NPIC DATA SYSTEM DATA AND CONTROL SEGMENT ACQUISITION PHASE APPENDIX B3 SCHEDULES

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP84T00037R000500060001-0
Release Decision: 
RIPPUB
Original Classification: 
U
Document Page Count: 
42
Document Creation Date: 
December 28, 2016
Document Release Date: 
June 18, 2007
Sequence Number: 
1
Case Number: 
Publication Date: 
February 24, 1982
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP84T00037R000500060001-0.pdf1.36 MB
Body: 
.....-, Approved For Release 2007/06/18: CIA-RDP84T00037R000500060001-0 UNCLASSIFIED NPIC DATA SYSTEM DATA AND CONTROL SEGMENT ACQUISITION PHASE APPENDIX B3 SCHEDULES 24 February 1982 UNCLASSIFIED Approved For Release 2007/06/18: CIA-RDP84T00037R000500060001-0 STAT Approved For Release 2007/06/18: CIA-RDP84T00037R000500060001-0 UNCLASS1 Fl ED NPIC DATA SYSTEM DATA AND CONTROL SEGMENT ACQUISITION PHASE APPENDIX B3 SCHEDULES 24 February 1982 This data, furnished in connection with Request for Proposal 82-B-015 as amended, shall not be dis- closed outside the Government and shall not be duplicated, used, or disclosed in whole or in part for any purpose other than to evaluate the proposal. If a contract is awarded to this offeror as a result of or in connection with the submission of this data, the Government shall have the right to duplicate, use, or disclose the data to the extent provided in the contract. This restriction does not limit the Government's right to use information contained in the data if it is obtained from another source without restriction. UNCLASS1 Fl ED Approved For Release 2007/06/18: CIA-RDP84T00037R000500060001-0 Approved For Release 2007/06/18: CIA-RDP84T00037R000500060001-0 UNCLASSI Fl ED APPENDIX B-3 SCHEDULES 1 UNCLASSI Fl ED Approved For Release 2007/06/18: CIA-RDP84T00037R000500060001-0 Approved ForRelease2007/06/18 : CIA-RDP84T00037R000500060001-0 UNCLASS1 Fl ED This appendix supplements Section 5, Project Plans; it provides additional detailed data that includes a comprehensive CDRLs delivery schedule and detailed CPCI develop- ment schedules. Section 5.1 of the Management Proposal shows the D/C Segment Master Schedule that includes the major activities and milestones required for the NPIC devel- opment. Sections 5.2 through 5.7 show a lower level of schedule detail for each specific plan. This appendix provides a subsequent level of detail that will allow the program management team to continually focus on the further refinement and adher- ence to the detailed schedules consistent with the proposed management approach. Schedule risk minimization is a major benefit from the in-depth understanding of the required activities, the ability to take prompt correctivity action when scheduled events are missed, and the concrete proof of overall development progress which occurs when a capability is demonstrated at the successful completion of a scheduled activity, task or milestone. Table 1 presents the delivery schedule for all CDRLs. The CDRLs are broken into pre- liminary, update (built to), final (as built) for BOC, IOC