FI ED
Statement of Work
SPECIFICATION NO.
7935495
23892
ITEM NO. DESCRIPTION
7 ILS
8 Hardware Development
DATE
See SDRL
Figure 8-1
9 Work Station Qualification TBD
Testing
10 Work Station Production Figure 8-1
11 Training AR
STAG
?
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
UNCLASSIFIED
Statement of Work
I CODE IDENT. NO.
23892
?
facility in
SPECIFICATION NO.
7935495
The point of acceptance for all software will be at the Buyer's software
The point of inspection and conditional acceptance shall be at the
Subcontractor's facility. Final acceptance shall be at Buyer's facility
in following completion of integration and system
testing or other Washington area location as directed.
The point of acceptance for data items will be at Buyer's facility
7.2 ACCEPTANCE CRITERIA
7.2.1 Software
in
REV.
A
The Subcontractor will prepare the necessary testing documentation
in accordance with the criteria set forth in Section 4 of this SOW, for
approval by Buyer. This documentation will define the testing and
pass/fail criteria for a particular group of software while performing
as an integrated portion of the NPIC system. Acceptance will be provided,
following successful completion of integrated testing, by a "Certificate
of Completion" signed by the Buyer's Subcontract Administrator.
? 7-1
UNCLASSI FI ED
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
STAT
STAT
STAT
STAT
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
UNCLASSIF=IED
Statement of Work
23892
SPECIFICATION NO.
7935495
Preliminary testing of the Hardware provided hereunder will be
conducted as Subcontractor's facility using test procedures approved 30
days prior to the start of testing by the Buyers Subcontract Admininstrator.
These test procedures will clearly state the. testing methodology and
pass/fail criteria. Following successful completion of testing at the
Subcontractor's facility, permission to ship the hardware to Buyer will
be obtained from Buyer's Subcontract Administrator.
Final acceptance will follow integrated testing of the hardware at
Buyer's facility using test procedures approved by Buyer. Final acceptance
will be in the form of a "Certificate of Completion" signed by the
Buyer's Subcontract Administrator.
Acceptance or rejection, of data items requiring approval, will be
forthcoming within 60 days of receipt of the data item at Buyer's facility.
Concurrent with disapproval, the Buyer will state the reasons for disapproval
and the required date for resubmission. Data items not requiring approval
shall be considered accepted upon receipt of a completed document by the
Buyer's Subcontract Adminstrator; however, resubmission may be required
for incomplete data 'items or those containing inaccuracies or errors.
All original data shall normally be delivered in the form of a
reproducible master of high quality suitable for photographic reproduction
without touchup. Black letering and drawing on 8 1/2" x 11" high quality
white bond paper is required. Drawings larger than this size shall be
reduced to this size providing that no clarity of detail of readibility
is lost.
Original data in the form of computer printouts must be delivered on
white paper from one copy printouts, with alpha/numerical impressions
sharp and clear in high black contrast to the paper.
7-2
?
?
I awar+1 n nnr r-I r- r-%
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
UNCLASSIFIED
Statement of Work
23892
REV.
A
The Buyer will provide the following facilities and items of support
to the Subcontractor on the for
the performance of the classified software tasks required under this
Statement of Work:
a. Software Development Laboratory, containing necessary computer
systems and other equipment for the development and test of NPIC
software;
b. Office facilities equivalent to those utilized by the Buyer's
personnel at the same professional level, including desks,
chairs, file cabinets, etc.;
d. Typing and other administrative support, including document
reproduction service, equivalent to that utilized by the Buyer's
NPIC Program Office; and
e. Stationery and office supplies equivalent to those available to
the Buyer's NPIC Program Office.
These facilities and items of support will be available for the period
of performance of this Statement of Work.
The Buyer and the Subcontractor shall agree at the time of subcontract
negotiations upon the number and professional level of 0 personnel to
be resident on thel (premises.
8-1
STAT
STAT
STAT
STAT
UNCLASSIFIED
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
UNCLASSIFIED
Statement of Work
[CODE (DENT. NO
23892
SPECIFICATION NO.
7935495
REV.
A
?
The Buyer reserves the right, with prior advise to the Subcontractor,
to, at any time during the Subcontract, place in residence one or more
Buyer personnel for monitoring, evaluation and coordination.
The Subcontractor shall provide normal office services and facilities
to Buyer Personnel.
UNCLASSIFIED
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
STAT
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
UNCLASSI FI ED
?
Statement of Work
CODE IDENT. NO.
23892
Appendix A
SPECIFICATION NO.
7935495
UNCLASSIFIED
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
STAT
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
UNCLASSI FHi ED
Statement of Work
CODE IDENT. NO
23892
SPECIFICATION NO
7935495
The following is a list of all subcontract data deliverable with
delivery schedule and format references, The associated DRDs are shown
in Appendix B herein.
Data items should normally be submitted as a camera-ready copy and
six copies. Publication and approval will be accomplished by the Buyer.
Copies of computer printouts may be reduced.
REV.
A
The camera-ready copy shall be of high quality suitable for photographic
reproduction without touchup. Black lettering and line drawings on
8 1/2" x 11" high quality white bond paper is required. Drawings larger
than this size shall be reduced to this size, providing that no clarity
of detail or readibility is lost. Separate, individual drawings shall
be prepared if drawing reduction cannot be accomplished.
Data in the form of computer printouts must.be delivered on white
paper from one copy impressions, with all printing sharp and clear in
high black contract to the white paper. The original printout, as
specified, shall serve as a camera-ready master.
No.
Data Requirement
Date Required
?C102
Financial Plan
To be specified
C103
Master Schedule
As required
C104
Development Plan
To be specified
C105
Security Plan
To be specified
C109
Monthly Financial Report
10 days after end of
accounting month
Every 6 months
0
C111
Milestone Report
Weekly
Monthly
C113
Quarterly Progress and Status
10 days after end o
Report
accounting quarter
C115
Segment Transition & IntegratLon
Plan
.PAR - 60 Days (Preliminary)
CDR - 60 Days (Update)
DRD
800
801
708
802
805 STAT
806
807
809 STAT
726
H/W Dlvg. - 120 Days (Final)
A-2
....~. A t'I I I I r- r-%
Approved For Release 2007/09/06: 4%
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
UNCLASSIFIED,:
?
?
?
Statement of Work
CODE IDENT. NO. 1 SPECIFICATION NO.
23892 7935495
No. Data Requirement
C116 Segment Operations Concept
C117 Segment Design Specification
C118 S/W - OPNS - H/W Interface
Standards
C119 Requirements Traceability.
& Verif. Matrix
C120 Engineering Tech Notes
C121 Segment Verification Plan
C122 Segment Design Analysis Report
C124 Maintenance and Logistics
Plan (TBR)
C125 Data Base Specification
C126 Operations/Software Interface
Specification
C127 Operations/Hardware Interface
Specification
C128 Hardware/Software Interface
Specification
C129 Software/Software Interface
Specification
REV.
A
STAT
Date Required DRD
PDR - 45 days (Final) 700
PDR - 45 days (Final) 706
PDR 45 days
PDR - 45 days (Update) 717
CDR - 45 days (Final)
PDR - 45 days (Update) 812
CDR - 45 days (Final)
PDR - 45 days '(Preliminary) 813
CDR - 45 days (Final)
PDR - 60 days 722
PDR - 45 days (Preliminary) 710
CDR - 45 days (Final)
PDR - 60 Days (Preliminary) 712
CDR - 60 Days (Final)
PDR - 60 Days (Preliminary) 713
CDR - 60 Days (Final)
PDR - 60 Days_ (Preliminary) 714
CDR - 60 Days (Final)
PDR - 60 Days (Preliminary) 715
CDR - 60 Days (Final)
PDR - 45 days (Preliminary) 718
CDR - 45 days (Final)
PDR + 45 days (Preliminary) 814
CDR - 45 days (Final)
UNCLASSIFIED
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
U N C L ASS I F1 ED
Statement of Work
23892
I SPECIFICATION NO.
7935495
No. Data Requirement
STAT
REV.
A
Date Required DRD
C136 Equipment Operations & CDR - 45 days (Preliminary) 727
Maintenance Manual First Delivery to STAT
45 days (Update)
C137 Data Base Administrator Manual PDR -. 45 days (Preliminary) 818
CDR - 45 days (Update)
Start of Training (Final)
C138 Programmers Manual CDR - 45 days (Preliminary) 819
Segment Acceptance (Final)
C141 CPCI Part I Specifications PDR - 45 days . 709
C142 CPCI Part II Spcifications PDR.- 45 days (Preliminary) 719
CDR - 45 days (Build to)
Segment Acceptance (As built)
C143 CI Specification PDR - 45 days ' 820.10
C144 Component Specification PDR - 45 days (Preliminary) 821
CDR - 45 days (Build to)
C145 Data Dictionary PDR 45 days (Preliminary) 822
CDR 45 days (Buildto)
Segment Acceptance (As built)
C146 Training Requirements As prepared
C148 Equipment Operations and Ship (Preliminary)
Maintenance Manual Segment Acceptance + 45 days
(Final)
C150 CPCI Listings (As built) Segment Acceptance + 45 days 730
C151 Reliability Demonstration Plan Demo- 90 days
C152 S/W Version Description Document Ship + 15 days
C154 Segment Test Reports Test + 10 days 733
C156 Data Accession List Updated Monthly 828
C201 Weekly Financial Report Weekly 900
C202 Status Data for NDPO Schedule Updated Monthly 901
System
?
I aRI#%I n t'(' ra rr%
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
UNCLASSIFIED
?
Statement of Work
CODE IDENT. NO.
23892
STAT
REV.
A
?
?
Data Requirement
C203 Systems Operations Manual
C204 Project Master Control Plan
C205 Review Minutes and Action Items
I SPECIFICATION NO.
7935495
Date Required
Same as CPCI II Specs
To be specified
Review + 5 days
C206 Segment/Systems Operations Manual To be defined
C207 Review Data Package
C209 Computer Utilization/Problem
Report (CU/PR)
C213 Configuration Management Plan
C214 Configuration Management Data
C210 Drawings, Engineering and
Associated Lists
C212 Design Validation Report
Review-30 Days
Test-45 Days
End of each Test Period
30 DAC
As Required
PDR and CDR
(1) In accordance with DOD-STD-1000B, Level 3.
(2) In accordance with Operating Procedures and MIL-STD-480A.
UNCLASSIFIED
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
DRD
720
902
TBS
Note 2
Note 1
STAT
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
UNCLASSIFIED
0
?
Note: The DRDs are not included with this proposal to NPIC because
the DRDs are duplicates of those in the RFP.
?
UNCLASSIFIED
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
UNCLASSIFIED
?
Statement of Work
23892
SPECIFICATION NO.
7935495
OPERATING PROCEDURES
29-12A
31-04'
31-11
31-20
?
?
(NOTE: References tol in these
procedures applies to the entire Washington
Metropolitan Area, including
UNCLASSIFIED
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
REV.
STAT
STAT
STAT
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
UNCLASSIFIED
TO: MANAGERS & Selected Off-site Locations
SUBJECT: FSD PROCEDURES - NEW/REVISED
NUMBER TITLE AND COMMENTS
29-12A Engineering Documents - Release and See below 1 thru 8 and
Change Attachment A.
All dated
3/15/78.
This release (see Exceptions) replaces all ;previous issues of OP 29-12 at all
locations, and obsoletes OP 29-04 by incorporation.
Retain pages 9 thru 11 of old OP 29-12 (Section VI, Manufacturing Engineering
Documents) until OP 29-12C is released to replace them.
Retain pages 1 thru 4, OP 29-12, Corrigendum (Section VII, Processing Revisions
to Component Documents - Class II Changes) until OP 29-12B is released to
replace them.
STAT
STAT
i
STAT
?
I I&If%I A C`C" 1 ri r-m
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
UNCLASSIFIED
Section: Engineering/Configuration Management
SUBJECT: ENGINEERING DOCUMENTS - RELEASE & CHANGE
Contact: Engineering/Configuration Management
.Index: 29-12A
Page: I -of 10
Issued: 7/21/80
STAT
Defines the system for releasing and changing engineering documents,
author' work, and maintaining records of all such transactions T
in the ata base, 0 Parts Identification and Usage System STAT
(OPIUS
1. When it is necessary to deviate, the concerned Program
Office shall issue a supplement to this procedure in the
form of a Program Directive that defines the system to be
used on that program. This Program Directive must
be approved by Configuration Management, Engineering,
Operations, and Quality Assurance.
?
2. See OP 29-12B for Component Class II Changes.
3. See OP 29-12C for Manufacturing Engineering Documents-Release
and Change.
II. CONTENTS
Section III, GENERAL (Requirements).
Section IV, FORMS (Used in this Procedure)
Section V, PROCEDURE - ENGINEERING RELEASE
Section VI, PROCEDURE - ENGINEERING CHANGE
ATTACHMENT A - DEFINITIONS
ATTACHMENT B - STOCK DISPOSITION CODES
A. Classified Engineering Documents land Government) - Refer to
the appropriate Security Procedures for specific requirements
concerning originating and handling of classified documents.
? C-3
UNCLASSIFIED
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
STAT
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
UNCLASSIFIED
?
STAT
Index: 29-12A
Page: 2 of 10
Issued: 7/21/80
B. An Engineering Notice (EN) release package is comprised "f. an EN
and original Engineering Documents (drawings, parts list, wire
lists, procedures, specifications, as applicable, and Component
Part/Materials Analysis Reports (CPMARs), when applicable).
C. An Engineering Notice (EN) change package is comprised of an EN and
as applicable: (i) Part Where-Used List, (ii) marked copies of
Engineering documents reflecting changes, (iii) copy of EN affected
(Notice Only Change transaction), and (iv) CPMARs, when applicable.
D. An Engineering Order (EO) change package is comprised of a completed
EO form and, when needed, includes reproducible pictorial/textual
attachments in order to adequately describe the changes required.
All EOs shall be incorporated by EN and design documentation in
accordance with the EO Rule.
a. The maximum quantity of outstanding EOs shall not be greater
than - three (3) at Owego, and five (5) at 0 unless STAT
previously approved by Configuration Management. Outstanding
EO count not to exceed nine (9) when Configuration Management
waiver option is exercised.
1. At~ - Quality Assurance is responsible for enforcement STAT
of the EO Rule.
2. Atl H Configuration Management is responsible for STAT
enforcement of the EO Rule.
b. EO monitoring is required by all sign-off areas and Engineering/
Manufacturing Documentation (Records). The following reflects
conditions that could force #0 incorporation before the above
maximum is reached.
1. Engineering receives written notification from Manufacturing/
Manufacturing Engineering and Quality Assurance that a
new update is required clue to poor document legibility to
avoid increased cost or prevent schedule slippage/impact.
2. Needed to meet a specific contractual requirement.
o EO/EN must indicate the incorporation of EER(s) - When the EO/EN
contains data previously generated. and incorporated by EER(s), the
following rules apply.
I InI!?`I ACCI CI Cll
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
UNCLASSIFIED
Index: 29-12A
Page: ? 3 of 10
Issued: 7/21/80
* a. The EO/EN may cover only the electrical functional changes
effected by the EER(s).
* b. Any additional changes not affecting electrical function may
be incorporated concurrently, but the EO/EN must clearly state
the difference.
* c. The EO/EN should clearly "as accurately as possible" state the
S/N(s) of the items that have been or are intended to be
incorporated via EER.
* d. Copies of the EER(s) covered by the E0/EN must be incorporated
into the change package.
STAT
E. Sheet Numbering:
1. Mark sheet number and total number of sheets that make up the
EN/EO package. Mark remaining sheets, including all attachments,
consecutively with sheet numbers only.
2. In a multiple Part No. EN/E0, when the total number of sheets
comprising the package exceeds one (including the basic form,
EN/EO continuation forms, pictorial-type attachments and
textual-type attachments), the originator shall indicate the
sheet numbers affected for each part number changed, adjacent
to the affected part number in the body of the basic EN/EO
form (and in the body of the continuation forms, if necessary).
F. When a disposition of an EO/EN requires rework of affected parts,
and such rework definition is not self evident nor covered by
standard procedures, then rework instructions and/or rework drawings
are required as part of the package.
G. Once established by the Program Office, there shall be no deviation
to Approval Signature List without Program Office approval.
H. Unresolved problems during EN approval cycle shall be elevated for
management resolution.
I. Software Configuration/Hardware Configuration Change Board (SCCB/HCCB)
is normally chaired by Configuration Management. EN/EOs must have
all engineering approvals before submission for board review.
Other approval signatures may be obtained at board meetings or by
sequential EN/EO Package review and approval by affected functions.
UNCLASSIFIED
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
UNCLASSI FI ED
Index: ? 29-12A
Page: 4 of 10
Issued: 7/21/80
STAT
J. All releases and changes which affect test equipment, test software,
procedure/specification or testability shall be reviewed by the
responsible test area prior to approval by the Configuration
Control Board.
K. Specification Change Notices (SCN)' are released with an EO. The
SCN is an approved specification change at this stage, but the EO
serves as a mechanism for entering the SCN to OPIUS as well as
informing CCB of its approval and release.
L. The department responsible for the design and documentation of the
part is responsible for initiating an EO that affects the Part/Document.
4. It is the responsibility of the originator's Manager/Project Manager
to verify need prior to authorizing the issue of an EO/EN.
N. When an EO/EN is requested by an area other than the responsible .
department, the following information is required from the requester
to the responsible department:
2. Latest Engineering Notice (EN) and Outstanding EO numbers
applicable to the document/part numbers affected
3. Description of the problem
4. Requester's name, department, and telephone number
0. When processing an EN/E0, red lead pencils shall be used to mark
all required changes on the documents and may be ordered from
stationery stores under MRO 782 704076.
P. A Notice Only EO/EN package will include a copy of the EO/EN
affected.
Q. All product hardware documentation being processed at by EN
must be inspected per location General Inspection Procedure 485
(GIP) covering Inspection of Engineering Documents.
952-0023
Engineering Notice
952-6003
EN Continuation
952-0044
Engineeringing Order
952-6010
EO Continuation
i
STAT
1 1R1f% I A C%C%I f"I r7 r-%
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
UNCLASSIFIED
Index: 29-12A
Page: 5 of 10
Issued: 7/21/80
V. PROCEDURE - ENGINEERING RELEASE. Pertains to all new Documentation
processed to Records.
A. Originator
1. Prepare an EN in accordance with the instructions on the back
of the form.
2. Obtain all required Engineering signatures (including Manager,
Project Manager, and Engineering CCB representatives, when
applicable).
3. At~- Forward the EN Package to Component Control for
processing and return.
4. Forward the EN Package to Configuration Management.
B. Component Control -
1. Inspect product hardware documentation in accordance with GIP
485 covering Inspection of Engineering Documents.
2. Return EN Package to originator for further processing.
C. Configuration Management
1. Schedule and chair SCCB/HCCB meetings.
2. Verify that adequate contractual data exists for action being
addressed by the EN.
Determine the Selected Item Code (as a board decision) on
releases occurring after the original Selected Item List (SIL)
is established. See Attachment C for definitions.
4. Obtain required Change Board approval signatures on the EN.
5. Sign EN approval and release to Records for further processing.
NOTE: Change Board coordinates the resolution of any differences
noted during this phase of approval.
?
UNCLASSIFIED
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
STAT
STAT
STATE
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
UNCLASSIFIED
Index: 29-12A
Page: 6 of 10
Issued: 7/21/80
Review the Package, source code release, resolve any manufactur-
ability problems with Engineering, and sign EN approval.
E. Quality Assurance
Review the Package in. accordance with Quality Control Procedures,
and sign EN approval.
F. Product Test
1., Review the EN package in accordance with department Procedure.
2. Resolve any testability problems and sign EN approval.
G. Other CCB Representatives
Review EN Package for impact on area they represent and sign EN
approval.
H. Records
1. Assign Engineering Notice (EN) numbers upon request.
2. Verify that the content of the EN Package is complete, and
,that all signature blocks on drawing format are signed and
dated in accordance with current department procedures.
3. Take necessary action to record the item identification (i.e.,
Code Identification, Part Number, Rev., Level, etc.) into the
OPIUS data base.
4. Affix a Release Stamp (R) and date to all Engineering documents.
5. Arrange for distribution of the EN Package in accordance with
instructions established by the Program Office and requests
from Management for the program involved.
NOTE: Include distribution to those FSD sites that are jointly
working the programs affected by the release.
STAT
i iniri rccI FII Fl
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
?
0
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
UI\IUL/SSII-IEU
Index: 29-12A
Page: 7 of 10
Issued: 7/21/80
NOTE: a. Refer any problems regarding EN Package completeness to
the CCB chairperson for resolution.
b. Ensure that the automated Part List(s) and the OPIUS data
base contain the exact information provided in the EN
Package.
7. File Master documents and balance of EN Package in accordance
with Records Retention procedures.
1. Inspect copies of Engineering documentation for acceptable
legibility and distribute per program distribution lists.
NOTE: Reject all illegible document packages to Records for subsequent
return to the Engineer concerned.
NOTE: On programs involving two or more locations, ensure that vital
records files are updated at the affected sites.
3. Return Master documents to Records.
J. Production Control
Implement the package in accordance with Production Control procedures.
VI. PROCEDURE - ENGINEERING CHANGE
Pertains to change (see Definition) required on Engineering documentation
that is formally released. The EO authorizes expedited changes, and an
EN authorizes change, plus updating the revision level of the affected
documentation.
1. When processing an EN, request copies of documents requiring
changes, and Engineering Orders (EOs) outstanding against
those documents from Records.
2. Prepare the EN form or the EO form in accordance with the
instructions on the back of the forms.
UNCLASSIFIED
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
STAT
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
UNCLASSI FI ED
?
Index: 29-12A STAT
Page: 8 of 10
Issued: 7/21/80
3. Obtain all required Engineering signatures, including Manager,
Project Manager, and Engineering CCB representative, when
applicable.
4. Atli- Forward EN/EO Package to Component Control for
processing and return.
NOTE: If the EN/EO is causing changes to multiple sheet drawings and
all sheets are not affected, unaffected sheets shall not be
included in the EN Package.
B. Component Control -u
1. Inspect product hardware documentation in accordance with GIP
485 covering Inspection of Engineering Documents.
2. Return EN/E0 Package to originator for further processing.
2. Verify that the correct class of change and contract authority,
if applicable, is reflected on the EN/EO.
3. Obtain other required signatures on EN/EO for program involved.
*4. Return any disapproved EN/EO Package to Engineering Change
Board representative.
5. Sign approval and forward EN/EO Package to Records for release.
STAT
STAT
D. Records
1. Verify that the EN/EO Package is complete and affix an (R)
stamp and date to documents in the package.
2. Arrange expedited distribution of the EN/EO Package in accordance
with distribution instructions established by the Program
Office for the affected program.
NOTE: Include distribution to thos sites that are jointly STAT
working the programs affecte: Y the release.
S
I Iwae.I A & , % C % r1 Ir-M
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
UNCLASSIFIED
Index: 29-12A
Page: 9 of 10
Issued: 7/21/80
3. Provide copies of the EN/EO and all attachments to be forwarded
to Production Control and Manufacturing Engineering.
4. Update the automated records (OPIUS) to reflect the new config-
uration and ensure accuracy of revised computer output:
5. Coordinate master documentation updating with applicable
Engineering group.
6. Send updated Masters to Micro-Graphics.
NOTE: Once the Change Board has approved the EN/EO and CM has delivered
the Package to Records, the Package shall not leave the Records
area prior to the (R) stamp being affixed to the documents
therein unless directed by CM. CM is responsible for ensuring
that additional changes are not made unless concurred with by
those who previously approved the EN/E0.
7. File updated master documentation and balance of the EN Package.
8.. Return the original marked-up documents to the original EN
file (not required for factory test equipment).
9. Generate monthly Outstanding EO Reports with EO release dates
and send reports to appropriate managers and Quality Assurance.
E.
Micro-Graphics
1.
Update Vital Records file.
NOTE:
On programs involving two or more locations, ensure
that vital
2.
records files are updated at the affected sites.
Return master documentation to Records.
F. Product Test
1. Review the EN/EO package in accordance with department Procedure.
2. Resolve any testability problems and sign EN/EO approval.
G. Production Control
1. Implement the EN/EO in accordance with Production Control
procedures.
?
UNCLASSIFIED
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
STAT
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
UNCLASSIFIED
Index: 29-12A
Page: 10 of 10
Issued: 7/21/80
?
STAT
2. Issue the necessary documentation and forward the EN/E0 and
needed paperwork to Manufacturing Engineering for incorporation
with open floor orders.
H. Manufacturing Engineering
1. Review and reconcile EO quantity outstanding to EO Rule prior
to sign-off.
2. Upon receipt of the Production Order, evaluate the EN/E0 in
accordance with department procedures.
3. Incorporate the EN/EO with specific open floor orders in
accordance with the Operating Procedure covering Floor Revisions
to Manufacturing Orders.
I. Quality Assurance
1. Review EN/E0 package for reproducibility/legibility to ensure
acceptable microfilm quality. Reject illegible document
packages and coordinate them with Micro-Graphics; Records and
Engineering.
*Release replaces all previous issues of OP 29-12 and obsoletes OPs 29-
04, 29-25 and 29-34 by incorporation. OP 29-12A, Attachment A, covers
Definitions - Attachment B, Covers stock Disposition Codes and Definitions
Attachment C covers Selected Item Codes.
o
ncciC1Gn
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
UNCLASSIFIED
OPERATING PROCEDURE ATTACHMENT A Index: 29-12A STAT
Page: 1 of 2
Issued: 3/15/78
1. Engineering Notice (EN) - A record and action by which documents,
identified under the FSD Numbering Procedure, are released, as
formal documentation to all affected areas. All EN documents will
be released at a dash (-) level and letter assigned in alphabetical
order for each succeeding revision.
2. Change - The process of revising a document and, if applicable,
giving an engineering disposition to facilitate manufacture, correct
drawings, clarify information, incorporate Engineering Orders,
improve product performance and reliability, update document require-
ments, or improve the design of an item.
3. Notice Only Change - An Engineering Notice (EN) is originated to
alter disposition or make other changes to a previous change notice.
Processing for Notice Only Change is the same as a normal change,
except that a document is not affected.
4. Engineering Order (EO) - A system for processing changes or releases
when it is prudent not to update documentation at the time of
release because of cost or schedule considerations.
5. Document - Official papers relied on as the basis, proof, or support
of the design, procurement, manufacture, test and inspection of
hardware and/or software items or services under a contract.
6. Class of Change - There are two - see below. For a more explicit
definition of these classes, see ANA Bulletin 445, MIL-STD-480 or
MIL-STD-481, as applicable.
a. Class I, Engineering. Change - Is any change which affects the
contractually specified form, fit or function of the item.
(Ref. MIL-STD-480)
b. Class II, Engineering Change - Is any change which does not
fall within the definition of a Class I Engineering Change.
7. Effectivity - The specific contract end item (or range or items)
identified by special numbers to which part numbers, engineering
changes Form DD 250, waiver documents, etc. are addressed and/or
incorporated. Effectivity is actually where the end result of the
change action is intended to be used.
is C-13
UNCLASSIFIED
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
UNCLASSI FI ED
OPERATING PROCEDURE ATTACHMENT A Index: 29-12A
Page: 2 of 2
Issued: 3/15/78
8. Break-In-Point (BIP) - The lowesi serial numbered item that will
contain the change prior to initial customer acceptance of that
item. Instructions for establishing the BIP are specified in the
Notes Section of the Engineering Notice/Engineering Order, as
applicable.
9. Authorized Signature List - A listing of personnel authorized to
approve a release, change notice or order.
0
STAT
STAT
is
I IRII I A (( I ri irr?
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
UNCLASSIFIED
Section: Engineering/Configuration Management
SUBJECT: HARDWARE CONFIGURATION CONTROL BOARD (HCCB)
Contact: Configuration Management
Index: 31-04 STAT
Page: 1 of 4
Date: 6/18/80
'Defines the responsibilities of a Hardware Configuration Control Board.
Configuration Control Board (HCCB) - an administrative body established
to evaluate and approve or disapprove proposed hardware design
releases/changes.
Note: This procedure addresses hardware configuration control.
There are other configuration control activities known as:
*Software Configuration Control Board, 31-04A (SCCB) which contolrs
the release of software modules, and
"Control.Requirements Review Board (CRRB) which controls
the preparation and processing of Engineering Change
Proposals (ECP).
B. Class I and II changes - See MIL-STD-480 for basic definitions of
Class I ana Class II changes. For definitions on specific/individual
programs see the applicable contractual requirements for any
modification to MIL-STD-480 definitions.
*A. The HCCB will function on all hardware programs released for
manufacturing or on any program contractually requiring an internal
HCCB operation. OP's 29-12A and 29-20 define the release and
change documentation used in this process.
"B. Board membership shall normally be composed of representatives from
the areas listed below. The applicable Program Office may authorize
membership changes as appropriate. A representative may serve more
than one area such as the Systems Engineering member representing
Reliability/Maintainability. Representation from other areas
will be requested by the chairman, as necessary, to support these
activities, e.g. Contracts, Procurement, etc.
0 C-15
UNCLASSIFIED
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
UNCLASSIFIED
5. Quality Assurance
6. Program Office
7. Circuit Packaging
1. Configuration Management (Chairperson)
2. Manufacturing Engineering
3. Production Control _
4. Engineering Design & Software Development Groups
Each board member will have full authority and responsibility to
commit their area concerning appropriate change action.
9. Cost Engineering
10. Materials Engineering
11. System Engineering
12. Operations Coordination
The board Chairperson will schedule and call all meetings.
Proposed changes for more than one program may be scheduled for
review at a single meeting. Time and frequency of the meetings
will be determined on the basis of u::gency and proposed change
volume.
'D. Changes shall be complete with requixed Engineering Management
signatures and any supplementary information necessary to
enable the board to properly evaluate the change and reach a decision.
However, preliminary proposals may be presented to for
evaluation and recommendation prior co expending the resources
necessary to present a formal change package.
E. No.part of an approved change shall 'De subsequently revised in any
manner without the approval and dated signature of HCCB Chairperson.
Board members will be informed of all such changes.
Index: 31-04 STAT
Page: 2 of 4
Date: 6/1.8/80
STAT
STAT
?
I awIA-% I i c%c+I CI Cf1
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
UNCLASSI Ft ED
Index: 31-04 STAT
Page: 3,of 4
Date: 6/18/80
IV RESPONSIBILITIES
*A. HCCB Chairperson
1. Schedule meetings as determined by the requirements of the
specific Program.
2. Evaluate each change to determine its proper classification
(CLASS I-or II), Program Office authority, configuration item
effectivity and implementation disposition.
3. Responsible fort lapproval/rejection/deferral of proposed change. STAT
4. Maintain a status record of all changes by Program, indicating
action taken.
5. Obtain customer concurrence of change documentation when
required.
2. Evaluate each release and change in sufficient detail to
enable the member's sign-off to represent a commitment that
the release/change is technically acceptable and can be
implemented within the represented area's schedule and cost
allocations.
3. Secure backup information, as necessary, concerning specific
department requirements.
4. Follow-up specific department commitments associated with
approved changes.
5. The authorized Production Control change board member will
review, approve or disapprove, and understand the impact of
all proposed "K-Code" and "Make-From" changes resulting from a
particular Engineering Change. This member will assure proper
implementation of "K-Code" and "Make-From" changes within the
division.
0 C-17
UNCLASSI Ft ED
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
UNCLASSIFIED
?
Index: 31-04STAT
Page: 4 of '
Date: 6/18/80
This list is an aid in establishing the affects of an engineering
change under HCCB consideration.
