NPIC DATA SYSTEM DATA AND CONTROL SEGMENT ACQUISITION PHASE APPENDIX B3 SCHEDULES
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP84T00037R000500060001-0
Release Decision:
RIPPUB
Original Classification:
U
Document Page Count:
42
Document Creation Date:
December 28, 2016
Document Release Date:
June 18, 2007
Sequence Number:
1
Case Number:
Publication Date:
February 24, 1982
Content Type:
REPORT
File:
Attachment | Size |
---|---|
CIA-RDP84T00037R000500060001-0.pdf | 1.36 MB |
Body:
.....-,
Approved For Release 2007/06/18: CIA-RDP84T00037R000500060001-0
UNCLASSIFIED
NPIC DATA SYSTEM
DATA AND CONTROL SEGMENT
ACQUISITION PHASE
APPENDIX B3
SCHEDULES
24 February 1982
UNCLASSIFIED
Approved For Release 2007/06/18: CIA-RDP84T00037R000500060001-0
STAT
Approved For Release 2007/06/18: CIA-RDP84T00037R000500060001-0
UNCLASS1 Fl ED
NPIC DATA SYSTEM
DATA AND CONTROL SEGMENT
ACQUISITION PHASE
APPENDIX B3
SCHEDULES
24 February 1982
This data, furnished in connection with Request for Proposal 82-B-015 as amended, shall not be dis-
closed outside the Government and shall not be duplicated, used, or disclosed in whole or in part for
any purpose other than to evaluate the proposal. If a contract is awarded to this offeror as a result of
or in connection with the submission of this data, the Government shall have the right to duplicate,
use, or disclose the data to the extent provided in the contract. This restriction does not limit the
Government's right to use information contained in the data if it is obtained from another source
without restriction.
UNCLASS1 Fl ED
Approved For Release 2007/06/18: CIA-RDP84T00037R000500060001-0
Approved For Release 2007/06/18: CIA-RDP84T00037R000500060001-0
UNCLASSI Fl ED
APPENDIX B-3
SCHEDULES
1
UNCLASSI Fl ED
Approved For Release 2007/06/18: CIA-RDP84T00037R000500060001-0
Approved ForRelease2007/06/18 : CIA-RDP84T00037R000500060001-0
UNCLASS1 Fl ED
This appendix supplements Section 5, Project Plans; it provides additional detailed
data that includes a comprehensive CDRLs delivery schedule and detailed CPCI develop-
ment schedules. Section 5.1 of the Management Proposal shows the D/C Segment Master
Schedule that includes the major activities and milestones required for the NPIC devel-
opment. Sections 5.2 through 5.7 show a lower level of schedule detail for each
specific plan. This appendix provides a subsequent level of detail that will allow
the program management team to continually focus on the further refinement and adher-
ence to the detailed schedules consistent with the proposed management approach.
Schedule risk minimization is a major benefit from the in-depth understanding of the
required activities, the ability to take prompt correctivity action when scheduled
events are missed, and the concrete proof of overall development progress which
occurs when a capability is demonstrated at the successful completion of a scheduled
activity, task or milestone.
Table 1 presents the delivery schedule for all CDRLs. The CDRLs are broken into pre-
liminary, update (built to), final (as built) for BOC, IOC and FOC where appropriate.
Also included is the appropriate work breakdown structure number for each CDRL
delivery. These schedules were developed using SCRIPT for ease of monitoring and
updating by the Project Control Office. They will be reviewed by the responsible
performing managers and their staffs at weekly Project Master Control Plan (PMCP)
meetings. Monthly, they will be reviewed by executive management. Schedule status
will be formally reported monthly to NDPO. Major milestones will be indentified in
concert with NDPO and updated at least every six months.
Figures 1 through 17 show the detailed CPCI development schedules for the seventeen
CPICs defined in Section 5.3, Software Development Plan, of the Management Proposal.
Also included are enlarged copies of the five project plans as described in Section
5.
a. Master Schedule (Figure 18)
b. Systems Engineering Schedule (Figure 19)
c. Software Development Schedule (Figure 20)
e. Integration and Test/Installation and Checkout Schedule (Figure 22)
f. Training Schedule (Figure 23)
2
UNCLASSI Fl ED
Approved For Release 2007/06/18 CIA-RDP84T00037R000500060001-0
? Approved For Release 2007/06/18: CIA-RDP84T00037R000500060001-0
lanle 1. CDRL Delivery Schedule
I-
SCHEDULE
IGEN PROJECT 8/S
b0C
10C
FOC
--T
FINAL/
FINAL/
FINAL/
CORL
UPDATE/
AS
UPDATE/
AS
UPDATE/
AS
NO
NAME
W3S NO
DATE
WBS
NO Iekm.
6J1LD TO
BUILT
WBS
NO
PREL
BUILD TO
BUILT
WBS
NO
PREL
BUILD TO
BUILT
101
-f
Contract
-f--
5/3u/82
641100
WDS
102
financial
6411uU
5/30/82
Plan
103
Mister
641100
S/30/82
Scheaule
104
Oevelup-
went Plan
642106
5/30/6Z
105
Security
i'1,111
641500
5/30/82
106
Cd Plah
691400
m/30/t3.
10/
SO4 Update
641100
5/30/d2
103
QA elan
661300
5/30/82
109
Monthly
041203
monthly
Financial
deport
110
Milestone
Updates
1)41200
every
six
months
111
Milestone
b41200
weekly
Report
112
donthiy
b4loUu
monthly
Statu
Review
113
Quarterly
2roq and
041200
Eah
quarter
Status
Report
NOTE 1: 10 days atter Sbh and each CDR as required by schedule.
Approved For Release 2007/06/18: CIA-RDP84T00037R000500060001-0
ssv oN n
C13 Id IssvioNn
? Approved For Release 2007/06/18: CIA-RDP84T00037R000500060001-0
Table 1. CDRI. Delivery Schedule (Cont.)
SCHEDULE
1--
7
IGEN PROJEcT M/S
-
BOC
IOC I FOC
1 FINAL/
FINAL/
-r--
FINAL/
CDHL
1
UPDATE/ 1 AS
UPDATE/
AS
UPDATE/
AS
NO
NAME IwbS NO
DATE
WBS NO
PHEL
BUILD TO1 BUILT
WBS NO
PREL
BUILD TO
BUILT
WBS NO
PHEL
BUILD TO
BUILT
---i-
f -I--
?I
Action
641200
note 1
---4
?1
114
Item List
113
Soy T1:AUS
and Intey
842500
10/82
3/83
9/04
642501
10/82
11/83
9/84
642102
10/82
11/83
9/84
PidA
lb o
Soy Ups
642300
Prop
8/82
642301
Prop
8/82
64 2302
Prop
8/82
Coucept
117
Sey Design
642400
6/82
642400
8/82
64 2400
8/82
Specs
118
VW Opus
642103
8/82
642104
8/82
64 2 10 5
8/82
H/W
Interface
119
'NIA Trace
642200
Prop
8/82
12/82
6422U1
Prop
8/82
6/83
642202
Prop
8/82
10/83
Vent.
Matrix
120
Eng Tech
Notes
dS
required
o42221
642222
642223
121
Seg Vent
642600
10/82
642601
10/82
642602
10/82
Plan
122
Soy Leslyu
642209
Prop
0/82
12/82
642210
Prop
8/82
6/83
642211
Prop
8/82
10/83
Analy Rpt
123
068 Plan
642312
10/82
2/83
642313
10/82
11/83
642314
10/82
11/83
Manual.
1
124
&Wit and
642315
9/82
12/83
642316
9/82
12/83
642317
9/82
12/83
Loy Pion
125
DB Spec
642401
10/82
2/83
642401
10/82
11/83
642401
10/82
11/83
12o
Ops/SW
622405
9/82
1/83
622406
9/82
1/83
622407
9/82
10/83
Int Spec
12/
Ops/HW
622405
9/82
1/83
622406
9/82
1/83
622407
9/82
10/83
Int Spec
Approved For Release 2007/06/18: CIA-RDP84T00037R000500060001-0
CI3 Id IssviaNn
ISSV1ONn
? Approved For Release 2007/06/18: CIA-RDP84T00037R000500060001-0
?
Table 1. COHL Delivery Schedule (Cont.)
r--
SCHEDULE
?T
T?
5/S 1 tIOC
IOC
FOC
16E8
PHOJECT
1
?4 -I--
i, I
FINAL/
FINAL/
?4
1FINAL/
I
CON!.I
1 [UPDATE/
AS
UPDATE/
AS
UPDATE/ 1 AS
NO
NA d0
WbS
NU 1 L)AT IWkiS NO 1 ehLL 'BUILD TU
BUILT
WBS NO
PRL
BUILD TO
BUILT
WBS No
!REL
BUILD TOIBUILT
____i_
?4? 4 4-
123
?4
114/SW
9/82
t ?4--
-1--------U
1/83
9/82
---4
1/83
622407
9/82
10/83
622405
022406
Int Spec
121
SW/SW
022405
9/82
1/83
622400
9/82
1/83
622407
9/82
/65
Int spec
130
seg eSt
042603
10/82
2/83
642604
10/82
11/83
642605
fa /8 2
11/63
Plan
131
Tec elan
641011
1/83
2/83
641111
1/83
11 /8 3
641211
1/83
11/83
132
Seg Prog
643004
9/82
1/83
643007
9/82
9/83
643007
9/82
9/83
P, S 6 C
133
Seg Ups
642300
10/82
642301
10/82
642302
10/82
Specs
134
Se9 Inst
041331
10/82
2/83
10/83
641431
10/82
9/83
10/83
641531
10/82
9/83
10/83
Plea
135
User
64230.3
10/82
2/83
2/84
642304
10/62
2/83
3/85
642305
10/82
2/83
7/85
Manual ?
136
Operator
042306
10/82
2/83
2/84
642307
10/82
2/83
3/85
642308
10/82
2/83
7/85
Manual
131
DB Admin
10/82
2/83
2/84
10/82
9/83
3/85
11)/82
9/83
7/85
Manuai
1
138
Pr09r3mmer.6.
danual
2/83
5/84
9/83
5/85
9/83
9/85
139
eacility
041320
10/82
2/83
3/84
041420
10/82
10/83
4/65
641520
10/821
10/83 .
8/85
IONS
140
Tray Plan
041713
1/83
2/83
641714
1/83
11/83
641715
1/83
11/83
143
CI SpC
6462U1
10/82
646201
10/82
1
144
Component
646401
10/82
646201
10/82
Spec
046204
2/83
647201
6/83
046208
5/84
647205
5/65
Approved For Release 2007/06/18: CIA-RDP84T00037R000500060001-0
issvioNn
0
ISSV1ON11
? Approved For Release 2007/06/18: CIA-RDP84T00037R000500060001-0
Table 1. CDHL Delivery Schedule (Cont.)
SCHEDULE
--1
I
?T
IGEN PROJECT N/S BUG
10 C O C
FINAL/
FINAL/
FINAL/
CDRL
UPDATE/ I AS
UPDATE/
AS
UPDATE/
AS
NO
AMIE
WBS NO
DATE I WBS NO
PREL
BUILD TUI BUILT
WBS NO
PHEL
BUILD TO
BUILT
WBS NO
PHEL
BUILD TO
BUILT
V----4
Tray
4-
641720
3/83
-4-
12/83
641721
10/83
4---
1/85
641722
-4
10/83
5/85
146
Materials
641730
3/83
12/83
641731
10/83
1/85
641732
10/83
5/85
641740
3/83
12/83
641741
10/83
1/85
641742
10/83
5/85
141
Shipping
841330
11/84
641430
1/85
641530
4/85
Plan
148
Equip OBE
646253
1/84
7/84
647212
3/84
7/85
648212
6/85
11/85
Manual
149
QA Audit
Audit
641310
641311
641312
Report
+ 15
151
08 Packages
643015
5/84
644013
5/85
645013
9/85
152
SW Desc Doc
641410
2/84
641411
4/85
641412
7/85
153
Sys Test/
641350
11/83
11/84
641450
1/85
8/85
641550
3/85
?
Demo lap
154
Sey Test
641341
6/84
041441
6/85
641541
10/85
Reports
155
Tech Pert
-As
642203
642204
642205
Meas
Required
156
Accession
Monthly
641800
641801
641802
List
Manual
* Complete 15 days atter last system demo.