and FOC where appropriate. Also included is the appropriate work breakdown structure number for each CDRL delivery. These schedules were developed using SCRIPT for ease of monitoring and updating by the Project Control Office. They will be reviewed by the responsible performing managers and their staffs at weekly Project Master Control Plan (PMCP) meetings. Monthly, they will be reviewed by executive management. Schedule status will be formally reported monthly to NDPO. Major milestones will be indentified in concert with NDPO and updated at least every six months. Figures 1 through 17 show the detailed CPCI development schedules for the seventeen CPICs defined in Section 5.3, Software Development Plan, of the Management Proposal. Also included are enlarged copies of the five project plans as described in Section 5. a. Master Schedule (Figure 18) b. Systems Engineering Schedule (Figure 19) c. Software Development Schedule (Figure 20) e. Integration and Test/Installation and Checkout Schedule (Figure 22) f. Training Schedule (Figure 23) 2 UNCLASSI Fl ED Approved For Release 2007/06/18 CIA-RDP84T00037R000500060001-0 ? Approved For Release 2007/06/18: CIA-RDP84T00037R000500060001-0 lanle 1. CDRL Delivery Schedule I- SCHEDULE IGEN PROJECT 8/S b0C 10C FOC --T FINAL/ FINAL/ FINAL/ CORL UPDATE/ AS UPDATE/ AS UPDATE/ AS NO NAME W3S NO DATE WBS NO Iekm. 6J1LD TO BUILT WBS NO PREL BUILD TO BUILT WBS NO PREL BUILD TO BUILT 101 -f Contract -f-- 5/3u/82 641100 WDS 102 financial 6411uU 5/30/82 Plan 103 Mister 641100 S/30/82 Scheaule 104 Oevelup- went Plan 642106 5/30/6Z 105 Security i'1,111 641500 5/30/82 106 Cd Plah 691400 m/30/t3. 10/ SO4 Update 641100 5/30/d2 103 QA elan 661300 5/30/82 109 Monthly 041203 monthly Financial deport 110 Milestone Updates 1)41200 every six months 111 Milestone b41200 weekly Report 112 donthiy b4loUu monthly Statu Review 113 Quarterly 2roq and 041200 Eah quarter Status Report NOTE 1: 10 days atter Sbh and each CDR as required by schedule. Approved For Release 2007/06/18: CIA-RDP84T00037R000500060001-0 ssv oN n C13 Id IssvioNn ? Approved For Release 2007/06/18: CIA-RDP84T00037R000500060001-0 Table 1. CDRI. Delivery Schedule (Cont.) SCHEDULE 1-- 7 IGEN PROJEcT M/S - BOC IOC I FOC 1 FINAL/ FINAL/ -r-- FINAL/ CDHL 1 UPDATE/ 1 AS UPDATE/ AS UPDATE/ AS NO NAME IwbS NO DATE WBS NO PHEL BUILD TO1 BUILT WBS NO PREL BUILD TO BUILT WBS NO PHEL BUILD TO BUILT ---i- f -I-- ?I Action 641200 note 1 ---4 ?1 114 Item List 113 Soy T1:AUS and Intey 842500 10/82 3/83 9/04 642501 10/82 11/83 9/84 642102 10/82 11/83 9/84 PidA lb o Soy Ups 642300 Prop 8/82 642301 Prop 8/82 64 2302 Prop 8/82 Coucept 117 Sey Design 642400 6/82 642400 8/82 64 2400 8/82 Specs 118 VW Opus 642103 8/82 642104 8/82 64 2 10 5 8/82 H/W Interface 119 'NIA Trace 642200 Prop 8/82 12/82 6422U1 Prop 8/82 6/83 642202 Prop 8/82 10/83 Vent. Matrix 120 Eng Tech Notes dS required o42221 642222 642223 121 Seg Vent 642600 10/82 642601 10/82 642602 10/82 Plan 122 Soy Leslyu 642209 Prop 0/82 12/82 642210 Prop 8/82 6/83 642211 Prop 8/82 10/83 Analy Rpt 123 068 Plan 642312 10/82 2/83 642313 10/82 11/83 642314 10/82 11/83 Manual. 