Description of Change Adequate
Drawings/Parts Affected
Justification Adequate
Development Status
Alternate Solutions
Value Engineering
Mandatory
Responsive to Customer RFP
Other FSD Programs
Common Parts/Assembly
Part Number Changes
Other CEI's/CI's Affected
Technical "Prior To"
Approval Requirements
Manufacturing
Procurement
Quality
Logistics
Facilities/Capital Equipment
Tooling
Tool Effectivity
Retrofit Effectivity
Delivery Schedule - CEI's/CI's
K-Code Impact
Make-From Impact
SC/MWO/TCTO
Pack and Ship
Contract Provisions
Human Factors
Basis for Cost Estimate
Contract Specifications
Eng/Log Critical
Interface Documents
System Specification
GFP/GFE
Trainers/Simulators
Performance
Weight
Safety
Reliability
Qualification
Service Life
RFI/EMI
Data/Publications
Combat Effectiveness
Training
Maintenance
Spares
Computer Programs
Est. Out-of-Service Time
AGE/SE
Systems Analysis
Change Classification
Programming Development
Test Equipment
* - Revision this issue.
Replaces issue dated 8/6/79.
?
I I R I I A C % CI C Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
UNCLASSIFIED
(OPERATING PROCEDURE Index: 31-04A
Page: 1 of 6
Section: Programs/Contracts Management Issued: 7/2/80
SUBJECT: SOFTWARE CHANGE CONTROL BOARD (SCCB)
Contact: Configuration Management
STAT
Defines the responsibilities of a Software Configuration Control Board (SCCB).
?
A. Software Configuration Control Board (SCCB) - a body representing
diversified disciplines, established: (1) to evaluate and approve
or disapprove proposed software related changes to programs or its
associated documentation; (2) to approve or disapprove the movement
of changed program modules from the development libraries to the
controlled Test and Integration libraries; and to the master or
delivery libraries; (3) to coordinate and approve system builds;
and (4) to approve software deliveries. Traceability of changes
and the authority for such changes shall be insured at all levels
thus effecting configuration control.
B. Class I and II changes - see DoD-STD-480A for definitions of class
changes. On specific programs, refer to the contractual requirements
for any modification to the DoD-STD-480A definitions.
A. The SCCB will function on all programs with software applications.
This includes operational computer programs, support computer
programs, test software, test equipment software, and any software
used for acceptance testing of manufactured equipment. The board
will function on a standalone basis for "software-only" contractual
basis, and will function in conjunction with the Hardware Configuration
Control Board on projects having both types of products. On small
projects the board function will remain the same with the membership
of the board being reduced where one person can represent more than
one functional area of concern.
B. SCCB membership shall normally be composed of representatives from
the areas listed below. The applicable Program Office will authorize
membership changes as appropriate. Representatives from other
areas may be requested by the board-chairperson, as necessary, to
support'change activities.
is C-19
UNCLASSIFIED
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
UNCLASSIFIED
Configuration Management (Chairperson)
Index: 31-04A
Page: 2 of 6
Issued: 7/2/80
*2. Systems Engineering/Integration (Product Test)
*3. Software Development
*4. Software Quality Assurance
*5. Software Control/Software Integration & Test
6. Program Office
7. Integrated Logistics Support
Note: * = Required for a quorum.
A quorum must be present for approval of a Master library update,
system builds and deliveries. Each member will have full authority
and responsibility to commit his/her area to appropriate software
change action. Customer representatives may be invited to the
meeting as appropriate.
Any member required for a quorum, may stop any change by notifying,
the chairperson of his/her veto. Veto of any build must be removed
by correcting the anamoly or by issuing a Program Office Directive
from requiring the anamoly be disregarded with subsequent scheduling
of problem disposition.
C. Any member of the SCCB may call for a meeting by notifying the SCCB
chairperson. The SCCB chairperson will schedule all SCCB meetings.
Proposed software changes affecting more than one project (changes
affecting end items controlled by two or more different SCCBs) may
be.scheduled as required at a single SCCB. Time and frequency of
the regular meetings will be determined on-the basis of urgency and
proposed change volume of the specific program.
0. Changes shall be complete with required Engineering/Software Management
signatures and supporting information necessary to enable the SCCB
to evaluate the change and reach a decision. Preliminary proposals
may be presented to the board for evaluation prior to expending the
resources necessary to present a formal change package.
E. All software changes incorporated to a customer approved baseline
(previous delivery) for the purpose of a customer witnessed test, a
certification test, or delivery to a customer location shall be
complete and approved by the customer before the test or delivery
can be started.
STAT
UNCLASSIFIED
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
UNULASSI F1 ED
?
Index: 30-04A
Page: 3 of 6
Issued: 7/2/80
F. Prior to release by Records (Manufacturing/Engineering Records), no
part of an approved software change, including documentation, shall
be subsequently revised without approval and the dated signature of
the SCCB chairperson. Board members will be informed of all such
changes. All changes or initial releases shall be made by Engineering
Notice (EN) or Engineering (E0) in accordance with the existing
division procedures.
IV RESPONSIBILITIES
A. SCCB Chairperson
1. Schedule SCCB meetings as determined by the requirements of
the specific program.
2. Evaluate each software change with the board to determine its
proper classification (Class I or II), Program Office authority,
configuration item effectivity and implementation disposition.
STAT
3. Responsible for a approval/rejection/deferral of proposed STAT
software changes.
4. Maintain a status record (by EN or EO) of all software changes
by program/part or document number, and indicate action taken.
6. . Obtain customer concurrence of software change documentation
when required.
1. Evaluate each software release and change in sufficient detail
to enable the member's sign-off to represent a commitment that
the release/change is complete and technically acceptable, is
supported by specification and/or procedure changes (either
complete or in process) and is compatible with hardware systems
available for testing.
2. Evaluate whether the software release/change is acceptable and
within the represented area's schedule and cost allocations.
? C-21
UNCLASSI FI ED
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
UNCLASSIFIED
Index: 31-04A
Page: 4 of 6
Issued: 7/2/80
3. Secure back-up information as necessary concerning specific
change requirements.
4. Follow-up department commitments associated with approved or
proposed software changes.
1. Evaluate each software release/change in sufficient detail to
enable the member's sign-off to represent a commitment that
the release/change is technically acceptable, is supported by
documentation changes, is identified as to implementing customer
approved Engineering Change Proposal (ECP) or a contract
requirement, and is compatible with prior changes or modules
which have been approved.
2. Assess the software release/change as acceptable and within the
represented area's schedule and cost allocations.
3. Secure back-up information as necessary concerning specific.
change requirements.
4. Follow-up department commitme-Lcs associated with approved or
proposed software changes.
1. Evaluate each release and change in sufficient detail to
enable the member's sign-off to represent a commitment that
the release/change is acceptable in regards to quality, and
produced in an acceptable manner including all appropriate
reviews and/or inspections.
2. Assess whether the software release/change documentation is
acceptable and conforms to the contractual quality and imposed
standards requirements.
3. Inspect and bond copies of software media which reflect documented
changes or releases for deliver:.es and/or acceptance testing.
4. Follow-up department commitments associated with approved
software changes through delivery or customer acceptance.
STAT
?
1 1KIrl AQQMi r:1n
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
UNCLASSIFIED
Index: 31-04A
Page: 3 of 6
Issued: 7/2/80
STAT
E. Program Office Representative
1. Evaluate each software release and change in sufficient detail
to enable the member's sign-off to represent a commitment that
the release/change is authorized by an approved ECP, contract
modification, or contractual requirement.
2. Assess whether the software release/change is acceptable and
within the represented program's schedule and cost guidelines
.or accept the cost overrun.
3. Follow-up on cost allocations, Program Directives, and ECP
submittals as required.
4. Maintain customer interface for negotiations and requirements
affecting software change considerations.
1. Evaluate each software release and change in sufficient
detail to enable the member's sign-off to represent a commitment
that the release/change is technically acceptable and can be
tested by existing or in-process test procedures.
2. Evaluate whether the software release/change is acceptable and
within the represented area's schedule and cost allocations or
assess the impact and notify the Program Office.
3. Secure back-up information as necessary to support specific
software change requests.
4. Follow-up department commitments associated with approved or
proposed software changes.
1. Evaluate each software release/change in sufficient detail to
enable the member's sign-off to represent a commitment that
the release/change is covered by enough information to support
any software build requirements, is in sufficient detail to
allow and support any required drawings or drawing changes for
the EO/EN package, and will be compatible with the existing
software library controls.
2. Assess whether the software release/change is acceptable and
within the represented area's schedule and cost allocations or
assess impact and notify Program Office.
UNCLASSIFIED
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
UNCLASSI FI ED
?
Index: 31-04A
Page: 6 of 6
Issued: 7/2/80
3. Secure supporting information as necessary concerning specific
change package requirements and prepare the EO/EN package for
approval by this board.-
4. Promptly follow-up department commitments associated with
approved or proposed software changes.
H. Integrated Logistics Support Member
1. Evaluate each release and change in sufficient detail to
enable the member's sign-off to represent a commitment that
the release/change is technically acceptable, and is compatible
with fleet maintenance and operational objectives.
2. Evaluate whether the release/change is acceptable and within
the represented area's schedule and cost allocations.
3. Secure back-up information as necessary to support specific
change requests.
4. Follow-up department commmitments associated with approved or
proposed changes.
STAT
40-
Update ofI ~ssued dated 3/80; new at all other (locations. STAT
?
Approved ForIRelease 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
UNCLASSIFIED
Index: 31-11 STAT
Page: 1
Issue: .6/11/79
Section: Engineering/Configuration Management
SUBJECT: TECHNICAL REVIEWS AND AUDITS
Contact: Engineering/Configuration Management/Software Engineering
To define the objectives, tasks and responsibilities associated with
conducting technical reviews and audits.
II APPLICABILITY
A. Covers technical reviews and audits required by contract--commonly called:
System Requirements Review (SRR) Functional Configuration Audit (FCA)
System Design Review (SDR) Physical Configuration Audit (PCA)
Preliminary Design Review (PDR) Formal Qualification Review (FQR)
Critical Design Review (CDR)
B. An_internal design review requirement for cost, reliability,
tainability and manufacturability is separate and defined in
E7 OP 31-15, Cost, Reliability, Maintainability, and Manufactur-
a i ity (CRMM) Design Reviews.
C. MIL-STD-1521A, Technical Reviews and Audits for Systems, Equipment
and Computer Programs prescribes the audits and reviews stated
in Section A. Portions of the standard may be selected as appropriate
to the activity to be performed.
STAT
STAT
D. Software Standard D-P 3-07099 013, Technical Review Practice, shall STAT
be applied to software review/audits.
III SCOPE - of audits and reviews vary with individual applications;
therefore, it is required that the scope of these efforts be approved by
the procuring agency/customer.
A. Serve as chairperson.
B. Review and agree with review/audit minutes.
C. Approve resolution of any action item required as a result of the
activity.
D. Formally acknowledge adequacy of the review/audit and satisfactory
0 completion.
C-25
UNCLASSIFIED
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
UNCLASSIFIED
Index: 31-11
Page: 2
Issue: 6/11/79
V (RESPONSIBILITIES
A. Program Office
1. Designate the co-chairperson of the activity.
2. Assess the readiness for conducting the review and the need for
dry runs. _
B. Co-Chairperson
1. Coordinate time, place and agenda with the procuring
agency/customer.
2. Designate the team members for full-time and stand-by
participation.
3. Conduct any required per-audit/review internal briefings
to confirm responsibilities.
4. Notify the participants of time and place of the activity,
including the support required from each.
5. Coordinate the availability of all documentation required
for performance of the activity and confirm who is respon-
sible for providing it.
6. Prepare and distribute minutes and status reports internally,
and to the Program Office for external distribution.
7. Coordinate resolution/completion of any action items within
Dand with the procuring agency/customer to ensure
a satisfactory completion.
a. Establish (with the procuring agency) the form to be
used for coordinating action items (see MIL-STD-1521A,
Figure 2 for a suggested sample).
b. Compile and distribute a summary of action items including,
action to be taken, responsibility and related details.
c. Provide action item status reports as required.
VI TEAM MEMBERS
A. Analyze agenda to confirm individual responsibilities.
B. Be an active participant as appropriate.
C. Support action item resolution as required.
Consolidates and replaces all previous issues of OPs 31-11, 31-12, and
31-13 a new at all other FSD locations.
STAT
o
STAT
?
STAT
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84TOO037ROO0500040001-2
UNCLASSIFIED
__]OPERAT-ING PROCEDURE
Section: Programs/Contracts Management
SUBJECT: SUBCONTRACTOR CONFIGURATION MANAGEMENT
Contact: Configuration Management
Index: 31-20
Page: 1 of 2
Issued: 12/27/79
I PURPOSE
To define the method of evaluating prospective subcontractors for Configuration
Management (CM) competency and cover the conditions which should be
considered in implementing a Subcontractor CM program.
A. A CM Survey will be performed on prospective Build-To-Print subcontractors,
and prospective subcontractors with partial or total design/development
responsibility for the Configuration Item (CI).
B. Surveys are conducted by CM or by someone designated by mutual
agreement with the Program Office.
C. The survey will utilize a CM check list - Attachment I. The survey
of a Build-To-Print subcontractor will address, primarily, the in-
house change control process, whereas the survey of a subcontractor
with design/development responsibility will include the total CM
process.
D. If required, a survey report will be provided to the Program Office
and will include a positive statement with regard to the acceptability
of the surveyed subcontractor.
STAT
A. A CM requirements document will be levied on the subcontractor and
will include consideration of the following, as appropriate:
1. A statement of general CM relationship with El or any associated STAT
contractors.
2. Applicable documents.
3. Configuration Identification requirements, including engineering
documentation, part numbering, nomenclature, nameplate, reference
designator, serial number, and reference designator requirements.
4. Configuration Control requirements, including methods of
processing Class I changes, Class II changes, deviations, and
waivers.
. C-27
UNCLASSIFIED
Approved For Release 2007/09/06: CIA-RDP84TOO037ROO0500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
UNCLASSIFIED
Index: 31-20
Page: 2 of 2
Issued: 12/27/79
5. Subcontractor responsibility, relative to directed changes.
6. The control of Government and/or =furnished material.
7. Subcontractor obligations to support audits, reviews, and
general surveillance.
8. Recognition of software and hardware, in regard to application
of CM requirements.
9. CM accountability requirements, including the format and
content, of required reports concerning Baseline Configuration,
As Built Configuration and Retrofit status.
11. Submittal of a CM plan by the subcontractor outlining how all
of the foregoing will be accomplished.
CM will surveil subcontractors as appropriate to assure that the
required CM disciplines are maintained. The degree of surveillance
will depend primarily on the complexity of the CI, the degree of
design responsibility and the observed performance of the subcontractor.
C. Subcontractor audits will be conducted as required to confirm that
the CI design is current and contractually authorized. Audits will
ususlly consist of:
1. A test baseline configuration audit to establish the CI configuration
to be subjected to Functional Configuration Audit.
2.. A Physical Configuration Audit (PCA) to establish the con-
figuration baseline for production.
3. An audit of each deliverable CI: As-built record to assure that
the configuration is compatible with the authorized design
configuration.
4. Configuration Control requirements, including-methods of
processing Class I changes, Class II changes, deviations, and
waivers.
STAT
STAT
Replaces issue dated 04/28/76 atl Inew at all other locations. STAT
?
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
?
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
?
PROGRAM
RFP NO. 82-B-015
DATE:
WORK BREAKDOWN STRUCTURE INDEX
NPIC D/C SEGMENT
CONTRACT NO.
2.24-82
>
LL
CONTRACT
SOW
SPECIFICATION
w
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
WBS
p
Z
~
LINE
PARA
NUMBER
Z 0
CODE NO.
n
Q
c
n
ITEM
.
NO
Jz
1
2
3
4
5
6
0
M
~
.
X
D/C Segment
140000
X
Project Management
241000
X
0001
Project Management
341100
X
0001
Project Management
441100
X
0001
X
Provide Project Management (2d & 3d
541100
X
0001
Level)
Provide Project Management (2d & 3d
641100
X
0001
level) Including NDPO Interface - BOC
Provide Project Management (2d & 3d
641101
X
0001
Level) Including NDPO Interface - IOC
Provide Project Management (2d & 3d
641102
X
0001
Level) Including NDPO Interface - FOC
In
m
0
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
PROGRAM
WORK BREAKDOWN STRUCTURE INDEX
NPIC D/C SEGMENT
R FP NO. 82-B-01 5
DATE:
CONTRACT NO.
2-24-82
w
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
WBS
w
CONTRACT
SOW
SPECIFICATION
z z
CODE NO.
w
a
w
LINE
pgRA
NUMBER
1
2
3
4
15
16
1
0
2
ITEM
NO.
Project Control
341200
X
0001
Project. Control
441200
X
0001
X
Project Control
541200
X
0001
Monitor, Control and Report Schedule
641200' -
X
0001
Status - BOC
----- --... ~r
Monitor, Control and Report Schedule
641201
X
0001
Status - IOC
Monitor, Control and Report Schedule
641202
X
0001
Status - FOC
awILitvr, %1AutiOi auu Report Cost jtatus
041ZU3
X
0001
- BOC
-
Monitor, Control and Report Cost Status
641204
X
0001
- IOC
Monitor, Control and Report Cost Status
641205
X
0001
- FOC
?
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
?
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
W
PROGRAM
RFP NO.82-B-015
DATE:
WORK BREAKDOWN STRUCTURE INDEX
NPIC D/C SEGMENT
CONTRACT NO.
2-24-82
W
LL
CONTRACT
SOW
SPECIFICATION
w
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
WBS
'
p
i
Z
LINE
PARA.
NUMBER
Z p
CODE
NO.
v
i
in
ITEM
NO
JZ
1
2
3
4
5
6
a
M
.
Quality Assurance
341300
X
0001
Quality Assurance
441300 -
X
0001
X
Provide & Implement Quality Assur. Plan
541300
X
0001
Provide Quality Assurance Plan - BOC
641300
X
0001
Implement Software Quality Assurance
641301
X
0001
- BOC
Implement Software Quality Assurance
641302
X
0001
- IOC
Implement Software Quality Assurance
641303
X
0001
- FOC
Implement Hardware Quality Assurance
641304
X
0001
- BOC
Implement Hardware Quality Assurance
641305
X
0001
- IOC
Implement Hardware Quality Assurance
641306
X
0001
- FOC
Monitor Subcontractor Quality Assurance
641307
X
0001
- BOC
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
PROGRAM
R FP NO. 82-B-01 5
DATE:
WORK BREAKDOWN STRUCTURE INDEX
NPIC D/C SEGMENT
CONTRACT NO.
2-24-82
>
LL
CONTRACT
SOW
SPECIFICATION
w
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
WBS
o
LINE
PARA
NUMBER
Z p
i
CODE NO.
U)
w
z
a
u)
w
ITEM
.
NO
Z
1
21
3
41
51
6
.
Monitor Subcontractor Quality Assurance
641308
X
0001
- IOC
Monitor Subcontractor Quality Assurance
641309
X
0001
- FOC
Provide QA Audit Reports BOC
641310
X
0001
0 10
m
0
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
?
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
-
?
PROGRAM
RFP NO. 28 B-015
DATE:
WORK BREAKDOWN STRUCTURE INDEX
NPIC D/C SEGMENT
CONTRACT NO.
2-24-82
w
LL
CONTRACT
SOW
SPECIFICATION
w
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
WBS
p
I-
LINE
PARA
NUMBER
K O
CODE NO.
in
z
ITEM
.
NO
J z
1
2
3
4 5
16
0
2
UJ
.
Configuration Management
341400
X
0001
Configuration Management
441400
X
0001
X
Provide Config. Mgmt. of HW, SW,
541400
X
0001
Procedures and Documentation Per NDPO
& Contractor CM Plans
Prepare and Maintain CM Plan and
641400
X
0001
Procedures and Documentation - BOC
Prepare Eng'g Change Notices/Requests
641401
X
0001
and Other CM Related Documents - BOC
Prepare Eng'g Change NoticesJRequests
641402
X
0001
and Other CM Related Documents - IOC
Prepare Eng'g Change Notices/Requests
641403
X
0001
and Other CM Related Documents - FOC
Perform CM Audits - BOC
641404
X
0001
Perform CM Audits - IOC
641405
X
0001
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
WORK BREAKDOWN STRUCTURE INDEX
PROGRAM NPIC D/C SEGMENT
RFP NO.82-B-015
DATE:
CONTRACT NO.
2-24-82
WBS
CONTRACT
SOW
SPECIFICATION
Z
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
Z
LINE
PARA
NUMBER
0
CO
DE NO.
v
W
.
Jz
1
2
3
4
5
6
0
ITEM
NO.
X
Provide Master Product & Document
541401
X
0001
Control
Provide Master Product & Document
641407
X
0001
Control - BOC
Provide Master Product & Document
641408
X
0001
Control - IOC
Prepare and Maintain Software Version
641410
X
.0001
Description Document - BOC
Prepare and Maintain Software Version
641411
X
0001
Description Document - IOC
Prepare and Maintain Software Version
641412
X
0001
Description Document - FOC
?
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
?
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
?
PROGRAM
RFP N0.82-B-01 5
DATE:
WORK BREAKDOWN STRUCTURE INDEX
NPIC D/C SEGMENT
CONTRACT NO.
2-24-82
>
w
~+-
CONTRACT
SOW
SPECIFICATION
w
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
WBS
p
D
z
1
t
-l
LINE
PARA.
NUMBER
CODE NO.
ui
ITEM
NO.
z
1
2
3
4 51
61
o
H
Security
341500
X
0001
Security
441500
X
0001
X
Security
541500
X
0001
Prepare Project Security Plan and
641500
X
0001
Security Procedures - BOC
Implement Security Procedures - BOC
641501
X
0001
Implement Security Procedures - IOC
641502
X
0001
Implement Security Procedures - FOC
641503
X
0001
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
PROGRAM
RFP NO.82-B-015
DATE:
WORK BREAKDOWN STRUCTURE INDEX
NPIC D/C SEGMENT
CONTRACT NO.
2-24-82
w
LL
CONTRACT
SOW
SPECIFICATION
w
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
WBS
0
LINE
PARA
NUMBER
Z O
CODE NO.
Z5
Z
(n
ITEM
.
JZ
1
2
3
4
5
6
o
H
NO.
Status Reviews
341600
X
0001
Status Reviews
441600
X
0001
X
Status Reviews
541600
X
0001
Provide Monthly Status Reviews - BOC
641600
X
0001
Provide Monthly Status Reviews - IOC
641601
X
0001
Provide Monthly Status Reviews - FOC
641602
X
0001
Subcontractor Management
341700
X
0001
Subcontractor Management
441700
X
0001
X
Provide Management, Control and
541700
X
0001
Visibility to Cost & Schedule of
Subcontractors
Provide Management, Control and
641700
X
0001
Visibility to Cost & Schedule of E]
- BOC
Provide Management, Control and
641701
X
0001
Visibility to Cost & Schedule of
- IOC
?
U
STAT
STAT
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
?
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
w
?
PROGRAM
RFP NO. 2g B-015
DATE:
WORK BREAKDOWN STRUCTURE INDEX
NPIC D/C SEGMENT
CONTRACT NO.
2-24-82
w
U.
CONTRACT
SOW
SPECIFICATION
w
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
WBS
p
i
LINE
PARA
NUMBER
O
CODE NO.
v
i
z
vi
ITEM
.
NO
JZ
1
2
3
4
5
6
0
<
LU
.
Provide Management, Control and
641702
X
0001
Visibility to Cost & Schedule of
- FOC
Provide Management, Control and
641703
X
0001
Visibility to Cost & Schedule of
- BOC
Provide Management, Control and
641704
X
0001
Visibility to Cost & Schedule of
- IOC
Provide Management, Control and
641705
X
0001
Visibility to Cost & Schedule of
- FOC
Provide Management,.Control and
641706
X
0001
Visibility to Cost & Schedule of
- BOC
Provide Management, Control and
641707
X
0001
Visibility to Cost & Schedule of
- IOC
Provide Management, Control and
641708
X
0001
Visibility to Cost & Schedule of
- FOC
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
T
m
v
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
PROGRAM
RFP NO. 82-B-015
DATE:
WORK BREAKDOWN STRUCTURE INDEX
NPIC D/C SEGMENT
CONTRACT NO.
2-24-82
>
w
CONTRACT
SOW
SPECIFICATION
w
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
WBS
o
-
I-
LINE
PARA
NUMBER
Z O
CODE NO.
V)
z
w
ITEM
.
NO
JZ
1
2
3
4
5
6
0
.
Document Publication and Control
341800
X
0001
Document Publication and Control
441800
X
0001
X
Document Publication and Control
541800
X
0001
Provide Publication, Maintenance and
641800
X
0001
Control of all Project Documentation
- BOC
Provide Publication, Maintenance and
641801
X
0001
Control of all Project Documentation
- IOC
Provide Publication, Maintenance and
641802
X
0001
Control of all Project Documentation
- FOC
Prepare and Administer Document
641803
X
0001
Management Plan - BOC
11
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/0 6: C
AIA-RDP84TOO037ROO0500040001-2
PROGRAM
RFP NO. 82-B 015
DATE:
WORK BREAKDOWN STRUCTURE INDEX
NPIC D/C SEGMENT
CONTRACT NO.
224-82
>
w
4 -
SOW
SPECIFICATION
w
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
WBS
p
c
1
Z
LINE
PARA.
NUMBER
Z 0
CODE NO.
v
i
2
in
ITEM
NO
JZ
1
2
3
4 5
6
0
H
.
X
System Engineering
242000
X
0002
System Engineering Management
342100
X
0002
System Engineering Management
442100
X
0002
X
Provide Tech. Mgmt of Project
542100
X
0002
Provide Tech. Mgmt of Project - BOC
642100
X
0002
Provide Tech. Mgmt of Project - IOC
642101
X.
0002
Provide Tech. Mgmt of Project - FOC
642102
X
0002
X
Provide/Enforce S/W-Opns-HW Interface
542101
X
0002
Stds
Provide/Enforce S/W-Opns-HW Interface
642103
X
0002
Stds - BOC
Provide/Enforce S/W-Opns-HW Interface
642104
X
0002
Stds - IOC
Provide/Enforce S/W-Opns-HW Interface
642105
X
0002
Stds - FOC
Prepare Segment Development Plan
542102
X
0002
Prepare Segment Development Plan - BOC
642106
X
0002
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
WORK BREAKDOWN STRUCTURE INDEX
PROGRAM NP1C D/C SEGMENT
RFP NO. 82-B-015
DATE:
CONTRACT NO.
2-24-82
w
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
WBS
w
p
LL
CONTRACT
SOW
SPECIFICATION
NUMBER
p
Jz
CODE NO.
V)
z
Cn
1~-
l
LINE
PARA.
2
3
4 5
6
a
H
ITEM
.
NO.
Analysis
342200
X
0002
Analysis
442200
X
0002
X
Provide Requirements Analysis &
542200
X
0002
Traceability
Provide Requirements Analysis &
642200
X
0002
Traceability - BOC
Provide Requirements Analysis &
642201
X
0002
Traceability - IOC
Provide Requirements Analysis &
642202
X
0002
Traceability - FOC
X
Provide Performance Analysis
542201
X
0002
Provide Performance Analysis
642203
X
0002
(Perform Tech Performance Measurements)
- BOC
Provide Performance Analysis
642204
X
0002
(Perform Tech Performance Measurements)
- IOC
Provide Performance Analysis
642205
X
0002
(Perform Tech Performance Measurements)
- FOC
?
?
m
m
0
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06 :CIA-RDP84T00037R000500040001-2 is
PROGRAM
RFP N0.82-13-015
DATE:
WORK BREAKDOWN STRUCTURE INDEX
NPIC D/C SEGMENT
CONTRACT NO.
2-24-82
>
w
w
CONTRACT
SOW
SPECIFICATION
w
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
WBS
.0
i
Z) Z
Z
LINE
PARA.
NUMBER
CODE NO.
vi
ww
<
vi
U U3
NO.
i Z
1
2
3
4 51
61
X
Provide RMA Analysis
542202
X
0002
X
Provide RMA Analysis - BOC
642206
X
0002
Provide RMA Analysis - IOC
642207
X
0002
Provide RMA Analysis - FOC
642208
X
0002
X
Prepare Segment Design Analysis Report
542203
X
0002
Prepare Segment Design Analysis Report
642209
X
0002
- BOC
Prepare Segment Design Analysis Report
642210
X
0002
- IOC
Prepare Segment Design Analysis Report
642211
X
0002
- FOC
X
Accomplish Trade Studies
542204
X
0002
Accomplish Trade Studies - BOC
642212
X
0002
Accomplish Trade Studies - IOC
642213
X
0002
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
m
a
PROGRAM
R FP NO. 82-B-01 5
DATE:
WORK BREAKDOWN STRUCTURE INDEX
NPIC D/C SEGMENT
CONTRACT NO.
2-24-82
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
WBS
w
~-
CONTRACT
SOW
SPECIFICATION
NUMBER
Z O
DE NO.
CO
v
Z
F-
LINE
PARA.
J Z
1
2
31
41
51
6
w
2
F
ITEM
NO.
Accomplish Trade Studies - FOC
642214
X
0002
X
Provide Support to Intersegment
542206
X
0002
Interface Definition & Requirements
Determination
Provide Support to Intersegment
642218
X
0002
Interface Definition & Requirements
Determination - BOC
Provide Support to Intersegment
642219
X
0002
Interface Definition & Requirements
Determination - IOC
Provide Support to Intersegment
642220
X
0002
Interface Definition & Requirements
Determination - FOC
X
Prepare Eng. Technical Notes
542207
X
0002
Prepare Eng. Technical Notes - BOC
642221
X
0002
0
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
?
PROGRAM
RFP NO. 82-B-015
DATE:
WORK BREAKDOWN STRUCTURE INDEX
NPIC 0/C SEGMENT
CONTRACT NO.
2-24-82
>
w
L+-
CONTRACT
SOW
SPECIFICATION
w
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
WBS
p
:)
z
F-
LINE
PARA.
NUMBER
CODE NO.
n
v
i
ITEM
NO
z
I T
2
3
4
51
61
o
Z
H
.
X
Prepare Eng. Technical Notes - IOC
642222
X
0002
Prepare Eng. Technical Notes - FOC
642223
X
0002
Operations Engineering & Development
342300
X
0002
Operations Engineering & Development
442300
X
0002
X
Develop Segment Operations Concepts,
542300
X
0002
Procedures & Specifications, Including
Human Factors Eng. - BOC
Develop Segment Operations Concepts,
642300
X
0002
Procedures & Specifications, Including
Human Factors Eng. - IOC
Develop Segment Operations Concepts,
642301
X
0002
Procedures & Specifications, Including
Human Factors Eng. - FOC
Develop Segment Operations Concepts,
642302
X
0002
Procedures & Specifications, Including
Human Factors Eng.
X
Develop User Manuals
542301
X
0002
Develop User Manuals - BOC
642303
X
0002
Develop User Manuals - IOC -
642304
X
0002
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
WORK BREAKDOWN STRUCTURE INDEX
PROGRAM
NPIC D/C SEGMENT
RFP NO. 82 B 015
DATE:
CONTRACT NO.
2-24-82
Z
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
w
LL
CONTRACT
SOW
SPECIFICATION
NUMBER
0
CODE NO.
ci
Z
in
LINE
PARA.
J z
1
2
3
4
5
6
0
ITEM
NO.
Develop User Manuals - FOC
642305
X
0002
X
Develop Segment/Systems Operations
542302
X
0002
Manuals
Develop Segment/Systems Operations
642306
X
0002
Manuals - BOC
Develop Segment/Systems Operations
642307
X
0002
Manuals - IOC
Develop Segment/Systems Operations
642308
X
0002
Manuals - FOC
X
Conduct Productivity Enhancement Studies
542303
X
0002
Conduct Productivity Enhancement Studies
642309
X
0002
- BOC
Conduct Productivity Enhancement Studies
642310
X
0002
-IOC
Conduct Productivity Enhancement Studies
642311
X
0002
- FOC
X
Prepare 0 & M Plan
542304
X
0002
Prepare 0 & M Plan - BOC
642312
X
L
-
L
0002
?
m
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/0 6: Cl
A-RDP84T00037R000500040001-2
PROGRAM
RFP NO. 82 B 015
DATE:
WORK BREAKDOWN STRUCTURE INDEX
NPIC D/C SEGMENT
CONTRACT NO.
2-24-82
>
w
LL
CONTRACT
SOW
SPECIFICATION
w
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
WBS
p
z
~
LINE
PARA.