Approved For Release 2007/06/18: CIA-RDP84T00037R000500060001-0
CI3 Id issvioNn
(::
2!
0
rm-
)1*
(/)
? Approved For Release 2007/06/18: CIA-RDP84T00037R000500060001-0
4110
Table 1. CURL Delivery Schedule (Cont.)
SCHEDULE
IGEN
PROJECT B/S
BOC
IOC I FOC
-4
I
I FINAL/
FINAL/I
FINAL/
CURL
I
UPDATE/ 1 AS
UPDATE/
AS
UPDATE/
AS
SU
NAME
WBS
NO
DATE
WBS NO I PREL
BUILD TOI BUILT
WBS NO
PREL
BUILD TO
BUILT IWBS NO
pith'.
BUILD TO
BUILT
1---
______,_
-?
-1
i
-4-
4_
---1
BPPRE
131
test Plans
643021
10/82
643021
10/82
643024
11/82
644017
8/83
138
Prog14m-
643023
11/82
644016
8/83
mer's
643034
5/10
644026
5/85
Manual
141
Part I
1343018
8/82
643018
8/82
Specs
142
edit II
643020
8/82
643020
8/82
Specs
64302243036
6
12/82
5/84
644015
644028
8/83
5/85
145
Data
643019
8/82
12/82
5/84
643019
8/82
8/83
5/85
Dictionary
150
CPCI
643032
7/84
644025
7/85
Listings
BEMGMT
131
Test Plans
643041
11/82
643041
11/82
643044
1/83
644031
7/83
138
Program-
643043
1/83
644030
7/83
mer's
643053
5/84
644040
5/85
Manual
141
?art I
643038
8/82
643038
8/82
Specs
142
Part II
643040
8/82
643040
8/82
Specs
643042
1/63
644029
7/83
643055
5/84
644042
5/85
145
Data
643039
8/82
1/83
5/84
643039
8/82
7/83
5/85
Dictionary
150
CPCI
643052
7/84
b44039
7/85
Listings
Approved For Release 2007/06/18: CIA-RDP84T00037R000500060001-0
ssv aN n
rn
0
G 3 Id issvioNn
Approved For Release 2007/06/18: CIA-RDP84T00037R000500060001-0
?
Table 1. CDHL Delivery Schedule (Cont.)
SCHEDULE
IGEN PNUJECT M/S
b0C
IOC
FOC
FINAL/
FINAL/
FINAL/
CDHL
UPDATE/
AS
UPDATE/
AS
UPDATE/
AS
NO
NAME
WBS NO I DATE
WBS NO
PEEL
bUILD TO
BUILT
WBS NO
PREL
BUILD TO
BUILT
WBS
NO
PHEL
BUILD TO
BUILT
4 -+--
-4
BEXSUP
?_-1
131
Test Plans
643285
11/82
643285
11/82
643286
12/82
844200
5/83
138
Progiam?
643287
12/82
844199
5/83
mec's
843298
5/84
644209
5/85
Manual
141
Pait I
643281
8/82
843281
8/82
Specs
142
Fart 11
643284
8/82
843284
8/82
Specs
643286
12/82
844198
5/83
643300
5/84
644211
5/85
145
Data
643282
8/82
12/82
5/84
643282
8/82
5/83
5/85
Dictionary
150
CPC.).
643296
7/84
644208
7/85
Listings
BENtsU
131
Test Plans
1343060
11/82
643060
11/82
643063
12/82
644045
6/83
138
Program-
643062
12/82
644044
6/83
mer's
643072
5/84
644054
5/85
Manual
141
Pd11 1
843057
8/82
843057
8/82
Specs
142
Part 11
643059
8/82
643059
8/82
Specs,
643061
12/82
644043
6/83
643074
5/84
644056
5/85
145
Data
843058
13/82
12/82
5/84
643058
8/82
6/83
5/85
Dictionary
150
CPC1
843071
1/84
644053
7/85
Listings
-_L
Approved For Release 2007/06/18: CIA-RDP84T00037R000500060001-0
issvioNn
Approved For Release 2007/06/18: CIA-RDP84T00037R000500060001-0
Table 1. CDRL Delivery Schedule (C.ont.)
SCHEDULE
-r
IGEN
PROJLCI M/S
IsOC IOC
FOC
-4
FINAL/I
FINAL/
FINAL/
CDHL
UPDATE/
AS I
UPDATE/
AS
UPDATE/
AS
NO
NAME IWBS
NO
DATE
NUS NO
PREL
BUILD TO
BUILT IwBS NO
PREL
BUILD TO
BUILT
NHS
NO
PULL
BUILD TO
BUILT
-f
81,31'111P
-1
131
rest Plans
643097
11/82
043091
11/62
643100
1/63
644059
5/83
138
Proylau-
643099
1/83
644058
5/83
uier ?S
643109
5/u4
644068
5/85
Manual
141
Pact I
643301
8/82
643301
8/82
Specs
142
Part II
643096
8/82
643096
8/82
Specs
643098
1/83
644057
5/83
643111
5/84
644070
5/85
145
Data
643095
8/82
1/83
5/84
643095
8/82
5/83
5/85
Dictionary
150
CPC1
643106
7/84
64.4067
7/B5
Listinqs
USIA TN
131
Test Plans
643116
12/82
843116
12/82
643119
2/83
644013
9/83
138
Proyiam-
643118
2/83
644072
9/83
wefts
643128
5/54
644083
5/85
Manual
141
Part 1
643113
9/82
643113
9/82
Specs
142
Part 11
643115
9/82
643115
9/82
Specs
643117
2/83
644071
9/83
643130
5/84
6 440 85
5/85
145
Data
643114
9/82
2/83
5/84
643114
9/82
9/83
5/85
Dictionary
1!..0
CPCI
643127
7/84
644082
7/85
Listinys
Approved For Release 2007/06/18: CIA-RDP84T00037R000500060001-0
03 Id issvioNn
? Approved For Release 2007/06/18: CIA-RDP84T00037R000500060001-0
L
table 1. CDRL Delivery Schedule (Cont.)
SCHEDULE
CONL
NO NAME
BM% Dr
131 'test Plans
138 Proy
wet's
141 ea 1
Lipec.t;
142 ea rt IL
14s Data
uict lona ry
150 CPC1
Lis Li flys
BC CII Ii(
131 T,tst.
138 Program?
Ser 11.>
0441141?1
141 kat 1
Specs
142 Part 11
Specs
145
150
Data
Dictionary
C,?4:1
List.4nys
-r
I GEN P h v3 ECT 11/S BOC I IOC
I- ?T ?I- ?r ---r- ?I-- -r
I FINAL/
UPDATE/ I AS UPDATE/
iiI3S NO LArE 441.46 NO P NEL BUILD 1.01 BUILT ii DS NO PREL BUILD TO
?1- ?I- ?1 ?1 --( 1-- ?I- ?1?
9/82
01.13171 1/133
04 3174
04 317 2/83
043103
64 3104 114/82
643110 10/02
643172 2/63
64 3185
04 3109 10/432 2/433
0143102
A_
2/83
5/84
5/84
5/814
7/014
044102
041.101
644 111
643 1s4.4
6 4 4 100
044113
6414 110
043171
b44110
44 115
644 125
6431138
1343 170
6144 1 14
044 121
043109
b 44124
12/02
11/83
9/82
9/82
9/82
1/83
13/83
10/82
10/82
10/82
11/8 3
11/8 3
8/83
8/83
FOC
1? i T---1
FINAL/ I I FINAL/
AS UPDATE/ AS
BUILT FIBS NOI PREL 'BUILD TO BUILT
1-- ?I-
1/83
5/85
5/85
5/85
7/85
8/83
5/65
5/85
5/85
7/85
1_ J--
04 5017
64 50 16
64 5026
643150
64 5015
64502 8
64 5025
64 3171
04 5031
6145030
04 5040
6143168
64 3 170
6415029
64 5042
6143169
64 5039
Approved For Release 2007/06/18: CIA-RDP84T00037R000500060001-0
12/82
11/83
9/82
9/82
9/132
1/83
10/83
10/82
10/8 2
10/8 2
11/83
11/83
10/63
144/83
9/85
9/8
9/8S
10/83
9/85
d issvioNn
rn
r-
Approved For Release 2007/06/18: CIA-RDP84T00037R000500060001-0
Table 1. CURL Delivery Schedule (Cont.)
?
SCREDULE
CURL
NO NAML
131
(AuUERY
IGEN PROJECT M/S BOC 1
?+ ?r
NRS NO DATE WBS NO PREL
___.4 4_____ _f___ --1- -I
Test Plans
136 Program-
mer's
manual
141 Part I
Specs
142 Part II
Specs
145 Data
Dictionary
150 CPCI
Listings
BAPPLS
131 Test Plans
138 Program-
mer's
Manual
141 Part I
Specs
142 Part Il
specs
145 Data
Dictionary
150 CPC' ?
Listings
643190 12/82
643192
643201 1/83
643187 9/62
64.3169 9/82
643191
643203
643188 9/82
643200
643208 1/83
643211
643210 2/83
643220
643205 10/82
643207 10/82
643209
643222
643206 10/82
643219
-1-
IOC
FOC
1. FINAL/
UPDATE/ 1 AS
BUILD TO( BUILT WBS NO
PREL
UPDATE/
BUILD TO
FINAL/1
AS 1
BUILT 1WBS NO
PREL
1/83
1/83
2/83
2/83
64319U 12/82
1/83 ? 644130
644129 5/83
5/84 644139
643187 9/82
643189 9/82
644128
5/84 644141
5/84 643188 9/82
7/84 644138
643208 1/83
2/83 644144
644143 7/83
5/84 644153
643205 10/82
643207 10/82
.644142
5/84 644155
5/84 643206 10/82
? 7/84 644152
5/83
5/83
7/83
7/83
5/85
5/85
5/85
5/85
7/85
7/83
5/85
5/85
5/85
7/85
FINAL/
UPDATE/ AS
BUILD TO BUILT
--f
Approved For Release 2007/06/18: CIA-RDP84T00037R000500060001-0
ssv oN n
rn
0
031d ISSV13N11
? Approved For Release 2007/06/18: CIA-RDP84T00037R000500060001-0
?
Table 1. CDRL Delivery Schedule (Cont.)
SCHEDULE
16EN PROJECT M/S 1
BOC
IOC
FOC
CORL
NO NAME WES NO DATE I WES No
1-----1 ____4 -I? --1-
EOMArS
1:31
138
1141
142
145
150
131
138
141
142
145
Test Plans
Frogram-
mer's
Manual
Part I
Specs
kart 11
Specs
Data
Dictionary
CPC1
Listings
EITDEY
Test Plans
Program-
4415 r? s
Manual
Part I
SpeCb.