1 124 &Wit and 642315 9/82 12/83 642316 9/82 12/83 642317 9/82 12/83 Loy Pion 125 DB Spec 642401 10/82 2/83 642401 10/82 11/83 642401 10/82 11/83 12o Ops/SW 622405 9/82 1/83 622406 9/82 1/83 622407 9/82 10/83 Int Spec 12/ Ops/HW 622405 9/82 1/83 622406 9/82 1/83 622407 9/82 10/83 Int Spec Approved For Release 2007/06/18: CIA-RDP84T00037R000500060001-0 CI3 Id IssviaNn ISSV1ONn ? Approved For Release 2007/06/18: CIA-RDP84T00037R000500060001-0 ? Table 1. COHL Delivery Schedule (Cont.) r-- SCHEDULE ?T T? 5/S 1 tIOC IOC FOC 16E8 PHOJECT 1 ?4 -I-- i, I FINAL/ FINAL/ ?4 1FINAL/ I CON!.I 1 [UPDATE/ AS UPDATE/ AS UPDATE/ 1 AS NO NA d0 WbS NU 1 L)AT IWkiS NO 1 ehLL 'BUILD TU BUILT WBS NO PRL BUILD TO BUILT WBS No !REL BUILD TOIBUILT ____i_ ?4? 4 4- 123 ?4 114/SW 9/82 t ?4-- -1--------U 1/83 9/82 ---4 1/83 622407 9/82 10/83 622405 022406 Int Spec 121 SW/SW 022405 9/82 1/83 622400 9/82 1/83 622407 9/82 /65 Int spec 130 seg eSt 042603 10/82 2/83 642604 10/82 11/83 642605 fa /8 2 11/63 Plan 131 Tec elan 641011 1/83 2/83 641111 1/83 11 /8 3 641211 1/83 11/83 132 Seg Prog 643004 9/82 1/83 643007 9/82 9/83 643007 9/82 9/83 P, S 6 C 133 Seg Ups 642300 10/82 642301 10/82 642302 10/82 Specs 134 Se9 Inst 041331 10/82 2/83 10/83 641431 10/82 9/83 10/83 641531 10/82 9/83 10/83 Plea 135 User 64230.3 10/82 2/83 2/84 642304 10/62 2/83 3/85 642305 10/82 2/83 7/85 Manual ? 136 Operator 042306 10/82 2/83 2/84 642307 10/82 2/83 3/85 642308 10/82 2/83 7/85 Manual 131 DB Admin 10/82 2/83 2/84 10/82 9/83 3/85 11)/82 9/83 7/85 Manuai 1 138 Pr09r3mmer.6. danual 2/83 5/84 9/83 5/85 9/83 9/85 139 eacility 041320 10/82 2/83 3/84 041420 10/82 10/83 4/65 641520 10/821 10/83 . 8/85 IONS 140 Tray Plan 041713 1/83 2/83 641714 1/83 11/83 641715 1/83 11/83 143 CI SpC 6462U1 10/82 646201 10/82 1 144 Component 646401 10/82 646201 10/82 Spec 046204 2/83 647201 6/83 046208 5/84 647205 5/65 Approved For Release 2007/06/18: CIA-RDP84T00037R000500060001-0 issvioNn 0 ISSV1ON11 ? Approved For Release 2007/06/18: CIA-RDP84T00037R000500060001-0 Table 1. CDHL Delivery Schedule (Cont.) SCHEDULE --1 I ?T IGEN PROJECT N/S BUG 10 C O C FINAL/ FINAL/ FINAL/ CDRL UPDATE/ I AS UPDATE/ AS UPDATE/ AS NO AMIE WBS NO DATE I WBS NO PREL BUILD TUI BUILT WBS NO PHEL BUILD TO BUILT WBS NO PHEL BUILD TO BUILT V----4 Tray 4- 641720 3/83 -4- 12/83 641721 10/83 4--- 1/85 641722 -4 10/83 5/85 146 Materials 641730 3/83 12/83 641731 10/83 1/85 641732 10/83 5/85 641740 3/83 12/83 641741 10/83 1/85 641742 10/83 5/85 141 Shipping 841330 11/84 641430 1/85 641530 4/85 Plan 148 Equip OBE 646253 1/84 7/84 647212 3/84 7/85 648212 6/85 11/85 Manual 149 QA Audit Audit 641310 641311 641312 Report + 15 151 08 Packages 643015 5/84 644013 5/85 645013 9/85 152 SW Desc Doc 641410 2/84 641411 4/85 641412 7/85 153 Sys Test/ 641350 11/83 11/84 641450 1/85 8/85 641550 3/85 ? Demo lap 154 Sey Test 641341 6/84 041441 6/85 641541 10/85 Reports 155 Tech Pert -As 642203 642204 642205 Meas Required 156 Accession Monthly 641800 641801 641802 List Manual * Complete 15 days atter last system demo. Approved For Release 2007/06/18: CIA-RDP84T00037R000500060001-0 CI3 Id issvioNn (:: 2! 