NUMBER
Z 0
CODE NO.
n
v
i
ITEM
NO
Jz
1
2
3
4 5
6
O
.
X
Prepare Maintenance & Logistics Plan
542305
X
0002
Prepare Maintenance & Logistics Plan
642315
X
0002
- BOC
Prepare Maintenance & Logistics Plan
642316
X
0002
- IOC
Prepare Maintenance & Logistics Plan
642317
X
0002
- FOC
Design
342400
X
0002
Design
442400
X
0002
X
Prepare Segment Design Specification
542400
X
0002.
Including Requirement Allocation
Prepare Segment Design Specification
642400
X
0002
Including Requirement Allocation - BOC
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
WORK BREAKDOWN STRUCTURE INDEX
PROGRAM NPIC D/C SEGMENT
RFP NO. 82-B-015
DATE:
CONTRACT NO.
2-24-82
w
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
WBS
o
CONTRACT
SOW
SPECIFICATION
NUMBER
O
JZ
CODE NO.
Z
I-
w
LINE
PARA.
1
2
3
4
5
6
Wp
2
F
-
ITEM
NO.
X
Provide Data Base Specification
542401
X
0002
Provide Data Base Specification - BOC
642401
X
0002
X
Provide Eng. Specialties Design
542402
X
0002
Provide Eng. Specialties Design - BOC
642402
X
0002
X
Develop Interface Specs.
542403
X
0002
Develop Interface Specs. - BOC
642405
X
0002
Develop Interface Specs. - IOC
642406
X
0002
Develop Interface Specs. - FOC
642407
X
0002
?
m
m
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
is
PROGRAM
RFP NO. 82-B-015
DATE:
WORK BREAKDOWN STRUCTURE INDEX
NPIC D/C SEGMENT
CONTRACT NO.
2-24-82
w
LL
CONTRACT
SOW
SPECIFICATION
w
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
WBS
0
z
LINE
PARA
NUMBER
Z O
CODE NO.
n
Q
w
ITEM
.
NO
J Z
1
2
31
415
16
1
a
.
Transition & Integration Planning and
342500
X
0002
Support
Transition & Integration Planning and
442500
X
0002
Support
X
Develop Segment Trans. & Integ. Plan
542500
X
0002
Develop Segment Trans. & Integ. Plan
642500
X
0002
- BOC
Develop Segment Trans. & Integ. Plan
642501
X
0002
- IOC
Develop Segment Trans. & Integ. Plan
642502
X
0002
- FOC
X
Support Facility Planning, Installation
542501
X
0002
and Checkout
Support Facility Planning, Installation
642503
X
0002
and Checkout - BOC
Support Facility Planning, Installation
642504
X
0002
and Checkout - IOC
Support Facility Planning, Installation
642505
X
0002
and Checkout - FOC
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
PROGRAM
R IP NO.82-B-01 5
DATE:
WORK BREAKDOWN STRUCTURE INDEX
NPIC D/C SEGMENT
CONTRACT NO.
2-24-82
w
LL
CONTRACT
SOW
SPECIFICATION
w
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
WBS
o
z
LINE
PARA
NUMBER
O
CODE NO.
Q
In
w
ITEM
.
NO
Jz
1
2
3
4
5
6
0
.
X
Support Transition of New Capability
542502
X
0002
into the Operational Environment
Support Transition of New Capability
642506
X
0002
into the Operational Environment - BOC
Support Transition of New Capability
642507
X
0002
into the Operational Environment - IOC
Support Transition of New Capability
642508
X
0002
into the Operational Environment - FOC
Test Support
342600
X
0002
Test Support
442600
X
0002
X
Prepare Segment Verification Plan
542600
X
0002
Prepare Segment Verification Plan - BOC
642600
X
0002
Prepare Segment Verification Plan - IOC
642601
X
0002
Prepare Segment Verification Plan - FOC
642602
X
0002
?
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/0 6: CIA
-RDP84T00037R000500040001-2 ?
PROGRAM
RFP NO. 82-B-015
DATE:
WORK BREAKDOWN STRUCTURE INDEX
NPIC D/C SEGMENT
CONTRACT NO.
2-24-82
>
w
LL
CONTRACT
SOW
SPECIFICATION
w
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
WBS
0
z
~
LINE
PARA
NUMBER
0
CODE NO.
v
w
<
v
i
w
ITEM
.
NO
J z
1
2
31
4 51
61
0
2
.
X
Prepare Segment Test Plan and Prepare
542601
X
0002
Procedures
X
Prepare Segment Test Plan - BOC
642603
X
0002
X
Prepare Segment Test Plan - IOC
642604
X
0002
Prepare Segment Test Plan - FOC
642605
X
0002
X
Support the Execution and Evaluation
542602
X
0002
of Tests
Support the Execution and Evaluation
642606
X
0002
of Tests - BOC
Support the Execution and Evaluation
642607
X
0002
of Tests - IOC
Support the Execution and Evaluation
642608
X
0002
of Tests - FOC
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
PROGRAM
RFP NO. 82 B-015
DATE:
WORK BREAKDOWN STRUCTURE INDEX
NPIC D/C SEGMENT
CONTRACT NO.
2-24-82
>
w
LL
CONTRACT
SOW
SPECIFICATION
w
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
WBS
p
(
n
z
LINE
PARA.
NUMBER
CODE NO.
v
i
w
u)
ITEM
NO
Z
1
21
31
4
51
61
p
H
.
Config. Mgmt. Support
342700
X
0002
Config. Mgmt. Support
442700
X
0002
X
Evaluate Proposed Changes and Provide
542700
X
0002
Change Request Impact Analysis Including
Interface Control
Evaluate Proposed Changes and Provide
642700
X
0002
Change Request Impact Analysis Including
Interface Control - BOC
Evaluate Proposed Changes and Provide
642701
X
0002
Change Request Impact Analysis Including
Interface Control - IOC
Evaluate Proposed Changes and Provide
642702
X
0002
Change Request Impact Analysis Including
Interface Control - FOC
Technical Reviews
342800
X
0002
Technical Reviews
442800
X
0002
PDR Technical Review
542800
X
0002
PDR Technical Review - BOC
642800
X
0002
l
?
?
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
W
?
PROGRAM
RFP NO. 82-6-015
DATE:
WORK BREAKDOWN STRUCTURE INDEX
NPIC D/C SEGMENT
CONTRACT NO.
2-24-82
>
w
w
CONTRACT
SOW
SPECIFICATION
w
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
WBS
p
D
z
N
LINE
PARA.
NUMBER
Z
CODE NO.
D
w
<
ITEM
NO.
1
2
31
4151
61
Q
W
PDR Technical Review - IOC
642801
X
0002
PDR Technical Review - FOC
642802
X
0002
X
CDR Technical Review
542801
X
0002
CDR Technical Review - BOC
642803
X
0002
CDR Technical Review - I0C
642804
X
0002
CDR Technical Review - FOC
642805
X
0002
X
SDR Technical Review
542802
X
0002
SDR Technical Review - BOC
642806
X
0002
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
WORK BREAKDOWN STRUCTURE INDEX
PROGRAM
NPIC D/C SEGMENT
RFP NO. 82-B-015
DATE:
CONTRACT NO.
2-24-82
Z
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
WBS
-
CONTRACT
sow
SPECIFICATION
NUMBER
o
CO
DE NO.
v
Z
c
LINE
PARA.
J z
1
2
3
4 5
6
0
2
ITEM
NO.
X
Conduct Technical Audits/Misc. Reviews
542803
X
0002
Conduct Technical Audits/Misc. Reviews
642809
X
0002
- BOC
Conduct Technical Audits/Misc. Reviews
642810
X
0002
- IOC
Conduct Technical Audits/Misc. Reviews
642811
X
0002
- FOC
?
m
0
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/0 6: Cl
A-RDP84T00037R000500040001-2 ?
PROGRAM
RFP NO. 2g B-015
DATE:
WORK BREAKDOWN STRUCTURE INDEX
NPIC D/C SEGMENT
CONTRACT NO.
2-24-82
>
w
CONTRACT
SOW
SPECIFICATION
w
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
WBS
o
j
Z
u
LINE
PARA.
NUMBER
p
CODE NO.
W
ww
ITEM
NO
JZ
1
2
3
4
5
6
<
F
.
X
Software Development (BOC)
243000
X
0003
Software Development Management - BOC
343100
X
0003
Software Development Management - BOC
443100
X
0003
X
Manage All SW Devel. Activities
543100
X
0003
Manage All SW Devel. Activities
643001
X
0003
X
Provide & Enforce Program Design,
543101
X
0003
Coding & Test Practices, Standards &
Conventions
NPIC Specific Software Training
643002
X
0003
(Univac System & COBOL)
Software Tool Development
643003
X
0003
X
Software Engineering
543102
X
0003
Software Architecture
643004
X
0003
Technical Support to Subcontract Mgmt.
643005
X
0003
Segment PPS & C
643007
X
0003
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
WORK BREAKDOWN STRUCTURE INDEX
PROGRAM
NPIC D/C SEGMENT
RFP NO. 82-B-01 5
DATE:
CONTRACT NO.
2-24-82
Z
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
WBS
>
0
u.
CONTRACT
SOW
SPECIFICATION
NUMBER
O
J
DE NO.
CO
z
in
1
LINE
PARA.
-
Z
1
2
3
4
1
5
6
1
0
2
ITEM
NO.
COBOL Code Conversion
643008
X
0003
X
Software Control
543103
X
0003
Library Control
643009
X
0003
Software Builds & Releases
643010
X
0003
X
Provide Inputs to Segment Devel. Plan
543104
X
0003
Provide Inputs to Segment Devel. Plan
643011
X
0003
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
?
PROGRAM
82-B-015
RFP NO.
DATE:
WORK BREAKDOWN STRUCTURE INDEX
NPIC D/C SEGMENT
-
CONTRACT NO.
2 2482
w>
u-
CONTRACT
SOW
SPECIFICATION
w
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
WBS
p
i
1
Z)
LINE
PARA.
NUMBER
6
CODE NO.
v
i
ww
.
cch
ITEM
NO
JZ
1
2
3
4
5
6
W
.
X
Data Base Implementation (BOC)
543105
X
0003
X
DMS 1100 Level 6 to Level 8 Conversion
643012
X
0003
X
Data Base Conversion
643014
X
0003
Design, Implementation, Verification
Data Base Package
643015
X
0003
Data Base Support to Development
643016
X
0003
and Test & Verification
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
WORK BREAKDOWN STRUCTURE INDEX
PROGRAM NPIC D/C SEGMENT
RFP NO.82-8-015
DATE:
CONTRACT NO.
2-24-82
w
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
WBS
>
0
LL
CONTRACT
SOW
SPECIFICATION
NUMBER
z O
CODE NO.
z
LINE
PARA.
J Z
1
2
3
45
6
0
2
ITEM
NO.
BEPPRE
CPCI: Pre-Exploitation - BOC
343200
X
0003
Prelim. Design
44321A
X
0003
X
Prepare Prelim. Design Specs
54321A
X
0003
X
Requirements Analysis & Allocation
643017
X
0003
Prepare Prelim. Design Part I Specs
643018
X
0003
and Conduct Internal Design Reviews
Prepare Data Dictionary
643019
X
0003
Prepare Prelim. Part II Specs
643020
X
0003
11
H
Prepare CPCI Test Plan (Prelim.)
643021
X
0003
Annoniiiv f"r RRDRRE
?
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
? Approved For Release 2007/09/0IA-RDP84T00037R000500040001-2 ?
PROGRAM
RFP NO. 82-B-01 5
DATE:
WORK BREAKDOWN STRUCTURE INDEX
NPIC D/C SEGMENT
CONTRACT NO.
2-24-82
>
w
LL
CONTRACT
SOW
SPECIFICATION
w
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
WBS
p
'
Z)
z
LINE
PARA.
NUMBER
2
CODE NO.
IX
w
<
ITEM
NO.
JZ
1
2
31
41
51
61
o
H
Critical Design
44322A
X
0003
X
Prepare Build-to Design Specs
54322A
X
0003
Prepare Build-to Part II Specs
643022
X
0003
and Conduct Internal Design Reviews
Prepare Prelim. Programmer's Manual
643023
X
0003
Prepare CPCI Test Plan (Final).
643024
X
0003
Appendix for BEPPRE
Development
44323A
X
0003
X
Develop CPC's
54323A
X
0003
Code & Unit Test
643025
X
0003
Integr & Test to CPC Level
643026
X
0003
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
PROGRAM
WORK BREAKDOWN STRUCTURE INDEX
NPIC D/C SEGMENT
RFP NO. 82-B-015
DATE:
CONTRACT NO.
2-24-82
w
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
WBS
"'
a
U.
Z)
CONTRACT
LINE
SOW
SPECIFICATION
NUMBER
i Z
CODE NO.
w
Q
w
PARA.
1
2
3
1415
16
1
0
ITEM
NO.
X
Test
44324A
X
0003
Test
54324A
X
0003
Test at the CPC and CPCI Levels
643027
X
0003
Develop SW Test Procedures
643028
X
0003
Support Test & Verification
643029
X
0003
Prepare Test Reports
643030
X
0003
9
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
?
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
w
?
PROGRAM
RFP NO. 82-B-015
DATE:
WORK BREAKDOWN STRUCTURE INDEX
NPIC D/C SEGMENT
CONTRACT NO.
2-24-82
>
LL
CONTRACT
SOW
SPECIFICATION
w
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
WBS
p
i
z
~
LINE
PARA.
NUMBER
J Z
CODE NO.
v
i
w
Q
w
ITEM
NO
1
2
31
41
51
61
0
~
.
Documentation
44325A
X
0003
X
Prepare As-built Documentation
54325A
X
0003
Prepare Inputs to User, Operator and
643031
X
0003
Data Base Administration Manuals
CPCI Listings As-built
643032
X
0003
Prepare Programmer's Manual (Final)
643034
X
0003
Prepare Inputs to Training Manuals
643035
X
0003
Prepare As-built Part II Specs
643036
X
0003
m
v
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
m
0
PROGRAM
FiFP NO. 82-B-015
DATE:
WORK BREAKDOWN STRUCTURE INDEX
NPIC D/C SEGMENT
CONTRACT NO.
2-24-82
>
LL
CONTRACT
SOW
SPECIFICATION
w
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
WBS
o
z
LINE
PARA
NUMBER
z p
CODE NO.
n
vi
ITEM
.
NO
J z
1
2
3
4
51
6
0
2
.
BEMGMT
CPCI: Exploitation Management - BOC
343201
X
0003
Prelim. Design
44321B
X
0003
X
Prepare Prelim. Design Specs
54321B
X
0003
Requirements Analysis & Allocation
643037
X
0003
Prepare Prelim. Design Part I Specs
643038
X
0003
and Conduct Internal Design Reviews
Prepare Data Dictionary
643039
X
0003
Prepare Prelim. Part II Specs
643040
X
0003
Prepare CPCI Test Plan (Prelim.)
643041
X
0003
?~-_-~___ L.__ TT~ll%sm
Appendix 1oL" DiSIIUl"11
?
?
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/0 6: ClA-RDP84T00037R000500040001-2
PROGRAM
RFP NO. 82-B-015
DATE:
WORK BREAKDOWN STRUCTURE INDEX
NPIC D/C SEGMENT
CONTRACT NO.
2-24-82
u-
CONTRACT
SOW
SPECIFICATION
w
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
WBS
I
Z
LINE
PARA.
NUMBER
Z p
CODE NO.
n
UJ
W
V
ITEM
NO
J Z
1
2
3
4 5
6
.
Critical Design
44322B
X
0003
X
Prepare Build-to Design Specs
54322B
X
0003
X
Prepare Build-to Part II Specs and
643042
X
0003
Conduct Internal Design Reviews
X
Prepare Prelim. Programmer's Manual
643043
X
0003
Prepare CPCI Test Plan (Final)
643044
X
0003
Appendix for BEMGMT
Development
44323B
X
0003
X
Develop CPC's
54323B
X
0003
Code & Unit Test
643045
X
0003
Integr & Test to CPC Level
643046
X
0003
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
WORK BREAKDOWN STRUCTURE INDEX
PROGRAM
NPIC D/C SEGMENT
RFP NO. 82-B-015
DATE:
CONTRACT NO.
2-24-82
w
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
WBS
>
o
u.
Z)
~
CONTRACT
SOW
SPECIFICATION
NUMBER
Z O
J z
CODE NO.
ci~
Z
v
i
LINE
PARA.
1
2
3
4
1
516
1
ITEM
NO.
Test
44324B
0003
X
Test
54324B
0003
Test at the CPC and CPCI Levels
643047
0003
Develop SW Test Procedures
643048
0003
Support Test & Verification
643049
0003
Prepare Test Reports
643050
X
0003
m
v
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
?
PROGRAM
82-B-015
RFP NO
DATE:
WORK BREAKDOWN STRUCTURE INDEX
NPIC D/C SEGMENT
.
2-24-82
CONTRACT NO.
w
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
WBS
>
o
u
CONTRACT
SOW
SPECIFICATION
NUMBER
O
CODE NO.
n
w
z
1,
in
1
LINE
TE
PARA.
z
1
2
3
45
6
Q
<
W
M
I
NO.
Documentation
44325B
X
0003
X
Prepare As-built Documentation
54325B
X
0003
Prepare Inputs to User, Operator and
643051
X
0003
Data Base Administration Manuals
CPCI Listings As-built
643052
X
0003
Prepare Programmer's Manual (Final)
643053
X.
0003
Prepare Inputs to Training Manuals
643054
X
0003
Prepare As-built Part II Specs
643055
X
0003
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
PROGRAM
R FP NO. 82-B-01 5
DATE:
WORK BREAKDOWN STRUCTURE INDEX
NPIC D/C SEGMENT
CONTRACT NO.
2-24-82
w
LL
CONTRACT
SOW
SPECIFICATION
w
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
WBS
.
z
I-
LINE
PARA
NUMBER
Z p
CODE NO.
ww
ITEM
.
NO
JZ
1
2
3
4
5
6
<
W
.
BERESU
CPCI: Exploitation Results - BOC
343202
X
0003
X
Prelim. Design
44321C
X
0003
Prepare Prelim. Design Specs
54321C
X
0003
Requirements Analysis & Allocation
643056
X
0003
Prepare Prelim. Design Part I Specs
643057
X
0003
and Conduct Internal Design Reviews
Prepare Data Dictionary
643058
X
0003
Prepare Prelim Part II Specs
643059
X
0003
Pranara CPCT Tact Plan (Prsal;m)
o;4in1n
1Y
1
I nnn
Appendix for BERESU
?
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/0 6: C
IA-RDP84T00037R000500040001-2 ?
PROGRAM
RFP NO. 82-B-015
DATE:
WORK BREAKDOWN STRUCTURE INDEX
NPIC D/C SEGMENT
CONTRACT NO.
2-24-82
>
w
LL
CONTRA CT
SOW
SPECIFICATION
w
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
WBS
j
o
o
I
z
z
~
LINE
PARA.
NUMBER
O
CODE NO.
c
il
w
Q
cn
w
ITEM
NO.
J Z
1
2
31
41
51
61
0
Critical Design
44322C
X
0003
X
Prepare Build-to Design Specs
54322C
X
0003
X
Prepare Build-to Part II Specs
643061
X
0003
and Conduct Internal Design Reviews
Prepare Prelim. Programmer's Manual
643062
X
0003
Prepare CPCI Test Plan (Final)
643063
X
0003
Appendix for BERESU
Development
44323C
X
0003
X
Develop CPC's
54323C
X
0003
Code & Unit Test
643064
X
0003
Integr. & Test to CPC Level
643065
X
0003
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
WORK BREAKDOWN STRUCTURE INDEX
PROGRAM
NPIC D/C SEGMENT
RFP NO. 82 8 015
DATE:
CONTRACT NO.
2-24-82
Z
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
WBS
Uj
0
LL
Z
H
CONTRACT
SOW
SPECIFICATION
NUMBER
J z 0
CODE NO.
LINE
PARA.
1
2
13
4
5
16
1
w
0
W
H
ITEM
NO.
Test
44324C
X
0003
X
Test
54324C
X
0003
X
Test at the CPC and CPCI Levels
643066
X
0003
Develop SW Test Procedures
643067
X
0003
Support Test & Verification
643068
X
0003
Prepare Test Reports
643069
X
0003
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
i
?
PROGRAM
RFP NO. 82-B-015
DATE:
WORK BREAKDOWN STRUCTURE INDEX
NPIC D/C SEGMENT
CONTRACT NO.
2-24-82
CONTRACT
SOW
ATION
w
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
WBS
0
1
j
1
LINE
PARA
NUMBER
0
CODE NO.
v
w
z
Q
in
w
ITEM
.
NO
2
1
2
31
4 5
6
0
2
.
Documentation
44325C
X
0003
X
Prepare As-built Documentation
54325C
X
0003
X
CPCI Listings As-built
643071
X
0003
X
Prepare As-built Part II Specs
643074
X
0003
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
WORK BREAKDOWN STRUCTURE INDEX
PROGRAM
NPIC D/C SEGMENT
RFP NO. 82-B-015
DATE:
CONTRACT NO.
2-24-82
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
WBS
w
U.
CONTRACT
SOW
SPECIFICATION
NUMBER
Z O
DE NO.
CO
v
w
Z
tn-
LINE
PARA.
JZ
1
2
3
4
5
6
Q
<
Ui
ITEM
NO.
BMANIP
CPCI: Data Manipulation - BOC
343204
X
0003
Prelim. Design
44321E
X
0003
X
Prepare Prelim. Design Specs.
54321E
X
0003
Requirements Analysis & Allocation
643094
X
0003
Prepare Prelim. Design Part I Specs.
643301
X
0003
and Conduct Internal Design Reviews
Prepare Data Dictionary
643095
X
0003
Prepare Prelim. Part II Specs.
643096
X
0003
H
Prepare CPCI Test Plan (Prelim.)
643097
X
0003
Anncn.1 r fnr RMANTP
T
m
0
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/0 6: Cl
A-RDP84TOO037ROO0500040001-2
PROGRAM
RFP NO. 82-B-015
DATE:
WORK BREAKDOWN STRUCTURE INDEX
NPIC D/C SEGMENT
CONTRACT NO.
2-24-82
>
w
CONTRACT
SOW
SPECIFICATION
w
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
z
~
LINE
PARA.
NUMBER
Z
CODE NO.
(n
<
c
n
ITEM
NO
J
1
2
3
45
6
0
H
.
Critical Design
44322E
X
0003
X
Prepare Build-to Design Specs.
54322E
X
0003
Prepare Build-to Part II Specs.
643098
X
0003
and Conduct Internal Design Reviews
Prepare Prelim. Programmer's Manual
643099
X
0003
Prepare CPCI Test Plan (Final)
643100
X
0003
Appendix for BMANIP
Development
44323E
X
0003
X
Develop CPC's
54323E
X
0003
Code & Unit Test
643101
X
0003
Integr. & Test to CPC Level
643102
X
0003
Approved For Release 2007/09/06: CIA-RDP84TOO037ROO0500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
PROGRAM
RFP NO. 82 B 015
DATE:
WORK BREAKDOWN STRUCTURE INDEX
NPIC D/C SEGMENT
CONTRACT NO.
2-24-82
w
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS?
WBS
w
o
~+
CONTRACT
SOW
SPECIFICATION
NUMBER
O
CODE NO.
vii
ww
z
vi
LINE
PARA.
Jz
1
2
3
4
5
6
ITEM
NO.
Test
44324E
0003
X
Test
54324E
0003
Test at the CPC and CPCI Levels
643103
0003
Develop SW Test Procedures
643104
0003
Support Test & Verification
643105
0003
Prepare Test Reports
643106
X
0003
ii
m
0
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/0 6: C
AIA-RDP84TOO037ROO0500040001-2
PROGRAM
RFP NO. 82-B-015
DATE:
WORK BREAKDOWN STRUCTURE INDEX
NPIC D/C SEGMENT
CONTRACT NO.
2-24-82
>
w
LL
CONTRACT
SOW
SPECIFICATION
w
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
WBS
p
i
Z)
Z
LINE
PARA.
NUMBER
Z
CODE NO.
v
i
<
w
ITEM
NO
1
2
3
4
5
6
o
.
Documentation
44325E
X
0003
X
Prepare As-built Documentation
54325E
X
0003
Prepare Inputs to User, Operator and
643107
X
0003
Data Base Administration Manuals
CPCI Listings As-built
643108
X
0003
Prepare Programmer's Manual (Final)
643109
X
0003
Prepare Inputs to Training Manuals
643110
X
0003
Prepare As-built Part II Specs
643111
X
0003
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
PROGRAM
RFP NO. 82-B-015
DATE:
WORK BREAKDOWN STRUCTURE INDEX
NPIC D/C SEGMENT
CONTRACT NO.
2-24-82
w
U.
CONTRACT
SOW
SPECIFICATION
w
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
WBS
z
~
LINE
PARA
NUMBER
z O
CODE NO.
N
w
Q
v
i
w
ITEM
.
O
2
1
2
3
4
5
6
p
H
,
N
BSTATR
CPCI: Statistics Reporting - BOC
343205
X
0003
Prelim. Design
44321F
X
0003
X
Prepare Prelim. Design Specs.
54321F
X
0003
Requirements Analysis & Allocation
643112
X
0003
Prepare Prelim. Design Part I Specs.
643113
X
0003
and Conduct Internal Design Reviews
Prepare Data Dictionary
643114
X
0003
Prepare Prelim. Part II Specs.
643115
X
0003
Prepare CPCI Test Plan (Prelim.)
643116
X
0003
AnnranMiv to RSTATR
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/0 A -RDP84T00037R000500040001-2
PROGRAM
R F P NO. 82-B-015
DATE:
WORK BREAKDOWN STRUCTURE INDEX
NPIC D/C SEGMENT
CONTRACT NO.
2-24-82
>
w
U.
CONTRACT
SOW
SPECIFICATION
w
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
WBS
o
Z
H
LINE
PARA.
NUMBER
z o
CODE NO.
W
a
ld
ITEM
NO.
z
1
21
3
41
51
61
p
2
Critical Design
44322F
X
0003
X
Prepare Build-to Design Specs.
54322F
X
0003
Prepare Build-to Part II Specs. and
643117
X
0003
Conduct Internal Design Reviews
Prepare Prelim. Programmer's Manual
643118
X
0003
Prepare CPCI Test Plan (Final)
643119
X
0003
Appendix for BSTATR
Development
44323F
X
0003
X
Develop CPC's
54323F
X
0003
Code & Unit Test
643120
X
0003
Integr. & Test to CPC Level
643121
X
0003
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
PROGRAM
82 B-015
RFP NO
DATE:
WORK BREAKDOWN STRUCTURE INDEX
NPIC D/C SEGMENT
.
CONTRACT NO.
2-24-82
WBS
>
LL
CONTRACT
SOW
SPECIFICATION
w
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
z
LINE
PARA
NUMBER
O
CODE NO.
c0
cn
TE
.
J z
1
2
3
4
51
6
a
2
H
I
M
NO.
Test
44324F
0003
X
Test
54324F
0003
X
Test at the CPC and CPCI Levels
643122
0003
Develop SW Test Procedures
643123
0003
Support Test & Verification
643124
X
0003
Prepare Test Reports
643125
X
0003
0 is
r
C/)
m
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
w
?
PROGRAM
RFP N0. 82 B 015
DATE:
WORK BREAKDOWN STRUCTURE INDEX
NPIC D/C SEGMENT
CONTRACT NO.
2-24-82
>
w
LL
CONTRACT
SOW
SPECIFICATION
w
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
WBS
i
z
LINE
PARA.
NUMBER
CODE NO.
v
i
w
<
vi
ITEM
NO
Jz
1
2
3
45
6
Q
W
.
Documentation
44325F
X
0003
X
Prepare As-built Documentation
54325F
X
0003
CPCI Listings As-built
643127
X
0003
Prepare As-built Part II Specs.
643130
X
0003
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
WORK BREAKDOWN STRUCTURE INDEX
PROGRAM
NPIC D/C SEGMENT
RFP NO. 28 B-015
DATE:
CONTRACT NO.
2-24-82
w
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
WBS
o
j
CONTRACT
SOW
NPECIFICATION
NUMBER
z O
CODE NO.
vU-i
ww
z
<
-
LINE
PARA.
J z
1
2
3
4
5
6
w
ITEM
NO.
BMMGMT
CPCI: Materials Management - BOC
343207
X
0003
Prelim. Design
44321H
X
0003
X
Prepare Prelim. Design Specs.
54321H
X
0003
Requirements Analysis & Allocation
643149
X
0003
Prepare Prelim. Design Part I Specs.
643150
X
0003
and Conduct Internal Design Reviews
Prepare Data Dictionary
643151
X
0003
Prepare CPCI Test Plan (Prelim.)
643153
X
0003
Appendix for BMMGMT
i
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/0 6: Cl
A-RDP84T00037R000500040001-2 ?
PROGRAM
R FP NO. 82-B-01 5
DATE:
WORK BREAKDOWN STRUCTURE INDEX
NPIC D/C SEGMENT
CONTRACT NO.
2-24-82
w
LL
CONTRACT
SOW
SPECIFICATION
w
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
WBS
o
a
LINE
PARA
NUMBER
O
CODE NO.
c
n
z
Q
cn
w
ITEM
.
NO
J 2
1
2
3
141
516
0
~
-
.
X
Critical Design
44322H
X
0003
Prepare Build-to Design Specs
54322H
X
0003
Prepare Prelim. Programmer's Manual
643155
X
0003
Prepare CPCI Test Plan (Final)
643156
X
0003
Appendix for BMMGMT
X
Development
44323H
X
0003
Develop CPC's
54323H
X
0003
Integr. & Test to CPC Level
643158
X
0003
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
PROGRAM
RFP NO. 82-8-015
DATE:
WORK BREAKDOWN STRUCTURE INDEX
NPIC D/C SEGMENT
CONTRACT NO.
2-24-82
>
w
u
CONTRACT
SOW
SPECIFICATION
w
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
WBS
a
Z
LINE
PARA.
NUMBER
Z
Z
CODE NO.
c
n
w
<
vi
ITEM
NO
J
1
2
31
41
51
61
W
W
.
Test
443241
0003
X
Test
543241
0003
Test at the CPC and CPCI Levels
643159
X
0003
Develop SW Test Procedures
643160
0003
Support Test & Verification
643161
X
0003
Prepare Test Reports
643162
X
0003
?
C
Z
n
r
Cn
U)
m
m
P-I
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
qw
?
PROGRAM
RFP NO. 82 B 015
DATE:
WORK BREAKDOWN STRUCTURE INDEX
NPIC D/C SEGMENT
CONTRACT NO.
2-24-82
>
w
`L
CONTRACT
SOW
SPECIFICATION
w
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
WBS
p
Z)
Z
LINE
PARA.
NUMBER
2 O
CODE NO.
N
w
a
vi
w
ITEM
NO
Z
1
2
31
41
51
61
p
.
Documentation
44325H
X
0003
X
Prepare As-built Documentation
54325H
X
0003
CPCI Listings As-built
643163
X
0003
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
RFP NO. 82-B-015
DATE:
CONTRACT NO.
2-24-82
w
z O
n
WO
R
K
BR
EAKDOWN STRUCTURE ELEMENTS/TASKS
WBS
CODE NO.
W
?
W
LL
z
<
w
CONTRACT
LINE
ITEM
SOW
PARA.
NO
SPECIFICATION
NUMBER
z
.
BCCNTR
CPCI: Command & Control - BOC
343208
Prelim. Design
443211
Prepare Prelim. Design Specs.
543211
Requirements Analysis & Allocation
643167
Prepare Prelim. Design Part I Specs.
643168
and Conduct Internal Design Reviews
643169
Prepare Prelim. Part II Specs.
643170
Prepare CPCI Test Plan (Prelim.)
643171
Appendix for BCCNTR
?
?
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/0 IA-RDP84T00037R000500040001-2 ?
PROGRAM
RFP NO. 2~ B-015
DATE:
WORK BREAKDOWN STRUCTURE INDEX
NPIC D/C SEGMENT
CONTRACT NO.
2-24-82
>
w
LL
CONTRACT
sow
SPECIFICATION
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
WBS
p
z
~
LINE
PARA.