Part 11
Spec:,
Data
Dictionary
150 CPC1
Listings
L----
643127
643230
643229
643239
643224
643226
643228
643241
643225
643238
643246
643249
643248
643258
643243
643245
643247
643260
643144
643257
PREL
11/82
12/82
9/82
9/82
9/82
12/82
9/02
9/82
9/82
1 FINAL/
UPDATE/ 1 AS
EU11,0 TO1 BUILT
WBS NO PREL
UPDATE/
BUILD TO
FINAL/
AS
BUILT WBS NO
PREL
UPDATE/
BUILD TO
12/02
12/82
12/82
12/82
643227 11/82
12/82 644158
644157 9/83
5/84 644167
643224 9/82
643226 9/82
644156
5/84 644169
5/84 643225 9/82
7/84 644166
643246 11/82
12/82 644172
644171 8/83
5/84 644181
643243 9/82
643245 9/82
644170
5/84 644183
5/84 643244 9/82
7/84 644180
9/83
9/83
8/83
8/83
9/83
5/85
5/85
5/85
7/85
8/83
5/65
5/65
5/65
7/85
64 3 24 6
645045
645044
645054
64 324 3
643245
645043
645056
643244
645053
11/82
11/83
9/132
9/82
9/82
11/83
11/83
FINAL/
AS
BUILT
-1
11/83
9/85
9/85
9/85
9/85
Approved For Release 2007/06/18: CIA-RDP84T00037R000500060001-0
issvioNn
0
ISSV1ON11
? Approved For Release 2007/06/18: CIA-RDP84T00037R000500060001-0
Table 1. COM. Delivery schedule (Cont.)
r-
SCHEDULE
1--
ibEn PftuJEcT
I 80C
IOC I FOC
n/s
FINAL/
?T
FINAL/
FINAL/
CSHL
UPDATE/
AS
UPDATE/
AS I
UPDATE/
AS
NO NAME 148S NO DATE I WBS NO
PREL
BUILD TO
BUILT
WBS NO
PREL
BUILD TO
BUILT IWBS NO
FEEL
BUILD TO
BUILT
4A Pt
4
?4
?f-----+
131
Te.,IL
843285
1/83
643265
1/83
(3432u8
2/83
644186
6/83
138
efOjEdIll-
843267
2/83
644185
6/83
643277
5/84
644195
5/85
141
earl I
643262
10/82
643262
10/82
Spec
142
II
643264
10/82
643264
10/82
Specs
643266
2/83
644184
6/83
643279
5/84
644197
5/85
145
Data
043263
10/82
2/83
5/84
643263
10/82
6/83
5/85
Dictionary
130
CPCI
643270
7/84
644194
7/85
Li:.;tinys
Approved For Release 2007/06/18: CIA-RDP84T00037R000500060001-0
CI3 Id issvloNn
ISSV1ONil
Approved For Release 2007/06/18: CIA-RDP84T00037R000500060001-0
BEPPRE
82
83
84
85
AMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASOND
PRELIM. DESIGN
- PART I SPECS
- DATA DICT
- PART II SPECS
- TEST PLAN
CRITICAL DESIGN
- PART II SPECS
'BUILD TO'
- PRELIM. PROG.
MARL.
- TEST PL AN .
DEVELOPMENT
- C & TEST
- INT. & TEST CPC
TEST
- UNIT TEST
- DEV. TEST
PROCEDURES
- SUPPORT T & V
- PREPARE REPCRTS
DOCUIENTATION
- ItRUTS TO USER,
OPS & D.B. ADMIN.
MAKALS
- CPCI LISTINGS
'AS BUILT'
- PROGRAWZR MANUAL
- TRAINING MANUAL
INPUTS
- PART II SPECS
'AS BUILT'
B
BODE
I
1-1
I
1-I1
.1
I
, .1
8
I
8
I
15
..
I
B
i -i
I
..
11-,
B
I
I
I
1
I
B
B
1--1
,
B
I
r----1
I
1-I
B
I
I
B
I
1/-13-1
B
I
B
I
B
r----1
I
I-1
I
I-I
B
I
Approved For Release 2007/06/18: CIA-RDP84T00037R000500060001-0
FIGURE I. CPCI DEVELOPMENT SCHEDULE
issvioNn
031d ISSV13N11
?
Approved For Release 2007/06/18: CIA-RDP84T00037R000500060001-0
BEMGMT
?
82
83
84
85
AMJJASONDJF
M
AMJJ ASONDJF
M AMJJA
SONDJF MANJJA SONO
PREL IN. DESIGN
- PART I SPECS
- DATA 0 I CT
- PART I I SPECS
- TEST PLAN
CAI T I CAL DESIGN
- PART I I SPECS
'BUILD TO'
- PIM.B PROG.
MANUAL
- TEST PLAN
DEVELOPNENT
- CODE a TEST
- INT. & TEST CPC
TEST
- UN I T TEST
- DEV. TEST
PROCEDURES
- SUPPORT T & V
- PREPARE FtEPCRTS
DOCUIENTAT ION
- INPUTS TO USER.
CPS & D.B. ADMIN.
MAt4UALS
- CPC! LISTINGS
'AS BUILT'
- PROGRAMER MAMIAL
- TRAINING MANUAL
INPUTS
- PART II SPECS
'AS BUILT'
8
8
I
I
1
I
1
1
8
i
B
8
1
---i
r?ii
r
I
I?I
8
I
B
1
8
I
8
I
I1
I
I
B
1
,
,B
,EI
i_B_I
I
I?I
I
1-1
I-I
I
I--1
I
1---1
i?T
,
1--1
1_15_1
I?,
8
Approved For Release 2007/06/18: CIA-RDP84T00037R000500060001-0
FIGURE 2 CPCI DEVELOPMENT SCHEDULE
issvioNn
0
031d ISSV13NI1
Approved For Release 2007/06/18: CIA-RDP84T00037R000500060001-0
BEXUP
82
83
84
85
AMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASOND
PRELIM. DESIGN
- PART I SPECS
e
1
1
B
- DATA DICT
1------1
. .8
- PART II SPECS
A-1
B
I-I
- TEST PLAN
I
I--i
CRITICAL DESIGN
-PART II SPECS
8
1
I
'BUILD TO'
8
- PRELIM. PROG.
1-1
I
MANIAL
'
8
I
-TEST PLAN
I-I
DEVELOPMENT
8
I
- CODE It TEST
1
BPC
I
- INT. a TEST C
1
1
TEST
8
I
-UNIT TEST
8
I
-DEV. TEST PROC.
I
II
B
I
- SUPPORT T At V
B
I
1
-PREPARE REPORTS
I-1
I-I
DOCUMENTATION
8
- INPUTS TO USER.
1-1
OPS a D.B. ADMIN.
MANUALS
I
- CPCI LISTINGS
I-11
'AS BUILT'
I
- PROGRAMMER MAPAIAL
FP-1
1-1
.
I
- TRAINING MANUAL
F-14
F-1
INPUTS
I
- PART II SPECS
I-81
F-I
'AS BUILT'
Approved For Release 2007/06/18: CIA-RDP84T00037R000500060001-0
?
FIGURE 3. CPCI DEVELOPMENT SCHEDULE
IssvioNn
0
03 Id ISSV13Nn
Approved For Release 2007/06/18: CIA-RDP84T00037R000500060001-0
BERESU
82
83
84
85
AMJJASONDJFMANJJASONDJFMAMJJ?SOND.JFMANJJASOND
PRELIM. DESIGN
- PART I SPECS
- DATA DICT
- PART II SPECS
- TEST PLAN
CRITICAL DESIGN
- PART II SPECS
'BUILD TO'
- PRELIM. PROG.
MANUAL .
- TEST PLAN
DEVELOPmENT
- CODE 2 TEST
- INT. 2 TEST CPC
TEST
- U TEST
- DEV. TEST
PROCEDURES
- SUPPORT T 2 V
- PREPARE REPORTS
DOCUMENTATION
- ipwrs TO USER,
OPS At D.B. ADMIN.
MANUALS
- CPCI LISTINGS
'AS BUILT'
- PROGIA164ER MANUAL
- TRAINING MANUAL
D4Purs
- PART II SPECS
'AS BUILT'
B
8
B
B
I
1--1
I
I
I?I
I
h--i
6
I
. .8
I
11-1
B
1--I
B
I---1
B
I
I-05-1
I
6NIT
13
I
1-BH 1?I
Ij-31
B
F--I
Approved For Release 2007/06/18: CIA-RDP84T00037R000500060001-0
?
FIGURE 4. CPCI DEVELOPMENT SCHEDULE
031d issvioNn
031d ISSV13N11
Approved For Release 2007/06/18: CIA-RDP84T00037R000500060001-0
IIIP
BMAN IP
82
83
84
85 ?
AMJJASONDJFNAMJJASONDJFMAMJJASONDJFMAMJJASOND
PRELIM. DESIGN
- PART I SPECS
- DATA DICT
- PART II SPECS
- TEST PLAN
CRITICAL DESIGN
- PART II SPECS
'BUILD TO'
- PRELIM. PROG.
MANUAL ?
- TEST PLAN
DEVELOPIENT
- CODE 2 TEST
- INT. IL TEST CPC
TEST
-UNIT TEST
-DEV. TEST PROC.
- SUPPCPT T 2 V
-PREPARE REPCRTS
DOCUMENTATION
- INPUTS TO USER,
CPS 2 D.B. ADMIN.
MAMLALS
- CPCI LISTINGS
'AS BUILT'
- PROGRAMMER MANUAL
- TRAINING MANUAL
INPUTS
- PART II SPECS
'AS BUILT'
B
8
I
I?I
I
I
I
I
8
B
I?BI
I
B
F?I
I?I
I
I
I
F?I
6
I
I
I----I
B
5
I
I
B
8
8
I'
B
8
I
--I
8
I?I
B
1--I
Fj-3 I
Fill
5
I?I
IllI?I
I
I?I
I
1
F?I
FII
Approved For Release 2007/06/18: CIA-RDP84T00037R000500060001-0
FIGURE 5. CPCI DEVELoPmENT SCHEDULE
C13 Id issvioNn
031d ISSViONfl
?
Approved For Release 2007/06/18: CIA-RDP84T00037R000500060001-0
11.
BSTAT R
82
83
BN
85
ANJJASONDJFNAMJJASONDJFMAMJJASONDJFMAMJJAS,OND
PRELIM. DESIGN
- PART I SPECS
- DATA DICT
- PART 11 SPECS
- TEsi. PLAN
CRITICAL DESIGN
- pARf II SPECS
-suiLo To-
- PRELIM. PROG.
MANUAL
-TEST PLAN '
DEVELDDIENT
- coot 2 TEST
- INT. 2 TEST CPC
TEST
-UNIT TEST
-DEV. TEST PROC.
- SUPPORT T /1 V
-PREPARE REPORTS
DOCUMENTATION
- INPUTS TO U.
OPS /I, D.B. ADMIN.
MANUALS
- CPCI LISTINGS
'AS BUILT'
- PROGRANNER MANUAL
- TRAINING MANUAL
INPUTS
- PART II SPECS
'AS BUILT'
B
6
i
I-1
I
1
I
I
I
. .8
1--6
-I
o
I?i
'Ali
B
I?I
.
5
1
F?I
1
8
I?I
BI
.
B
.I
8
I
I
I-1
6
I?I
I
F?I
ili
8
I?I
1
I?I
I
1---1
Approved For Release 2007/06/18: CIA-RDP84T00037R000500060001-0
FIGURE 6. CPCI DEVELOPMENT SCHEDULE
issvloNn
rn
0
CI3 Id ISSV13Nfl
?
Approved For Release 2007/06/18: CIA-RDP84T00037R000500060001-0
BMMGMT
82
83
84
85
AMJJASONDJFMAMJJASONDJFMAMJJASONDJFAIAMJJASOND
PRELIM. DESIGN
- PART I SPECS
- DATA DICT
- PART II SPECS
- TEST PLAN
CRITICAL DESIGN
- PART II SPECS
'BUILD TO'
- PRELIM. PROG.
MAMA_
- TEST PLAN
DEVELOPMENT
- CODE 8 TEST
- INT. 6 TEST CPC
TEST
-UNIT TEST
-DEV. TEST PROC.
- SUPPCPT T 8 V
-PREPARE REPORTS
DOCUMENTATICN
- INPUTS TO USER.F
CPS 11 0.6. ADMIN.
MANUALS
- CPCI LISTINGS
'AS BUILT'
- PROGRAMMER MANUAL
- TRAINING MANUAL
INPUTS
- PART II SPECS
'AS BUILT'
6
, .13
I
I
I?I
I
F
I
F
F
FI
F
F-I
F
I-1
I
F
I
6
I?I
s
F-I
I
I
I
I-I
I
.
1
.
'i
I
I
.
I
F
t-----1
i
I
I
I-I
IF
B
---I
F
6
I---I
I
I-I
F
F-
I--I
"F
F
I-I
Approved For Release 2007/06/18: CIA-RDP84T00037R000500060001-0
?
FIGURE 7. CPCI DEVELOPMENT SCHEDULE
issviaNn
ISSV1ONn
?
Approved For Release 2007/06/18: CIA-RDP84T00037R000500060001-0
BCCNTR
82
83
84
85
AMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASOND
PRELIM. DESIGN
- PART I SPECS
- DATA DICT
- PART II SPECS
- TEST PLAN
CRITICAL DESIGN
- PART II SPECS
'BUILD TO'
- PRELIM. PROD.
MANUAL
- TEST PLAN
DEVELCPMENT
- COOE 2 TEST
- INT. 2 TEST CPC
TEST
-UNIT TEST
-DEV. TEST PROC.