0 rm- )1* (/) ? Approved For Release 2007/06/18: CIA-RDP84T00037R000500060001-0 4110 Table 1. CURL Delivery Schedule (Cont.) SCHEDULE IGEN PROJECT B/S BOC IOC I FOC -4 I I FINAL/ FINAL/I FINAL/ CURL I UPDATE/ 1 AS UPDATE/ AS UPDATE/ AS SU NAME WBS NO DATE WBS NO I PREL BUILD TOI BUILT WBS NO PREL BUILD TO BUILT IWBS NO pith'. BUILD TO BUILT 1--- ______,_ -? -1 i -4- 4_ ---1 BPPRE 131 test Plans 643021 10/82 643021 10/82 643024 11/82 644017 8/83 138 Prog14m- 643023 11/82 644016 8/83 mer's 643034 5/10 644026 5/85 Manual 141 Part I 1343018 8/82 643018 8/82 Specs 142 edit II 643020 8/82 643020 8/82 Specs 64302243036 6 12/82 5/84 644015 644028 8/83 5/85 145 Data 643019 8/82 12/82 5/84 643019 8/82 8/83 5/85 Dictionary 150 CPCI 643032 7/84 644025 7/85 Listings BEMGMT 131 Test Plans 643041 11/82 643041 11/82 643044 1/83 644031 7/83 138 Program- 643043 1/83 644030 7/83 mer's 643053 5/84 644040 5/85 Manual 141 ?art I 643038 8/82 643038 8/82 Specs 142 Part II 643040 8/82 643040 8/82 Specs 643042 1/63 644029 7/83 643055 5/84 644042 5/85 145 Data 643039 8/82 1/83 5/84 643039 8/82 7/83 5/85 Dictionary 150 CPCI 643052 7/84 b44039 7/85 Listings Approved For Release 2007/06/18: CIA-RDP84T00037R000500060001-0 ssv aN n rn 0 G 3 Id issvioNn Approved For Release 2007/06/18: CIA-RDP84T00037R000500060001-0 ? Table 1. CDHL Delivery Schedule (Cont.) SCHEDULE IGEN PNUJECT M/S b0C IOC FOC FINAL/ FINAL/ FINAL/ CDHL UPDATE/ AS UPDATE/ AS UPDATE/ AS NO NAME WBS NO I DATE WBS NO PEEL bUILD TO BUILT WBS NO PREL BUILD TO BUILT WBS NO PHEL BUILD TO BUILT 4 -+-- -4 BEXSUP ?_-1 131 Test Plans 643285 11/82 643285 11/82 643286 12/82 844200 5/83 138 Progiam? 643287 12/82 844199 5/83 mec's 843298 5/84 644209 5/85 Manual 141 Pait I 643281 8/82 843281 8/82 Specs 142 Fart 11 643284 8/82 843284 8/82 Specs 643286 12/82 844198 5/83 643300 5/84 644211 5/85 145 Data 643282 8/82 12/82 5/84 643282 8/82 5/83 5/85 Dictionary 150 CPC.). 643296 7/84 644208 7/85 Listings BENtsU 131 Test Plans 1343060 11/82 643060 11/82 643063 12/82 644045 6/83 138 Program- 643062 12/82 644044 6/83 mer's 643072 5/84 644054 5/85 Manual 141 Pd11 1 843057 8/82 843057 8/82 Specs 142 Part 11 643059 8/82 643059 8/82 Specs, 643061 12/82 644043 6/83 643074 5/84 644056 5/85 145 Data 843058 13/82 12/82 5/84 643058 8/82 6/83 5/85 Dictionary 150 CPC1 843071 1/84 644053 7/85 Listings -_L Approved For Release 2007/06/18: CIA-RDP84T00037R000500060001-0 issvioNn Approved For Release 2007/06/18: CIA-RDP84T00037R000500060001-0 Table 1. CDRL Delivery Schedule (C.ont.) SCHEDULE -r IGEN PROJLCI M/S IsOC IOC FOC -4 FINAL/I FINAL/ FINAL/ CDHL UPDATE/ AS I UPDATE/ AS UPDATE/ AS NO NAME IWBS NO DATE NUS NO PREL BUILD TO BUILT IwBS NO PREL BUILD TO BUILT NHS NO PULL BUILD TO BUILT -f 81,31'111P -1 131 rest Plans 643097 11/82 043091 11/62 643100 1/63 644059 5/83 138 Proylau- 643099 1/83 644058 5/83 uier ?S 643109 5/u4 644068 5/85 Manual 141 Pact I 643301 8/82 643301 8/82 Specs 142 Part II 643096 