NUMBER
Z
O
CODE NO.
v
w
Q
v
i
w
ITEM
NO.
'iz
1
2
3
4
5
6
p
Critical Design
443221
X
0003
X
Prepare Build-to Design Specs.
543221
X
0003
Prepare Build-to Part II Specs and
643172
X
0003
Conduct Internal Design Reviews
Prepare Prelim. Programmer's Manual
643173
X
0003
Prepare CPCI Test Plan (Final)
643174
0003
Appendix for BCCNTR
Development
443231
X
0003
X
Develop CPC's
543231
X
0003
Code & Unit Test
643175
X
0003
Integr. & Test to CPC Level
643176
X
0003
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
PROGRAM
RFP NO. 82-B-015
DATE:
WORK BREAKDOWN STRUCTURE INDEX
NPIC D/C SEGMENT
CONTRACT NO.
2-24-82
w
w
CONTRACT
SOW
SPECIFICATION
w
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
WBS
p
-
z
LINE
PARA.
NUMBER
Z
CODE NO.
D
w
Q
U)
w
ITEM
NO.
Z
1
2
31
41
5161
p
H
Test
443241
X
0003
X
Test
543241
X
0003
Test at the CPC and CPCI Levels
643177
X
0003
Develop SW Test Procedures
643178
X
0003
Support Test & Verification
643179
0003
Prepare Test Reports
643180
X
0003
?
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
?
PROGRAM
RFP NO. 82
DATE:
WORK BREAKDOWN STRUCTURE INDEX
NPIC D/C SEGMENT
CONTRACT NO.
2-24-82
>
LL
CONTRACT
SOW
SPECIFICATION
w
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
WBS
p
z
LINE
PARA.
NUMBER
CODE NO.
n
w
<
cn
w
ITEM
NO.
1
2
31
41
51
61
w
Documentation
443251
X
0003
X
Prepare As-built Documentation
543251
X
0003
CPCI Listings As-built
643182
X
0003
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
WORK BREAKDOWN STRUCTURE INDEX
PROGRAM NPIC D/C SEGMENT
RFP NO. 82-B-015
DATE:
CONTRACT NO.
2-24-82
w
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
WBS
p
CONTRACT
SOW
SPECIFICATION
NUMBER
Z O
J z
CODE NO.
U)
z
c~n
LINE
PARA.
1
2
3
4
5
16
0
H
ITEM
NO.
BQUERY
CPCI: Query - BOC
343209
X
0003
Prelim. Design
44321J
X
0003
X
Prepare Prelim. Design Specs.
54321J
X
0003
Requirements Analysis & Allocation
643186
X
0003
Prepare Prelim. Design Part I Specs.
643187
X
0003
and Conduct Internal Design Reviews
Prepare Data Dictionary
643188
X
0003
Prepare Prelim. Part II Specs.
643189
X
0003
1
14
Prepare CPCI Test Plan (Prelim.)
643190
X
0003
Appendix for BQUERY
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/0 6: Cl
A-RDP84T00037R000500040001-2
PROGRAM
RFP NO. 82-B-01 5
DATE:
WORK BREAKDOWN STRUCTURE INDEX
NPIC D/C SEGMENT
CONTRACT NO.
2-24-82
>
w
LL
CONTRACT
SOW
SPECIFICATION
w
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
WBS
z
Z
~
LINE
PARA.
NUMBER
z
CODE NO.
u
w
Q
c
i~
w
ITEM
NO.
J
1
2
31
4151
61
?
2
Critical Design
44322J
X
0003
X
Prepare Build-to Design Specs.
54322J
X
0003
Prepare Build-to Part II Specs. and
643191
X
0003
Conduct Internal Design Reviews
Prepare CPCI Test Plan (Final)
643192
X
0003
Appendix for BQUERY
Development
44323J
X
0003
X
Develop CPC's
54323J
X
0003
Code & Unit Test
643193
X
0003
Integr. & Test to CPC Level
643194
X
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
WORK BREAKDOWN STRUCTURE INDEX
PROGRAM NPIC D/C SEGMENT
RFP NO. 28 B-015
DATE:
CONTRACT NO.
2-24-82
w
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
WBS
>
u.
'
CONTRACT
SOW
SPECIFICATION
NUMBER
J z
CODE NO.
Q
Cn
LINE
PARA.
1
2
3
4 5
6
p
H
w
ITEM
NO.
Test
44324J
X
0003
X
Test
54324J
X
0003
Test at the CPC and CPCI Levels
643195
X
0003
Develop SW Test Procedures
643196
X
0003
Support Test & Verification
643197
X
0003
Prepare Test Reports
643198
X
0003
?
?
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
?
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
V
PROGRAM
RFP NO. 82-B-01 5
DATE:
WORK BREAKDOWN STRUCTURE INDEX
NPIC D/C SEGMENT
CONTRACT NO.
2-24-82
w
u
CONTRACT
SOW
SPECIFICATION
w
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
WBS
z
N
LINE
PARA.
NUMBER
z_
CODE NO.
w
w
ITEM
NO.
J z
1T
2
R3
4-
51
61
p
Documentation
44325J
X
0003
X
Prepare As-built Documentation
54325J
X
0003
X
CPCI Listings As-built
643200
X
0003
X
Prepare As-built Part II Specs.
643203
X
0003
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
WORK BREAKDOWN STRUCTURE INDEX
PROGRAM
NPIC D/C SEGMENT
RFP NO. -82-B-01 5
DATE:
CONTRACT NO.
2-24-82
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
WBS
CONTRACT
SOW
SPECIFICATION
NUMBER
Z o
DE NO.
CO
N
z
-
LINE
PARA.
2
1
2
3
4
5
6
0
ITEM
NO.
BAPPLS
CPCI: Application Support - BOC
343210
X
0003
Prelim. Design
44321K
X
0003
X
Prepare Prelim. Design Specs.
54321K
X
0003
Requirements Analysis & Allocation
643204
X
0003
Prepare Prelim. Design Part I Specs.
643205
X
0003
and Conduct Internal Design Reviews
Prepare Data Dictionary
643206
X
0003
Prepare Prelim. Part II Specs.
643207
X
0003
Prepare CPCI Test Plan(Prelim.)
6_4.320.8
X
Appendix for BAPPLS
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
? Approved For Release 2007/09/0 6: Cl
A-RDP84T00037R000500040001-2 is
PROGRAM
RFP NO. 82-B-015
DATE:
WORK BREAKDOWN STRUCTURE INDEX
NPIC D/C SEGMENT
CONTRACT NO.
2-24-82
>
w
w
CONTRACT
SOW
SPECIFICATION
w
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
WBS
o
z
LINE
.
PARA.
Z
O
CODE NO.
-)
w
<
in
w
ITEM
NO.
-' 2
1
2
31
41
51
61
p
Z
Critical Design
44322K
X
0003
X
Prepare Build-to Design Specs.
54322K
X
0003
X
Prepare Build-to Part II Specs. and
643209
X
0003
Conduct Internal Design Reviews
X
Prepare Prelim. Programmer's Manual
643210
X
0003
X
Prepare CPCI Test Plan (Final)
643211
0003
Appendix for BAPPLS
Development
44323K
X
0003
X
Develop CPC's
54323K
X
0003
Code & Unit Test
643212
0003
Integr. & Test to CPC Level
643213
0003
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
V
WORK BREAKDOWN STRUCTURE INDEX
PROGRAM
NPIC D/C SEGMENT
RFP NO. 82-B-015
DATE:
CONTRACT NO.
2-24-82
Z
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
WBS
CONTRACT
SOW
SPECIFICATION
NUMBER
O
DE NO.
CO
v
z
in
LU
LINE
PARA.
Jz
1
2
3
4
56
0
ITEM
NO.
Test
44324K
0003
X
Test
54324K
0003
X
Test at the CPC and CPCI Levels
643214
0003
X
Develop SW Test Procedures
643215
0003
Support Test & Verification
643216
0003
X
Prepare Test Reports
643217
0003
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2 ?
PROGRAM
RFP NO. 82-B-015
DATE:
WORK BREAKDOWN STRUCTURE INDEX
NPIC D/C SEGMENT
CONTRACT NO.
2-24-82
>
w
w
CONTRACT
SOW
SPECIFICATION
w
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
WBS
p
z
N
LINE
PARA.
NUMBER
Z
CODE NO.
ti
w
<
LU
ITEM
NO.
J
1
21
31
41
51
61
Documentation
44325K
X
0003
X
Prepare As-built Documentation
54325K
X
0003
X
CPCI Listings As-built
643219
X
0003
X
Prepare Programmer's Manual (Final)
643220
X
0003
X
Prepare Inputs to Training Manuals
643221
X
0003
X
Prepare As-built Part II Specs.
643222
0003
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
PROGRAM
WORK BREAKDOWN STRUCTURE INDEX
NPIC D/C SEGMENT
HFP NO. 82 B 015
DATE:
CONTRACT NO.
2-24-82
w
WORK BREAKDOWN STRUCTURE?ELEMENTS/TASKS
WBS
U
LL
CONTRACT
SOW
SPECIFICATION
NUMBER
J z
CODE NO.
w
a
in
LINE
PARA.
1
2
3
4
5
6
Q
<
W
ITEM
NO.
BDMAPS
CPCI: DBM Application Support - BOC
343211
0003
Prelim. Design
44321L
X
0003
X
Prepare Prelim. Design Specs.
54321L
X
0003
X
Requirements Analysis & Allocation
643223
X
0003
Prepare Prelim. Design Part I Specs.
643224
X
0003
and Conduct Internal Design Reviews
Prepare Data Dictionary
643225
X
0003
Prepare Prelim. Part II Specs.
643226
X
0003
Prepare CPCI Test Plan (Prelim.)
643227
0003
A----A4- -C-- DnUAnO
a7~/j/a. aaViA 1V1 LLLIAlJ
m
m
0
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
?
W
?
PROGRAM
RFP NO. 82-B-015
DATE:
WORK BREAKDOWN STRUCTURE INDEX
NPIC D/C SEGMENT
CONTRACT NO.
2 2482
w
LL
CONTRACT
SOW
SPECIFICATION
w
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
WBS
p
Z
a
LINE
PARA.
NUMBER
p
i
CODE NO.
Cn
ww
<
i
w
ITEM
NO
Z
1
2
31
41
5
6
.
Critical Design
44322L
X
0003
X
Prepare Build-to Design Specs
54322L
X
0003
X
Prepare Build-to Part II Specs and
643228
X
0003
Conduct Internal Design Reviews
X
Prepare Prelim. Programmer's Manual
643229
X
0003
X
Prepare CPCI Test Plan (Final)
643230
0003
Appendix for BDMAPS
Development
44323L
X
0003
X
Develop CPC's
54323L
X
0003
Code & Unit Test
643231
0003
Integr. & Test to CPC Level
643232
0003
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
WORK BREAKDOWN STRUCTURE INDEX
PROGRAM
NPIC D/C SEGMENT
RFP NO. 82-B-015
DATE:
CONTRACT NO.
2-24-82
w
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
WBS
w
w
CONTRACT
sow
SPECIFICATION
NUMBER
z 0
iz
CODE NO.
N
z
y
LINE
PARA.
1
2
3
4
5
6
0
2
ITEM
NO.
Test
44324L
0003
X
Test
54324L
0003
X
Test at the CPC and CPCI Levels
643233
0003
X
Develop SW Test Procedures
643234
0003
X
Support Test & Verification
643235
0003
Prepare Test Reports
643236
0003
?
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
? Approved For Release 2007/09/06 C
IA-RDP84T00037R000500040001-2
PROGRAM
RFP NO. 82-B-015
DATE:
WORK BREAKDOWN STRUCTURE INDEX
NPIC D/C SEGMENT
CONTRACT NO.
2-24-82
>
LL
CONTRACT
SOW
SPECIFICATION
w
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
WBS
0
Z
H
LINE
PARA
NUMBER
J 0
CODE NO.
cn
z
w
ITEM
.
NO
1
2
3
4
56
E
.
Documentation
44325L
0003
X
Prepare As-built Documentation
54325L
0003
X
CPCI Listings As-built
643238
0003
X
Prepare As-built Part II Specs.
643241
0003
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
PROGRAM
RFP NO. 82-B-015
DATE:
WORK BREAKDOWN STRUCTURE INDEX
NPIC D/C SEGMENT
CONTRACT NO.
2-24-82
>
w
LL
CONTRACT
SOW
SPECIFICATION
w
WORK BREAKDOWN STRUCTUREELEMENTS/TASKS
WBS
0
Z)
z
LINE
A
NUMBER
z 0
CODE NO.
w
w
ITEM
NO.
J z
1
21
3
41
51
61
2
BTTDEV
CPCI: Test & Training - BOC
343212
X
0003
Prelim. Design
44321M
X
0003
X
Prepare Prelim. Design Part I Specs.
54321M
X
0003
X
Requirements Analysis & Allocation
643242
X
0003
X
Prepare Prelim. Design Part I Specs.
643243
X
0003
and Conduct Internal Design Reviews
X
Prepare Data Dictionary
643244
X
0003
X
Prepare Prelim. Part II Specs.
643245
X
0003
V
n...,.......,, rDrT Test P1 on (Pre im. )
643246
0003
Appendix for BTTDEV
10 0
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
?
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
W
?
PROGRAM
RFP NO. 82-B-015
DATE:
WORK BREAKDOWN STRUCTURE INDEX
NPIC D/C SEGMENT
CONTRACT NO.
2 2482
>
LL
CONTRACT
SOW
SPECIFICATION
W
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
WBS
p
-
z
-
LINE
PARA.
NUMBER
z
CODE NO.
v
i
w
ITEM
NO.
z
1
21
31
4151
61
w
Ui
Critical Design
44322M
X
0003
X
Prepare Build-to Design Specs
54322M
X
0003
X
Prepare Build-to Part II Specs and
643247
X
0003
Conduct Internal Design Reviews
X
Prepare Prelim. Programmer's Manual
643248
X
0003
X
Prepare CPCI Test Plan (Final)
643249
0003
Appendix for BTTDEV
Development
44323M
X
0003
X
Develop CPC's
54323M
X
0003
Code & Unit Test
643250
0003
Integr. & Test to CPC Level
643251
0003
m
0
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
PROGRAM
RFP NO. 82 8 015
DATE:
WORK BREAKDOWN STRUCTURE INDEX
NPIC D/C SEGMENT
CONTRACT NO.
2-24-82
WBS
>
LL
CONTRACT
SOW
SPECIFICATION
w
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
o
v
D
z
F-
LINE
PARA.
NUMBER
O
CODE NO.
Z
1
2
3
4
1
51
6
1
0
<
W
ITEM
NO.
-
Test
44324M
0003
X
Test
54324M
0003
X
Test at the CPC and CPCI Levels
643252
0003
X
Develop SW Test Procedures
643253
0003
X
Support Test & Verification
643254
0003
X
Prepare Test Reports
643255
0003
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
0
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
?
PROGRAM
RFP NO, 82-B-015
DATE:
WORK BREAKDOWN STRUCTURE INDEX
NPIC D/C SEGMENT
CONTRACT NO.
2-24-82
w
LL
CONTRACT
SOW
SPECIFICATION
w
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
WBS
o
D
LINE
PARA
NUMBER
Z p
CODE NO.
C/)
w
Z
vi
ITEM
.
NO
-'Z
1
2
3
4
56
o
.2
H
.
Documentation
44325M
X
0003
X
Prepare As-built Documentation
54325M
X
0003
X
Prepare Inputs to User, Operator and
643256
X
0003
Data Base Administration Manuals
CPCI Listings As-built
643257
X
0003
X
Prepare Programmer's Manual (Final)
643258
X
0003
X
Prepare Inputs to Training Manuals
643259
X
0003
Prepare As-built Part II Specs.
643260
X
0003
C
z
n
r
m
0
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
PROGRAM
RFP NO. 82-B-015
DATE:
WORK BREAKDOWN STRUCTURE INDEX
NPIC D/C SEGMENT
CONTRACT NO.
2-24-82
>
LL
CONTRACT
SOW
SPECIFICATION
w
WORK BREAKDOWN STRUCTURE. ELEMENTS/TASKS
WBS
o
D
z
LINE
PARA
NUMBER
z
CODE NO.
W
<
W
ITEM
.
NO
1
2
3
4
5
6
.
WAPPLS
CPCI: Work Station Applications - BOC
343213
0003
Prelim. Design
44321N
X
0003
X
Prepare Prelim. Design Specs.
54321N
X
0003
X
Requirements Analysis & Allocation
643261
X
0003
X
Prepare Prelim. Design Part I Specs.
643262
X
0003
and Conduct Internal Design Reviews
Prepare Data Dictionary
643263
X
0003
Prepare Prelim. Part II Specs.
643264
X
0003
n------ On/'T m... n1.... /n,...1;... 1
L Lcp/aLC VL V1 Lco~. L tau I. La-.1s. /
6432a.v65
-*....
Y
nnn3
.. ..-~
Appendix for WAPPLS
?
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
PROGRAM
RFP NO. 82-B-01 5
DATE:
WORK BREAKDOWN STRUCTURE INDEX
NPIC D/C SEGMENT
CONTRACT NO.
2-24-82
>
W
CONTRACT
SOW
SPECIFICATION
w
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
WBS
0
i
Z)
z
LINE
PARA.
NUMBER
z
CODE NO.
v
i
w
<
vi
ITEM
NO
z
1
2
31
41
51
61
w
W
.
Critical Design
44322N
X
0003
X
Prepare Build-to Design Specs.
54322N
X
0003
X
Prepare Build-to Part II Specs. and
643266
X
0003
Conduct Internal Design Reviews
X
Prepare Prelim. Programmer's Manual
643267
X
0003
X
Prepare CPCI Test Plan (Final)
643268
0003
Appendix for WAPPLS
Development
44323N
X
0003
X
Develop CPC's
54323N
X
0003
Code & Unit Test
643269
X
0003
Integr. & Test to CPC Level
643270
X
0003
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
WORK BREAKDOWN STRUCTURE INDEX
PROGRAM NPIC D/C SEGMENT
RFP NO. 82-B-015
DATE:
CONTRACT NO.
2-24-82
w
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
WBS
w
0
LL
Z)
CONTRACT
sow
SPECIFICATION
NUMBER
Z O
J Z
CODE NO.
Z
N
LINE
PARA.
1
2
3
14
1 5
6
0
ITEM
NO.
Test
44324N
0003
X
Test
54324N
0003
X
Test at the CPC and CPCI Levels
643271
0003
X
Develop SW Test Procedures
643272
0003
X
Support Test & Verification
643273
0003
Prepare Test Reports
643274
0003
i 0 ?
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
w
?
PROGRAM
RFP NO. 82-B-015
DATE:
WORK BREAKDOWN STRUCTURE INDEX
NPIC D/C SEGMENT
CONTRACT NO.
2-24-82
w
LL
CONTRACT
SOW
SPECIFICATION
w
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
WBS
a
~
D
LINE
PARA
NUMBER
? 0
CODE NO.
c
ii
z
Q
In
w
ITEM
.
NO
J z
1
2
3
4 5
6
0
.
Documentation
44325N
X
0003
X
Prepare As-built Documentation
54325N
X
0003
X
Prepare Inputs to User, Operator and
643275
X
0003
Data Base Administration Manuals
CPCI Listings As-built
643276
X
0003
X
Prepare Programmer's Manual (Final)
643277
X
0003
Prepare Inputs to Training Manuals
643278
0003
Prepare As-built Part II Specs.
643279
X
0003
C
Z
C)
r
11
m
v
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
WORK BREAKDOWN STRUCTURE INDEX
PROGRAM
NPIC D/C SEGMENT
RFP NO.82-B-015
DATE:
CONTRACT NO.
2-24-82
WBS
LL
CONTRACT
SOW
SPECIFICATION
Z
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
I
z
LINE
PARA
NUMBER
O
DE NO.
CO
in
TE
.
Jz
1
2
3
4
5
6
0
<
uJ
I
M
NO.
BEXSUP
CPCI: Exploitation Support - BOf
343214
X
0003
Prelim. Design
443210
X
0003
X
Prepare Prelim. Design Specs.
543210
X
0003
X
Requirements Analysis & Allocation
643280
X
0003
Prepare Prelim. Design Part I Specs.
643281
X
0003
and Conduct Internal Design Reviews
Prepare Data Dictionary
643282
X
0003
Prepare Prelim. Part II Specs.
643284
X
0003
1
H
Prepare CPCI Test Plan (Prelim.)
643285
0003
.
Appendix for BEXSUP
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06 :CIA-RDP84T00037R000500040001-2 is
PROGRAM
RFP NO. 82-B-015
DATE:
WORK BREAKDOWN STRUCTURE INDEX
NPIC D/C SEGMENT
CONTRACT NO.
2-24-82
>
w
LL
CONTRACT
SOW
SPECIFICATION
w
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
WBS
p
i
Z
LINE
PARA.
NUMBER
Z 0
CODE NO.
v
i
W
<
U)
ITEM
NO
Z
1
2
31
4151
61
W
.
Critical Design
4432211
X
0003
X
Prepare Build-to Design Specs.
543220
X
0003
X
Prepare Build-to Part II Specs. and
643286
X
0003
Conduct Internal Design Reviews
X
Prepare Prelim. Programmer's Manual
643287
X
0003
Prepare CPCI Test Plan (Final)
643288
0003
Appendix for BEXSUP
Development
443230
X
0003
X
Develop CPC's
5432311
X
0003
Code & Unit Test
643289
0003
Integr. & Test to CPC Level
643290
0003
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
PROGRAM
WORK BREAKDOWN STRUCTURE INDEX
NPIC D/C SEGMENT
RFP NO. 82-B-015
DATE:
CONTRACT NO.
2-24-82
w
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
WBS
>
U
CONTRACT
SOW
SPECIFICATION
NUMBER
Z 0
J Z
CODE NO.
w
z
w
LINE
PARA.
1
2
3
14
5
16
1
0
<
ITEM
NO.
Test
443240
0003
X
Test
543240
0003
X
Test at the CPC and CPCI Levels
643291
0003
X
Develop SW Test Procedures
643292
0003
X
Support Test & Verification
643293
0003
X
Prepare Test Reports
643294
0003
m
m
v
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2 ?
0 V
PROGRAM
RFP NO. 82-B-015
DATE:
WORK BREAKDOWN STRUCTURE INDEX
NPIC D/C SEGMENT
CONTRACT NO.
2-24-82
>
w
"
CONTRACT
SOW
SPECIFICATION
w
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
WBS
i
z
~
LINE
PARA.
NUMBER
z
Z
CODE NO.
v
i
w
<
v
i
ITEM
NO
1
2
3
4
5161
L
.
Documentation
443250
X
0003
X
Prepare As-built Documentation
543250
X
0003
X
Prepare Inputs to User, Operator and
643295
X
0003
Data Base Administration Manuals
X
CPCI.Listings As-built
643296
X
0003
X
Prepare Programmer's Manual (Final)
643298
X
0003
Prepare Inputs to Training Manuals
643299
X
0003
Prepare As-built Part II Specs.
643300
X
0003
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
WORK BREAKDOWN STRUCTURE INDEX
PROGRAM
NPIC D/C SEGMENT
RFP NO. 82-B-01 5
DATE:
CONTRACT NO.
2-24-82
w
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
WBS
W
0
U.
Z)
CONTRACT
SOW
SPECIFICATION
NUMBER
Z O
J z
CODE NO.
w
z
Q
F'
w
LINE
PARA.
1
2
3
14
15
16
1
a
f-
ITEM
NO.
X
Software Development (IOC)
244000
0004
Software Development Management
344100
0004
Software Development Management
444100
X
0004
X
Manage All SW Devel. Activities
544100
X
0004
X
Manage All SW Devel. Activities
644001
X
0004
X
Provide & Enforce Program Design,
544101
X
0004
Coding & Test Practices, Standards &
Conventions
Software Engineering
644005
X
0004
X
Software Architecture
544102
X
0004
Tech. Support to Subcontract Mgm't.
644006
X
0004
Software Trade Studies
?
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
?
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
W
PROGRAM
RFP NO. 82-B-01 5
DATE:
WORK BREAKDOWN STRUCTURE INDEX
NPIC D/C SEGMENT
CONTRACT NO.
2-24-82
w
LL
CONTRACT
SOW
SPECIFICATION
w
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
WBS
0
Z
LINE
PARA.
NUMBER
J Z
CODE NO.
w
a
ve
ITEM
NO
1
2
3
45
6
0
<
W
.
X
COBOL Code Conversion
644007
X
0004
X
Software Control
644008
X
0004
X
Library Control
544103
X
0004
X
Software Builds & Releases
644009
X
0004
X
Provide Inputs to Segment Devel. Plan
544104
X
0004
X
Provide Inputs to Segment Devel. Plan
644010
X
0004
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
WORK BREAKDOWN STRUCTURE INDEX
PROGRAM NPIC D/C SEGMENT
RFP NO. 82-B-015
DATE:
CONTRACT NO.
2-24-82
Z
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
WEIS
LU
0
LL
CONTRACT
SOW
SPECIFICATION
NUMBER
0
DE NO.
CO
z
(n
LINE
PARA:
J Z
1
2
31
41 51
6
0
2
ITEM
NO.
X
Data Base Implementation (IOC)
544105
X
0004
X
Data Base Conversion
644012
X
0004
Design, Implementation, Verification
X
Data Base Package
644013
X
0004
X
Data Base Support to Development
644014
X
0004
and Test & Verification
?
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
?
WORK BREAKDOWN STRUCTURE INDEX
PROGRAM
NPIC D/C SEGMENT
RFP NO. 82-B-015
DATE:
CONTRACT NO.
2-24-82
WBS
w
u
CONTRACT
SOW
SPECIFICATION
w
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
o
Z
LINE
PARA
NUMBER
O
CODE NO.
n
w
ai
E
.
_j Z
1
2
3
4
5
6
Q
<
W
IT
M
NO.
BEPPRE
CPCI: Pre-Exploitation - IOC
344200
X
0004
Critical Design
44422A
X
0004
X
Prepare Build-to Design Specs.
54422A
X
0004
X
Prepare Build-to Part II Specs. and
644015
X
0004
Conduct Internal Design Reviews
X
Prepare Prelim. Programmer's Manual
644016
X
0004
Prepare CPCI Test Plan (Final)
644017
0004
Appendix for BEPPRE
Development
44423A
X
0004 -
X
Develop CPC's
54423A
X
-
0004
Code & Unit Test
644018
0004
Integr. & Test to CPC Level
644019
0004
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
PROGRAM
RFP NO. 82-B-015
DATE:
WORK BREAKDOWN STRUCTURE INDEX
NPIC D/C SEGMENT
CONTRACT NO.
2-24-82
WBS
>
ti
CONTRACT
SOW
SPECIFICATION
w
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
0
z
LINE
PARA
NUMBER
O
DE NO.
CO
w
Q
in
w
TEM
.
J z
1
2
3
4
5
6
0
H
I
NO.
Test
44424A
0004
X
Test
54424A
0004
X
Test at.the CPC & CPCI Levels
644020
0004
X
Develop SW Test Procedures
644021
0004
X
Support Test & Verification
644022
0004
X
Prepare Test Reports
644023
0004
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/0 6: C
AIA-RDP84TOO037ROO0500040001-2
PROGRAM
82-B-015
RFP NO
DATE:
WORK BREAKDOWN STRUCTURE INDEX
NPIC D/C SEGMENT
.
CONTRACT NO.
2-24-82
>
w
LL
CONTRACT
SOW
SPECIFICATION
w
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
WBS
z
z
LINE
PARA.
NUMBER
z
CODE NO.
n
w
<
U)
ITEM
NO.
1
2
31
4151
61
W
H
Documentation
44425A
X
0004
X
Prepare As-built Documentation
54425A
X
0004
X
CPCI Listings As-built
644025
X
0004
X
Prepare Programmer's Manual (Final)
644026
X
0004
X
Prepare As-built Part II Specs.
644028
X
0004
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
PROGRAM
RFP NO.82-B-01 5
DATE:
WORK BREAKDOWN STRUCTURE INDEX
NPIC D/C SEGMENT
CONTRACT NO.
2-24-82
WBS
w
CONTRACT
SOW
SPECIFICATION
w
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
o
a
Z
LINE
PARA
NUMBER
Z 0
CODE NO.
c
n
w
in
E
.
JZ
1
2
3
45
6
w
<
H
IT
M
NO.
BEMGMT
CPCI: Exploitation Management - IOC
344201
X
0004
Critical Design
44422B
X
0004
X
Prepare Build-to Design Specs.
54422B
X
0004
X
Prepare Build-to Part II Specs. and
644029
X
0004
Conduct Internal Design Reviews
X
Prepare Prelim. Programmer's Manual
644030
X
0004
Prepare CPCI Test Plan (Final)
644031
0004
Appendix for BEMGMT
Development
44423B
X
0004
X
Develop CPC's
54423B
X
UUU4
Code & Unit Test
644032
0004
Integr. & Test to CPC Level
644033
0004
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
w
?
WORK BREAKDOWN STRUCTURE INDEX
PROGRAM
NPIC D/C SEGMENT
RFP NO. 82-B-015
DATE:
CONTRACT NO.
2-24-82
w
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
WBS
w
o
LL
~
CONTRACT
SOW
SPECIFICATION
NUMBER
Z
Z
CODE NO.
ci~
Z
v
i
LINE
PARA.
1
2
3
4
5
16
1
p
H
ITEM
NO.
Test
44424B
0004
X
Test
54424B
0004
-
X
Test at the CPC & CPCI Levels
644034
0004
X
Develop SW Test Procedures
644035
0004
X
Support Test & Verification
644036
0004
X
Prepare Test Reports
644037
0004
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
PROGRAM
RFP NO. 82-B-01 5
DATE:
WORK BREAKDOWN STRUCTURE INDEX
NPIC D/C SEGMENT
CONTRACT NO.
2-24-82
WBS
w
LL
CONTRACT
SOW
SPECIFICATION
w
Z
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
o
D
Z
~
LINE
PARA.
NUMBER
O
CODE NO.
(n
ww
v
i
ITEM
JZ
1
2
3
4
5
6
<
W
NO.
Documentation
44425B
X
0004
X
Prepare As-built Documentation
54425B
X
0004
X
CPCI Listings As-built
644039
X
0004
Prepare Programmer's Manual (Final)
644040
X
0004
Prepare Inputs to Training Manuals
644041
X
0004
H
1
1
-1
. I
I
I
Prepare As-built Part II Specs.
644042
X
0004
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
?
?
WORK BREAKDOWN STRUCTURE INDEX
PROGRAM NPIC D/C SEGMENT
RFP NO. 82-8-015
DATE:
CONTRACT NO.
2-24-82
w
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
WBS
w
U.
CONTRACT
SOW
SPECIFICATION
NUMBER
z O
'z
CODE NO.
-0
z
<
v~i
LINE
PARA.
1
2
3
4
5
6
p
w
ITEM
NO.
BERESU
CPCI: Exploitation Results - IOC
344202
X
0004
Critical Design
44422C
X
0004
X
Prepare Build-to Design Specs.
54422C
X
0004
X
Prepare Build-to Part II Specs. and
644043
X
0004
Conduct Internal Design Reviews
X
Prepare Prelim. Programmer's Manual
644044
X
0004
X
Prepare CPCI Test Plan (Final)
644045
0004
Appendix for BERESU
Development
44423C
X
0004
X
Develop CPC's
54423C
X
0004
Code & Unit Test
644046
0004
Integr. & Test to CPC Level
644047
X
0004
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84TOO037ROO0500040001-2
PROGRAM
82-B-015
RFP NO.
DATE:
WORK BREAKDOWN STRUCTURE INDEX
NPIC D/C SEGMENT
-
CONTRACT NO.
2-24-82
WBS
w
t+-
CONTRACT
SOW
SPECIFICATION
w
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
o
Z
N
LINE
PARA.
NUMBER
? O
CODE NO.
w
ITEM
Jz
1
2
3
4
5
6
o
w
NO.