- SUPPORT T 2 V
-PREPARE REPORTS
DOCUMENTATION
- INPUTS TO USER,
OPS it D.B. ADMIN.
MANUALS
- CPCI LISTINGS
'AS BUILT'
- PROGRAMER MANUAL
- TRAINING MANUAL
B
8
I
F-4
I
F .
F
F
I---I
1
F
F
1-1
F
F
I
11.1
B
B
1---4
.
i
8
I
I
F-1
I
I
B
1-1
8
B
I
B
I
I
I
" F
F
I-I
I
8
1-1
1-1
B
I
F
F
1-
1--1
F
I
B
1-I
B
1-1
12-3I
I
1-1
I
1-1
ELI
F
I--I
I-El
I-El
INPUTS
- PART II SPECS
'AS BUILT'
Approved For Release 2007/06/18: CIA-RDP84T00037R000500060001-0
?
FIGURE 8. CPCI DEVELOPMENT SCHEDULE
issvioNn
a
Approved For Release 2007/06/18: CIA-RDP84T00037R000500060001-0
BQUERY
82
83
84
85
AMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASOND
PRELIM. DESIGN
- PART I SPECS
6
6
1.---1
- DATA DICT
8
- PART II SPECS
I-I
I
- TEST PLAN
1--6 1
I-I
CRITICAL DESIGN
-PART II SPECS
I
8
I
f
I
'BUILD TO'
I
- PRELIM. PROG.
MANUAL
8
I
-TEST PLAN
I-I
1--I
DEVELOPMENT
6
I
- CODE 8. TEST
I
B
I
- INT. 2 TEST CPC
TEST
8
I
-UNIT TEST ,
I
6
-DEV. TEST PROC.
I-A
8
I
I
- SUPPORT T It V
8
I
-PREPARE REPCRTS
1---1
I-I
DOCLMENTATION
I
- IIPUTS TO USER.
I-I
OPS It D.B. ADMIN.
MANUALS
I
- CPCI LISTINGS
Ell4
1-----1
'AS BUILT'
- PROCRAIAER MANUAL
EJL4
I
- TRAINING MANUAL
I-I
INPUTS
I
- PART II SPECS
1-----1
'AS BUILT'
Approved For Release 2007/06/18: CIA-RDP84T00037R000500060001-0
?
FIGURE 9. CPCI DEVELOPMENT SCHEDULE
ssv oN n
ISSV1ON11
?
Approved For Release 2007/06/18: CIA-RDP84T00037R000500060001-0
BAPPLS
82
83
84
85
AMJJASONDJFNAMASONDJFmAMJJAS0NDJFNAMJJASOND
PRELIM. DESIGN
- PART I SPECS
- DATA DICT
- PART II SPECS
- TEST PLAN
CRITICAL DESIGN
- PART II SPECS
'BUILD TO'
- PRELIM. PROG.
MANUAL
- TEST PLAN
DEVELOPNENT
- CODE a TEST
- INT. & TEST CPC
TEST
-UNIT TEST
-DEV. TEST PROC.
- SUPPORT T JI v
-PREPARE REPORTS
DOCUNENTAT ION
- INPUTS TO USER.
OPS a D.B. ADMIN.
MANUALS
- CPCI LISTINGS
'AS BUILT'
- PROGRAMER MANUAL
- TRAINING MANUAL
INPUTS
- PART II SPECS
'AS BUILT'
6
B
I
1--1
I I
I
I
I
I
6
6
6
6
I?I
I
6
E--1
B
I
I
I
B
I
I?I
I
6
I
I
B
I
I
6
I
I
I?I
I
II
' 6
I-1
1-5-1
B
II
6
1---1
F5?I
II3-1
I
I?I
I
I?I
I
I-1
I
/--I
I
I?I
I-1-4
Approved For Release 2007/06/18: CIA-RDP84T00037R000500060001-0
?
FIGURE 10 CPCI DEVELOPMENT SCHEDULE
issvioNn
ISSV1DNII
? Approved For Release 2007/06/18: CIA-RDP84T00037R000500060001-0
?
BDMAPS
82
83
84
85
AMJJASONDJFMAMJJASONDJFMANJJASONDJFMAMJJASOND
PRELIM. DESIGN
- PART I SPECS
- DATA DICT
-PART II SPECS
- TEST PLAN
CRITICAL DESIGN
- PART II SPECS
'BUILD to.
- PRELIM. PROG.
14AAAJAL
- TEST PLAN .
DEVELOPIENT
- CODE .1 TEST
- INT. At TEST CPC
TEST
-UNIT TEST
-DEV. TEST PROC
- SUPPORT T /I V
-PREPARE REPORTS
DOCUMENTATION
- INPUTS TO USER,
OPS & D.B. ADMIN.
MANUALS
- CPCI LISTINGS
'AS BUILT'
- PROGRAMER MANUAL
- TRAINING MANUAL
IMDUTS
- PART II SPECS
'AS BUILT'
8
B
I
I?I
I
I
1
I
I
I
13
. .
r? ---i
..
B-1
1
OA
6
I?B?I
I?I
I
I
B
I
I-1
I
1
6
1
I
I
I
B I
i----1-1
B
1
B
I-I
OA
1-B I
I
I-I
I
I?I
I
I
/--I
I
1-1
Approved For Release 2007/06/18: CIA-RDP84T00037R000500060001-0
FIGURE 11 CPCI DEVELOPMENT SCHEDULE
issvioNn
0
031d ISSV1ON11
?
Approved For Release 2007/06/18: CIA-RDP84T00037R000500060001-0
BTTDEV
82
83
_
84
65
?MJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASOND
PRELIM. DESIGN
- PART I SPECS
- DATA DICT
- PART II SPECS
- TEST PLAN
CRITICAL DESIGN
- PART II SPECS
'BUILD TO'
- PRELIM. PROG.
MANUAL
- TEST PLAN
DEVELOPMENT '
- CODE .1 TEST
- INT. & TEST CPC
TEST
- UN TEST
- DEV. TEST
PROCEDLRES
- SUPPORT T & V
- PREPARE REPORTS
DOWENTAT ION
- INPUTS TO USER.
OPS 6 D.B. ADMIN.
MANUALS
- CPCI LISTINGS
'AS BUILT'
- PROGRAMER MANUAL
- TRAINING MANUAL
i tIRJTS
- PART I I SPECS
'AS BUILT'
8
1
I-1
I
I
FI
I
F
I-1
F
I-I
I
e
I
8
e
liLl
B
, B ,
6
I
F
I
I-1
r-t
B
B
r
6
I-1
I
13
------t
1IT
1--I
F
12-II
I?LI
Et
F?I
FILII
1-1
F-6 I
F-B-II
}-I
F?II
F
I-I
F
F--1 I?I
F
I-1 I?I
r-------1
Approved For Release 2007/06/18: CIA-RDP84T00037R000500060001-0
?
FIGURE 12. CPCI DEVELOPMENT SCHEDULE
issvloNn
031d ISSV13Nfl
?
Approved For Release 2007/06/18: CIA-RDP84T00037R000500060001-0
WAPPLS
82
83
84
85
AMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASOND
PRELIM. DESIGN
- PART I SPECS
- DATA DICT
- PART II SPECS
- TEST PLAN
CRITICAL DESIGN
- PART II SPECS
'BUILD TO
- PRELIM. PROG.
MANUAL
- TEST PLAN
M-VELCPMENT .
- CODE It TEST
- INT. /I TEST CPC
TEST
- UNIT TEST
- DEV. TEST
PROCEDURES
- SUPPCRT T /1 V
- PREPARE REPORTS
DOCUMENTATION
- INPUTS TO USER.
OPS it D.B. ADMIN.
MANUALS
- CPCI LISTINGS
'AS BUILT'
- PROGRAMER MANUAL
- TRAINING MANUAL
INPUTS
- PART II SPECS
'AS BUILT'
.
B
B
1
I-1
I
I
I
B
I
I
1
8
I-B I
I
I
I
1
.
.___B___.
i
I
I
I
13 .
I
r----i
B
1
B
I
I
B
I
1
13
I
1
I
1
-i
8
FE-1
B
I
1--1
I-1
I
I-I
I-1
I-I
13-1I
r----1
1--8 I
I--B-1I
Approved For Release 2007/06/18: CIA-RDP84T00037R000500060001-0
FIGURE 13. CPCI DEVELOPMENT SCHEDULE
issvioNn
ISSV1ON11
? Approved For Release 2007/06/18: CIA-RDP84T00037R000500060001-0
BSYSM
82
83
_
84
85
AMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASOND
PRELIM. DESIGN
- PART I SPECS
B
- DATA DICT
- PART II SPECS
- TEST PLAN
CRITICAL DESIGN
- PART II SPECS
'BUILD TO'
- PRELIM. PROG. '
MANUAL
DEVELOPMENT
- CODE & TEST
- INT. it TEST CPC
TEST
- SUPPORT T 4 V
DOCUMENTATION
- INPUTS TO USER.
OPS & 0.8. ADMIN.
MANUALS
- CPCI LISTINGS
'AS BUILT'
- PROGRAMER MANUAL
- TRAINING MANUAL
INPUTS
- PART II SPECS
'AS BUILT'
_
Approved For Release 2007/06/18: CIA-RDP84T00037R000500060001-0
,
FIGURE 14. CPCI DEVELOPMENT SCHEDULE
IssvioNn
0
SSV1ONfl
Approved For Release 2007/06/18: CIA-RDP84T00037R000500060001-0
IIP
BDDMS1
82
63
84
85
AMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASOND
PRELIM. DESIGN
- PART / SPECS
B
- DATA DICT
- PART II SPECS
- TEST PLAN
CRITICAL DESIGN
- PART II SPECS
'BUILD TO'
- PRELIM. PKG..
MANUAL
DEVELOPMENT
- CODE & TEST
- INT. A TEST CPC
TEST
- SUPPORT T II V
DOCUMENTATION
- INPUTS TO USER.
OPS & D.B. ADMIN.
MANUALS
- CPCI LISTINGS
'AS BUILT'
- PRoGRAteER MANUAL
- TRAINING MANUAL
INPUTS
- PART II SPECS
'AS BUILT'
Approved For Release 2007/06/18: CIA-RDP84T00037R000500060001-0
?
FIGURE 15. CPCI DEVELOPMENT SCHEDULE
C13 Id issviaNn
ISSV1ON11
Approved For Release 2007/06/18: CIA-RDP84T00037R000500060001-0
FSYSTM
?
82
83
64 85
AMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASOND
PRELIM. DESIGN
- PART I SPECS
- DATA DICT
- PART II SPECS
- TEST PLAN
CRITICAL DESIGN
- PART II SPECS
'BUILD TO'
- PRELIM..PROG.
MANUAL
DEVELOPNENT
- CODE il TEST
- INT. A TEST CPC
TEST
- SUPPORT T it V
DOCUMENTATION
- INNJTS TO USER.
CPS A D.B. ADMIN.
MANUALS
- CPCI LISTINGS
'AS BUILT'
- PROCiRAMMER MANUAL
- TRAINING MANUAL
INPUTS
- PART II SPECS
'AS BUILT'
0
Approved For Release 2007/06/18: CIA-RDP84T00037R000500060001-0
FIGURE 16. CPCI DEVELOPMENT SCHEDULE
issvioNn
rn
0
031d ISSV13Nfl
?
Approved For Release 2007/06/18: CIA-RDP84T00037R000500060001-0
WSYSTM
82
83
84
85
AMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASOND
PRELIM. DESIGN
e
- PART I SPECS
I
- DATA DICT
PART II SPECS
- TEST PLAN
CRITICAL DESIGN
- PART II SPECS
'BUILD TO'
- PRELIM. PROG.
MANUAL
DEVELOPMENT
- CODE IL TEST
- INT. 2 TEST CPC
TEST
- SUPPORT T it V
DOCUMENTATION
- INPUTS TO U.
CPS 2 D.B. ADMIN.
MANUALS
- CPCI LISTINGS
,As BUILT'
- PROGIAMER MANUAL
- TRAINING MANUAL
INPUTS
- PART II SPECS
'AS BUILT'
Approved For Release 2007/06/18: CIA-RDP84T00037R000500060001-0
?