8/82 643096 8/82 Specs 643098 1/83 644057 5/83 643111 5/84 644070 5/85 145 Data 643095 8/82 1/83 5/84 643095 8/82 5/83 5/85 Dictionary 150 CPC1 643106 7/84 64.4067 7/B5 Listinqs USIA TN 131 Test Plans 643116 12/82 843116 12/82 643119 2/83 644013 9/83 138 Proyiam- 643118 2/83 644072 9/83 wefts 643128 5/54 644083 5/85 Manual 141 Part 1 643113 9/82 643113 9/82 Specs 142 Part 11 643115 9/82 643115 9/82 Specs 643117 2/83 644071 9/83 643130 5/84 6 440 85 5/85 145 Data 643114 9/82 2/83 5/84 643114 9/82 9/83 5/85 Dictionary 1!..0 CPCI 643127 7/84 644082 7/85 Listinys Approved For Release 2007/06/18: CIA-RDP84T00037R000500060001-0 03 Id issvioNn ? Approved For Release 2007/06/18: CIA-RDP84T00037R000500060001-0 L table 1. CDRL Delivery Schedule (Cont.) SCHEDULE CONL NO NAME BM% Dr 131 'test Plans 138 Proy wet's 141 ea 1 Lipec.t; 142 ea rt IL 14s Data uict lona ry 150 CPC1 Lis Li flys BC CII Ii( 131 T,tst. 138 Program? Ser 11.> 0441141?1 141 kat 1 Specs 142 Part 11 Specs 145 150 Data Dictionary C,?4:1 List.4nys -r I GEN P h v3 ECT 11/S BOC I IOC I- ?T ?I- ?r ---r- ?I-- -r I FINAL/ UPDATE/ I AS UPDATE/ iiI3S NO LArE 441.46 NO P NEL BUILD 1.01 BUILT ii DS NO PREL BUILD TO ?1- ?I- ?1 ?1 --( 1-- ?I- ?1? 9/82 01.13171 1/133 04 3174 04 317 2/83 043103 64 3104 114/82 643110 10/02 643172 2/63 64 3185 04 3109 10/432 2/433 0143102 A_ 2/83 5/84 5/84 5/814 7/014 044102 041.101 644 111 643 1s4.4 6 4 4 100 044113 6414 110 043171 b44110 44 115 644 125 6431138 1343 170 6144 1 14 044 121 043109 b 44124 12/02 11/83 9/82 9/82 9/82 1/83 13/83 10/82 10/82 10/82 11/8 3 11/8 3 8/83 8/83 FOC 1? i T---1 FINAL/ I I FINAL/ AS UPDATE/ AS BUILT FIBS NOI PREL 'BUILD TO BUILT 1-- ?I- 1/83 5/85 5/85 5/85 7/85 8/83 5/65 5/85 5/85 7/85 1_ J-- 04 5017 64 50 16 64 5026 643150 64 5015 64502 8 64 5025 64 3171 04 5031 6145030 04 5040 6143168 64 3 170 6415029 64 5042 6143169 64 5039 Approved For Release 2007/06/18: CIA-RDP84T00037R000500060001-0 12/82 11/83 9/82 9/82 9/132 1/83 10/83 10/82 10/8 2 10/8 2 11/83 11/83 10/63 144/83 9/85 9/8 9/8S 10/83 9/85 d issvioNn rn r- Approved For Release 2007/06/18: CIA-RDP84T00037R000500060001-0 Table 1. CURL Delivery Schedule (Cont.) ? SCREDULE CURL NO NAML 131 (AuUERY IGEN PROJECT M/S BOC 1 ?+ ?r NRS NO DATE WBS NO PREL ___.4 4_____ _f___ --1- -I Test Plans 136 Program- mer's manual 141 Part I Specs 142 Part II Specs 145 Data Dictionary 150 CPCI Listings BAPPLS 131 Test Plans 138 Program- mer's Manual 141 Part I Specs 142 Part Il specs 145 Data Dictionary 150 CPC' ? Listings 643190 12/82 643192 643201 1/83 643187 9/62 64.3169 9/82 643191 643203 643188 9/82 643200 643208 1/83 643211 643210 2/83 643220 643205 10/82 643207 10/82 643209 643222 643206 10/82 643219 -1- IOC FOC 1. FINAL/ UPDATE/ 1 AS BUILD TO( BUILT WBS NO PREL UPDATE/ BUILD TO FINAL/1 AS 1 BUILT 1WBS NO PREL 1/83 1/83 2/83 2/83 64319U 12/82 1/83 ? 644130 644129 5/83 5/84 644139 643187 9/82 643189 9/82 644128 5/84 644141 5/84 643188 9/82 7/84 644138 643208 1/83 2/83 644144 644143 7/83 5/84 644153 643205 10/82 643207 10/82 .644142 5/84 644155 5/84 643206 10/82 ? 