Test
44424C
X
0004
X
Test
54424C
X
0004
X
Test at the CPC & CPCI Levels
644048
X
0004
Develop SW Test Procedures
644049
X
0004
Support Test & Verification
644050
X
0004
Prepare Test Reports
644051
X
0004
Approved For Release 2007/09/06: CIA-RDP84TOO037ROO0500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
w
?
WORK BREAKDOWN STRUCTURE INDEX
PROGRAM NPIC D/C SEGMENT
RFP
NO. 82-B
-01015
DATE:
N
CONTRACT
2-24-82
w
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
WBS
w
LL
CONTRACT
SOW
SPECIFICATION
NUMBER
0
1Z
CODE NO.
z
vi
LINE
PARA.
1
2
3
14
1 5
6
0
2
ITEM
NO.
Documentation
44425C
X
0004
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
WORK BREAKDOWN STRUCTURE INDEX
PROGRAM NPIC D/C SEGMENT
RFP NO.82-B-015
DATE:
CONTRACT NO.
2-24-82
w
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
WBS
W
C)
LL
D
CONTRACT
sow
SPECIFICATION
Nil IRAQCD
z
CODE NO.
<
LINE
PARA.
1
2
3
4
5
16
1
w
W
ITEM
NO.
BMANIP
CPCI: Data Manipulation - IOC
344203
X
0004
Critical Design
44422D
X
0004
X
Prepare Build-to Design Specs.
54422D
X
0004
Prepare Build-to Part II Specs. and
644057
X
0004
Conduct Internal Design Reviews
Prepare Prelim. Programmer's Manual
644058
X
0004
Prepare CPCI Test Plan (Final)
644059
0004
Appendix for BMANIP
Development
44423D
X
0004
X
Develop CPC's
54423D
X
0004
Code & Unit Test
644060
0004
Integr. & Test to CPC Level
644061
X
0004
?
m
0
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/0 IA-RDP84T00037R000500040001-2
PROGRAM
RFP NO. 82-B-01 5
DATE:
WORK BREAKDOWN STRUCTURE INDEX
NPIC D/C SEGMENT
CONTRACT NO.
2 2462
>
w
^
CONTRACT
SOW
SPECIFICATION
w
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
WBS
p
c
LINE
PARA
NUMBER
CODE NO.
c
i-
z
<
vi
w
ITEM
.
NO
Z
1
2
3
45
6
o
F
-
.
Test
44424D
0004
X
Test
54424D
0004
X
Test at the CPC & CPCI Levels
644062
0004
X
Develop SW Test Procedures
644063
0004
X
Support Test & Verification
644064
0004
X
Prepare Test Reports
644065
0004
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
WORK BREAKDOWN STRUCTURE INDEX
PROGRAM
NPIC D/C SEGMENT
RFP NO. 82-B-01 5
DATE:
CONTRACT NO.
2-24-82
w
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
WBS
>
p
LL
Z)
.
CONTRACT
SOW
SPECIFICATION
NUMBER
z 0
CODE NO.
n
z
v)
w
LINE
PARA.
Jz
1
21
3
45
6
0
2
I
-
ITEM
NO.
Documentation
44425D
0004
X
Prepare As-built Documentation
54425D
X
0004
X
CPCI Listings As-built
644067
X
0004
X
Prepare Programmer's Manual (Final)
644068
X
0004
1
1
1
1
11
X
1
Prepare As-built Part II Specs.
644070
X
0004
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
?
WORK BREAKDOWN STRUCTURE INDEX
PROGRAM
NPIC D/C SEGMENT
RFP NO. 82-B-015
DATE:
CONTRACT NO.
2-24-82
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
WBS
>
0
LL
CONTRACT
SOW
SPECIFICATION
NUMBER
z O
CO
DE NO.
Zn-
z
I-
U)
LINE
PARA.
'z
1
2
3
45
6
o
H
ITEM
NO.
BSTATR
CPCI: Statistics Reporting - IOC
344204
X
0004
Critical Design
44422E
X
0004
X
Prepare Build-to Design Specs.
54422E
X
0004
X
Prepare Build-to Part II Specs. and
644071
X
0004
Conduct Internal Design Reviews
X
Prepare Prelim. Programmer's Manual
644072
X
0004
X
Prepare CPCI Test Plan (Final)
644073
0004
Appendix for BSTATR
Development
44423E
X
0004
X
Develop CPC's
54423E
X
0004
Code & Unit Test
644074
X
0004
Integr. & Test to CPC Level
644075
X
0004
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
PROGRAM
RFP NO. 82-B-015
DATE:
WORK BREAKDOWN STRUCTURE INDEX
NPIC D/C SEGMENT
CONTRACT NO.
2-24-82
w
LL
CONTRACT
SOW
SPECIFICATION
w
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
WBS
a
=,
z
~
LINE
PARA
NUMBER
O
CODE NO.
v
ww
t
n
ITEM
.
NO
Jz
1
2
3
4
5
6
W
.
Test
44424E
0004
X
Test
54424E
0004
X
Test at the CPC & CPCI Levels
644076
0004
Develop SW Test Procedures
644077
0004
X
Support Test & Verification
644078
0004
Prepare Test Reports
644079
0004
r i
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
?
PROGRAM
RFP NO. 82-B-015
DATE:
WORK BREAKDOWN STRUCTURE INDEX
NPIC D/C SEGMENT
2-24-82
CONTRACT NO.
>
LL
CONTRACT
SOW
SPECIFICATION
w
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
WBS
o
~
LINE
PARA
NUMBER
0
CODE NO.
ciT
w
Z
v
i
TE
.
z
1
2
3
4
5
16
1
p
<
H
M
I
NO.
Documentation
4442SE
X
0004
X
Prepare As-built Documentation
54425E
X
0004
X
CPCI Listings As-built
644082
X
0004
X
Prepare Programmer's Manual (Final)
644083
X
0004
X
Prepare As-built Part II Specs.
644085
X
0004
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
PROGRAM
5
RFP NO. 82 B-01
DATE:
WORK BREAKDOWN STRUCTURE INDEX
NPIC DIG SEGMENT
CONTRACT NO.
2-24-82
>
-
CONTRACT
SOW
SPECIFICATION
w
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
WBS
C
1
D
1
LINE
PARA
N"~""BER
? O
CODE NO.
v
w
Z
in
ITEM
.
NO
J Z
1
2
3
4
5
6
Q
W
.
BMMGMT
CPCI: Materials Management - IOC
344206
X
0004
Critical Design
44422G
X
0004
X
Prepare Build-to Design Specs.
54422G
X
0004
X
Prepare Build-to Part II Specs. and
644100
X
0004
Conduct Internal Design Reviews
X
Prepare Prelim. Programmer's Manual
644101
X
0004
Prepare CPCI Test Plan (Final)
644102
0004
Appendix for BMMGMT
Development
44423G
X
0004
X
Develop CPC's
54423G
X
0004
Code & Unit Test
644103
0004
11
11
1
1
Integr. & Test to CPC Level
1
644104
0004
?
m
m
0
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
w
?
PROGRAM
RFP NO. 82-B-01 5
DATE:
WORK BREAKDOWN STRUCTURE INDEX
NPIC D/C SEGMENT
2-24-82
CONTRACT NO.
>
U.
CONTRACT
SOW
SPECIFICATION
w
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
WBS
0
cn
I-
LINE
PARA
NUMBER
z 0
CODE NO.
v
i
W
z
ITEM
.
NO
Jz
1
2
3
4
5
6
Q
~
W
.
Test
44424G
0004
X
Test
54424G
0004
X
Test at the CPC & CPCI Levels
644105
0004
X
Develop SW Test Procedures
644106
0004
X
Support Test & Verification
644107
0004
L
L
X
I
Prepare Test Reports
644108
0004
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
PROGRAM
RFP NO. 82-B-015
DATE:
WORK BREAKDOWN STRUCTURE INDEX
NPIC D/C SEGMENT
CONTRACT NO.
2-24-82
w
LL
CONTRACT
SOW
SPECIFICATION
w
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
WBS
p
LINE
PARA
NUMBER
Z O
CODE NO.
n
w
Z
in
ITEM
.
NO
JZ
1
2
3
4
5
6
Q
<
W
.
Documentation
44425G
X
0004
X
Prepare As-built Documentation
54425G
X
0004
X
CPCI Listings As-built
644110
X
0004
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/0 IA-RDP84T00037R000500040001-2
PROGRAM
RFP NO. 82-B-015
DATE:
WORK BREAKDOWN STRUCTURE INDEX
NPIC D/C SEGMENT
CONTRACT NO.
2-24 82
w
LL
CONTRACT
SOW
SPECIFICATION
w
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
WBS
o
i
7)
z
LINE
PARA.
NUMBER
p
CODE NO.
v
i
ww
<
vi
W
ITEM
NO
J z
1
2
3
4
516
1
.
BCCNTR
CPCI: Command & Control - IOC
344207
X
0004
Critical Design
44422H
X
0004
X
Prepare Build-to Design Specs.
54422H
X
0004
X
Prepare Build-to Part II Specs. and
644114
X
0004
Conduct Internal Design Reviews
X
Prepare Prelim. Programmer's Manual
644115
X
0004
X
Prepare CPCI Test Plan (Final)
644116
0004
Appendix for BCCNTR
Development
44423H
X
0004
X
Develop CPC's
54423H
X
0004
Code & Unit Test
644117
0004
Integr. & Test to CPC Level
644118
X
0004
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
PROGRAM
RFP NO
82-B-015
DATE:
WORK BREAKDOWN STRUCTURE INDEX
NPIC D/C SEGMENT
.
CONTRACT NO.
2-24-82
w
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
WBS
w
p
U.
I-
CONTRACT
SOW
SPECIFICATION
NUMBER
O
CODE NO.
vCn
w
z
LINE
PARA.
J z
1
2
3
4
51
6
p
2
H
ITEM
NO.
Test
44424H
0004
X
Test
54424H
0004
X
Test at the CPC & CPCI Levels
644119
0004
X
Develop SW Test Procedures
644120
0004
X
Support Test & Verification
644121
0004
A
X
Prepare Test Reports
644122
0004
?
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
?
PROGRAM
WORK BREAKDOWN STRUCTURE INDEX
NPIC D/C SEGMENT
R FP NO. 82-B-01 5
DATE:
CONTRACT NO.
2-24-82
w
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
WBS
w
LL
z
CONTRACT
SOW
SPECIFICATION
NUMBER
O
J z
CODE NO.
w
~
in
LINE
PARA.
P
1
2
3
141 5
6
p
H
ITEM
NO.
Documentation
44425H
X
0004
X
Prepare As-built Documentation
54425H
X
0004
X
Prepare Inputs to User, Operator and
644123
X
0004
Data Base Administration Manuals
X
CPCI Listings As-built
644124
X
0004
X
Prepare Inputs to Training Manuals
644126
X
0004
X
Prepare As-built Part II Specs.
644127
X
0004
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
WORK BREAKDOWN STRUCTURE INDEX
PROGRAM NPIC D/C SEGMENT
RFP NO. 82-B-015
DATE:
CONTRACT NO.
2-24-82
ui
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
WBS
>
o
LL
CONTRACT
SOW
SPECIFICATION
NUMBER
Z O
CODE NO.
ci~
w
Z
v~i
LINE
PARA.
J Z
1
2
3
4 5
6
Q
ITEM
NO.
BQUERY
CPCI: Query - IOC
344208
X
0004
Critical Design
444221
X
0004
Prepare Build-to Design Specs.
544221
X
0004
Prepare Build-to Part II Specs. and
644128
X
0004
Conduct Internal Design Reviews
Prepare Prelim. Programmer's Manual
644129
X
0004
Prepare CPCI Test Plan (Final)
644130
X
0004
Appendix for BQUERY
Development
444231
X
0004
Develop CPC's
544231
X
0004
Code & Unit Test
644131
X
0004
Integr. & Test to CPC Level
644132
X
0004
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/0 6: C
AIA-RDP84TOO037ROO0500040001-2
?
PROGRAM
82-B-01 5
R FP NO
DATE:
WORK BREAKDOWN STRUCTURE INDEX
NPIC D/C SEGMENT
.
2-24-82
CONTRACT NO.
w
CONTRACT
SOW
SPECIFICATION
w
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
WBS
HE
RA
NUMBER
J
CODE NO.
w
z
T
Z
1
2
3
4
15
16
1
O
Test
444241
X
0004
X
Test
544241
X
0004
Test at the CPC & CPCI Levels
644133
X
0004
Develop SW Test Procedures
644134
X
0004
Support Test & Verification
644135
X
0004
Prepare Test Reports
644136
X
0004
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
PROGRAM
RFP NO. 82-B-01 5
DATE:
WORK BREAKDOWN STRUCTURE INDEX
NPIC D/C SEGMENT
CONTRACT NO.
2-24-82
w
u.
CONTRACT
SOW
SPECIFICATION
w
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
WBS
o
2
N
LINE
PARA
NUMBER
Z p
CODE NO.
n
w
ITEM
.
NO
J Z
1
2
3
4
51
6
Q
2
W
.
Documentation
444251
X
0004
X
Prepare As-built Documentation
544251
X
0004
X
Prepare Inputs to User, Operator and
644137
X
0004
Data Base Administration Manuals
CPCI Listings As-built
644138
X
0004
X
Prepare Programmer's Manual (Final)
644139
X
0004
Prepare Inputs to Training Manuals
644140
X
0004
Prepare As-built Part II Specs.
644141
X
0004
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
?
?
W
PROGRAM
82-B-015
RFP NO
DATE:
WORK BREAKDOWN STRUCTURE INDEX
NPIC D/C SEGMENT
.
CONTRACT NO.
2-24-82
WBS
Uj
o
CONTRACT
SOW
SPECIFICATION
w
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
-
D
LINE
PARA
NUMBER
Z O
CODE NO.
Zn
z
t
TE
.
Jz
1
2
3
4
5
6
o
~
F-
M
I
NO.
BAPPLS
CPCI: Applications Support - IOC
344209
X
0004
Critical Design
44422J
X
0004
X
Prepare Build-to Design Specs.
54422J
X
0004
X
Prepare Build-to Part II Specs. and
644142
X
0004
Conduct Internal Design Reviews
Prepare Prelim. Programmer's Manual
644143
X
0004
Prepare CPCI Test Plan (Final)
644144
0004
Appendix for BAPPLS
Development
44423J
X
0004
X
Develop CPC's
54423J
X
0004
Code & Unit Test
644145
X
0004
Integr. & Test to CPC Level
644146
X
0004
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
PROGRAM
WORK BREAKDOWN STRUCTURE INDEX
NPIC D/C SEGMENT
RFP NO. 82-B-015
DATE:.
CONTRACT NO.
2-24-82
U.,
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
WBS
o
D
CONTRACT
sow
SPECIFICATION
NUMBER
O
Jz
CODE NO.
z
'-
LINE
PARA.
1
2
3
4
5
6
0
2
ITEM
NO.
Test
44424J
0004
X
Test
54424J
0004
X
Test at the CPC & CPCI Levels
644147
0004
X
Develop SW Test Procedures
644148
0004
Support Test & Verification
644149
0004
Prepare Test Reports
644150
0004
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/0 6: C
AIA-RDP84TOO037ROO0500040001-2
?
PROGRAM
RFP NO. 82-B-015
DATE:
WORK BREAKDOWN STRUCTURE INDEX
NPIC D/C SEGMENT
CONTRACT NO.
2-24-82
WBS
w
CONTRACT
SOW
SPECIFICATION
w
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
p
-
z
LINE
PARA
NUMBER
z O
CODE NO.
U
in
ITEM
.
NO
i 2
1
2
3
4
5
6
0
2
.
Documentation
44425J
X
0004
X
Prepare As-built Documentation
54425J
X
0004
X
CPCI Listings As-built
644152
X
0004
X
Prepare Programmer's Manual (Final)
644153
X
0004
X
Prepare Inputs to Training Manuals
644154
X
0004
Prepare As-built Part II Specs.
644155
X
0004
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
WORK BREAKDOWN STRUCTURE INDEX
PROGRAM
NPIC DIC SEGMENT
RFP NO. 82 8 015
DATE:
CONTRACT NO.
2-24.82
w
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
CONTRACT
SOW
SPECIFICATION
z 0
CODE NO.
vii
z
v~i
1
LINE
PARA.
Jz
1
1
2
3
4
5
6
1
0
2
F
ITEM
NO.
BDMAPS
CPCI: DBM Application Support - IOC
344210
X
0004
Critical Design
44422K
X
0004
X
Prepare Build-to Design Specs.
54422K
X
0004
X
Prepare Build-to Part II Specs. and
644156
X
0004
Conduct Internal Design Reviews
X
Prepare Prelim_ Programmer's Manual
644157
X
0004
X
Prepare CPCI Test Plan (Final)
644158
0004
Appendix for BDMAPS
Development
44423K
X
0004
X
Develop CPC's
54423K
X
0004
Code & Unit Test
644159
0004
Integr. & Test to CPC Level
644160
X
0004
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
is
PROGRAM
RFP NO. 82-8-015
DATE:
WORK BREAKDOWN STRUCTURE INDEX
NPIC D/C SEGMENT
CONTRACT NO.
2-24-82
w
U-
CONTRACT
SOW
SPECIFICATION
w
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
WBS
p
LINE
PARA
NUMBER
p
CODE NO.
N
z
~
N
ITEM
.
NO
Jz
1
2
3
45
6
a
~
.
Test
44424K
0004
X
Test
54424K
0004
X
Test at the CPC & CPCI Levels
644161
0004
X
Develop SW Test Procedures
644162
0004
X
Support Test & Verification
644163
0004
X
Prepare Test Reports
644164
0004
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
WORK BREAKDOWN STRUCTURE INDEX
PROGRAM
NPIC D/C SEGMENT
RFP NO. 82-B-01 5
DATE:
CONTRACT NO.
2-24-82
u:
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
WBS
o
D
~
CONTRACT
SOW
SPECIFICATION
NUMBER
Z O
Jz
CODE NO.
N
z
v
i
W
LINE
PARA.
1
2
3
4
5
6
p
2
t
ITEM
NO.
Documentation
44425K
X
0004
X
Prepare As-built Documentation
54425K
X
0004
X
CPCI Listings As-built
644166
X
0004
X
Prepare Programmer's Manual (Final)
644167
X
0004
X
Prepare Inputs to Training Manuals
644168
X
0004
Prepare As-built Part II Specs.
644169
X
0004
1 0
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
?
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
V
PROGRAM
82-B-015
RFP NO
DATE:
WORK BREAKDOWN STRUCTURE INDEX
NPIC D/C SEGMENT
.
CONTRACT NO.
2-24-82
w
LL
CONTRACT
SOW
SPECIFICATION
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
WBS
o
~
LINE
PARA
NUMBER
O
CODE NO.
v
i
ww
z
in
ITEM
.
NO
z
1
2
3
45
6
'
F
.
BTTDEV
CPCI: Test & Training - IOC
344211
X
0004
Critical Design
44422L
X
0004
X
Prepare Build-to Design Specs.
54422L
X
0004
X
Prepare Build-to Part II Specs. and
644170
X
0004
Conduct Internal Design Reviews
X
Prepare Prelim. Programmer's Manual
644171
X
0004
Prepare CPCI Test Plan (Final)
644172
0004
Appendix for BTTDEV
Development
44423L
X
0004
X
Develop CPC's
54423L
X
0004
Code & Unit Test
644173
X
0004
Integr. & Test to CPC Level
644174
X
0004
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
PROGRAM
RFP NO. 82-B-015
DATE:
WORK BREAKDOWN STRUCTURE INDEX
NPIC D/C SEGMENT
CONTRACT NO.
2-24-82
WBS
>
LL
CONTRACT
SOW
SPECIFICATION
w
Z
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
o
z
LINE
PARA.
NUMBER
J z
CODE NO.
w
Q
cn
TEM
1
2
3
4
51
61
2
I
NO.
Test
44424L
0004
X
Test
54424L
0004
X
Test at the CPC & CPCI Levels
644175
0004
X
Develop SW Test Procedures
644176
0004
X
Support Test & Verification
644177
0004
X
Prepare Test Reports
644178
0004
9
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
?
PROGRAM
82-B-015
RFP NO
DATE:
WORK BREAKDOWN STRUCTURE INDEX
NPIC D/C SEGMENT
.
CONTRACT NO.
2-24-82
w
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
WBS
w
o
LL
D
-
CONTRACT
SOW
SPECIFICATION
NUMBER
O
CODE NO.
vii
z
w
1
LINE
E
PARA.
J z
1
2
3
4 5
6
Q
<
W
IT
M
NO.
Documentation
44425L
X
0004
X
Prepare As-built Documentation
54425L
X
0004
X
CPCI Listings As-built
644180
X
0004
X
Prepare Programmer's Manual (Final)
644181
X
0004
X
Prepare Inputs to Training Manuals
644182
X
0004
Prepare As-built Part II Specs.
644183
O
X
0004
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
WORK BREAKDOWN STRUCTURE INDEX
PROGRAM NPIC D/C SEGMENT
R FP NO. 82-B'01 5
DATE:
CONTRACT NO.
2.24-82
w
WORK BREAKDOWN STRUCTU R E. E LEMENTS/TASKS
WBS
u> .+
0
LL
CONTRACT
SOW
SPECIFICATION
NUMBER
z 0
J z
CODE NO.
_Cn
z
vvi
LINE
PARA.
1
2
3
14
1 5
16
wQ
W
ITEM
NO.
WAPPLS
CPCI: Work Station Applications - IOC
344212
X
0004
Critical Design
44422M
X
0004
X
Prepare Build-to Design Specs.
54422M
X
0004
X
Prepare Build-to Part II Specs. and
644184
X
0004
Conduct Internal Design Reviews
Prepare Prelim. Programmer'"s Manual
644185
X
0004
Prepare CPCI Test Plan (Final)
644186
0004
Appendix for WAPPLS
Development
44423M
X
0004
X
Develop CPC's
54423M
X
0004
Code & Unit Test
644187
X
0004
Integr. & Test to CPC Level
644188
X
0004
0
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/0 6: C
AIA-RDP84TOO037ROO0500040001-2
PROGRAM
R F P NO. 82-B-01 5
DATE:
WORK BREAKDOWN STRUCTURE INDEX
NPIC D/C SEGMENT
CONTRACT NO.
2 2482
w
LL
CONTRACT
SOW
SPECIFICATION
w
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
WBS
p
c
LINE
PARA
NUMBER
CODE NO.
t
n
w
Z
<
v)
ITEM
.
NO
z
1
2
3
4
51
61
o
W
.
Test
44424M
0004
X
Test
54424M
0004
X
Test at the CPC & CPCI Levels
644189
0004
X
Develop SW Test Procedures
644190
0004
X
Support Test & Verification
644191
0004
Prepare Test Reports
644192
0004
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
PROGRAM
WORK BREAKDOWN STRUCTURE INDEX
NPIC D/C SEGMENT
015
B
R
NO. R2
01
DATE:
ONTRACT
N
CONTRACT
2-24-82
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
WBS
w
u.
~
CONTRACT
I SOW
SPECIFICATION
Ni RARER
CODE NO.
v
w
z
v
i
LINE
PARA.
z
1
2
31
41 51
6
Q
W
ITEM
NO.
Documentation
44425M
0004
X
Prepare As-built Documentation
54425M
X
0004
X
Prepare Inputs to User, Operator and
644193
X
0004
Data Base Administration Manuals
X
CPCI Listings As-built
644194
X
0004
X
Prepare Programmer's Manual (Final)
644195
X
0004
Prepare Inputs to Training Manuals
644196
X
0004
Prepare As-built Part II Specs.
644197
X
0004
?
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06 C
IA-RDP84T00037R000500040001-2 ?
WORK BREAKDOWN STRUCTURE INDEX
PROGRAM
NPIC D/C SEGMENT
RFP NO. 82-B-01 5
DATE:
CONTRACT NO.
2-24-82
w
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
WBS
w
0
LL
CONTRACT
SOW
SPECIFICATION
NUMBER
rz
CODE NO.
ci~
2
vi
LINE
PARA.
-
1
2
3
4
5
16
0
ITEM
NO.
BEXSUP
CPCI: Exploitation Support - IOC
344213
X
0004
Critical Design
44422N
X
0004
X
Prepare Build-to Design Specs.
54422N
X
0004
X
Prepare Build-to Part II Specs. and
644198
X
0004
Conduct Internal Design Reviews
Prepare Prelim. Programmer's Manual
644199
X
0004
X
Prepare CPCI Test Plan (Final)
644200
0004
Appendix for BEXSUP
Development
44423N
X
0004
X
Develop CPC's
54423N
X
0004
Code & Unit Test
644201
0004
Integr. & Test to CPC Level
644202
X
0004
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
WORK BREAKDOWN STRUCTURE INDEX
PROGRAM
NPIC D/C SEGMENT
RFP NO.-82-B-015
DATE:
CONTRACT NO.
2-24-82
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
WBS
w
LL
-
CONTRACT
SOW
SPECIFICATION
NUMBER
J z
CODE NO.
w
z
Q
w
LINE
PARA.
1
2
3
14
15
16
1
p
(-
ITEM
NO.
Test
44424N
0004
X
Test
54424N
0004,
X
Test at the CPC & CPCI Levels
644203
0004
X
Develop SW Test Procedures
644204
0004
Support Test & Verification
644205
0004
X
Prepare Test Reports
644206
0004
0
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
?
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
w
WORK BREAKDOWN STRUCTURE INDEX
PROGRAM NPIC D/C SEGMENT
RFP NO. 82-B-015
DATE:
CONTRACT NO.
2-24-82
w
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
WBS
a
D
'
CONTRACT
SOW
SPECIFICATION
NUMBER
O
z
CODE NO.
w
z
Q
w
LINE
PARA.
1
2
3
45
6
p
~
H
ITEM
NO.
Documentation
44425N
X
0004
X
Prepare As-built Documentation
54425N
X
0004
X
CPCI Listings As-built
644208
X
0004
X
Prepare Programmer's Manual (Final)
644209
X
0004
Prepare Inputs to Training Manuals
644210
X
0004
X
Prepare As-built Part II Specs.
644211
X
0004
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
PROGRAM
R FP NO. 82-B-01 5
DATE:
WORK BREAKDOWN STRUCTURE INDEX
NPIC D/C SEGMENT
CONTRACT NO.
2-24-82
WBS
>
LL
CONTRACT
SOW
SPECIFICATION
w
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
z z
q
LINE
PARA
NUM
uER
z
p
CODE
NO.
v
w
<
c
W
ITEM
.
NO
J z
1
2
3
4
5
6
.
X
Software Development (FOC)
245000
X
0005
Software Development Management
345100
X
0005
Software Development Management
445100
X
0005
X
Manage All SW Devel. Activities
545100
X
0005
Manage All SW Devel. Activities
645001
X
0005
X
Provide & Enforce Program Design,
545101
X
0005
Coding & Test Practices, Standards &
Conventions
Software Engineering
(,4Snnb
Y
nnn5
X
Software Architecture
545102
X
0005
Tech. Support to Subcontract Mgm't.
645005
X
0005
?
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
?
PROGRAM
RFPNO.2$ B-015
DATE:
WORK BREAKDOWN STRUCTURE INDEX
NPIC D/C SEGMENT
CONTRACT NO.
2 24-82
WBS
>
LL
CONTRACT
SOW
SPECIFICATION
w
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
o
~
z
LINE
PARA.
NUMBER
? O
CODE NO.
c
i~
w
Q
,
w
ITEM
NO
z
1
2
3
4
56
p
~
F-
.
X
Software Control
645008
X
0005
X
Library Control
545103
X
0005
X
Software Builds & Releases
645009
X
0005
X
Provide Inputs to Segment Devel. Plan
545104
X
0005
X
Provide Inputs to Segment Devel. Plan
645010
X
0005
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
PROGRAM
RFP NO. 82-B-015
DATE:
WORK BREAKDOWN STRUCTURE INDEX
NPIC D/C SEGMENT
CONTRACT NO.
2-24-82
WBS
>
LL
CONTRACT
SOW
SPECIFICATION
.
w
Z
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
Z
LINE
PARA
vuivibtri
i
O
CODE NO.
w
in
.
J Z
1
2
31
4
51
6
Q
<
W
ITEM
NO.
X
Data Base Implementation (FOC)
545105
X
0005
X
Data Base Package
645013
X
0005
Data Base Support to Development
645014
X
0005
and Test & Verification
?
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
?
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
W
PROGRAM
RFP NO. 82-B-015
DATE:
WORK BREAKDOWN STRUCTURE INDEX
NPIC D/C SEGMENT
CONTRACT NO.
2-24-82
>
LL
CONTRACT
SOW
SPECIFICATION
w
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
WBS
p
UD
Z
t
LINE
PARA.
NUMBER
p
CODE NO.
65
ww
t
ITEM
NO
JZ
1
2
3
45
6
<
W
.
BMMGMT
CPCI: Materials Management - FOC
345200
X
0005
Critical Design
44522A
X
0005
X
Prepare Build-to Design Specs.
54522A
X
0005
X
Prepare Build-to Part II Specs. and
645015
X
0005
Conduct Internal Design Reviews
Prepare Prelim. Programmer's Manual
645016
X
0005
Prepare CPCI Test Plan (Final)
645017
0005
Appendix for BMMGMT
Development
44523A
X
0005
X
Develop CPC's
54523A
X
0005
Code & Unit Test
645018
0005
Integr. & Test to CPC Level
645019
X
0005
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
PROGRAM
WORK BREAKDOWN STRUCTURE INDEX
NPIC D/C SEGMENT
RFP NO. 82-B-015
DATE:
CONTRACT NO.
2-24.82
w
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
WBS
>
LL
Z
CONTRACT]
sow
SPECIFICATION
NUMBER
? O
J
CODE NO.
Q
H
U)
LINE
PARA.
`
1
2
3
4
5
6
ITEM
NO.
Test
44524A
0005
X
Test
54524A
0005
X
Test at the CPC .& CPCI Levels
645020
0005
X
Develop SW Test Procedures
645021
0005
Support Test & Verification
645022
0005
Prepare Test Reports
645023
0005
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
w
z WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
Documentation
Prepare As-built Documentation
Prepare Inputs to User, Operator and
Data Base Administration Manuals
CPCI Listings As-built
Prepare Programmer's Manual (Final)
Prepare Inputs to Training Manuals
Prepare As-built Part II Specs.
WBS w u
CODE NO. w w
44525A
54525A
645024
645025
645026
645027
645028
?
RFP NO. 82-B-015 DATE:
CONTRACT NO. 2-24-82
CONTRACT
LINE
ITEM
SOW
PARA.
NO.
SPECIFICATION
NUMBER
0005
0005
0005
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
PROGRAM
RFP NO. 82-B-01 5
DATE:
WORK BREAKDOWN STRUCTURE INDEX
NPIC D/C SEGMENT
CONTRACT NO.
2-24-82
W
"
CONTRACT
SOW
SPECIFICATION
W
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
WBS
p
0
2
LINE
PARA
NUMBER
Z p
CODE NO.
n
w
U)
W
ITEM
.
NO
Z
1
21
31
41
51
61
Q
.
BCCNTR
CPCI: Command & Control - FOC
345201
X
0005
Critical Design
44522B
X
0005
X
Prepare Build-to Design Specs.
54522B
X
0005
Prepare Build-to Part II Specs. and
645029
X
0005
Conduct Internal Design Reviews
Prepare Prelim. Programmer's Manual
645030
X
0005
Prepare CPCI Test Plan (Final)
645031
0005
Appendix for BCCNTR
Development
44523B
X
0005
X
Develop CPC's
54523B
X
0005
Code & Unit Test
645032
X
0005
Integr. & Test to CPC Level
645033
X
0005
0 .
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
?
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
w
PROGRAM
82-B-01 5
RFP NO
DATE:
WORK BREAKDOWN STRUCTURE INDEX
NPIC D/C SEGMENT
.
2-24-82
CONTRACT NO.
>
LL
CONTRACT
SOW
SPECIFICATION
w
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
WBS
o
LINE
PARA
NUMBER
z O
CODE NO.
ww
z
<
ti
TEM
.
O
J z
1
2
3
4
5
16
1
I
N
.