FIGURE 17. CPU DEVELOPMENT SCK1DULE
IssvioNn
rn
0
Approved For Release 2007/06/18: CIA-RDP84T00037R000500060001-0
UNCLASSIFIED
82
63
04
85
86
ANJJASONDJFMAMJJAS0110J0111AMJJASONDJFMAMJJASONDJ
MAMJJASOND
NPIC SYSTEM MILESTONES
Illggalg002! 44I/0 ()wows foc
4/414 5le4 10/84
OC
AILI
7/65
11;64'
(BOC) MILESTONES
F 1) CONTRACT START
F 2) SBR (TOTAL SEGMENT)
F 3) INTERNAL DESIGN REVIEW
F 4) PDR (TOTAL SEGMENT)
F 5) INTERNAL DESIGN REVIEW
F 6) CDR
F 7) INTERNAL DESIGN REVIEW
F 8) PQT
F 9) FOT
F 10) INS A/N INTEGRATION TESTING
F 11) SEGMENT INTEGRATION TESTING
F 12) FACTORY ACCEPTANCE TESTING
F 13) SHIP
S 14) INSTALL 278 BASIC A/N
S 15) HAI ADPE INSTALL a C/O TEST
S 16) S/W INSTALL I C/O TEST
S 17) SITE SEGMENT TEST
S 18) SEGMENT ACCEPTANCE
S 19) SITE INTER SEGMENT DEMOS
S 20) SITE INTER PROGRAM DEMOS
S 21) DOC TRAINING
S 22) INTERFACE OPERATIONAL
S 23) SEGMENT BOC
S 24) SYSTEM DOC
S 24) DOC 0 i M
Ak7/1
AL8/15
9/1
A__I__I-_,A
AL12/15
I/1
2/1
4/1
411-1-4?A
?4/I
401/1 4,1011
IZI
?
211
III
2/ IA_A3/1
47/15
A8/I 411/1
WI
A
410/141,
12/
I
?
12/61/1
461/1
461/1 ALS/1
1 gel
2116A3ii
4/3/1 1113/111
AS/1S
44/1 4,9/I
Avi 4I05
3/1 S/I
AS/ IS
A45/15
A,10/15
aI0/I5
10C MILESTONES
F 1) PDR IOC UPDATE
2) INTERNAL DESIGN REVIEW
F 3) CDR
F 4) INTERNAL DESIGN REVIEW
F 5) PQT
F 6) FRT
F 7) INS CID INTEG TESTING
F 8) SEGMENT INTEG. TESTING
F 9) FACTORY ACCEPTANCE TESTING
F 10) SHIP
4111513/1
A8/'F
A
17/1
?
szt
414/I A10/1
Ae/t
_A2/1
2/1 3/1
A__A
43/1
AilI 412/1
AL1,,,
68/1
Figure 18. Master Schedule (Sheet 1 of 2)
31
Approved For Release 2007/06/18: CIA-RDP84T00037R000500060001-0
UNCLASSIFIED
Approved For Release 2007/06/18 : CIA-RDP84T00037R000500060001-0
UNCLASSIFIED
82
83
84
85
86
ANJJASONDJFNAMJJASONDJFMANJJASONDJFMANJJASOND
FNAMJJ?ASOND
NPIC SYSTEM MILESTONES
/NTERPROGRAN I/F CHANGES BOC
DEW ? ? ?
4/84 5/84 10/84
AlCC
7/85
FOC17374'
S 11) INSTALL 82 BASIC A/N 8 296
EXPANDED A/N 11 100 IMAGERY
S 12) H/11 ADPE INSTALL 4 C/O TEST
S 13) S/W INSTALL I C/O TEST
S 14) SITE SEGMENT TEST
S 15) SEGMENT ACCEPTANCE
S 16) SITE INTER SEGMENT DEMOS
S 17) SITE INTER PROGRAM DEMOS
S 18) IOC TRAINING
S 19) SEGMENT IOC
S 20) SYSTEM IOC
S21) IOC 0 4, M
& 1/1 411:6/1
9/30
A
3/1 4/1
A_A
3/1 4/1
A-A
4/1
&JO/15
A5/15
?5/1 -...-A6/15
6/1 7/15
&L--?
6/1 7/15
3/15 ? 4/1-....-? ?-...-?
40/15
7/15
A
7/15
?
FOC MILESTONES
F 1) POR FOC UPDATE
F 2) INTERNAL DESIGN REVIEW
F 3) CDR
F 4) INTERNAL DESIGN REVIEW
F 5) POT
F 6) FQT
F 7) SEGMENT INTEG TESTING
F 8) FACTORY ACCEPTANCE TESTING
F 9) SHIP
S 10) INSTALL 244 IMAGERY
S 11) INSTALL 4 C/O TEST
S 12) SITE SEGMENT TEST
S 13) SEGMENT ACCEPTANCE
S 14) SITE INTER SEGMENT DEMOS
S 15) SITE INTER PROGRAM DEMOS
S 16) FOC TRAINING
S 17) SEGMENT FOC
S 18) SYSTEM FOC
S 19) FOC 0 & M
4/1 5/1
A-A
i9/15
11/1
II
1/1
A3/1
?7/1
INSTALLATION THROUGH 7/87
--...---.....?10/1
A9/1 Ae2/I
12/14&---A2/1
A2/1 --_A3/1
A3/I
6/1
?
7/15
SUPPORT AS REQUIRED THROUGH 7/87 3.
S&PP0RT AS REQUIRED THROUGH 7/47
a
JULY 1987
10/1 THROUGH 7/88
-A
8/15 9/15A_A
A9/15
el TEST
A TEST
8/1A1.---AL9/15
40/15
F = FIELD
S . SITE
Approved For Release 2007/06/18: CIA-RDP84T00037R000500060001-0
IPIC1 0101 .IPIC
Figure 18. Master Schedule (Sheet 2 of 2)
32
UNCLASSIFIED
Approved For Release 2007/06/18: CIA-RDP84T00037R000500060001-0
UNCLASSIFIED
PLANNED BY DATE
LOCATION
PAGE 1 OF 1
SHEET 1 OF 1
NETWORK NPIC 15118NET SYSENG
5YMBOLS
NPIC PROGRAM
DATE
EARLY START OR FINISH A
SYSTEM ENGINEERING
ACTUAL START OR FINISH ?
RUN DATE 18FE882 FFRTR DATE
LATE FINISH V
NPIC SYSTEM ENGINEERING SCHEDULE
DURATION (NON-CRITICAL)
DURATION (CRITICAL)
TOTAL FLOAT - - - - _
I
NODE
J
NODE
DESCRIPT ION
NH
RESP
EARLY
START
EARLY
FINISH
LATE
START
LATE
FINISH
COAL
82
11 IM IJIJ IR IS IC IN I 0
83
J 'FIN IR IM IJIJ1R I 5 I CI IN 10
84
J IF Iti-111 FH I II I IA F9 III IN TD
BS
I IFIM IR )14 / 1 I I
RFS 1n r-N rn
86
i IFIN rn TI4-1 I I IR FIFA 1)' 11
87
-)18060
-11C2S0
-RC300
(411009
RADIO
RA020
RA030
RA040
ARM
RA060
RADIO
A8009
R8010
R8020
A8030
R8040
R8050
R8070
R8080
R8090
R8100
R8110
R8120
R8130
A8140
A8150
A8160
R8I70
R8190
R5200
R8210
R8220
R8230
A8240
AC249
RC260
RC270
AC280
AC290 ...---I0C
AC310
RC320
AC330
RC340
-RC350
PC360
RC362
AC364
AC370 _---BOC
-AC380
RC390
SYSTEM ENGRG MANAGEMENT
---BOC TECH MANAGEMENT
---ICC TECH MANAGEMENT
---FOC TECH MANAGEMENT
---80C H/5/0 IF SIDS
---I0C H/5/0 IF STDS
---FOC H/S/0 IF STOS
---SEGMENT DEVLOPMENT PLAN
SYSTEM ENGNRING ANALYSIS
---BOC ROMNTS ANAL 8. TRACE
--IOC ROMNTS ANAL & TRACE
---FOC ROMNTS ANAL & TRACE
---BOC PERF ANALYSIS
---IOC PERF ANALYSIS
---FOC PERF ANALYSIS
---BOC AMA ANALYSIS
---IOC AMA ANALYSIS
---FOC AMA ANALYSIS
---BOC SEG DESIGN ANAL RPT
---10C SEG DESIGN ANAL RPT
---FOC SEG DESIGN ANAL RPT
---BOC TRADE STUDIES
---10C TRADE STUDIES
---FOC TRADE STUDIES
---BOC ENGRG SPECIALTIES
---ICC ENGRG SPECIALTIES
---80C SUP INTRSEG IF ROMT
---ICC SUP INTRSEG IF ROT
---FOC SUP INTRSEG IF ROMT
---BOC ENGRG TECH NOTES
---ICC ENGRG TECH NOTES
---FOC ENGRG TECH NOTES
SE OPERATIONS ENGR & OEV-
---BOC SEG OPS CNCEPT.P.S.
---ICC SEG OPS CNCEPT.P.S.
---FOC SEG OPS CNCEPT.P.S.
---BOC USER MANUAL
USER MANUAL
---FOC USER MANUAL
---BOC SEG/SYS OPS MANUALS
---ICC SEG/SYS OPS MANUALS
---FOC SEG/SYS OPS MANUALS
---BOC PROD ENHANC STUDIES
-
---ICC PROD ENHANC STUDIES
---FOC PROD ENHANC STUDIES
---80C 0 6 M PLAN
---ICC 0 4 N PLAN
MRINT & LOGIST PLAN
---ICC MAINT & LOGIST PLAN
---FOC MRINT 4 LOGIST PLAN
0.00
130.40
39.00
8.80
130.40.1,
30.20
S2.00
8.60
0.00
91.20
48.00
34.80
91.20
83.00-
39.00
34.40
4.20
4.20
21.80
4.20
4.20
47.60
8.80
165.20_
34.40
99.80
21.80
43.60
4.20-
4.20
4.60
4.40
t 0.00
126.20
21.60
4.20
21.80
39.00
4.20
108.60
17.20
4.20
108.80
21.40
4.60
48.00
17.40
108.60
78.60
43.20
30RPR82
30RPR82
300CT84
30JUL85
30RPR82
30NOV84
01JUL85
30RPR82
30APR82
30APR82
30JAN84
31DEC84
30APR82
30MAY83
31DEC84
30SEP82
01AUG83
30SEP83
30JUL82
-
01AUG83
30SEP83
30APR82
0IRUG83
30SEP83
30NOV84
30AUG85
30APR82
300CT84
30AUG85
30JUL82
30AUG83
30NOV83
30APR82
30APR82
310EC84
30AUG85
30MAY84
010CT84
01JUL85
30JUN82
0IRPR85
01JUL85
30JUL82
30NOV84
30JUL85
31MAY82
30AUG84
30APR82
30MAY84
020EC85
30RPR82
300CT84
30JUL85
30SEP85
300CT84
01JUL85
30JUN86
30JUN82
30APR82
30JRN84
310EC84
30AUG85
30JRN84
310EC84
30SEP85
30MAY83
30AUG83
310CT83
300EC82
30AUG83
310CT83
30MAR83
30SEP83
010EC86
30JUL85
30JUL87
30SEP82
30AUG85
305EP85
30AUG82
30SEP83
30DEC83
30APR82
010CT84
30MAY85
30SEP85
300CT84
01JUL85
30JUL85
30JUL84
30JUL85
30JUL85
30AUG84
30APR85
30AUG85
02MAY83
310EC84
30MAY84
020EC85
30SEP86
I
A
...
ITTIMr11-111/111
-
-
-
118
?
118
118.
-
-
104
119
A----A
A
119
119
155
155
155
122
ts--A
6.--d
A--A
6--A
127
722
6-----A
-
A--A
- ...
-
-
-
-
A
-
120 A--8 -
120
120
_ A
116M33 t,
A
-
116/133
116/133
135
135_
135 -
136 A
A
.
A--A
A A
.