7/84 644152 5/83 5/83 7/83 7/83 5/85 5/85 5/85 5/85 7/85 7/83 5/85 5/85 5/85 7/85 FINAL/ UPDATE/ AS BUILD TO BUILT --f Approved For Release 2007/06/18: CIA-RDP84T00037R000500060001-0 ssv oN n rn 0 031d ISSV13N11 ? Approved For Release 2007/06/18: CIA-RDP84T00037R000500060001-0 ? Table 1. CDRL Delivery Schedule (Cont.) SCHEDULE 16EN PROJECT M/S 1 BOC IOC FOC CORL NO NAME WES NO DATE I WES No 1-----1 ____4 -I? --1- EOMArS 1:31 138 1141 142 145 150 131 138 141 142 145 Test Plans Frogram- mer's Manual Part I Specs kart 11 Specs Data Dictionary CPC1 Listings EITDEY Test Plans Program- 4415 r? s Manual Part I SpeCb. Part 11 Spec:, Data Dictionary 150 CPC1 Listings L---- 643127 643230 643229 643239 643224 643226 643228 643241 643225 643238 643246 643249 643248 643258 643243 643245 643247 643260 643144 643257 PREL 11/82 12/82 9/82 9/82 9/82 12/82 9/02 9/82 9/82 1 FINAL/ UPDATE/ 1 AS EU11,0 TO1 BUILT WBS NO PREL UPDATE/ BUILD TO FINAL/ AS BUILT WBS NO PREL UPDATE/ BUILD TO 12/02 12/82 12/82 12/82 643227 11/82 12/82 644158 644157 9/83 5/84 644167 643224 9/82 643226 9/82 644156 5/84 644169 5/84 643225 9/82 7/84 644166 643246 11/82 12/82 644172 644171 8/83 5/84 644181 643243 9/82 643245 9/82 644170 5/84 644183 5/84 643244 9/82 7/84 644180 9/83 9/83 8/83 8/83 9/83 5/85 5/85 5/85 7/85 8/83 5/65 5/65 5/65 7/85 64 3 24 6 645045 645044 645054 64 324 3 643245 645043 645056 643244 645053 11/82 11/83 9/132 9/82 9/82 11/83 11/83 FINAL/ AS BUILT -1 11/83 9/85 9/85 9/85 9/85 Approved For Release 2007/06/18: CIA-RDP84T00037R000500060001-0 issvioNn 0 ISSV1ON11 ? Approved For Release 2007/06/18: CIA-RDP84T00037R000500060001-0 Table 1. COM. Delivery schedule (Cont.) r- SCHEDULE 1-- ibEn PftuJEcT I 80C IOC I FOC n/s FINAL/ ?T FINAL/ FINAL/ CSHL UPDATE/ AS UPDATE/ AS I UPDATE/ AS NO NAME 148S NO DATE I WBS NO PREL BUILD TO BUILT WBS NO PREL BUILD TO BUILT IWBS NO FEEL BUILD TO BUILT 4A Pt 4 ?4 ?f-----+ 131 Te.,IL 843285 1/83 643265 1/83 (3432u8 2/83 644186 6/83 138 efOjEdIll- 843267 2/83 644185 6/83 643277 5/84 644195 5/85 141 earl I 643262 10/82 643262 10/82 Spec 142 II 643264 10/82 643264 10/82 Specs 643266 2/83 644184 6/83 643279 5/84 644197 5/85 145 Data 043263 10/82 2/83 5/84 643263 10/82 6/83 5/85 Dictionary 130 CPCI 643270 7/84 644194 7/85 Li:.;tinys Approved For Release 2007/06/18: CIA-RDP84T00037R000500060001-0 CI3 Id issvloNn ISSV1ONil Approved For Release 2007/06/18: CIA-RDP84T00037R000500060001-0 BEPPRE 82 83 84 85 AMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASOND PRELIM. DESIGN - PART I SPECS - DATA DICT - PART II SPECS - TEST PLAN CRITICAL DESIGN - PART II SPECS 'BUILD TO' - PRELIM. PROG. MARL. - TEST PL AN . DEVELOPMENT - C & TEST - INT. & TEST CPC TEST - UNIT TEST - DEV. TEST PROCEDURES - SUPPORT T & V - PREPARE REPCRTS DOCUIENTATION - ItRUTS TO USER, OPS & D.B. ADMIN. MAKALS - CPCI LISTINGS 'AS BUILT' - PROGRAWZR MANUAL - TRAINING MANUAL INPUTS - PART II SPECS 'AS BUILT' B BODE I 1-1 I 1-I1 .1 I , .1 8 I 8 I 15 .. I B i -i I .. 