Test
44524B
0005
X
Test
54424B
0005
X
Test at the CPC & CPCI Levels
645034
0005
X
Develop SW Test Procedures
645035
0005
Support Test & Verification
645036
0005
Prepare Test Reports
645037
0005
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
WORK BREAKDOWN STRUCTURE INDEX
PROGRAM
NPIC D/C SEGMENT
RFP NO. 82-B-01 5
DATE:
CONTRACT NO.
2.24-82
w
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
WBS
>
C3
U.
CONTRACT
SOW
SPECIFICATION
PLUMBER
Z 0
CODE NO.
n
Z
in
LINE
PARA.
J Z
1
2
3
4
51
61
0
H
ITEM
NO.
Documentation
44525B
X
0005
X
Prepare As-built Documentation
54525B
X
0005
X
CPCI Listings As-built
645039
X
0005
Prepare Programmer's Manual (Final)
645040
X
0005
H_
1
1
1
1
1
1
Prepare As-built Part II Specs.
645042
X
0005
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
?
WORK BREAKDOWN STRUCTURE INDEX
PROGRAM
NPIC D/C SEGMENT
RFP NO. 82-B-015
DATE:
CONTRACT NO.
2-24-82
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
WBS
w
LL
CONTRACT
SOW
SPECIFICATION
NUMBER
z 0
'z
CODE NO.
Z5
z
<
v~i
LINE
PARA.
1
2
3
4
5
6
0
Uj
ITEM
NO.
BTTDEV -
CPCI: Test & Training - FOC
345202
X
0005
Critical Design
44522C
X
0005
X
Prepare Build-to Design Specs.
54522C
X
0005
X
Prepare Build-to Part II Specs. and
645043
X
0005
Conduct Internal Design Reviews
Prepare Prelim. Programmer's Manual
645044
X
0005
Prepare CPCI Test Plan (Final)
645045
0005
Appendix for BTTDEV
Development
44523C
X
0005
X
Develop CPC's
54523C
X
0005
Code & Unit Test
645046
X
0005
Integr. & Test to CPC Level
645047
X
0005
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
WORK BREAKDOWN STRUCTURE INDEX
PROGRAM NPIC D/C SEGMENT
R FP NO. 82-B-01 5
DATE:
CONTRACT NO.
2-24-82
w
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
WBS
>
0
LL
CONTRACT
SOW
SPECIFICATION
NUMBcR
Z
J z
CODE NO.
N
Z
LINE
PARA.
1
2
3
4
5
6
wQ
<
W
ITEM
NO.
Test
44524C
0005
X
Test
54524C
0005
X
Test at the CPC & CPCI Levels
645048
0005
X
Develop SW Test Procedures
645049
0005
X
Support Test & Verification
645050
0005
Prepare Test Reports
645051
0005
0
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
?
PROGRAM
82-B-015
RFP NO
DATE:
WORK BREAKDOWN STRUCTURE INDEX
NPIC D/C SEGMENT
.
2-2482
CONTRACT NO.
w
~+
CONTRACT
SOW
SPECIFICATION
w
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
WBS
o
LINE
PARA
NUMBER
Z O
CODE NO.
n
z z
vv)
w
ITEM
.
O
J Z
1
2
3
14
1 5
6
a
2
N
.
Documentation
44525C
X
0005
X
Prepare As-built Documentation
54525C
X
0005
X
CPCI Listings As-built
645053
X
0005
Prepare As-built Part II Specs.
645056
X
0005
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
PROGRAM
WORK BREAKDOWN STRUCTURE INDEX
NPIC D/C SEGMENT
RFP NO. 82-B-015
DATE:
CONTRACT NO.
2-24-82
w
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
WBS
w
p
LL
D
CONTRACT
SOW
SPECIFICATION
N U
z
CODE NO.
w
a
w
LINE
PARA.
MBER
1
2
3
14
1 5
16
1
0
<
F,
ITEM
NO.
X
Hardware Development (BOC)
246000
X
0006
Hardware Development Management BOC
346100
X
0006
Hardware Development Management BOC
446100
X
0006
X
Manage All Hardware Development
546100
X
0006
Manage All Hardware Development
646100
X
0006
X
- Set and Maintain HW Design, Fab and
546101
X
0006
Test Practices, Standards & Conventions
X
Provide Inputs to Segment Devel. Plan
546102
X
0006
?
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Rp
?
PROGRAM
WORK BREAKDOWN STRUCTURE INDEX
NPIC D/C SEGMENT
5
RFP NO. 82-B-01
DATE:
CONTRACT NO.
2-24-82
w
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
WBS
>
CONTRACT
SOW
SPECIFICATION
NUMBER
O
CODE NO.
z
v~i
1
LINE
PARA.
-iz
1
2
3
4
5
6
1
0
2
l-
ITEM
NO.
CI: Basic IWS (BOC)
346200
X
0006
Prelim. Design
446210
X
0006
X
Accomplish Prelim. CI Design and Reqmts.
546210
X
0006
Analysis and Allocation
Accomplish Prelim. CI Design and Reqmts.
646200
X
0006
Analysis and Allocation
X
Prepare CI Specifications and Conduct
546211
X
0006
Internal Design Reviews
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
PROGRAM
RFP NO. 82-B-01 5
DATE
WORK BREAKDOWN STRUCTURE INDEX
NPIC D/C SEGMENT
CONTRACT NO.
2-24-82
ui
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
WBS
>
0
U.
Z)
CONTRACT
SOW
SPECIFICATION
nii infg~R
0
CODE NO.
ci~
w
z
vi
LINE
PARA.
J z
1
2
3
4
5
6
Q
ITEM
NO.
X
Accomplish Prelim. Design of Commercial
54 212
X
000
Product Modifications
Critical Design
446220
X
0006
X
Accomplish Detailed Design of CI
546220
X
0006
X
Accomplish Detailed Design of CI
646203
X
0006
X
Prepare Build-to Component Specs. and
546221
X
0006
Conduct Internal Design Reviews
X
Accomplish Critical Design of Commercial
546223
X
0006
Product Modifications
?
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
?
WORK BREAKDOWN STRUCTURE INDEX
PROGRAM NPIC D/C SEGMENT
RFP NO. 82-8-015
DATE:
CONTRACT NO.
2-24-82
w
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
WBS
w
LL
CONTRACT
SOW
SPECIFICATION
NUMBER
O
CODE NO.
vii
z
in
LINE
PARA.
'z
1
2
3
4
5
6
0
2
~
ITEM
NO.
Development
446230
X
0006
X
Accomplish Fab. of All Manufactured HW
546230
0006
X
Accomplish Fab. of All Manufactured HW
646206
0006
X
Accomplish Modif. of Commercial Products
546231
0006
X
Prepare As-built Component Specs.
546232
X
0006
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
WORK BREAKDOWN STRUCTURE INDEX
PROGRAM
NPIC D/C SEGMENT
RFP NO. 82-13-015
FP NO.
DATE:
CONTRACT NO.
2-24-82
w
WORK BREAKDOWN STRUCTURE ELEMENTSITASKS
WBS
w
O
L+
D
CONTRACT
SOW
SPECIFICATION
NU?ggEP
Z O
CODE NO.
v`i
z
in
w
LINE
PARA.
JZ
1
2
3
4
5
6
o
~
-
ITEM
NO.
Test
446240
0006
X
Prepare Hardware Test & TEMPEST
546240
0006
Test Procedures
X
Prepare Hardware Test & TEMPEST
646212
0006
Test Procedures
?
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
?
WORK BREAKDOWN STRUCTURE INDEX
PROGRAM NPIC D/C SEGMENT
RFP NO. 82-B-015
DATE:
CONTRACT NO.
2-24-82
w
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
WBS
>
0
U.
CONTRACT
SOW
SPECIFICATION
NUMBER
Z
CODE NO.
w
Q
w
LINE
PARA.
1
2
13
14
15
16
1
Q
2
ITEM
NO.
X
Test All HW at Component and CI Levels
546241
0006
Prior to Intergration (incl. TEMPEST)
X
Support Test and Verification
546242
0006
Documentation
446250
X
0006
X
Prepare Equipment Operation and
546250
X
0006
Maintenance Manuals
Prepare Equipment Operation and
646253
X
0006
Maintenance Manuals
X
Prepare Inputs to Segment/System
546251
X
0006
Operations and User Manuals
X
Prepare Inputs to Training Manuals
546252
X
0006
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
WORK BREAKDOWN STRUCTURE INDEX
PROGRAM NPIC D/C SEGMENT
5
HFP NO. 82-B-01
DATE:
CONTRACT NO.
2-24-82
WBS
>
LL
CONTRACT
SOW
SPECIFICATION
w
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
o
z
LINE
PARA
NUMBER
Z O
CODE NO.
ww
cn
.
JZ
_____________________________________
W
ITEM
NO.
CI: Enhanced IWS (BOC)
346201
X
0006
Prelim. Design
446211
X
0006
Accomplish Prelim. CI Design and Reqmts.
546213
X
0006
.
Analysis and Allocation
Accomplish Prelim. CI Design and Reqmts.
646217
X
0006
Analysis and Allocation
Prepare CI Specifications and Conduct
546214
X
0006
Internal Design Reviews
Prepare CI Specifications and Conduct
646218
X
0006
Internal Design Reviews
?
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/0 IA-RDP84T00037R000500040001-2 ?
PROGRAM
RFP NO
82-B-01 5
DATE:
WORK BREAKDOWN STRUCTURE INDEX
NPIC D/C SEGMENT
.
CONTRACT NO.
2-24-82
>
LL
CONTRACT
SOW
SPECIFICATION
w
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
WBS
o
Z
LINE
PARA
NUMBER
Z O
CODE NO.
Z
w
cn
ITEM
.
NO
JZ
1
2
3
4
5
6
<
W
.
X
Accomplish Prelim. Design of Commercial
546215
X
0006
Product Modifications
Critical Design
446221
X
0006
X
Accomplish Detailed Design of CI
546224
X
0006
X
Prepare Build-to Component Specs. and
546225
X
0006
Conduct Internal Design Reviews
Prepare Build-to Component Specs. and
646221
X
0006
Conduct Internal Design Reviews
X
Accomplish Critical Design of Commercial
546226
X
0006
Product Modifications
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
PROGRAM
RFP NO. 82-B-01 5
DATE:
WORK BREAKDOWN STRUCTURE INDEX
NPIC D/C SEGMENT
CONTRACT NO.
2-24-82
:L
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
WBS
w
LL
CONTRACT
SOW
SPECIFICATION
NUM3EFc
J
CODE,NO.
w
w
LINE
TEM
PARA.
Z
1
2
3
4
5
6
0
M
I
NO.
Development
446231
X
0006
X
Accomplish Fab. of All Manufactured HW
546232
0006
X
Accomplish Modif. of Commercial Products
546233
0006
X
Prepare As-built Component Specs.
546234
X
0006
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
0
PROGRAM
RFP NO
82-8-015
DATE:
WORK BREAKDOWN STRUCTURE INDEX
NPIC D/C SEGMENT
.
CONTRACT NO.
2-24-82
>
LL
CONTRACT
SOW
SPECIFICATION
w
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
WBS
Q
~
I--
LINE
PARA
NUMBER
O
CODE NO.
i
w
z
C
n
.
JZ
1
2
3
45
6
H
ITEM
NO.
Test
446241
0006
X
Prepare Hardware Test & TEMPEST
546243
0006
Test Procedures
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
PROGRAM
RFP NO. 82-B-015
DATE:
WORK BREAKDOWN STRUCTURE INDEX
NPIC D/C SEGMENT
CONTRACT NO.
2-24-82
WBS
w
LL
CONTRACT
SOUS
SPECIFICATION
w
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
o
'
z
LINE
PARA
NUMBER
Z O
CODE NO.
)
w
vi
ITEM
.
JZ
1
2
3
4
5
6
w
H
NO.
X
Test All HW at Component and CI Levels
546244
0006
Prior to Intergration (incl. TEMPEST)
X
Support Test and Verification
546245
0006
Support Test and Verification
646231
0006
Documentation
446251
X
0006
X
Prepare Equipment Operation and
546253
X
0006
Maintenance Manuals
Prepare Equipment Operation and
645232
X
0006
Maintenance Manuals
X
Prepare Inputs to Segment/System
546254
X
0006
Operations and User Manuals
Prepare Inputs to Segment/System
646233
X
0006
Operations and User Manuals
X
Prepare Inputs to Training Manuals
546255
X
0006
Prepare Inputs to Training Manuals
646234
X
0006
0
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
V
?
PROGRAM
R FP NO. 82-B-01 5
DATE:
WORK BREAKDOWN STRUCTURE INDEX
NPIC D/C SEGMENT
CONTRACT NO.
2-24-82
>
w
u
CONTRACT
SOW
SPECIFICATION
w
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
WBS
p
z
~
LINE
PARA.
NUMBER
p
CODE NO.
cis
w
2
c
i~
ITEM
NO
2
1
2
31
41
516
1
Q
W
.
CI: Full Capacity (BOC)
346202
X
0006
Prelim. Design
446212
X
0006
X
Accomplish Prelim. CI Design and Reqmts.
546216
X
0006
Analysis and Allocation
X
Prepare CI Specifications and Conduct
546217
X
0006
Internal Design Reviews
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84TOO037ROO0500040001-2
PROGRAM
RFP NO. 82-B-015
DATE:
WORK BREAKDOWN STRUCTURE INDEX
NPIC D/C SEGMENT
CONTRACT NO.
2-24-82
WBS
w
w
CONTRACT
SOW
SPECIFICATION
w
Z
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
o
a
Z)
z
F-
LINE
PARA.
NUMBER
O
CODE NO.
c
n
Q
c/)
w
ITEM
NO
J Z
1
T2
3
4
51
61
0
2
.
X
Accomplish Prelim. Design of Commercial
546218
X
0006
Product Modifications
Critical Design
446222
X
0006
X
Accomplish Detailed Design of CI
546227
X
0006
X
Prepare Build-to Component Specs. and
546228
X
0006
Conduct Internal Design Reviews
X
Accomplish Critical Design of Commercial
546229
X
0006
Product Modifications
?
Approved For Release 2007/09/06: CIA-RDP84TOO037ROO0500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
PROGRAM
82-B-015
RFP NO
DATE:
WORK BREAKDOWN STRUCTURE INDEX
NPIC D/C SEGMENT
.
2 24.82
CONTRACT NO.
>
LL
CONTRACT
SOW
SPECIFICATION
w
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
WBS
o
`
LINE
PARA
NUMBER
z O
CODE NO.
i
v
z
t
ITEM
.
NO
z
1
2
3
45
6
0
<
W
.
Development
446232
X
0006
Accomplish Fab. of All Manufactured HW
546236
0006
Accomplish Mod. of Commercial Products
546237
0006
Prepare As-built Component Specs.
546238
X
0006
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
PROGRAM
RFP NO. 82 B 015
DATE:
WORK BREAKDOWN STRUCTURE INDEX
NPIC D/C SEGMENT
24
2
82
CONTRACT NO.
-
-
w
U-
CONTRACT
sow
SPECIFICATION
:u
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
WBS
0
z
F-
LINE
PARA
~~%MBER
0
CODE NO.
w
<
w
ITEM
.
NO
-i 2
1
2
3
4
5
6
o
<
F-
.
Test
446242
0006
X
Prepare Hardware Test & TEMPEST
546246
0006
Test Procedures
?
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/0 IA-RDP84T00037R000500040001-2 ?
PROGRAM
R FP NO. 82-B-01 5
DATE:
WORK BREAKDOWN STRUCTURE INDEX
NPIC D/C SEGMENT
CONTRACT NO.
2-24-82
WBS
>
LL
CONTRACT
SOW
SPECIFICATION
w
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
z
LINE
PARA
NUMBER
? C
CODE NO.
v
w
<
vi
ITEM
.
NO
JZ
1
2
3
4
56
1
p
Z
H
.
.
X
Test All HW at Component and CI Levels
546247
0006
Prior to Intergration (incl. TEMPEST)
X
Support Test and Verification
546248
0006
Documentation
446252
X
0006
X
Prepare Equipment Operation and
546256
X
0006
Maintenance Manuals
X
Prepare Inputs to Segment/System
546257
X
0006
Operations and User Manuals
X
Prepare Inputs to Training Manuals
546258
X
0006
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
WORK BREAKDOWN STRUCTURE INDEX
PROGRAM
NPIC D/C SEGMENT
RFP NO. 82-B-015
DATE:
CONTRACT NO.
2-24-82
w
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
WBS
W
O
CONTRACT
SOW
SPECIFICATION
Nl1MH~P
O
CODE NO.
z
b-)
LINE
PARA.
J z
1
2
31
41
5
16
1
a
2
ITEM
NO.
X
Hardware Development (IOC)
247000
X
0007
Hardware Development Management
347100
X
0007
Hardware Development Management
447100
X
0007
X
Manage All Hardware Development
547100
X
0007
Manage All Hardware Development
647100
X
0007
X
Set and Maintain HW Design, Fab and
547101
X
0007
Test Practices, Standards & Conventions
X
Provide Inputs to Segment Devel. Plan
547102
X
0007
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/0 6: C
IA-RDP84T00037R000500040001-2 ?
S
I
PROGRAM
RFP NO. 82-8-015
DATE:
WORK BREAKDOWN STRUCTURE INDEX
NPIC D/C SEGMENT
CONTRACT NO.
2-24-82
>
w
U-
CONTRACT
SOW
SPECIFICATION
w
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
WBS
p
i
z
~
LINE
PARA.
NUMBER
p
CODE NO.
v
i
w
<
v
i
ITEM
NO
Z
1
2
31
4
5161
UJ
.
CI: Basic IWS (IOC)
347200
X
0007
Critical Design
447220
X
0007
X
Accomplish Detailed Design of CI
547220
X
0007
X
Prepare Build-to Component Specs.
547221
X
0007
and Conduct Internal Design Reviews
X
Accomplish Critical Design of Commercial
547222
X
0007
Product Modifications
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
WORK BREAKDOWN STRUCTURE INDEX
PROGRAM NPIC D/C SEGMENT
RFP NO. 82-B-015
DATE:
CONTRACT NO.
2-24-82
~++
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
WBS
w
o
LL
CONTRACT
SOW
SPECIFICATION
NUMBER
z
CODE NO.
W
Q
W
LINE
PARA.
1
2
3
4
5
6
Q
<
W
ITEM
NO.
Development
447230
X
0007
X
Accomplish Fab. of All Manufactured HW
547230
0007
X
Accomplish Modif. of Commercial Products
547231
0007
X
~
Prepare As-built Component Specs.
I
547232
1
X
1
I
I
I
0007
I
I ~
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
? Approved For Release 2007/09/0 6: C
IA-RDP84T00037R000500040001-2 ?
PROGRAM
RFP NO. 82-B-015
DATE:
WORK BREAKDOWN STRUCTURE INDEX
NPIC D/C SEGMENT
CONTRACT NO.
2-24-82
>
"
CONTRACT
SOW
SPECIFICATION
w
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
WBS
o
z
cn
LINE
PARA
NUMBER
O
CODE NO.
cn
w
Z
c
n
ITEM
.
NO
z
1
2
3
4
56
<
W
.
Test
447240
0007
X
Prepare Hardware Test & TEMPEST
547240
0007
Test Procedures
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
WORK BREAKDOWN STRUCTURE INDEX
PROGRAM
NPIC D/C SEGMENT
RFP NO. 82-B-015
DATE:
CONTRACT NO.
2-24-82
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
>
U
CONTRACT
SOW
SPECIFICATION
NUMBER
Z O
CODE NO.
v
w
z
-
LINE
PARA.
J Z
1
2
3
4
5
6
Q
<
W
ITEM
NO.
X
Test All HW at Component and CI Levels
547241
0007
Prior to Intergration (incl. TEMPEST)
X
Support Test and Verification
547242
0007
Documentation
447250
X
0007
X
Prepare Equipment Operation and
547250
X
0007
Maintenance Manuals
X
Prepare Inputs to Segment/System
547251
X
0007
Operations and User Manuals
l 1
1
1
1
1
X
1
I
Prepare Inputs to Training Manuals
I
547252
X
0007
?
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06CIA-RDP84T00037R000500040001-2
PROGRAM
82-B-01 5
RFP NO
DATE:
WORK BREAKDOWN STRUCTURE INDEX
NPIC D/C SEGMENT
.
CONTRACT NO.
2-24-82
>
w
LL
CONTRACT
SOW
SPECIFICATION
w
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
WBS
o
z
LINE
PARA.
NUMBER
z
CODE NO.
n
ww
cn
ITEM
NO
z
=
3
4
4
51
61
W
.
Cl: Enhanced IWS - IOC
347201
X
0007
Critical Design
447221
X
0007
X
Accomplish Detailed Design of CI
547223
X
0007
X
Prepare Build-to Component Specs.
547224
X
0007
and Conduct Internal Design Reviews
X
Accomplish Critical Design of Commercial
547225
X
0007
Product Modifications
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
PROGRAM
WORK BREAKDOWN STRUCTURE INDEX
NPIC D/C SEGMENT
R FP NO. 82-B-015
DATE:
CONTRACT NO.
2-24-82
w
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
WBS
"'
LL
CONTRACT
sow
SPECIFICATION
NUM
J z
CODE NO.
w
Q
U)
LINE
pgRA
BER
1
2
3
4
5
6
Q
<
Lu
ITEM
NO.
Development
447231
X
0007
X
Accomplish Fab. of All Manufactured HW
547233
0007
X
Accomplish Modif. of Commercial Products
547234
0007
X
Prepare As-built Component Specs.
547235
X
0007
l I
I
I
1
1
~
Prepare Mfg. Drawing Packages
I
647222
I
X
I
I
I
I
0007
I
I I
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/0 6: C
AIA-RDP84TOO037ROO0500040001-2
PROGRAM
RFP NO. 82-B-015
DATE:
WORK BREAKDOWN STRUCTURE INDEX
NPIC D/C SEGMENT
CONTRACT NO.
2-24-82
>
"'
11
CONTRACT
SOW
SPECIFICATION
w
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
WBS
p
i
~
LINE
PARA
NUMBER
z
CODE NO.
v
i
ww
z
i
v
ITEM
.
NO.
z
z
1
2
3
4
51
61
W
Test
447241
0007
X
Prepare Hardware Test & TEMPEST
547243
0007
Test Procedures
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
PROGRAM
WORK BREAKDOWN STRUCTURE INDEX
NPIC D/C SEGMENT
RFP NO.82-B-015
DATE:
CONTRACT NO.
2-24-82
w
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
WBS
>
o
LL
CONTRACT
SOW
SPECIFICATION
NUMBER
Z 0
CODE NO.
can
z
LINE
PARA.
JZ
1
2
3
45
6
w
s
L
ITEM
NO.
X
Test All HW at Component and CI Levels
547244
0007
Prior to Integration (incl. TEMPEST)
X
Support Test and Verification
547245
0007
X
Support Test and Verification
647226
0007
Documentation
447251
X
0007
X
Prepare Equipment Operation and
547253
X
0007
Maintenance Manuals
X
Prepare Inputs to Segment/System
547254
X
0007
Operations and User Manuals
X
Prepare Inputs to Training Manuals
547255
X
0007
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
V
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
CI: Full Capability IWS - IOC
Critical Design
Accomplish Detailed Design of CI
Accomplish Detailed Design of CI
Prepare Build-to Component Specs.
and Conduct Internal Design Reviews
Prepare Build-to Component Specs.
and Conduct Internal Design Reviews
Accomplish Critical Design of Commercial
Product Modifications
Accomplish Critical Design of Commercial
Product Modifications
WBS
CODE NO.
347202
447222
547226
647230
547227
647231
547228
647232
RFP NO. -82-B015
CONTRACT NO.
CONTRACT
LINE
ITEM
SOW
PARA.
NO.
?
DATE:
2-24-82
SPECIFICATION
NUMBER
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
PROGRAM
WORK BREAKDOWN STRUCTURE INDEX
NPIC D/C SEGMENT
RFP NO. 82-B-015
DATE:
CONTRACT NO.
2-24-82
w
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
WBS
w
U
Z
CONTRACT
SOW
SPECIFICATION
NUMBER
O
Jz
CODE NO.
D
w
LINE
PARA.
1
2
3
45
6
0
~
F
ITEM
NO.
Development
447232
X
0007
X
Accomplish Fab. of All Manufactured HW
547236
0007
X
Accomplish Modif. of Commercial Products
547237
0007
X
Prepare As-built Component Specs;
547238
X
0007
9) 0
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
?
PROGRAM
RFP NO. 82-B-015
DATE:
WORK BREAKDOWN STRUCTURE INDEX
NPIC D/C SEGMENT
CONTRACT NO.
2-24-82
>
w
u
CONTRACT
SOW
SPECIFICATION
w
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
WBS
p
Z
LINE
PARA
NUMBER
Z p
CODE NO.
U)
Z
Cn
ITEM
.
NO
J Z
1
2
3
4 51
61
p
2
H
.
Test
447242
0007
X
Prepare Hardware Test & TEMPEST
547246
0007
Test Procedures
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
WORK BREAKDOWN STRUCTURE INDEX
PROGRAM NPIC D/C SEGMENT
RFP NO.82-B-015
DATE:
CONTRACT NO.
2-24-82
Z
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
WBS
>
0
LL
Z)
CONTRACT
SOW
SPECIFICATION
NUMBER
O
CO
DE NO.
n
Z
I-
LINE
PARA.
JZ
1
2
3
4
5
6
ww
W
ITEM
NO.
X
Test All HW at Component and CI Levels
547247
X
0007
Prior to Integration (incl. TEMPEST)
X
Support Test and Verification
547248
X
0007
Documentation
447252
X
0007
X
Prepare Equipment Operation and
547256
X
0007
Maintenance Manuals
Prepare Equipment Operation and
647242
X
0007
Maintenance Manuals
Prepare Inputs to Segment/System
547257
X
0007
Operations and User Manuals
Prepare Inputs to Training Manuals
547258
x
0007
?
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
?
m
a
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
W
PROGRAM
RFP NO. 82-B-015
DATE:
WORK BREAKDOWN STRUCTURE INDEX
NPIC D/C SEGMENT
CONTRACT NO.
2-24-82
>
w
U-
CONTRACT
SOW
SPECIFICATION
w
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
WBS
p
Z
LINE
PARA.
NUMBER
CODE NO.
n
w
<
U)
ITEM
NO
z
1
21
31
41
51
61
U
.
Hardware Development (FOC)
248000
X
0008
Hardware Development Management
348100
X
0008
Hardware Development Management
448100
X
0008
X
Manage All Hardware Development
548100
X
0008
Manage All Hardware Development
648100
X
0008
Set and Maintain HW Design, Fab and
648101
X
0008
Test Practices, Standards & Conventions
Provide Inputs to Segment Devel. Plan
548102
0
X
0008
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
WORK BREAKDOWN STRUCTURE INDEX
PROGRAM
NPIC D/C SEGMENT
RFP NO. 82-B-015
DATE:
CONTRACT NO.
2-24-82
w
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
WBS
o
CONTRACT
SOW
SPECIFICATION
NUMBER
O
J
z
CODE NO.
U-)
zz
w
LINE
PARA.
1
2
13
14
5
16
1
0
<
ITEM
NO.
CI: Basic IWS - FOC
348200
X
0008
Critical Design
448220
X
0008
X
Accomplish Detailed Design of CI
548220
X
0008
X
Prepare Build-to Component Specs.
548221
X
0008
and Conduct Internal Design Reviews
X
Accomplish Critical Design of Commercial
548222
X
0008
Product Modifications
?
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
? Approved For Release 2007/09/0 IA-RDP84T00037R000500040001-2 ?
PROGRAM
RFP NO. 82-B-015
DATE:
WORK BREAKDOWN STRUCTURE INDEX
NPIC D/C SEGMENT
CONTRACT NO.
2-24-82
>
w
LL
CONTRACT
SOW
SPECIFICATION
w
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
WBS
C)
LINE
PARA
NUMBER
z p
E NO.
COD
U)
w
z
N
ITEM
.
NO
Jz
1
2
3
45
6
Q
<
W
.
Development
448230
X
0008
X
Accomplish Fab. of All Manufactured HW
548230
0008
X
Accomplish Modif. of Commercial Products
548231
0008
X
Prepare As-built Component Specs.
548232
X
0008
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
PROGRAM
RFP NO. 82-B-015
DATE:
WORK BREAKDOWN STRUCTURE INDEX
NPIC D/C SEGMENT
CONTRACT NO.
2-24-82
ww
CONTRACT
SOW
SPECIFICATION
w
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
WBS
(
LINE
PARA
NUMBER
Z O
CODE NO.
c
i-
z
vi
TEM
.
Jz
1
2
3
4
5
6
0
Ui
I
NO.
Test
448240
0008
X
Prepare Hardware Test & TEMPEST
548240
0008
Test Procedures
0 0 0
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
w
PROGRAM
82-B-015
RFP NO
DATE:
WORK BREAKDOWN STRUCTURE INDEX
NPIC D/C SEGMENT
.
2-24-82
CONTRACT NO.
WBS
w
LL
CONTRACT
SOW
SPECIFICATION
w
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
o
i
I-
LINE
PARA
NUMBER
O
Z
CODE NO.
vi
w
z
E
.
2
1
2
3
14 5
1
6
1
o
2
W
IT
M
NO.
X
Test All HW at Component and CI Levels
548241
0008
Prior to Integration (incl. TEMPEST)
X
Support Test and Verification
548242'
0008
Documentation
448250
X
0008
X
Prepare Equipment Operation and
548250
X
0008
Maintenance Manuals
X
Prepare Inputs to Segment/System
548251
X
0008
Operations and User Manuals
X
Prepare Inputs to Training Manuals
548252
X
0008
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
PROGRAM
82-B-015
kFP NO.
DATE:
WORK BREAKDOWN STRUCTURE INDEX
NPIC D/C SEGMENT
_
CONTRACT NO.
2-24-82
w
LL
CONTRACT
SOW
SPECIFICATION
w
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
WBS
0
i
Z
t
LINE
PARA
NUMBER
0
CODE NO.
v
i
w
Q
w
ITEM
.
NO
Z
=
3
4
4
51
61
0
.
Cl: Enhanced IWS - FOC
348201
X
0008
Critical Design
448221
X
0008
X
Accomplish Detailed Design of CI
548223
X
0008
X
Prepare Build-to Component Specs.
548224
X
0008
and Conduct Internal Design Reviews
X
Accomplish Critical Design of Commercial
548225
X
0008
Product Modifications
?
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
w
PROGRAM
RFP NO. 82-B-015
DATE:
WORK BREAKDOWN STRUCTURE INDEX
NPIC D/C SEGMENT
CONTRACT NO.
2-24-82
>
w
LL
CONTRACT
SOW
SPECIFICATION
w
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
WBS
p
-
I-
LINE
PARA
NUMBER
CODE NO.
w-
w
z
ITEM
.
NO
z
1
2
3
4
5 6
Q
W
.
Development
448231
X
0008
X
Accomplish Fab. of All Manufactured HW
548233
0008
X
Accomplish Modif. of Commercial Products
548234
0008
X
Prepare As-built Component Specs.
548235
X
0008
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
PROGRAM
RFP NO. 82-B-015
DATE:
WORK BREAKDOWN STRUCTURE INDEX
NPIC D/C SEGMENT
CONTRACT NO.
2-24-82
>
U-
CONTRACT
SOW
SPECIFICATION
w
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
WBS
o
Z
LINE
PARA
NUMBER
J
CODE NO.
W
a
W
ITEM
.
NO
z
1
2
3
41
5161
p
H
.
Test
448241
0008
X
Prepare Hardware Test & TEMPEST
548243
0008
Test Procedures
?
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
w
PROGRAM
RFP NO. 82-B-015
DATE:
WORK BREAKDOWN STRUCTURE INDEX
NPIC D/C SEGMENT
CONTRACT NO.
2-24-82
w >
LL
CONTRACT
SOW
SPECIFICATION
w
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
WBS
o
Z
N
LINE
PARA.
NUMBER
Z O
CODE NO.
n
2
W
ITEM
NO.