-
136
136
A
-
-
-
123
-
123
124 A
A
124 -
124
Figure 19. Systems Engineering Schedule
(Sheet 1 of 2)
33 UNCLASSIFIED
Approved For Release 2007/06/18: CIA-RDP84T00037R000500060001-0
STAT
STAT
STAT
Approved For Release 2007/06/18: CIA-RDP84T00037R000500060001-0
UNCLASSIFIED
PLANNED BY DATE
LOCATION
PAGE 1 OF 1
SHEET I OF 1
NETWORK NPIC ISUBNET SYSENG
5YMBOLS
NPIC PROGRAM
DATE
EARLY START OR FINISH A
A
SYSTEM ENGINEERING
ACTUAL START OR FINISH
LATE FINISH V
RUN DATE 18FEB82 IORTA DATE
NPIC SYSTEM ENGINEERING SCHEDULE
4
DURATION (NON-CRITICAL)
DURATION (CRITICAL) mommimmommmm
TOTAL FLOAT
I
J
EARLY
EARLY
LATE
LATE
82
83
134
85
86
87
NODE
NODE
DESCRIPTION
OUR
RESP
START
FINISH
START
FINISH
COAL
R IM IJIJ IR 1510 IN ID
JIEIMjPIMiJIJIAISIOJNfD
JIF1M IAIM IJ IJIA1S 101N10
JIF IM IA IM IJIJIA
ISIOINID
IFI 114114 IJ LJ 141SISIJNIQ
JIF IMIRI IJIJ
AD399
SYSTEM ENGRG DESIGN
j 0.00
30APR82
30APR82
A
..-
-
-
-
-
_
A0400
-A0410
---80C SEGMENT OESGN SPECS
82.60
_ 30APR82
30NOV83
117
-
---BOC DATA BASE SPECS
34.80
30APR82
30DEC82
725
A
P0420
A0430
A0432
A0436
---BOC ENGRG SPEC DESIGN
--IOC ENGRG SPEC OESIGN
--FOC ENGRG SPEC DESIGN
INTERFACE SPEC
69.40
43.80
43.80
104.20
30APR82
28FE883
28FEB83
30AUG83
300EC83
300EC83
A
-R0437
A0438
AE342
RE372
--BOC
---IC INTERFACE SPEC
---FOC INTERFACE SPEC
SE TRANS 4 INTEG PLANNING
SEG TERNS 4 INTEG PLAN
_
39.00
8.80
0.00
0INOV82
3000784
30JUL85
30SEP82
300CT84
30JUL85
30SEP85
30SEP82
126129
126129
126-129
A
-
IFIE380
RE390
AE470
---80C
---IOC SEG TRANS & INTEG PLAN
---FOC SEG TRANS 4 INTEG PLAN
---BOC SUP FRC PLNG 4 ICC
113.00
39.00
8.80
78.20
31MAY82
300CT84
30JUL85
30JUL84
30JUL85
30SEP85
_
115
115
115
-
RE480
AE490
AE500
---IOC SUP FRC PLNG & ICC
--FOC SUP FAC PLNG & ICC
-
---BOC SUP NEW CAP OPR ENV
8.60
4.60
-
108.60
30SEP82
310EC84
30JUL85
30SEP82
30MAR84
28FE885
30RUG85
-
-
RE510
AE520
AF529
AF530
-IOC SUP NEW CRP OPR ENV
---FOC SUP NEW CAP OPA ENV
SE TEST SUPPORT _
---80C SEGMENT VERIF PLAN
39.00
8.80
0.00
13.00
300CT84
30JUL85
30APR82
30RPR82
300CTE4
30JUL85
30SEP85
30APR82
_
_ a
_
_
.
AF540
AF550
AF560
---IOC SEGMENT VERIF PLAN
---FOC SEGMENT VERIF PLAN
---80C SEGMENT TEST PLAN
12.80
12.80
13.00
30DEC82
30DEC82
30SEP82
30JUL82
30MAR83
30MAR83
30DEC82
I
121 A
121
121 A
AF570
-
RF580
AF590
AF600
RF610
AG619 -SE
AG620
--IOC SEGMENT TEST PLAN-
---FOC SEGMENT TEST PLAN
---BOC SUPPORT TESTING
---IOC SUPPORT TESTING
---FOC SUPPORT TESTING
CONFIGURATION MRNAGMNT -
---BOC CHG CONTROL PROCESS
6.60
13.20
91.20
39.00
61.00
0.00
100.00
02MAY83
30JUN83
31JAN83
300CT84
30JUL85
30NOV82
30NOV82
30JUN83
-
30SEP83
3000784
30JUL85
305EP86
-
30NOV82
300CT84
-
130
130_ -
130
-
A -
4-----A
A
A
-
A
.
.
.
-
RG630
AG640
-RH049 -SE
AH050
---IOC CHG CONTROL PROCESS
---FOC CHG CONTROL PROCESS
-
TECH REVIEWS
---80C POR
39.00
47.80
0.00
13.20
300CT84
30JUL85
30AUG82
30AUG82
30JUL85
30JUN86
-
30AUG82
30NOV82
-
-
A _
_
Cr-A
.
-
-
-
-
???
AH070
AHI50
AH160 _
RH170
PHI80
A6680
---IOC FOR
----80C CDR
---IOC COR _
---FOC CDR
---80C SBR
---80C TECH AUDITS/MISC REV
4.60
12.80
17.40
8.80
4.40
82.80
30MAR83
30DEC82
30JUN83
310CT83
30JUN82
31MRY82
02MAY83
30MAR83
310CT83 _
300EC83
30JUL82
300EC83
_
A
_ -
A--6
A A
A9690
A9700
-
IOC TECH AUDITS/MISC REV
---FOC TECH AUDITS/MISC REV
-
21.80
21.40
T
T
30MAR84
30NOV84
T
30AUG84
30APR85
-
-
A
- _
-
A
A-
-
.i
SON'
?
J H J 1
i
J ? M J J ? 1
j ? ii? 0 N
?
J L 11 I,
?
82
83
84
85
86
87
Figure 19. Systems Engineering Schedule
(Sheet 2 of 2)
34
Approved For Release 2007/06/18: CIA-RDP84T00037R000500060001-0
UNCLASSIFIED
STAT
STAT
STAT
Approved For Release 2007/06/18: CIA-RDP84T00037R000500060001-0
UNCLASSIFIED
LANNED BY
NETWORK NPIC
NPIC PROGRAM
SUBNET SOFTWARE
DATE
DATE
SOFTWARE
RUN DATE 17FEB82
DATA DATE
NPIC PROGRAMMING SCHEDULE
NODE
NODE
LOCATION
PAGE 1 OF I
SHEET 1 OF 1
SYMBOLS
EARLY START OR FINISH
ACTUAL START OR FINISH
LATE FINISH
DURATION (NON-CRITICAL)
DURATION (CRITICAL)
TOTAL FLOAT
?
V
STAT
STAT
STAT
DESCRIPTION
EARLY EARLY
OUR RESP START FINISH
LATE LATE
82
83
84
START FINISH COAL CHM1J 1J IR IS 10 IN ID JIFIM (RIM IJ Li IA 1510 IN ID J iF
85
DA009
DA010
DA020
DA030
DA040
DA060
DA070
0A080
DA090
DA100
DAM
DA120
DA130
DA140
DA142
DA143
DA144
DA151
DR152
DA153
DA160
DA170
DA180
DA190
DA200
DA210
08213
08220
08230
08240
08242
08244
08246
DC245
0C250
DC 260
0C270
DC280
0C290
0C300
0C310
0C320
10C330
MANAGEMENT
---BOC
---FOC
---80C
---BOC
---FOC
---BOC
---FOC
---80C
---80C
---'DC
---BOC
---FOC
---80C
---FOC
---BOC
---IC
---FOC
-- --FOC
MANAGE
MANAGE
MANAGE
TOOL DEVELOPMENT
ENG ARCH
ENG ARCH
ENG ARCH
TRADE STUDIES
TRADE STUDIES
TRADE STUDIES
SEGMENT PPS 4 C
COBOL CONVERSION
COBOL CONVERSION
LIBRARY
LIBRARY
LIBRARY
BUILD & RELEASE
BUILD 4 RELEASE
BUILD 8, RELEASE
INPUT SEG OEV PLAN
INPUT SEG BEV PLAN
INPUT SEG DEV PLAN
DATA BASE
DATA BASE
DATA BASE
PRELIMINARY
---BOC PART
---BOC DATA
---BOC PART
---BOC PREL
- PREL
---FOC PREL
DESIGN
I SPECS
DICT
II SPECS
TEST PLAN
TEST PLAN
TEST PLAN
-CRITICAL DESIGN
---BOC PART II SPECS
--IOC PART II SPECS
---FOC PART II SPECS
---BOC
---FOC
---80C
---FOC
PRELIM PROG MANUAL
PRELIM FROG MANUAL
PRELIM PROG MANUAL
FINAL TEST PLAN
FINAL TEST PLAN
FINAL TEST PLAN
0.00
108.60
60.80
8.80
48.00
-104.20
60.80
30.40
104.20
91.60
30.40
74.00
30.40
47.80
69.40
65.20
8.80
69.40
48.00
21.80
Si-Dot
43.60
26.20
30.40
104.60
17.40
0.00
30.40
26.20
30.40
17.60
26.40
17.40
0.00
39.00
39.40
17.40
26.20
34.60
43.80
30.40
0.00
8.60
30APR82
30APR82
30MAY84
30JUL85
31MAY82
30RPR82
30DEC83
28FEB85
30APR82
30MRY83
28FEB85
30RPR82
300EC82
30AUG83
30DEC82
30APR84
30JUL85
300EC82
30APR84
01APR85
31MAY82
30APR84
28FEB85
30RPR82
30MAY83
30MAY85
30APR82
30APR82
30APR82
30APR82
30JUNB2
30MAR83
010CT84
30APR82
30JUN82
30MAR83
30NOV83
31MAY82
300EC82
28FE884
30RUG82
30MAR83
30JRN85
IN 1J IJ IA IS IOINID J (FIN (FIFA 1JI-J111 151.0 IN ID
30APR82
30.MAY84
30JUL85
30SEP85
02MAY83
30APR84
28FEB85
30SEP85
30RPR84
28FEB85
30SEP85
30SEP83
132
01AUG83
30JUL84
30APR84
30JUL85
30SEP85
30APR84
01APR85
30RUG85
30JAN84
28FEB85
30RUG85
30NOV82
151
A
30MAY85
151
30SEP85
151
30APR82
30NOV82
141*
A
01NOV82
145*
A
30NOV82
142'-
A
01NOV82
131*
30SEP83
131*
30JAN85
i
131*
30APR82
30MAR83
142
300EC83
142
30MAR84
142
A
30NOV82
-
138*
30AUG83
138*
31DEC84
138*
30MAR83
131*
30MAR83
131*
01APR85
t
131*
Approved For Release 2007/06/18: CIA-RDP84T00037R000500060001-0
hr-A
a
tr-A
A
Figure 20. Software Development Schedule
(Sheet 1 of 2)
35
UNCLASSIFIED
Approved For Release 2007/06/18: CIA-RDP84T00037R000500060001-0
UNCLASSIFIED
PLANNED BY DATE
LOCATION
PAGE I OF I
?
SHEET 1 OF 1
NETWORK NPIC ISUONET SOFTWARE
SYMBOLS
NPIC PROGRAM
DATE
EARLY START OR FINISH A
SOFTWARE
.