11-, B I I I 1 I B B 1--1 , B I r----1 I 1-I B I I B I 1/-13-1 B I B I B r----1 I I-1 I I-I B I Approved For Release 2007/06/18: CIA-RDP84T00037R000500060001-0 FIGURE I. CPCI DEVELOPMENT SCHEDULE issvioNn 031d ISSV13N11 ? Approved For Release 2007/06/18: CIA-RDP84T00037R000500060001-0 BEMGMT ? 82 83 84 85 AMJJASONDJF M AMJJ ASONDJF M AMJJA SONDJF MANJJA SONO PREL IN. DESIGN - PART I SPECS - DATA 0 I CT - PART I I SPECS - TEST PLAN CAI T I CAL DESIGN - PART I I SPECS 'BUILD TO' - PIM.B PROG. MANUAL - TEST PLAN DEVELOPNENT - CODE a TEST - INT. & TEST CPC TEST - UN I T TEST - DEV. TEST PROCEDURES - SUPPORT T & V - PREPARE FtEPCRTS DOCUIENTAT ION - INPUTS TO USER. CPS & D.B. ADMIN. MAt4UALS - CPC! LISTINGS 'AS BUILT' - PROGRAMER MAMIAL - TRAINING MANUAL INPUTS - PART II SPECS 'AS BUILT' 8 8 I I 1 I 1 1 8 i B 8 1 ---i r?ii r I I?I 8 I B 1 8 I 8 I I1 I I B 1 , ,B ,EI i_B_I I I?I I 1-1 I-I I I--1 I 1---1 i?T , 1--1 1_15_1 I?, 8 Approved For Release 2007/06/18: CIA-RDP84T00037R000500060001-0 FIGURE 2 CPCI DEVELOPMENT SCHEDULE issvioNn 0 031d ISSV13NI1 Approved For Release 2007/06/18: CIA-RDP84T00037R000500060001-0 BEXUP 82 83 84 85 AMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASOND PRELIM. DESIGN - PART I SPECS e 1 1 B - DATA DICT 1------1 . .8 - PART II SPECS A-1 B I-I - TEST PLAN I I--i CRITICAL DESIGN -PART II SPECS 8 1 I 'BUILD TO' 8 - PRELIM. PROG. 1-1 I MANIAL ' 8 I -TEST PLAN I-I DEVELOPMENT 8 I - CODE It TEST 1 BPC I - INT. a TEST C 1 1 TEST 8 I -UNIT TEST 8 I -DEV. TEST PROC. I II B I - SUPPORT T At V B I 1 -PREPARE REPORTS I-1 I-I DOCUMENTATION 8 - INPUTS TO USER. 1-1 OPS a D.B. ADMIN. MANUALS I - CPCI LISTINGS I-11 'AS BUILT' I - PROGRAMMER MAPAIAL FP-1 1-1 . I - TRAINING MANUAL F-14 F-1 INPUTS I - PART II SPECS I-81 F-I 'AS BUILT' Approved For Release 2007/06/18: CIA-RDP84T00037R000500060001-0 ? FIGURE 3. CPCI DEVELOPMENT SCHEDULE IssvioNn 0 03 Id ISSV13Nn Approved For Release 2007/06/18: CIA-RDP84T00037R000500060001-0 BERESU 82 83 84 85 AMJJASONDJFMANJJASONDJFMAMJJ?SOND.JFMANJJASOND PRELIM. DESIGN - PART I SPECS - DATA DICT - PART II SPECS - TEST PLAN CRITICAL DESIGN - PART II SPECS 'BUILD TO' - PRELIM. PROG. MANUAL . - TEST PLAN DEVELOPmENT - CODE 2 TEST - INT. 2 TEST CPC TEST - U TEST - DEV. TEST PROCEDURES - SUPPORT T 2 V - PREPARE REPORTS DOCUMENTATION - ipwrs TO USER, OPS At D.B. ADMIN. MANUALS - CPCI LISTINGS 'AS BUILT' - PROGIA164ER MANUAL - TRAINING MANUAL D4Purs - PART II SPECS 'AS BUILT' B 8 B B I 1--1 I I I?I I h--i 6 I . .8 I 11-1 B 1--I B I---1 B I I-05-1 I 6NIT 13 I 1-BH 1?I Ij-31 B F--I Approved For Release 2007/06/18: CIA-RDP84T00037R000500060001-0 ? FIGURE 4. CPCI DEVELOPMENT SCHEDULE 031d issvioNn 031d ISSV13N11 Approved For Release 2007/06/18: CIA-RDP84T00037R000500060001-0 IIIP BMAN IP 82 83 84 85 ? AMJJASONDJFNAMJJASONDJFMAMJJASONDJFMAMJJASOND PRELIM. DESIGN - PART I SPECS - DATA DICT - PART II SPECS - TEST PLAN CRITICAL DESIGN - PART II SPECS 'BUILD TO' - PRELIM. PROG. MANUAL ? - TEST PLAN DEVELOPIENT - CODE 2 TEST - INT. IL TEST CPC TEST -UNIT TEST -DEV. TEST PROC. - SUPPCPT T 2 V -PREPARE REPCRTS DOCUMENTATION - INPUTS TO USER, CPS 2 D.B. ADMIN. MAMLALS - CPCI LISTINGS 'AS