2
1
2
3
4 5
6
0
X
Test All HW at Component and CI Levels
548244
0008
Prior to Integration (incl. TEMPEST)
X
Support Test and Verification
548245
0008
Documentation
448251
X
0008
X
Prepare Equipment Operation and
548253
X
0008
Maintenance Manuals
X
Prepare Inputs to Segment/System
548254
X
0008
Operations and User Manuals
X
Prepare Inputs to Training Manuals
548255
X
0008
C
Z
n
r
rn
m
0
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
WORK BREAKDOWN STRUCTURE INDEX
PROGRAM NPIC D/C SEGMENT
R FP NO. 82-B-01 5
DATE:
CONTRACT NO.
2-24-82
2
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS.
w
u_
CONTRACT
SOW
SPECIFICATION
NUMBER
O
1
CODE NO.
v
1
z
I
v~i
LINE
pgRq
Z
1
2
3
4 5
6
0
ITEM
NO.
CI: Full Capability IWS - FOC
348202
X
0008
Critical Design
448222
X
0008
X
Accomplish Detailed Design of CI
548226
X
0008
X
Prepare Build-to Component Specs.
548227
X
0008
and Conduct Internal Design Reviews
X
Accomplish Critical Design of Commercial
548228
X
0008
Product Modifications
Accomplish Critical Design of Commerical
648232
X
0008
'
~
i
Product Modifications
1
I
I
I
I
I
I
I 1
?
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/0 6: C
AIA-RDP84TOO037ROO0500040001-2
?
PROGRAM
RFP NO. 82-8-015
DATE:
WORK BREAKDOWN STRUCTURE INDEX
NPIC D/C SEGMENT
CONTRACT NO.
2-24-82
w
LL
CONTRACT
SOW
SPECIFICATION
w
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
WBS
p
Z
LINE
PARA
NUMBER
O
CODE NO.
U)
w
Z
U)
ITEM
.
NO
Z
1
2
3
4 5
6
<
H
.
Development
448232
X
0008
X
Accomplish Fab. of All Manufactured HW
548236
0008
X
Accomplish Modif. of Commercial Products
548237
0008
X
Prepare As-built Component Specs.
548238
X
0008
I Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
PROGRAM
82-B-015
RFP NO
DATE:
WORK BREAKDOWN STRUCTURE INDEX
NPIC 0/C SEGMENT
.
CONTRACT NO.
2-24-82
CONTRACT
SOW
SPECIFICATION
w
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
WBS
o
LINE
PARA
NUMBER
O
CODE NO.
n
z
.
Jz
1
2
3
4
5
6
Q
<
W
ITEM
NO.
Test
448242
0008
X
Prepare Hardware Test & TEMPEST
548246
0008
I
I
I
I
I
I
I
Test Procedures
I
?
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
?
WORK BREAKDOWN STRUCTURE INDEX
PROGRAM NPIC D/C SEGMENT
R FP NO. 82-B-01 5
DATE:
CONTRACT NO.
2-24-82
w
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
WBS
LU
o
LL
CONTRACT
SOW
SPECIFICATION
NUMBER
iz
CODE NO.
v
z
-i
LINE
PARA.
1
2
3
4
5
1
6
0
2
Z
.
ITEM
NO.
X
Test All HW at Component and CI Levels
_
548247
0008
Prior to Integration (incl. TEMPEST)
X
Support Test and Verification
548248
0008
Documentation
448252
X
0008
X
Prepare Equipment Operation and
548256
X
0008
Maintenance Manuals
X
Prepare Inputs to Segment/System
548257
X
0008
Operations and User Manuals
X
Prepare Inputs to Training Manuals
548258
X
0008
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
PROGRAM
RFP NO. 82-B-015
DATE:
WORK BREAKDOWN STRUCTURE INDEX
NPIC D/C SEGMENT
CONTRACT NO.
2-24-82
CONTRACT
SOW
SPECIFICATION
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
WBS
LINE
PARA.
NUMBER
CODE NO.
M
Cn
ve
ITEM
NO.
J z
1
2
3
4
5
6
X
Automated Data Processing Equipment
249000
x
0009
(ADPE) Hardware and Software
Procurement
349100
X
0009
Management
449100
X
0009
X
Management
549100
X
0009
Manage All ADPE Procurement Activities
649100
X
0009
- BOC
Manage All ADPE Procurement Activities
649101
X
0009
- IOC
Provide & Enforce All Procurement
649103
X
0009
Practices, Standards & Conventions
- BOC
- -- ?11 n_ ..e..r
?
-'-
6491 4
X
0009
Provide & f~ce A.L.I. Lv~ uic qua u.
o
&
E
- ?- --
Practices, Standards & Conventions
l
1
l
1
l
l
1
- IOC
1
I
~
~
~
~
?
m
n
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/0 IA-RDP84T00037R000500040001-2 ?
PROGRAM
RFP NO. 82-B-015
DATE:
WORK BREAKDOWN STRUCTURE INDEX
NPIC D/C SEGMENT
CONTRACT NO.
2 2482
>
w
w
CONTRACT
SOW
SPECIFICATION
w
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
WBS
C)
Z
~
LINE
PARA.
NUMBER
NUMBER
CODE NO.
W
<
w
ITEM
NO
1
2
3
4
5 6
0
2
.
Procure ADPE (Include Labor Plus the
449101
X
0009
Actual Equipment & Product Costs)
X
Procure Commercial CPCI's
549101
X
0009
Project Labor to Support Procurement
649106
X
0009
- BOC
Project Labor to Support Procurement
649107
X
0009
- IOC
X
Project Labor to Support Procurement
649108
X
0009
- FOC
Procurement - BOC
649109
X
0009
Procurement - IOC
649110
X
0009
X
Procure Commercial CI's
549102
X
0009
Project Labor to Support Procurement
649112
X
0009
- BOC
Project Labor to Support Procurement
649113
X
0009
- IOC
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
PROGRAM
RFP NO.82-B-015
DATE:
WORK BREAKDOWN STRUCTURE INDEX
NPIC D/C SEGMENT
CONTRACT NO.
2-24-82
WBS
>
u.
CONTRACT
SOW
SPECIFICATION
w O
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
v
z
LINE
PARA
NUMBER
DE NO.
CO
w
in
.
Jz
1
2
3
4
5
6
Q
<
W
ITEM
NO.
X
Procure - BOC
649115
X
0009
X
Procure - IOC
649116
X
0009
Test
349200
0009
Accomplish Acceptance Testing of
449200
0009
Commercial ADPE
X
Acceptance Test Commercial CPCI's - BOC
549200
0009
?
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
?
?
PROGRAM
RFP NO. 82-B-015
DATE:
WORK BREAKDOWN STRUCTURE INDEX
NPIC D/C SEGMENT
CONTRACT NO.
2-24-82
SPECIFICATION
w
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
WBS
w
p
LL
Z)
CONTRACT
LINE
SOW
PARA
NUMBER
z
CODE NO.
n
w
Z
vi
w
ITEM
.
NO.
J Z
1
2
31
41
51
61
X
Acceptance Test Commercial U's
549201
0009
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
C
z
n
r
C/)
yr
ii
m
r,
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
GFE
Install & Checkout GFE
Install & Checkout GFE
Install & Checkout GFE - BOC
Provide GFE Maintenance
Provide GFE Maintenance
Provide GFE Maintenance - BOC
Provide GFE Maintenance - FOC
WBS
CODE NO.
349300
449300
549300
649300
449301
549301
649301
649303
RFP NO. 82-B-015
CONTRACT NO.
CONTRACT
LINE
ITEM
SOW
PARA.
NO.
0009
0009
0009
0009
0009
DATE:
2-24-82
SPECIFICATION
NUMBER
m
m
0
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
ii
0
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
W
PROGRAM
RFP NO. 82-B-015
DATE:
WORK BREAKDOWN STRUCTURE INDEX
NPIC D/C SEGMENT
CONTRACT NO.
2-24-82
>
w
u-
CONTRACT
SOW
SPECIFICATION
w
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
WBS
0
1
D
LINE
PARA
NUMBER
? p
CODE NO.
-
UJ
Z
I-
U
ITEM
.
NO
-j Z
1
2
3
4
5
6
.
X
Test and Verification - BOC
241000
0010
Test & Verification Management
341010
X
0010
Test & Verification Management
441010
X
0010
X
Test & Verification Management
541010
X
0010
X
Provide Mgm't. of Segment Test
641010
X
0010
Activities - BOC
Prepare Test Plans - BOC
641011.
X
0010
Prepare Test Procedures - BOC
641012
X
0010
Prepare Test Plan for GFE Equipment
641013
X
0010
- BOC
Test Support
341020
X
0010
Test Support
441020
X
0010
X
Test Support
541020
X
0010
Provide Necessary Software to Support
641020
X
0010
Integrated Testing - BOC
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
WORK BREAKDOWN STRUCTURE INDEX
PROGRAM
NPIC D/C SEGMENT
RFP NO. 82-B-01 5
DATE:
CONTRACT NO.
2-24-82
w
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
WBS
>
o
LL
CONTRACT
SOW
SPECIFICATION
NUMBER
Z O
J z
CODE NO.
N
z
-
LINE
PARA.
1
2
3
4
1
5
16
1
0
H
ITEM
NO.
X
Provide Necessary Hardware to Support
641021
0010
Integrated Testing - BOC
Provide Necessary Data to Support
641022
0010
Integrated Testing - BOC
Integration Test
341030
0010
Integration Test
441030
0010
X
Integration Test
541030
0010
Accomplish Inter-CI Testing - BOC
641030
0010
Accomplish Inter-CPCI Testing - BOC
641031
0010
Accomplish Integrated CPCI/CI Testing
641032
X
0010
- BOC
Provide Integration Test Reports - BOC
641033
X
0010
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
w
is
PROGRAM
RFP NO. 82-B-015
DATE:
WORK BREAKDOWN STRUCTURE INDEX
NPIC D/C SEGMENT
CONTRACT NO.
2.24-82
>
w
LL
CONTRACT
SOW
SPECIFICATION
w
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
WBS
o
i
z
z
LINE
PARA.
NUMBER
CODE NO.
v
i
w
u
ITEM
NO
z
1
2
31
41
51
61
p
H
.
Factory Preship Test
341040
0010
Factory Preship Test
441040
0010
X
Factory Preship Test
541040
0010
Perform Formal Preship Test - BOC
641040
0010
Provide Preship Test Report - BOC
641041
0010
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
PROGRAM
WORK BREAKDOWN STRUCTURE INDEX
NPIC D/C SEGMENT
RFP NO. 82-B-015
DATE:
CONTRACT NO.
2-24-82
w
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
WBS
w
LL
CONTRACT
sow
SPECIFICATION
0 Z
CODE NO.
w
Z
w
LINE
PARA.
NUMBER
1
2
3
14
5
6
0
H
ITEM
NO.
X
Test and Verification - IOC
241100
0011
Test & Verification Management
341110
X
0011
Test & Verification Management
441110
X
0011
X
Test & Verification Management
541110
X
0011
Provide Mgm't. of Segment Test
641110
X
0011
Activities - IOC
Prepare Test Plans - IOC
641111
X
0011
Prepare Test Procedures - IOC
641112
0011
Prepare Test Plan for GFE Equipment
641113
X
0011
- IOC
Test Support
341120
X
0011
Test Support
441120
X
0011
X
Test Support
541120
X
0011
Provide Necessary Software to Support
641120
X
0011
I 1
1
1
1
1
1
1
Integrated Testing - IOC
I
I
I
I
I
I
I I
?
T
v
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
0
0
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
V
?
PROGRAM
RFP NO. 82-B-015
DATE:
WORK BREAKDOWN STRUCTURE INDEX
NPIC D/C SEGMENT
CONTRACT NO.
2-24-82
>
w
LL
CONTRACT
SOW
SPECIFICATION
w
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
WBS
~
z
~
LINE
PARA.
NUMBER
p
CODE NO.
c
i)-
u
i
ITEM
NO
Jz
1
2
3
4
5
6
0
2
H
.
X
Provide Necessary Hardware to Support
641121
0011
Integrated Testing - IOC
Provide Necessary Data to Support
641122
0011
Integrated Testing - IOC
Integration Test
341130
0011
Integration Test
441130
0011
X
Integration Test
541130
X
0011
Accomplish Inter-CI Testing - IOC
641130
X
0011
Accomplish Inter-CPCI Testing - IOC
641131
X
0011
Accomplish Integrated CPCI/CI Testing
641132
X
0011
- IOC
Provide Integration Test Reports - IOC
641133
X
0011
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
WORK BREAKDOWN STRUCTURE INDEX
PROGRAM NPIC D/C SEGMENT
RFP NO. 82-B-015
DATE:
CONTRACT NO.
2-24-82
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
WEIS
Lu
u-
I-
CONTRACT
SOW
SPECIFICATION
NUMBER
K O
DE NO.
CO
rn
z
w
LINE
PARA.
JZ
1
2
3
4 5
6
p
F
-
ITEM
NO.
Factory Preship Test
341140
0011
Factory Preship Test
441140
0011
X
Factory Preship Test
541140
0011
Perform Formal Preship Test - IOC
641140
0011
L 1
1
1
1
11
1
Provide Preship Test Report - IOC
1
641141
0011
~
?
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
is
PROGRAM
RFP NO. $2B015
DATE:
WORK BREAKDOWN STRUCTURE INDEX
NPIC D/C SEGMENT
CONTRACT NO.
2-24-82
SPECIFICATION
w
LL
CONTRACT
SOW
NUMBER
w
W
O
RK
B
R
EAKDOWN STRUCTURE ELEMENTS/TASKS
WBS
-
z
LINE
PARA.
O
CODE NO.
w
Q
w
ITEM
NO.
Z
1
2
3
4
5
6
p
~
H
X
Test and Verification - FOC
241200
0012
Test & Verification Management
341210
X
0012.
Test & Verification Management
441210
X
0012
X
Test & Verification Management
541210
X
0012
Provide Mgm't. of Segment Test
641210
X
0012
Activities - FOC
Prepare Test Plans - FOC
641211
0012
Prepare Test Procedures - FOC
641212
0012
Test Support
341220
0012
Test Support
441220
X
0012
X
Test Support
541220
X
0012
Provide Necessary Software to Support
641220
X
0012
Integrated Testing - FOC
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
z6
J z
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
WBS
CODE NO.
RFP NO. 82-8.015
CONTRACT NO.
CONTRACT
LINE
ITEM
SOW
PARA.
NO.
Provide Necessary Hardware
Integrated Testing - FOC
Provide Necessary Hardware
Integrated Testing
Integration Test - FOC
to Support
to Support
341230
Integration Test
441230
0012
Integration Test
541230
0012
Accomplish Inter-CI Testin
g
641230
0012
Accomplish Inter-CPCI Test
ing
641231
0012
Accomplish Integrated CPCT
/CT Testing
641232
nn in
Provide Integration Test R
eports
641233
?
DATE:
2-24-82
SPECIFICATION
NUMBER
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/0 A -RDP84T00037R000500040001-2 ?
PROGRAM
RFP NO.82-B-01 5
DATE:
WORK BREAKDOWN STRUCTURE INDEX
NPIC D/C SEGMENT
CONTRACT NO.
2-24-82
>
w
LL
CONTRACT
SOW
SPECIFICATION
w
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
WBS
'
LINE
PARA
NUMBER
Z
CODE NO.
Cn
w
z
<
In
ITEM
.
NO
1
2
31
41 5
6
W
H
.
Factory Preship Test - FOC
341240
0012
Factory Preship Test
441240
0012
X
Factory Preship Test
541240
0012
Perform Formal Preship Test
641240
0012
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
WORK BREAKDOWN STRUCTURE INDEX
PROGRAM NPIC D/C SEGMENT
R FP NO. 82-B-01 5
DATE:
CONTRACT NO.
2-24-82
w
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
WBS
>
LL
CONTRACT
SOW
SPECIFICATION
NUMBER
O
CODE NO.
z
in
LINE
PARA-
Jz
1
2
3
4
5
6
wQ
<
UJ
ITEM
NO.
X
Installation, Checkout and Test - BOC
241300
0013
Install., Checkout & Test Management
341310
X
0013
Install., Checkout & Test Management
441310
X
0013
X
Install., Checkout & Test Management
541310
X
0013
Provide Management of Installation and
641310
X
0013
Checkout Activities - BOC
Facility Planning - BOC
341320
X
0013
Facility Planning
441320
X
0013
X
Facility Planning
541320
X
0013
Provide Facility Interface
641320
0013
Drawings/Requirements (IDRs) - BOC
!
!
!
!
Provide Facility Planning - BOC
I
641321
i
l
l
l
1
0013
I
I 1
?
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
0
?
PROGRAM
RFP NO. 82-B-015
DATE:
WORK BREAKDOWN STRUCTURE INDEX
NPIC D/C SEGMENT
CONTRACT NO.
2 24.82
>
w
U.
CONTRACT
SOW
SPECIFICATION
w
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
WBS
o
z
-
LINE
PARA.
NUMBER
Z
Jz
CODE NO.
w
<
in
ITEM
NO
1T
2
r3 T
4 51
61
0
2
.
Installation & Checkout - BOC
341330
X
0013
Installation & Checkout
441330
X
0013
X
Installation & Checkout
541330
X
0013
Prepare Segment Shipping Plan
641330
X
0013
Prepare Segment Installation Plan
641331
X
0013
Provide for Shipment, Installation
641332
X
0013
and Checkout of All Segment Items
Accomplish Segment Integration and
641333
X
0013
Transition to Operational Status
Site Segment Test - BOC
341340
X
0013
Site Segment Test
441340
X
0013
X
Site Segment Test
541340
X
0013
Perform Formal Site Segment Test
641340
X
0013
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
WORK BREAKDOWN STRUCTURE INDEX
PROGRAM NPIC D/C SEGMENT
RFP NO.82-B-015
DATE:
CONTRACT NO.
2-24-82
w
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
WBS
>
o
LL
CONTRACT
SOW
SPECIFICATION
NUMBER
J z
CODE NO.
w
z
w
LINE
PARA.
1
2
3
4
56
0
E-
ITEM
NO.
Provide Site Segment Test Report
641341
0013
Site Inter-Segment Demos
341350
X
0013
Site Inter-Segment Demos
441350
X
0013
X
Site Inter-Segment Demos
541350 ?
X
0013
Contribute to System Test Plan and Test
641350
X
0013
Report to be Prepared by the SI - BOC
Participate in On-Site System Testing
641351
X
0013
- BOC
Inter-Program Demos
341360
X
0013
Inter-Program Demos
441360
X
0013
X
Inter-Program Demos
541360
X
0013
. Provide Input to Inter-Program
641360
X
0013
Demonstration Plan to be Prepared
'
I I
by the SI - BOC
I
I
I
I
I
I
I
I
?
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
?
PROGRAM
RFP NO. 82-B-015
DATE:
WORK BREAKDOWN STRUCTURE INDEX
1
NPIC D/C SEGMENT
1
2-24-82
.
CONTRACT NO.
w
U.
CONTRACT
SOW
SPECIFICATION
w
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
WBS
o
LINE
PARA
NUMBER
O
CODE NO.
n
w
z
Q
vi
w
ITEM
.
NO
-' z
1
2
3
41
5
16
1
0
.
X
Support Program Demos - BOC
641361
X
0013
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
WORK BREAKDOWN STRUCTURE INDEX
PROGRAM NPIC D/C SEGMENT
5
RFP NO. 82-B-01
DATE:
CONTRACT NO.
2-24-82
w
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
WBS
>
o
LL
CONTRACT
SOW
SPECIFICATION
NUMBER
O
CODE NO.
-U-)
w
z
-
LINE
PARA.
JZ
1
2
3
4
5
6
Q
<
W
ITEM
NO.
X
Installation, Checkout and Test - IOC
241400
0014
Install., Checkout & Test Management
341410
0014
Install., Checkout & Test Management
441410
0014
X
Install., Checkout & Test Management
541410
0014
Provide Management of Installation and
641410
X
0014
Checkout Activities
Provide Test Plan
641411
0014
Facility Planning - IOC
341420
X
0014
I I
Facility Planning
441420
X
0014
X
Facility Planning
541420
X
0014
Provide Facility Interface
641420
X
0014
l 1
1
1
1
1
1
1
Drawings/Requirements (IDRs)
~
?
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
a
?
PROGRAM
RFP NO. 82-B-015
DATE:
WORK BREAKDOWN STRUCTURE INDEX
NPIC D/C SEGMENT
CONTRACT NO.
2.24.82
w
LL
CONTRACT
SOW
SPECIFICATION
w
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
WBS
p
Z
F-
LINE
PARA.
NUMBER
Z
J z
CODE NO.
w
Q
<
W
w
ITEM
NO
1
2
31
4 51
61
.
Installation & Checkout - IOC
341430
X
0014
Installation & Checkout
441430
X
0014
X
Installation & Checkout
541430
X
0014
Prepare Segment Shipping Plan
641430
X
0014
X
Prepare Segment Installation Plan
641431
X
0014
Provide for Shipment, Installation
641432
X
0014
and Checkout of All Segment Items
Accomplish Segment Integration and
641433
X
0014
Transition to Operational Status
Site Segment Test - IOC
341440
X
0014
Site Segment Test
441440
X
0014
X
Site Segment Test
541440
X
0014
Perform Formal Site Segment Test
641440
X
0014
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
Provide Site Segment Test Report
Site Inter-Segment Demos - IOC
Site Inter-Segment Demos
Site Inter-Segment Demos
Contribute to System Test Plan and Test
Report to be Prepared by the SI
Inter-Program Demos - IOC
Inter-Program Demos
Inter-Program Demos
n- ---'
tLUV M
iLu
e lupuL Lo inter-Program
Demonstration Plan to be Prepared
by the SI
WBS
CODE NO.
641441
341450
441450
541450
641450
341460
441460
541460
641460
?
RFP NO. 82-8-015
CONTRACT NO.
CONTRACT
LINE
ITEM
SOW
PARA.
NO.
0014
0014
0014
0014
0014
0014
0014
0014
0014
DATE:
2-24-82
SPECIFICATION
NUMBER
?
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
0
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
w
?
PROGRAM
RFP NO. 82-B-01 5
DATE:
WORK BREAKDOWN STRUCTURE INDEX
NPIC D/C SEGMENT
CONTRACT NO.
2-24-82
>
w
CONTRACT
SOW
SPECIFICATION
w
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
WBS
p
~
LINE
PARA
NUMBER
z
CODE NO.
ww
Z
<
v
i
W
ITEM
.
NO
J
1
2
3
45
6
.
X
Support Program Demos
641461
X
0014
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
WORK BREAKDOWN STRUCTURE INDEX
PROGRAM
NPIC D/C SEGMENT
RFP NO. 82-B-015
DATE:
CONTRACT NO.
2-24-82
w
WORK BREAKDOWN STRUCTUREELEMENTS/TASKS
WBS
LU
o
LL
CONTRACT
SOW
SPECIFICATION
NUMBER
Z O
JZ
CODE NO.
z
<
~i v
LINE
PARA.
1
2
3
415
16
1
ww
W
ITEM
NO.
X
Installation, Checkout and Test - FOC
241500
0015
Install., Checkout & Test Management
341510
X
0015
Install., Checkout & Test Management
441510 .
X
0015
X
Install., Checkout & Test Management
541510
X
0015
Facility Planning - FOC
341520
X
0015
Facility Planning
441520
X
0015
X
Facility Planning
541520
X
0015
Provide Facility Interface
641520
X
0015
Drawings/Requirements (IDRs)
'
'
'
'
Provide Facility Planning
1
641521
1
X
1
1
1
1
0015
I
I 1
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
0 .w
PROGRAM
RFP NO. 82-B-015
DATE:
WORK BREAKDOWN STRUCTURE INDEX
NPIC D/C SEGMENT
CONTRACT NO.
2-24-82
>
w
LL
CONTRACT
SOW
SPECIFICATION
w
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
WBS
p
Z)
Z
LINE
PARA.
NUMBER
Z
CODE NO.
v
ww
<
Uj
ITEM
NO.
-j Z
1
21
3
41
51
61
Installation & Checkout - FOC
341530
X
0015
Installation & Checkout
441530
X
0015
X
Installation & Checkout
541530
X
0015
Prepare Segment Shipping Plan
641530
X
0015
Prepare Segment Installation Plan
641531
X
0015
Provide for Shipment, Installation
641532
X
0015
and Checkout of All Segment Items
Accomplish Segment Integration and
641533
X
0015
Transition to Operational Status
Site Segment Test - FOC
341540
X
0015
Site Segment Test
441540
X
0015
Site Segment Test
541540
X
0015
Perform Formal Site Segment Test
641540
X
0015
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
PROGRAM
WORK BREAKDOWN STRUCTURE INDEX
NPIC D/C SEGMENT
RFP NO. 82-B-015
DATE:
CONTRACT NO.
2-24-82
w
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
WBS
"'
C)
`L
Z)
CONTRACT
SOW
SPECIFICATION
Z
CODE NO.
U)
zQ
w
LINE
PARA.
NUMBER
1
2
3
14 5
6
<
ITEM
NO.
Provide Site Segment Test Report
641541
0015
Site Inter-Segment Demos - FOC
341550
X
0015
Site Inter-Segment Demos
441550
X
0015
X
Site Inter-Segment Demos
541550
X
0015
Contribute to System Test Plan and Test
641550
X
0015
Report to be Prepared by the SI
Participate in On-Site System Testing
641551
X
0015
Inter-Program Demos - FOC
341560
X
0015
Inter-Program Demos
441560
X
0015
X
Inter-Program Demos
541560
X
0015
Provide Input to Inter-Program
641560
X
0015
Demonstration Plan to be Prepared
by the SI
?
m
m
0
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
V
?
PROGRAM
RFP NO. 82-B-015
DATE:
WORK BREAKDOWN STRUCTURE INDEX
NPIC D/C SEGMENT
CONTRACT NO.
2-24-82
>
w
u
CONTRACT
SOW
SPECIFICATION
w
WORK BREAKDOWNSTRUCTUREELEMENTS/TASKS
WBS
0
LINE
PARA
NUMBER
p
CODE NO
n
z
F-
.
.
ITEM
NO
z
21
31
4
51
61
Q
Lu
.
X
Support Program Demos
641561
X
0015
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
m
0
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
PROGRAM
RFP NO.82-B-015
DATE:
WORK BREAKDOWN STRUCTURE INDEX
NPIC D/C SEGMENT
CONTRACT NO.
2-24-82
w
WORK BREAKDOWN STRUCTURE ELEMENTSITASKS
WBS
w
o
w
CONTRACT
SOW
SPECIFICATION
NUMBER
Z 0
CODE NO.
-(n
Z
in
LINE
ITEM
PARA.
J z
1
2
3
4
51
61
0
NO
X
Development and Test Facility
241600
0016
Devel. & Test Facility Management
341610
X
0016
Devel. & Test Facility Management
441610
X
0016
X
Devel. & Test Facility Management
541610
X
0016
Provide Mgmnt., Planning & Control
641610
X
0016
of Facilities Req'd. for Analysis,
Human Eng'g., Devel., Test and Integr.
of All Segment Software & Hardware - BOC
Provide Mgmnt., Planning & Control
641611
X
0016
of Facilities Req'd. for Analysis,
Human Eng'g., Devel., Test and Integr.
of All Segment Software & Hardware - luc
Provide Mgmnt., Planning & Control
641612
X
0016
of Facilities Req'd. for Analysis,
Human Eng'g., Devel., Test and Integr.
of All Segment Software & Hardware - FOC
Devel. & Test Facility Services
341620
X
0016
Devel. & Test Facility Services
441620
X
0016
t
Il
i
l
l
l
l
Devel. & Test Facility Services
I
541620
I
l
l
X
i
l
0016
I
I i
?
C
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
?
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
w
?
PROGRAM
RFP NO. 28 -015
DATE:
WORK BREAKDOWN STRUCTURE INDEX
NPIC D/C SEGMENT
CONTRACT NO.
2-24-82
L-
CONTRACT
SOW
SPECIFICATION
w
W
O
RK B
R
EAKDOWN STRUCTURE ELEMENTS/TASKS
WBS
Z
LINE
PARA.
NUMBER
CODE NO.
w
Q
w
ITEM
NO.
''Z
2
3
45
6
X
Develop Necessary Test Tools, etc.
641622
X
0016
for Devel. & Test Facility - BOC
Develop Necessary Test Tools, etc.
641623
X
0016
for Devel. & Test Facility - IOC
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
C
z
0
r
cn
11
m
0
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
HFP NO. 82-B-015
DATE:
CONTRACT NO.
2-24-82
WBS
CODE NO.
CONTRACT
LINE
SOW
PARA.
SPECIFICATION
NUMBER
ITEM
NO.
Equipment
341630
0016
Equipment
441630
0016
Equipment
541630
0016
Provide ADPE Capable of Supporting
the Devel. & Test Facility - BOC
Provide ADPE Capable of Supporting
the Devel. & Test Facility - IOC
641630
0016
Operations & Maintenance
341640
Operations & Maintenance
441640
Operations & Maintenance
541640
?
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
0
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
V
?
PROGRAM
RFP NO.82-8-015
DATE:
WORK BREAKDOWN STRUCTURE INDEX
NPIC D/C SEGMENT
CONTRACT NO.
2-24-82
>
w
Z-
CONTRACT
SOW
SPECIFICATION
w
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
WBS
o
z
Z
~
LINE
PARA.
NUMBER
CODE NO.
w
<
v
i
W
ITEM
NO
z
1
2
3
45
6
w
.
X
Operate the Devel. & Test Facility - BOC
641640
0016
Operate the Devel. & Test Facility - IOC
641641
0016
Maintain the Devel. & Test Facility - BOC
641643
0016
Maintain the Devel. & Test Facility - IOC
641644
0016
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
WORK BREAKDOWN STRUCTURE INDEX
PROGRAM
NPIC D/C SEGMENT
5
B
RFP NO.82
0101
DATE:
N
CONTRACT
2-24-82
Uj
CONTRACT
SOW
SPECIFICATION
w
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
WBS
~
LINE
PARA
NUMBER
0
CODE NO.
D
w
z
v
i
.
Jz
1
2
3
4
5
6
Q
<
W
ITEM
NO.
Subcontractor Devel. & Test Facilities
341650
0016
Subcontractor Devel. & Test Facilities
441530
0016
X
Provide Management, Planning and Control
541650
X
0016
of Facilities
Provide Management, Planning and Control
641650
X
0016
of Facilities - BOC
Provide Management, Planning and Control
641651
X
0016
of Facilities - IOC
Provide Management, Planning and Control
641652
X
0016
of Facilities - FOC
X
Services
541651
X
0016
Services - BOC
641653
X
0016
Services - IOC
641654
X
0016
?
?
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
?
PROGRAM
RFP NO. 82-B-015
DATE:
WORK BREAKDOWN STRUCTURE INDEX
NPIC D/C SEGMENT
CONTRACT NO.
2-24-82
>
'1J
LL
CONTRACT
SOW
SPECIFICATION
w
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
WBS
z
~
LINE
PARA.
NUMBER
?
CODE NO.
v
ww
<
v
i
W
ITEM
NO
-i Z
1
2
3
4
5
6
1
'D
.
X
Services - FOC
641655
X
0006
X
Equipment
541652
X
0006
Equipment - BOC
641656
X
0006
Equipment - IOC
641657
X
0006
Equipment - FOC
641658
X
0006
X
Operations & Maintenance
541653
X
0006
Operate Subcontr. Devel. & Test Facil.
641659
0006
- BOC
Operate Subcontr. Devel. & Test Facil.
64165A
X
0006
- IOC
Operate Subcontr. Devel. & Test Facil.
64165B
X
0006
- FOC
Maintain Subcontr. Devel. & Test - BOC
64165C
X
0006
Maintain Subcontr. Devel. & Test - IOC
64165D
X
0006
Maintain Subcontr. Devel. & Test - FOC
64165E
X
0006
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
PROGRAM
WORK BREAKDOWN STRUCTURE INDEX
NPIC D/C SEGMENT
RFP NO. 82-B-015
DATE:
CONTRACT NO.
2-24-82
w
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
WBS
w
o
LL
CONTRACT
SOW
SPECIFICATION
z z
CODE NO.
w
<
z
in
LINE
PARA.