ACTUAL START OR FINISH A
RUN DATE 17FEB82 DATA DATE
LATE FINISH V
NPIC PROGRAMMING SCHEDULE
DURATION (NON-CRITICAL)
DURATION (CRITICAL)
I
TOTAL FLOAT
I
NODE
J
NODE
DESCRIPTION
DUR
RESP
EARLY
START
EARLY
FINISH
LATE
START
LATE
FINISH
CDRL
82
83
84
85
AIM LJIJ IA1_5 ID INID
J IFIM IR IIIIJIJIAIS TO INID
JIFIM-IAIM
JIJ IAISIOINID
JIF IM IRIMIJIJ TA NFIN ID
'
-0E460
-0F540
00002
00340
00350
00360
00370
00380
00390
DE399
DE410
0E430
DE432
0E440
0E450
0E470
0E480
0E490
0E500
-0E510
0E520
0F529
0F530
0F550
0F560
0F570
0F580
-0F590
0F600
OF610
0F620
OF630
-0F650
0F660
0F670
DEVELOPMENT
---BOC CODE AND TEST
--IOC CODE ANO TEST
---FOC PROD AND TEST
-
---BOC INT & TEST 4 CPC
--IOC INT & TEST 4 CPC
---FOC INT & TEST 4 CPC
TEST
- _
---BOC UNIT TEST
---IOC UNIT TEST
---FOC UNIT TEST
---BOC DEV TEST PROCEDURES
--IOC DEV TEST PROCEDURES
-
---FOC DEV TEST PROCEDURES
---80C SUPPORT T & V
--IOC SUPPORT T & V
---FOC SUPPORT T & V
---BOC PREPARE REPORTS_
_
--IOC PREPARE REPORTS
---FOC PREPARE REPORTS
DOCUMENTATION
---BOC INPUTS TO USERS_
_
--IOC INPUTS TO USERS
---FOC INPUTS TO USERS
---80C CPCI LISTINGS
---IC CPCI LISTINGS
---FOC CPCI LISTINGS-
_
---80C PROGRAMMER MANUAL
--IOC PROGRAMMER MANUAL
---FOC PROGRAMMER MANUAL
---80C TRNG MANS INPUTS
--IOC TRNG MANS INPUTS_
-
---BOC PART II SPECS
---IOC PART II SPECS
---FOC PART II SPECS
0.00
43.60
39.20
30.80
39.00
39.20
35.00
0.00
48.00
35.00
22.00
69.40
57.00
13.00
56.60
65.20
8.80
30.60
35.00
17.20
0.00
26.00
13.00
4.20
8.80
21.80
4.20
56.60
30.40
4.20
17.20
26.00
30.20
17.40
8.80
_
_ _
_
-
-
-
30APR82
30NOV82
30SEP83
_ 28FEB84
31JAN83
30NOV83
30MAR84
31MAY82
28FE883
28FEB84
01JUL85
30SEP82
30MRY83
-
01JUL85
30MAR83
30APR84
30JUL85
_ 30RUG83
30MAR84
30AUG85
30SEP83
_ 30SEP83
31DEC84
01JUL85
28FEB84
30RPR85
_ 30AUG85
300EC83
30JAN85
30AUG85
310CT83
31DEC84
30SEP83
30MRY85
30JUL85
30RPR82
30SEP83
02JUL84
_ 010CT84
310CT83
30AUG84
30NOV84
31MAY82
-
30JRN84
3000.84
020EC85
30JAN84
02JUL84
-
30SEP85
30APR84
30JUL85
30SEP85
_ 30MAR84
30NOV84
30DEC85
30SEP83
_ 30MAR84
011:1PR85
30JUL85
30RPR84
30SEP85
30SEP85
-
30JAN85
30AUG85
30SEP85
28FEB84
01JUL85
30RPR84
30SEP85
30SEP85
-
-
-
_
-
-
-
-
_
- -
_ -
_ -
_
- -
_ _
137
137
137
150*
150*
150*
138
138
138
_
142
142
142
A
_
A
-
-
A
A
-
A
-
_
/
A
_
-
-
_
AMJJFISONDJFMAMJJFISONDJF
_ -
-
A A
.
A---li
_
A
_
-
A
-
_
_
A--A
A---A
_
A
- A--6
A
8-A
-
-
.
A A
A
MAMJJ'SONDJ
---A
NM JLRSON'
ONE PER CPU
82
83
84
85
Figure 20. Software Development Schedule
(Sheet 2 of 2)
36 UNCLASSIFIED
Approved For Release 2007/06/18: CIA-RDP84T00037R000500060001-0
STAT
STAT
STAT
Approved For Release 2007/06/18: CIA-RDP84T00037R000500060001-0
?
UNCLASSIFIED
?
ORTE
LOCATION
PAGE I OF I
SHEET 1 OF I
NETWORK NPIC ISUBNET HARDWARE
$YMBOLS
NPIC PROGRAM
APPROVED BY DATE
EARLY START OR FINISH A
HARDWARE
ACTUAL START OR FINISH ?
RUN DATE 18FEB82 IDATR DATE
LATE FINISH V
WIC HARDWARE SCHEDULE
DURATION INON-CRITICALI
DURATION (CRITICAL)
TOTAL FLOAT
I
NODE
J
NODE
DESCRIPTION
OUR
RESP
EARLY
START
EARLY
FINISH
LATE
START
LATE
FINISH
82
83
84
85
86
87
CDRL
A w FISOND
FRAMJJASONDJFMAM
1
J AFRAM
111111.:111:111011111110110111.11
-EE450
_
-
-EF620
ER009
ER039
EA041
ER042
EA051
-
E8101
E8I10
E8120
EB130
-
E8140
E8I50
E8170
E6180
1
EC246
EC247
EC250
EC260
EC280
EC299
EC301
EC308
EC3I0
EC320
-
EC340
EC350
EC360
EC370
-EC380
EC390
EC392
EC393
EC394
+
EE399
EE400
EE420
EE430
EE440
EE460
EE470
EE480
EE490
EF529
EF530
EF540
EF550
EF560
EF570
EF580
EF590
EF600
MANAGEMENT
---BOC SET 6 MAINT 0/FIT
---IOC SET & MAINT 0/FIT
--FTC SET A MAINT 0/FIT
---80C INPUTS TO SEG OEV
PRELIMINARY DESIGN
---BOC DES 6 RUNTS ANAL
---80C SPECS A INTERNAL DES RE
---IOC SPECS 0 INTERNAL DES RE
---FOC SPECS 4 INTERNAL DES RE
---80C COMM PROD DES MODS
---IC COMM PROD DES MODS
---FOC COMM PROD DES MODS
CRITICAL DESIGN
---BOC DETAIL DESIGN
---IC DETAIL DESIGN
---FOC DETAIL DESIGN
---80C BUILD TO SPECS
---I 0C BUILD TO SPECS
---FOC BUILO TO SPECS
---80C COMM PROD MOOS DESIGN
---IC COMM PROD MODS DESIGN
--FOC COMM PROD MOOS DESIGN
---80C HARDWARE FABRICATION
---I0C HARDWARE FABRICATION
---FOC HARDWARE FABRICATION
---BOC COMM HARDWARE MODS
---IOC COMM HARDWARE MOOS
---FOC COMM HARDWARE MOOS
---BOC PREPARE AS BUILT SPECS
---IC PREPARE AS BUILT SPECS
--IOC PREPARE AS BUILT SPECS
TEST
---80C PREPARE PROCEDURES
---IOC PREPARE PROCEDURES
---FOC PREPARE PROCEDURES
-BOG TEST HARDWARE
---IOC TEST HARDWARE
---FOC TEST HARDWARE
---BOC SUPPORT I & V
---IC SUPPORT T 0 V
---80CSUPPORT T & V
DOCUMENTATION
---80C EOM MANUALS
---IOC EOM MANUALS
FOC EOM MANUALS
---80C INPUTS TO SEG/SYS OPS
---ITT INPUTS TO SEG/SYS OPS
---FOC INPUTS TO SEG/SYS OPS
---80C TRAINING MANUALS INPUT
---IC TRAINING MANUALS INPUT
---FOC TRAINING MANUALS INPUT
0.00
130.40
126.20
230.60
4.20
0.00
13.00
13.00
12.80
12.80
17.60
25.80
25.801
t 0.00
35.00
39.40
48.00
30.20
35.00
57.00
21.80
43.40
21.60
30.80
35.00
99.80
26.20
61.00.,_
104.20
57.00
52.00
34.80
0.00+
13.20
47.60
39.20
13.20
22.00
22.00
43.60
52.40
21.60
0.00
13.20
52.20
39.20
17.60
52.00
39.00
17.60
8.8001AUG83
-
4.20
_ 1-
_
_
_
_
30APR82
30APR82
28FE883
28FEB83
30APR82
30APR82
30APR82
30APR82
30N0V82
30NOV82
30JUN82
30SEP82
30SEP82
31MAY82
31MAY82
30MAR83
30MAY83
30JUL82
28FEB83
30MAY83
30JUL82
300EC82
, 30NOV83,
t t
28FEB83
28FE884
30JAN85
28FEB83
30AUG83
30NOV84
30MAY83
02JUL84
OIJUL85
30JUN82
30JUN82
30SEP82
30AUG83
30AUG83
30JUL84
30JUL84
30MAR83
30JAN84
30JAN85
30JUN82
30JUN82
30SEP82
30SEP83
30JUN82
0INOV82
310CT83
31MAY82
30JAN85
30APR82
300CT84
30JUL85
30JUL87
31MAY82
30APR82
30JUL82
30JUL82
28FE883
28FEB83
0INOV82
30MAR83
30MAR83
31MAY82
31JAN83
300EC83
30APR84
28FE883144
310CT83
02JUL84
300EC82
310CT83
30APR84
30SEP83
300CT84
300EC86
30AUG83
300CT84
010EC86
02JUL84
01JUL85
28FEB86
30JUN82
30SEP82
30AUG83
30MAY84
30NOV83
3IDEC84
310EC84
30JAN84
30JAN85
01JUL85
30JUN82
30SEP82
30SEP83
02JUL84
-
0INOV82
310CT83
30JUL84
30SEP82
30SEP83 _
28FE1385
T
A
, ?
A
6-6
A
?
.
I
A A
143
A
I
A
A
a
A
144
A
A
a
?
-
144
A -4---61
6. A
A
6
A
1
A
4. A
t
?
A
A A
A
?
A A
a
144
A
-
144
A
-
.
t
A A
?
a
?
.
?
_
A
.
A
148
148
A A
148
,
_
A
A
A
-
A IN IJIJ IR IS 10 IN ID
JIFIM IAINIJIJIRISIU IN Il;
JIF IH [A IN IJIJ I_AIS 111 IN ID_
JIFIM IA Ill IJIJ FR
[-SIC IN ID
1IFInIN_Lm 1.-1 L.1 IA I 5_1 0 IN LU
1-In LA IN LH.)
82
83
84
85
86
_J_I
87
Figure 21. Hardware Development Schedule
37
Approved For Release 2007/06/18: CIA-RDP84T00037R000500060001-0
UNCLASSIFIED
STAT
STAT
STAT
Approved For Release 2007/06/18: CIA-RDP84T00037R000500060001-0
UNCLASSIFIED
ORTE
LOCATION
PAGE 1 OF 1
SHEET I OF I
SYMBOLS
NETWORK NPIC ISUBNET INTEGTST
EARLY START OR FINISH A
ACTUAL START OR FINISH ?
LATE FINISH V
NPIC PROGRAM
APPROVED BY DATE
INTEGRATION TEST AND TRANSITION
RUN DATE 17FE882 IDATA DATE
DURATION INON-CRITICAL)
NPIC INTEGRATION TEST ANY TRANSITION srHpninF
DURATION 1CRITICAL) sm....B...
TOTAL FLOAT
I
NODE
J
NOOE
DESCRIPTION
OUR
RESP
EARLY
START
EARLY
FINISH
LATE
START
LATE
FINISH
CDRL
82
83
7177-1M IA IMIJ IJ TA IS 10 IN ID
84
J I IMAAflairl Limy 1 q-ru -INFO
8586
J-TFIK-IDFMIJI-JIR-FSAOFNFD
JFFIMIAIMIJIJFAISIOINID
87
JFF1MFAF14 TJ IJ
R IM IJIJ IA IS 10 IN ID
-00461
-00501
-CES70
-CE690
CR006
CA009
CR010
CR021
fA031
CA041
CR051
CA053
CA061
CR071
CR073
CA081
C6009
C8010
C6030
C6050
CC249
_ CC250
CC261
CC263
CC281
CC291
00293
-CC399
CC411
C0440
CC451
C0470
CD481
C0483
00490
00503
CE410
CE430
CE611
CE630
CE650
CE670
TEST 4 VERIFICATION
MANAGEMENT
---BOC MGMT SEG TEST ACT
---IC MCMI SEG TEST ACT
---FOC MGMT SEG TEST ACT
---BOC TEST PLANS
---IC TEST PLANS
---FOC TEST PLANS
---BOC TEST PROCEDURES
---I0C TEST PROCEDURES
---FOC TEST PROCEDURES
---BOC GFE TEST PLAN
TEST SUPPORT
---BOC SW HW 4 ORT FOR TESTNG
--IOC SW HW & OAT FOR TESTNG
---FOC SW HW & OAT FOR TESTNG
INTEGRATION TEST
---BOC INTER-CPCI4.60
--IOC INTER-CPCI
--FOC INTER-CPCI
---80C INTER CI
--IOC INTER CI
---FOC INTER CI
---BOC INTEGRATED CPCl/CI
--IOC INTEGRATED CPCl/CI
---80C REPORTS
--IOC REPORTS
FACTORY PRESHIP TEST
---BOC FORMAL PRESHIP
---IOC FORMAL PRESHIP
---FOC FORMAL PRESHIP
---80C REPORTS
---I0C REPORTS
---FOC REPORTS
INSTALLATION CHECKOUT 4 TEST
FACILITY PLANNING
---BOC FACILITY PLANNING
---IOC FACILITY PLANNING
---FOC FACILITY PLANNING
---80C IDA'S
---IOC IDA 'S _
---FOC IDR'S
0.00
0.00
87.00
126.20
230.20
17.40
13.20
21.80
13.00
13.20
26.40
13.00
0.00
13.20
8.60
4.60
0.00
4.60
4.40
4.60
4.60
4.40
13.00
21.80
4.20
4.40
0.00
8.80
4.20
4.20
4.20
4.40
4.40
0.00
0.00
65.20
74.00
82.80
65.20
74.00
82.80t
-
-
_
-
30APR82
30RPR82
30APR82
28FE883
31JRN83
30JUL82
30MAR83
30APR85
0INOV82
30MAY83
30MAY85
28FE883
30MAY83
_ 30MAY83
30MRY84
3000785
30AUG83
- 30AUG83
30JUL84
30NOV83
30AUG83
30JUL84
_ 30NOV83
30SEP83
30AUG84
300EC83
28FE885
310CT83
310CT83
30JRN85
30JRN85
300EC63
28FE885
28FE885
30RPR82
30APR82
-
30APR82
28FE883
30MAR83
30RPR82
28FE883 _
30MAR83
30APR82
30APR82
300EC83
30JUL85
30JUN87_
30NOV82
30JUN83
30SEP85
31JAN83
30AUG83-A
02DEC85
30MAY83
30MAY83
_ 30AUG83
30JUL84
020ECEI5
30AUG83
30SEPB3
30AUG84
300EC83
30SEP83
30AUG84
30DEC83
300EC83
30JAN85
30JAN84
01APR85
_
310CT83
300EC83
28FEB85
28FE885
30JRN84
-
01APR85
01APR85
30RPR82
30APR82-
_
01AUG83
30JUL84
300CT84
01AUG83
30JUL84
-
300CT84
--
-
-
-
131
131
131
-
-
139
139
139
A
A
A
-
_
-
-
-
-
-
-
_
-
-
-
A
A a
-A
A
A
A
A
- -
A
A--A
A
A
- A
A
Ar-A
6-6
ts----A
6--A
6-6,
A
.
A
.
6--6
6-6
tr--A
.
.
Figure 22. Integration and Test/Installation
and Checkout Schedule
(Sheet 1 of 2)
38
Approved For Release 2007/06/18: CIA-RDP84T00037R000500060001-0
UNCLASSIFIED
STAT
STAT
Approved For Release 2007/06/18: CIA-RDP84T00037R000500060001-0
UNCLASSIFIED
DATE
NETWORK NPIC 1SUBNET INTEGTST
NPIC PROGRAM
INTEGRATION TEST AND TRANSITION
RUN DATE 17FE882 I0RTR DATE
APPROVED BY DATE
NPIC INTEGRATION TEST AND TRANSITION SCHF0IIF
NODE
NODE
DESCRIPTION
OUR RESP
EARLY
START
EARLY LATE LATE
FINISH START FINISH CDRL
CF601 INSTALLATION I, CHECKOUT
CF620 ---BOC SEG SHIP PLAN
CF640 --IOC SEG SHIP PLAN
CF660 ---FOC SEG SHIP PLAN
CF680 --BOC SEG INSTALLATION PLAN
CF700 ---IC SEG INSTALLATION PLAN
CF720 ---FOC SEG INSTALLATION PLAN
CF760 --IOC
CF780 ---FOC
CF8I0 ---BOC
CF82I ---IOC
CF831 ---FOC
SHIP. INSTALL 4 CHECKOU_
SHIP. INSTALL K CHECKOU
SEG 1NTEG 4 TRANS
SEG INTEG 4 TRANS
SEG INTEG K TRANS
0.00
4.60
4.40_
4.20
26.00
8.80
4.40
0.00 T
8.60 T
13.00
4.40
61.00
30AUG82
300CT84
30AUG82
30NOV84
31DEC84 30JAN85
01APR85 30APR85
30AUG82 28FE883
30AUG83 310CT83
310EC84 30JAN85
28FE885 28FE885_
310EC84 28FE885
300EC83 30MAR84
28FE885 01APR85
01JUL85 01SEP86
_ -
CG801 SITE SEGMENT TEST 0.00- 30MAR84
CG850 ---BOC FORMAL 8.60 30MAR84
CG870 --IOC FORMAL 8.60 0IRPR85
CG890 ---FOC FORMAL 8.80 30JUL85
CG950 ---BOC REPORT 4.40_ 30APR84
- - _
CG970 --IOC REPORT 4.40 30APR85
C6990 ---FOC REPORT 4.20 30AUG85
CH801 SITE INTER SEG DEMOS 0.00 30JUN83
CH810 ---80C INPUTS TO SI 8.60 30JUN83
- - _
CH821 --IOC INPUTS TO SI 13.00 010CT84
CH831 ---FOC INPUTS TO SI 8.60 310EC84
CH840 ---80C ON SITE TESTING 13.20 30MAY84
CH860 --IOC ON SITE TESTING 13.20 30AUG84
CH880 ---FOC ON SITE TESTING 4.20 30AUG85
- - _
H940 ---BOC REPORT INPUT 4.20 010CT84
CH960 --IOC REPORT INPUT 4.20 01JUL85
CH980 ---FOC REPORT INPUT 4.20 30(111685
CI801 INTER PROGRAMS DEMOS- 0.00 30SEP83
- -
CI810 ---80C INPUTS TO SI 13.00 _ 30SEP83
CI821 --IOC INPUTS TO SI 65.20 30NOV83
CI831 ---FOC INPUTS TO SI 8.60 28FEB85
CI850 ---80C TEST SUPPORT 21.80 30MAY84
CI870 --IOC TEST SUPPORT 8.60 30MAY85
_
I - - _
CI890 ---FOC TEST SUPPORT 99.80 30AUG85
CI950 ---BOC REPORT INPUT 4.20 010CT84
CI970 ---IC REPORT INPUT 4.20 01JUL85
30MAR84
30MAY84
30MAY85
30SEP85
30MAY84_ 154
30MAY85 154
30SEP85 154
147
147
147
134
134
134
30JUN83
30AUG83_
310EC84
28FE885
30AUG84
30NOV84
30SEP85_,
3000784
30JUL85
30SEP85
30SEP83_
300EC83
28FE885
30APR85
300CT84
30JUL85_
30JUL87
3000784
30JUL85
-^
153
153
153
82
83
84
NIIIIP11111116 SMILIIIIMMBSIraffillEMIP111111C1111;SIMIKIIIIIIMMILMIMMILMIll
A
A
A-A
435
M J Jni171-07-71:4-,N
A-A
A-A
A Ii1JIJIA 15101,11D JIFIM IR I H IJI_J (F1 IS I 0 iN ID J (FIN If) IM IJIJIA I 5 10 -I Ni 0 J 1F1 M IA
82 83 E44
Approved For Release 2007/06/18: CIA-RDP84T00037R000500060001-0
BS
86
LOCATION
PAGE I OF 1
SHEET 1 OF I
SYMBOLS
EARLY START OR FINISH
ACTUAL START OR FINISH
LATE FINISH
DURATION (NON-CRITICAL)
DURATION (CRITICAL)
TOTAL FLOAT
87
A
A
?
V
1=11111111.M F 1M IA IM IJ 1.1
86 87
Figure 22.
31?
Integration and Test/Installation
and Checkout Schedule
(Sheet 2 of 2)
UNCLASSIFIED
STAT
STAT
J I /-k I
Approved For Release 2007/06/18: CIA-RDP84T00037R000500060001-0
UNCLASSIFIED
NETWORK NPIC
SUBNET TRAINING
DATE
NPIC PROGRAM
TRAINING
RUN DATE 17FEB82 I DATA DATE
APPROVED BY
NPIC TRAINING SCHEDULE
DATE
1.0CATION
PAGE I OF I
SHEET I OF I
SYMBOLS
EARLY START OR FINISH
ACTUAL START OR FINISH
LATE FINISH
DURATION (NON-CRITICAL)
DURATION (CRITICAL)
TOTAL FLOAT
STAT
?
NODE
NODE
DESCRIPTION OUR
EARLY EARLY LATE LATE
RESP START FINISH START FINISH CDRL
82
83
84
85
STAT
STAT
AIM IJ1 J ill 15 10 IN ID
J IFIM IA IM IJ IJ IA 1510 IN ID
J IF 111 1 IM IJ IJ IA IS TO IN ID J IFIM IRIM1JIJ111 IS
BROO9
TRAINING MANAGEMENT
0.00
30APR82
30APR82
BA010
---80C MANAGE
106.60
30APR82
30MRY84
BRO20
---IC MANAGE
60.80
30MAY84
30JUL85
BA030
---FOC MANAGE
6.80
30JUL85
30SEP85
BRO40
---BOC SEG TRNG PLAN
26.20
30APR82
01NOV82
140
8A051
---IOC SEG TRNG PLAN
30.80
28FE883
305EP83
140
A
BR061
---FOC SEG TRNG PLAN
17.40
300CT84
28FEB85
BB009
USER TRAINING
0.00
01NOV82
0INOV82
BB010
---BOC PREPARE MATERIALS
69.20
01NOV82
28FEB84
146
BB020
---IOC PREPARE MATERIALS
74.00
28FEB84
30JUL85
146
BB030
---FOC PREPARE MATERIALS
8.80
30JUL85
30SEP85
146
BB040
---BOC INPTS TO USR/OPS MTS
69.20
01NOV82
28FEB84
BB050
---IOC INPTS TO USR/OPS MTS
74.00
28FEB84
30JUL85
B8060
---FOC INPTS TO USR/OPS MTS
8.80
30JUL85
30SEP85
88071
---80C TRAIN USRS & INSTRUCTOR
17.80
28FEB84
02JUL84
BB081
TRAIN USRS & INSTRUCTOR
21.60
28FEB85
30JUL85
88090
---FOC TRAIN USRS & INSTRUCTOR
8.80
30JUL85
30SEP85
8C249
SE OPERATOR TRAINING
0.00
310CT83
310CT83
BC250
---80C PREPARE MATERIALS
21.80
310CT83
30MAR84
146
BC261
PREPARE MATERIALS
39.00
30RUG84
30MAY85
146
8C270
---FOC PREPARE MATERIALS
8.60
30MAY85
30JUL85
146
8C281
---BOC TRAIN OPS & MGMT PERSN
30.60
30NOV83
02JUL84
_8C291
TRAIN OPS & MGMT PERSN
21.60
28FEB85
30JUL85
BC 300
---FOC TRAIN OPS & MGMT PERSN
8.80
30JUL85
30SEP85
80399
MAINTENANCE TRAINING
0.00
310CT83
310CT83
B0400
---BOC PREPARE MATERIALS
21.80
310CT83
30MAR84
146
_80411
---ICC PREPARE MATERIALS
39.00
30AUG84
30MAY85
146
80420
---FOC PREPARE MATERIALS
8.60
30MAY85
30JUL85
146
80440
--80C TRAIN MAINT PERSONNEL
21.60
30NOV83
3ORPR84
80451
--IOC TRAIN MAINT PERSONNEL
21.60
28FEB85
30JUL85
BD460
--FOC TRAIN MAINT PERSONNEL
8.80
30JUL85
30SEP85
A
A
AMJJ SONDJFM AMJJ SONO
J F M
MJJASOND
JFM AMJJ A
82
83
84
85
Approved For Release 2007/06/18: CIA-RDP84T00037R000500060001-0
Figure 23.
40
Training Schedule
UNCLASSIFIED