NUMBER
1
2
4
15
16
w
ITEM
NO.
X
Training
241700
X
0017
Training Management
341710
X
0017
Training Management
441710
X
0017
X
Training Management
541710
X
0017
Manage All Training Activities - BOC
641710
X
0017
Manage All Training Activities - IOC
641711
X
0017
Manage All Training Activities - FOC
641712
X
0017
Provide Segment Training Plan - BOC
641713
X
0017
I
I
I
I
Provide Segment Training Plan - IOC
I
641714
I
X
I
I
I
I
0017
I
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
?
PROGRAM
RFP NO.k2-B-015
DATE:
WORK BREAKDOWN STRUCTURE INDEX
NPIC D/C SEGMENT
CONTRACT NO.
2-24-82
>
LL
CONTRACT
SOW
SPECIFICATION
w
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
WBS
a
D
z
~
LINE
PARA
NUMBER
O
CODE NO.
w
c
i~
ITEM
.
NO
Jz
1
2
3
4
5
6
w
2
W
.
User Training
341720
X
0017
User Training
441720
X
0017
X
User Training
541720
X
0017
Accept Other Segment Inputs and
641720
X
0017
Prepare User Training Materials - BOC
Accept Other Segment Inputs and
641721
X
0017
Prepare User Training Materials - IOC
Accept Other Segment Inputs and
641722
X
0017
Prepare User Training Materials - FOC
Train System Users and Gov't
641723
X
0017
Instructors - BOC
Train System Users and Gov't
641724
X
0017
Instructors - IOC
Train System Users and Gov't
641725
X
0017
Instructors - FOC
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
WORK BREAKDOWN STRUCTURE INDEX
PROGRAM NPIC D/C SEGMENT
RFP NO-82-B- 015
DATE:
CONTRACT NO.
2-24-32
WBS
w
LL
CONTRACT
SOW
SPECIFICATION
w
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
-
~
LINE
PARA
NUMBER
O
CODE NO.
U
)
z
<
c
n
uj
.
JZ
1
2
3
4
5
6
~
ITEM
NO.
Operator Training
341730
X
0017
Operator Training
441730
X
0017
X
Operator Training
541730
X
0017
Prepare and Deliver Operator Training
641730
X
0017
Materials - BOC
Prepare and Deliver Operator Training
641731
X
0017
Materials - IOC
Prepare and Deliver Operator Training
641732
X
0017
Materials - FOC
Train Segment and System Operators and
641733
X
0017
Management Personnel - BOC
Train Segment and System Operators and
641734
X
0017
Management Personnel - IOC
Train Segment and System Operators and
641735
X
0017
1 1
_1
1
1
1
1
1
Management Personnel - FOC
I
I
t
l
I
I
I
I
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
?
PROGRAM
82-B-015
RFP NO
DATE:
WORK BREAKDOWN STRUCTURE INDEX
NPIC D/C SEGMENT
.
CONTRACT NO.
2-24-82
>
LL
CONTRACT
SOW
SPECIFICATION
w
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
WBS
p
i
LINE
PARA
NUMBER
O
CODE NO.
v
i
z
vi
ITEM
.
NO
J z
1
2
3
14
1 5
6
0
<
W
.
Maintenance Training
341740
X
0017
Maintenance Training
441740
X
0017
X
Maintenance Training
541740
X
0017
Prepare and Deliver Maintenance
641740
X
0017
Training Materials - BOC
Prepare and Deliver Maintenance
641741
X
0017
Training Materials - IOC
Prepare and Deliver Maintenance
641742
X
0017
Training Materials - FOC
Train All Segment Maintenance Personnel
641743
X
0017
- BOC
Train All Segment Maintenance Personnel
641744
X
0017
- IOC
Train All Segment Maintenance Personnel
641745
X
0017
- FOC
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
PROGRAM
WORK BREAKDOWN STRUCTURE INDEX
NPIC D/C SEGMENT
R FP NO. 82-B-01 5
DATE:
CONTRACT NO.
2-24-82
w
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
WBS
w
p
U
CONTRACT
Sow
SPECIFICATION
Z
CODE NO.
U)
z
w
LINE
PARA.
IV vivioCn
1
2
13
14
15
16
1
a
ITEM
NO.
X
Operations & Maintenace (O&M)
241800
X
0018
0 & M Management
341810
X
0018
0 & M Management
441810
X
0018
X
Provide 0 & M Project Management
541810
X
0018
Provide 0 & M Project Management - BOC
641810
X
0018
Provide 0 & M Project Management - IOC
641811
X
0018
Provide 0 & M Project Management - FOC
641812
X
0018
X
Provide 0 & M Project Control
541811
X
0018
Provide 0 & M Project Control - BOC
641813
X
0018
Provide 0 & M Project Control - IOC
641814
X
0018
Provide 0 & M Project Control - FOC
641815
X
0018
?
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
?
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
?
PROGRAM
RFP NO. 82-B-01 5
DATE:
WORK BREAKDOWN STRUCTURE INDEX
NPIC D/C SEGMENT
CONTRACT NO.
2-24-82
w
LL
CONTRACT
SOW
SPECIFICATION
w
WORK BREAKDOWN STRUCTUREELEMENTS/TASKS
WBS
~
LINE
PARA
NUMBER
O
CODE NO.
Z
v
i
ITEM
.
NO
Z
1
2
3
45
6
.
Software Maintenance
341830
X
0018
Software Maintenance
441830
X
0018
C
z
n
1
U)
CAI
T
m
v
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
WORK BREAKDOWN STRUCTURE INDEX
PROGRAM NPIC D/C SEGMENT
RFP NO. 28 B-015
DATE:
CONTRACT NO.
2-24-82
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
WBS
w
LL
CONTRACT
SOW
SPECIFICATION
Nil BRAD CO
0
CODE NO.
Z~
z
in
LINE
PARA.
Jz
i
2
3
4
5
6
H
ITEM
NO.
X
Problem Analysis, Error Correction and
541832
X
0018
Update Documentation
Problem Analysis, Error Correction and
641836
X
0018
Update Documentation - BOC
Problem Analysis, Error Correction and
641837
X
0018
Update Documentation - IOC
Problem Analysis, Error Correction and
641838
X
0018
Update Documentation - FOC
X
Test
541833
0018
Test Software Changes - BOC
641839
X
0018
Test Software Changes - IOC
64183A
X
0018
Test Software Changes - FOC
64183B
X
0018
X
Maintain Commercial Software Products
541834
X
0018
Maintain Commercial Software Products
64183C
X
0018
- BOC
Maintain Commercial Software Products
64183D
X
0018
- IOC
?
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
?
PROGRAM
WORK BREAKDOWN STRUCTURE INDEX
NPIC D/C SEGMENT
RFP NO .28 8-015
DATE:
CONTRACT NO.
2-24-82
w
WORK BREAKDOWN STRUCTURE ELEMENTS/TASKS
WBS
w
LL
CONTRACT
SOW
SPECIFICATION
NUMBER
~ 6
CODE NO.
Q
w
LINE
PARA.
1
2
3
4
5
6
w
ITEM
NO.
Maintain Commercial Software Products
64183E
X
0018
- FOC
Hardware Maintenance
341840
X
0018
Hardware Maintenance
441840
X
0018
X
Problem Analysis, Error Correction
541840
X
0018
and Update Documentation - BOC
Problem Analysis, Error Correction
641840
X
0018
and Update Documentation - IOC
Problem Analysis, Error Correction
641841
X
0018
and Update Documentation - FOC
Problem Analysis, Error Correction
641842
X
0018
and Update Documentation
X
Maintain Commercial Hardware
541841 -
X
0018
Maintain Commercial Hardware - BOC
641843
X
0018
Maintain Commercial Hardware - IOC
641844
X
0018
Maintain Commercial Hardware - FOC
641845
X
0018
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
PROGRAM
RFP NO. 82-B-015
DATE:
WORK BREAKDOWN STRUCTURE INDEX
NPIC D/C SEGMENT
CONTRACT NO.
2-24-82
WBS
w
LL
CONTRACT
SOW
SPECIFICATION
w
z O
WORK BREAKDOWN STRUCTUREELEMENTS/TASKS
o
v
z
I-
LINE
PARA.
NUMBER
CODE NO.
ww
w
ITEM
-iz
1
2
3
4
5
6
2
NO.
Travel and Living
341870
X
0018
Travel and Living
441870
X
0018
X
Travel and Living
541870
X
0018
Provide Travel and Living Expenses
641870
X
0018
for 0 & M Personnel - BOC
Provide Travel and Living Expenses
641871
X
0018
for 0 & M Personnel - IOC
?
m
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
?
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
V
----T---- -
IGLN PROJECT E/S I
I F-- - r --t----~
I I 1 1
CDNLI I I I
NO INAEd MBS NO DATE YUS NO PNEL
I--+-----1---- - -i
1101 ICOatract 1u4110U 5/3u/d21
INBS I I
102 IPinaucial (041100
(Plan
103 Master 1041100
ISche0ule
104 1 u.:v0l0p- 1642106
Invent Plan
105 secucity 1641500
5/30/d2
5/30/B2
S/30/d 2
5/30/d2
I I 1 I
1106 CE Plan b41400 b/30/8i1
I I I I I
1101 (SOW ilpdate 1641100 5/30/621
1109 130athly 1041203 mouthiyl
1 1Finaucial I I
NepoEt I I
1 I 1
1110 1Eilestontl Io41200 avecy I
I 10pdates I 1 six
I 1 months I
I I I I I
l111 Eilestone 1641200 1 weekly I
itepOrt I I I
I 1
1112 1Eontbly 1641000 1 mouthlyl
StaLU:i I I I
INevlew I I I
I I I
Quacterly 1641200 1 Bach
(Prot' and
ISLatUs
INepoLt
1 1 1 I 1
I 1 1 1 1 I I
I I 1 I I I
I I I I I I
I I I 1 I
1 I. 1 1
1 I I I I
I I I I
1 I PINAL/I I I PINAL/I I I IPIBAL/
(UPDATE/ I AS I I (UPDATE/ AS I (UPDATE/ I AS
IBJILD TOI BUILT INNS NO I PHLL IIUILD TO (BUILT INNS NOIPBEL (BUILD 101501LT
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
FINAL/1
AS
BUILT 1SBS NO
I IPINAL/I I I IFINAL/
(UPDATE/ I AS I I IUPDATE/ I AS
PEEL (BUILD TO $BUILT IS8S SOIPHEL IBUILD TOIBUILT
I I I I
I I I I
9/84 1642501 110/82 111/83 19/84 1b42502110/82111/83 19/84
I I I I I 1
1 I I I 1 I
I I I 1 I
8/82 1642301 1 Prop 1 18/82 1642302IProp 1 18/82
8/82 1642400
8/82 1642104
12/82 1642201 1 Prop 18/82
1
1642222 I
1 1
I 1
10/82 1642601 {
I I 1
I 1 1
12/82 1642210 1 Prop 18/82
1 1
1 1
1 I
1 1
12/83 1642316 1 9/82"
642600
642209
642312
642315
1 I I I I
622405 9/82 1 1 1/83 1622406 1 9/82
I I
I 1
1/83 1622406 19/82
?
I(,EN 2RUJcLT N/S
F-- T -
I I 1 1
I I ( I (UPDATE/
ISO INAIB INbS NO
114 (Action 1641200
1 11tem List I
{ 11: ( Sey Trans
laud lnteg
1 IPlan
110 (Sag Ups
ICoucept
177 (Say Design
ISpecs
I I
1118 IS/N Opus
IH/N
{ Iiuterface 119 I Hymt Trace
j j'rerit.
1 IBatril
I i
{ 120 1 buy Tech
1 (Notes
121 Seg Vurif
Plan
122 1Sey Lesign
Abaly apt
123 10611 Plan
Ieauual
124 (8eint and
ILog Plan
1126 10D Spec 112'a 1 Ups/:.N
Ilut Spec
I I
1121 1Ops/HN
Itut Spec
DATE WBS NO 1 PHEL IUUILD TO
1 1
1 1
1 1
o42500 10/6213/83
642300 Prop
642400 I
b42103
as 1 642221
tegeAted1
18/82 1642400
.I I
8/8"2
8/82
6/83 16422021Prop 18/82 110/83
I I I I
I I I I
I I 1 I
16422231 1
16/83 16422111Prop 18/82 110/83
1 I 1 1 1
1 1 1 I
111/83 1642314110/821 11/b3
1 1 I I
I 1 1
112/83 164231719/82 112/63
I 1 1 1
I I I 111/83 1642401110/821 1 1 1/83
I I I I I
11/83 162240719/62 110/63
I I I 1 1 1/ 83 162 2 40 71 9/82 1 10/ 63
I 1
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
ICUNLI
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
F-T---T--- -T--
1 I GEN Pduiect m/s I
I I 1 1 1
CDHLI I
INO IMA fit 1485 NO I DATE NbS NO I
I--t-----F--i- -
1129 1nr/sw
lint Spec I
12y ISY/SN
1130 ISey Test
I I Plaa 1131 ('POSE Plan
I I
1132 15ey Ptoy
1 IP, S 6 C 1133 Iseg Ups
I ISpecs
622405
1 I FINAL/I I
(UPDATE/ I AS I
PHEL (BUILD TUI BUILT INNS NO I PHEL
--T-- 1 1 --
641011 11/83
643007 19/82
134 ISey last o41331 1 10/8212/83
(Plan 1 1
135 IUSer 1642303
18unual 1 1 1
10/d2 12/83
131 108 Admin
I8anual
13d 1Pto9ra?mer.
INanual
139 (Facility
(IONS
10/8212/83
1/b3 1622406 9/82
1/83 1622406 9/82
2/83 1642604 10/82
2/83 1641111 1/83
1/83 1643007 9/82
(FINAL/I 1
UPDATE/ I AS I I
BUILD TO (BUILT INKS 801P8EL
10/82 1642301
I I
I I
10/83 1641431 10/82 (9/83
1
I
2/84 1642304 10/82 12/83 I 1
2/84 1642307 10/82 12/83
11/83 162240719/82
I I
IFIBAL/
(UPDATE/ I AS
(BUILD TOINUILT
--1
( 110/83
11/83 1622407(9/62 (2/8~
1 1 I
1 I 1
111/83 1642605110/821 111/63
1 1
I I
111/83 164 12111 1/83
I 1
9/83 164300719/62
I 1
I I
110/82 10423021
11/83
9/83
10/83 1641531110/8219/b3 110/U3
1 I 1
1 I 1
3/85 1642305110/8212/83 17/85
1 1 I 1
I I
3/85 1642308110/8212/83 17/85
1 I 1 I I 1
i I I I
2/64 I 10/82 1 9/8 3 1.3/85 110/8219/83 17/15
5/84 9/83 I 15/85 1 19/83 1 ' 19/85
1 I I I 1
3/8 4 1641420 10/82 1 10/8 3 14/85 164152011 0/811 10/83 1 6/8S
I I I I
I - I I I I I
2/83 1641714 1/83 1 111/83 164171511/83 I 111/83
I I I I I
1646201 110/82 1 I 1
1646201 I 10/82 ( 1 1
I I 1 I I I
114U Ttny Plan I I I o41713 11/83
I I I 1 I 1
(143 ICI spec I I 1046201 110/821
1 I I I 1
1144 ICOmponeut I I b46c01 1 10/821
I ISPec I 1 o4b204 1 12/83
I I I 1046208 I I
1647201
5/84 164'7205
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
I GEN
I 1-
I ICDBLI
HO I1Aak UBS
I-- I ----- I -
1146 Ifcug I
(materials I
141 IShipping
IPlan
148 IEquip OGl
I manual
149 IQA Audit
IBepoct
I I I
I1:,1 10;; PacAsy-ea1
I I
1152 ISM Desc Doc1
1153 (Sys Test/
I IDeeo lup
1154 I5e9 Test I
INepocts 1
I I
1155 Ifech Pert I
Imeas
1 I
1156 (Accession I
1 IList I
INanual I
-r----1 -r----1---
1 I I I I *JNAL/I
I I 1 IUPDATE/ I AS I
NO I DATE I NBS Ni.) I PBEL IBUILD TOI BUILT IWBS NO
-I ----1--~~
1641720 13/63
b41730 3/d3
641740 3/83
641330
64b253 1/84
Audit 641310
+ 15
In.s
041410
1 641350 I 11/83
1 I 1 641341 I
1 1
I
As 1 642203
8equicedl
Iaonthly 1 641600
I IFINAL/I I 1 IFINAL/
(UPDATE/ I AS I I (UPDATE/ I AS
PEEL IBUILD TO IBUILT IVBS NOIPBEL (BUILD TOIBUILT
f----4 ---+- I --1----1---I
12/83 1641721 10/83 I 11/65 1641722110/831 15/85
12/83 1641731 10/83 1 11/85 1641732110/831 15/65
12/83 1641741 10/83 1 11/85 164 174 2110/831 15/85
11/84 164143U
1 7/84 1647212 1 3/84
I 1
1 I
(641311 I
I I
I I
5/80 Ir.uynt3 I
2/84 1641411 1
1 I
11/84 1641450 1/85
6/84 1b41441
lb42204
1641601
11/85 16415301 1 14/85
1 1 1
I I 1
17/85 164821216/85 111/85
14/HS
17/85
6/85 1b41541
164 2205
1641602
?
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
0
?
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
V
F -~ -.- T
It.EN PROJECT N/S I
I F ~- -4
1 I I I
ICUNLI I 180 INANE INKS NO DATE
1-- 1-----F----i -1
IBPPRt 1131 I Test Plans 1 1
(
I I
1138 1Prcyaan- I I 1
Imer's I 1 I
1 INanual 1 I
I I I I I
1141 (Part 1 I I
I (Specs I 1
I I 1 ?1
1142 (Part 11 I
I ISpec.~. ? I I
145 Data
1Dictiouary
150 ICPCI
IListings
1 BEMi~MT 1
131 ITact Plans
1 I
I 1
1138 IProyram- I
Imer~s 1
1 Nabual 1141 (Part I I
1 Specs 1 1142 (Part 11 I
(Spec:. I
I I
I I
1145 (Data
[Dictionary
I I
1150 ICPC1
t IListinys 1
--L__ -
IOC 1 FOC
I I FINAL/I 1 I ;FINAL/
(UPDATE/ I AS I I (UPDATE/ I AS
(BUILD TO $BUILT INKS NOIPEEL IBUILD TOIBUILT
1 I I FINAL/I I
(UPDATE/ I AS I I
NB3 NO PNEL IBUILD TOI BUILT IMBS NO I PEEL
I I
I I
643021 10/82 1643021 I 10/82
643024 I 11/62 1644017 1
I I 1
643023 11/821 1644016 18/83
643034 1 1 5/84 1644026 1
o43020 18/82 1643020 8/82
643022 112/82 1644015 1 18/83
643036 1 5/84 1644028 I
1 I 1
643019 1 8/82 112/82 5/84 1643019 1 8/82 18/63
?1 1
I I I
643031 7/84 1644025 I 1
643041 1 1118, el
643044 1
64 304 3 1 1/83
Ib43041
1/83 1644031
1644030 7/83
5/84 164404U
15/85
15/85
643038 1 8/82 1643038 8/82
1 I 1
I 1 I
6430-40 1 8/62 1643040 8/82 1
643042 1 11/83 1 1644029 1 17/83
643055 I 1 1 S/84 1644042 1 1
1 1 1 1
643039 18/82 11/83 15/84 1643039 8/82 17/83
1 1 1 1 I
1 1 1 1 1
b43052 1 I 17/84 1644039 I
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
?
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
r--
Table 1. CD8L Delivery Schedule (Coat.)
IGEN PNUJECT h/S
i
I
1
I
I I FINAL/I
IPINAL/I i I IPINAL/
CDNL
I
1
IUPDATE/ I AS
UPDATE/ I AS
I I IUPDATE/ I AS
NO
INANE
{NUS NO 1
DATE
NO I
WBS
i
PEEL IUUILD TOI BUILT INBS NO
PEEL
(BUILD TO IBUILT
INBS NOIPBEL 1BUILD TUIBUILT
I
f
IBEXSUP
----I
-
1131
ITest Plans
643285 111/821
I
1643285
11/82 1
?43286 1
1 12/82
1644200
I 1
I
I
1 1
I
I
1 I
Ilse
IPtogiam-
643287 1 12/821
1
1044199
1 5/83 1
I
I mer's
843296 I
15/84
1644209
1 1
1
(Nanual
I
1
1 I
I
I-
1 I
1141
(Part 1
Specs
1643281
I
1
1 8/82 1
I I
I 1
1142 (Part 11
6432u4
18/82
(843284
8/82 1
Specs
643286
I 112/62
1644198
15/83
643300
1 i
5/84
1644211
1
15/85
0\
1
I I
1
1
1145
Data
643262
1 8/82 112/82
15/84
1643282
8/82 15/83
15/85
1
Dictionaty
1 I
1
I
I
I I
I
1
1150
I
ICPC1
ILlstiug~i
I
I
I
o43496
I
1 1
I
7/84
1644208
IBEBEA
I
I
1
1
1
1
I
1
131
(Pest Pldiis
I
I
1644060
111/62
1643060
1 11/82
I
i
i
I 843063
I
12/82
(844045
I
I
I
1
I
I
1
1
138
IPr09r4m--
I
I
1 643062
12/82
1644044
1 6/83
Imet'~
I
1 643072
1
5/84
(644054
I
(Nanual
I
I
1
I
141 (t'art 1
ISpecs
11.2
(Part If
I
1 643059
8/02 I
1643059
1 8/82 1
1
(Specs
I
643081
1 112/62
1644043
16/83
1
{
i
1 643074
I I
5/84
1644056
15/85
I
I
1
1 1
I
1
I
145
1 Data
I
I 843050
I 8/82 112/82
5/84
1643058
8/82 16/83
15/65
IDictionary
I
I
I
I
1
1
I
I
j t
I
1
1 15u
I CPC(
I
I
I 043U7 1
I
7/84
1644053
17/85
i
i
jLiStiiig3
I
1
t
1 1
?
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
w
1 1 IGEN PHUJ Lcr N/S I
1 I I --_T -
I I I I I I
IC1)HL1 I I I (UPDATE/
1WO INANE IWB5 NO UA'11 I W8S NO I PHEL IDUILD TO
1BNANIP
l31 1reSt Plans
138 1Proytam-
Imer~s
iH4nual
141 (Part I
I Specs
142 IPart 11
I Specs
145 IUata
(Dictionary
150 ICPCI
IListisys
IDS'1'A1'H
131 (Pest Plans
138 Proytam-
ImerIs
Manual
141 (Part 1
specs
t
142 $Part 11
ISpecs
145 IData
I Dictsona ry
l
1!,0 I CPCI
IListtnys
I--1)43U97 11/62
643100
643099 1/83
b43109
643096 18/82 1
643098 I 11/83
643111 1 I
PIWAL/I
AS I
BUILT IWBS NO
1643097 1 11/62 1
1/63 1644059 15/83
I I
1644058 1 5/83
5/64 1644060
1643096 8/82
1644057
5/84 1644070
I I
5/85
5/85
643116 1 12/821 1 1643116 12/82
643119 I 12/83 1644073
I ! 1 I , I
643118 2/83 I I 1644072 9/83 1
o43128 I 1 5/84 1644083 1
POc
1PINAL/I I I IPIBAL/
1UPDATE/ I AS I I (UPDATE/ I AS
PEEL (BUILD TO IBUILT IWBS NOIPEEL BUILD TOIBUILT
1643113 9/82 1
t
643115 1 9/82 1 I 1643115 9/82 1
643117 I 12/83 1 1644071 19/83
I I I I I I
9/82 12/83 I S/84 1643114 19/82 19/83 15/85
1 1 I 1
1 I 1 I
17/84 1644082 17/aS
1 I 1 1
v
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
2
I I IGEN PkUJ.CT H/S
1 I I t
ICDNL1 I I I
NO INANE bBS NO I DATE WBS NO
I-`--1 1 -+
I IPHHGDT I
1 I
Ilil 1Test Plans
1 1
1138 Proyram-
I mar'::
Imanua1
b J
1141
PaLL I
r
Ispecs
I
I
1142
(Part I1
1
I
lypecs
1
1
145
I Data
I
V/
uictionary
I
I
m
{150
cecl
IList>nys
8cCNTH
1
m
1131 ITrst Plans
0
1
1138
IProyrab-
I
Imer's
IHauual
1
{
1 141
I Part I
I
ISpec~
1
I
I
I
1142 leart I1 1
?
I t t.i sf i nas t 1
$Specs 1
I I
I I
1145 1Data ( I
I Ibicciouary I
I I I
115U CPC1 I
1 I FINAL/I
(UPDATE/ I AS
PBEL IBUILD TOI BUILT INNS NO
FOC
T- T-T--1
1 IFINAL/I I I IFINAL/
(UPDATE/ I AS I $UPDATE/ AS
PBEL (BUILD TO IBUILT idBS NOIPkEL IBUILD TOIBUILT
-1----
I
I I
644102 112/82
11/83
1645017112/821
1644101 1
11/83
1
1645016111/83
1644111 I
15/85
16450261
1
I 1
I
I 1
$64315019/82
1 I
I
I I
I
I
t
I I
I
I I
(
1644100
9/82
111/83
164501519/82 1
1
I 1
1644113
15/65
16450281 1
I
{
I
I I
1
9/82
111/83
I
I I
1
I 1 I
I I
1
1
643171
1/83
1
Ib43171 1
1/83
164317111/83
643174
12/83
I b 44116
18/63
164 50311
-
643173
2/83 1
1644115
8/83
1645030110/83
643183
I 1
I I
1 5/84
I
1644125
I
15/85
16450401
I I
I I
I
I I I
64 3168
1
I 10/821
1 I
1
I
1643168
I
10/82
I
1643168110/821
1 I I
I
I 1
I
I I
1
1 I I
1 643170
10/621
1
1643170
10/82
I
1643170110/821
I o43172
1 2/63
I
1644114
8/83
16450291 1
1643185
5/84
1644127
15/85
16450421 I
{
I
I
I I I
043169
10/821 2/83
5/84
1643109
10/82 8/83
I5/85
1643169110/821
I
I
I
1
I 1
I I
I
I
I . 1
643162
7/84
1644124 1
17/85
16450391
I
1
?
I
111/63
11/83 1
19/U5
I
10/83 19/85
I
I 1
11/85
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
m
m
0
1 IOEN PROJECT M/S 1
i--r 1~---T
1 1 I I
ICilRLI I I I
SO NANE WUS NO DATE I WBS NO I PREL
I ---- +---- -F
1 buq_Ac?S 1
1 I I
I131 ITest P1411s 1643227 1 11/82
I I I I 1643230
I I I I I
I138 Irloyr4 w- I 643229 1 12/82
I Imer's I 1 643239 1
I INanuaI
I I
1141 (Pact I
I ISpec~
142 (kart LI 1 1 643220 1 9/82 1 I 1643226 1 9/82
ISPecs 1 1 643228 1 1 12/82 I 1644156 I
1 - t 643241 I 1 1 5/84 $644169 I
1 I 1 1 1 1 1
145 1Data 1 I b43225 9/82 1 12/82 1 5/84 1643225 9/82
IUictionary I 1 I I I I 1
I I I I I I I
153 ICPCI 164323U 1 1 1 7/84 1644166 1
IListi6ys 1 I I 1
1 I t 1
e_l !~_$ 1 1 1
I I
1J1 (Test Plans I 643240 11/8211
I 1 643249 1
1 1 I I I
138 IPcuycam- 1 I 1 643240 1 12/821
mer's 1 I 643258 1
1Hanual
141 (Part 1
Spu"
1 1
1145 1 ilata
I IDictioNacy
I 1
$150 ICPC1
I I PINAL/I
IUPDATE/ I AS I
IUUILU TOI BUILT IWBS NO I PREL
I IPINAL/I I I IPIUAL/
IUPDATE/ I AS I I IUPDATE/ I AS
IBUILD TO (BUILT IWBS NOIPREL IBUILD TOIBUILT
I 1 I
1 I
I (643227. 11/82
1 1 12/62 1644158
1 1 1 I
I 1 1644157 19/83
1 I 5/84 1644167 1
1 1
I I I
I 1643224 1 9/82
I Ib43246 11/82
1 12/82 1644172 I
I Ib44171 8/83
1 5/84 1644161
1 I
1 1
1643243 1 9/82
1 1
1043245 9/82
1644170 I
S/84 $644183
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
w
o43257
I 1 1 t
1 1 1 1
17/84 1644180
I I
1 04 3 246111/82
8/83 16450451
1 1
164 504 4111/83
5/05 16450541
1 1
I 1
164324319/82
1 1
1 1
164324519/82
164 504 31
5/85 16450561
1 1
8/83 15/85 164324419/82
1 1 1
1 I 1
17/85 16450531
1 .1 1
11/83 19/US
19/85
0
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
1 1
I8EN tHUJECT M/S I
1
I
I
I I
ICUBLI
I
I
Igo
NAN,
MBS NO
DATE
I MRS NO I
I
B~uEltx
I
131 (Test Plabs
138 PCOycdm-
IMel: Is
Nauuai
141 Part I
Specs42 IPdct 11
ISpcca
145 (Data
I DicL101ldrY
150 ICPCI
IListluys
IBAPPLS
131 1'rest Plans
138 Pr uy >::1 m-
Imec's
Nalludi
141 IPdrt I
ISpeCs
142 I?act 11
Ibpucs
145 I Da to
(Dictionary
I I I
1150 ICPCI I
1 ILlsti llys I
( IOC I roc
I 1 FINAL/I
(UPDATE/ I AS I
i'BEL IUUILD'TOI BUILT IUBS NO
1644129 5/83
5/84 1644 139
643169 19/82
643191 I 11/83
643203 1
1643169 19/82
1b44128 I
5/84 1644141 I
I IFIBAL/I I I I1'INAL/
(UPDATE/ I AS I I (UPDATE/ I AS
PBEL IBUILD TO IBUILT IMBS NOIPBEL IBUILD TOIBUILT
-I--"+ f---i-----1
b43208 11/83 1 1 1643208 1 1/83
b43211 I 1 12/83 1644144 I
I 1 I i I
643210 1 2/83 1 1 (644143 1 7/83
643220 1 1 15/04 1644153 I
643207 110/621 1643207 1 10/82
643209 I 12/83 1644142 I
643222 1 I 5/84 1644155 I
I I I I
643206 110/d21 2/63 5/84 1643206 1 10/82
I I I
I 1 1
643219 I I 1 7/84 1644152 I
( ( 1 1
7/83 15/85
17/85
9
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
16EN PROJECT tl/S I
I
ICJNL)
N3 (NA8B MBS NO DATE I NBS
- - - - - t----- t --I--
I I FINAL/I
(UPDATE/ I AS I
PNEL (BUILD TOI BUILT INNS
-t --1---t--
FO C
r- -r--r----r- -1
1 (FINAL/I I I IFINAL/
(UPDATE/ I AS I I (UPDATE/ I AS
NO PEEL IBUILD TO IBUILT INBS NOIPNEL (BUILD TUIbUILT
IA?'!'L_ I 1
I I
131 IT.at Liabs b43265 1/83 1043265 1/83
I 1 6432b8 2/83 1 b4418b
I I
138 (ecuyLam- 1 b432b7
ImtL,y I 64!277
1 Na11uaI I I I
1a1 Ieart 1
ISpecs
I I I I I
142 12dLt I1 I I 1 643264
1 Ispec~ I I i b432bb
I 1 I 1 1 643279
I 1
1145 (Data
1 IDictiubaLy
I1~w ICPC1 I
I I b43210
1 IListiuys 1 I 1
Ib44185 6/83
5/84 1644195
Ib432b2 10/82
I I
12/83 1 1644184 6/83
1 1 5/84 1644197 1 1 15/85
I I 1 I
10/821 2/83 1 5/84 Ib43263 1 10/82 b/83 15/85
I 1 1 11
I I 1 I 1
1 17/84 1b44194 17/85
I I I 1 I
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
Approved For Release 2007/09/06: CIA-RDP84T00037R000500040001-2
UNCLASSIFIED
UNCLASSIFIED