BUILT' - PROGRAMMER MANUAL - TRAINING MANUAL INPUTS - PART II SPECS 'AS BUILT' B 8 I I?I I I I I 8 B I?BI I B F?I I?I I I I F?I 6 I I I----I B 5 I I B 8 8 I' B 8 I --I 8 I?I B 1--I Fj-3 I Fill 5 I?I IllI?I I I?I I 1 F?I FII Approved For Release 2007/06/18: CIA-RDP84T00037R000500060001-0 FIGURE 5. CPCI DEVELoPmENT SCHEDULE C13 Id issvioNn 031d ISSViONfl ? Approved For Release 2007/06/18: CIA-RDP84T00037R000500060001-0 11. BSTAT R 82 83 BN 85 ANJJASONDJFNAMJJASONDJFMAMJJASONDJFMAMJJAS,OND PRELIM. DESIGN - PART I SPECS - DATA DICT - PART 11 SPECS - TEsi. PLAN CRITICAL DESIGN - pARf II SPECS -suiLo To- - PRELIM. PROG. MANUAL -TEST PLAN ' DEVELDDIENT - coot 2 TEST - INT. 2 TEST CPC TEST -UNIT TEST -DEV. TEST PROC. - SUPPORT T /1 V -PREPARE REPORTS DOCUMENTATION - INPUTS TO U. OPS /I, D.B. ADMIN. MANUALS - CPCI LISTINGS 'AS BUILT' - PROGRANNER MANUAL - TRAINING MANUAL INPUTS - PART II SPECS 'AS BUILT' B 6 i I-1 I 1 I I I . .8 1--6 -I o I?i 'Ali B I?I . 5 1 F?I 1 8 I?I BI . B .I 8 I I I-1 6 I?I I F?I ili 8 I?I 1 I?I I 1---1 Approved For Release 2007/06/18: CIA-RDP84T00037R000500060001-0 FIGURE 6. CPCI DEVELOPMENT SCHEDULE issvloNn rn 0 CI3 Id ISSV13Nfl ? Approved For Release 2007/06/18: CIA-RDP84T00037R000500060001-0 BMMGMT 82 83 84 85 AMJJASONDJFMAMJJASONDJFMAMJJASONDJFAIAMJJASOND PRELIM. DESIGN - PART I SPECS - DATA DICT - PART II SPECS - TEST PLAN CRITICAL DESIGN - PART II SPECS 'BUILD TO' - PRELIM. PROG. MAMA_ - TEST PLAN DEVELOPMENT - CODE 8 TEST - INT. 6 TEST CPC TEST -UNIT TEST -DEV. TEST PROC. - SUPPCPT T 8 V -PREPARE REPORTS DOCUMENTATICN - INPUTS TO USER.F CPS 11 0.6. ADMIN. MANUALS - CPCI LISTINGS 'AS BUILT' - PROGRAMMER MANUAL - TRAINING MANUAL INPUTS - PART II SPECS 'AS BUILT' 6 , .13 I I I?I I F I F F FI F F-I F I-1 I F I 6 I?I s F-I I I I I-I I . 1 . 'i I I . I F t-----1 i I I I-I IF B ---I F 6 I---I I I-I F F- I--I "F F I-I Approved For Release 2007/06/18: CIA-RDP84T00037R000500060001-0 ? FIGURE 7. CPCI DEVELOPMENT SCHEDULE issviaNn ISSV1ONn ? Approved For Release 2007/06/18: CIA-RDP84T00037R000500060001-0 BCCNTR 82 83 84 85 AMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASOND PRELIM. DESIGN - PART I SPECS - DATA DICT - PART II SPECS - TEST PLAN CRITICAL DESIGN - PART II SPECS 'BUILD TO' - PRELIM. PROD. MANUAL - TEST PLAN DEVELCPMENT - COOE 2 TEST - INT. 2 TEST CPC TEST -UNIT TEST -DEV. TEST PROC. - SUPPORT T 2 V -PREPARE REPORTS DOCUMENTATION - INPUTS TO USER, OPS it D.B. ADMIN. MANUALS - CPCI LISTINGS 'AS BUILT' - PROGRAMER MANUAL - TRAINING MANUAL B 8 I F-4 I F . F F I---I 1 F F 1-1 F F I 11.1 B B 1---4 . i 8 I I F-1 I I B 1-1 8 B I B I I I " F F I-I I 8 1-1 1-1 B I F F 1- 1--1 F I B 1-I B 1-1 12-3I I 1-1 I 1-1 ELI F I--I I-El I-El INPUTS - PART II SPECS 'AS BUILT' Approved For Release 2007/06/18: CIA-RDP84T00037R000500060001-0 ? FIGURE 8. CPCI DEVELOPMENT SCHEDULE issvioNn a Approved For Release 2007/06/18: CIA-RDP84T00037R000500060001-0 BQUERY 82 83 84 85 AMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASOND PRELIM. DESIGN - PART I SPECS 6 6 1.---1 - DATA DICT 8 - PART II SPECS I-I I - TEST PLAN 1--6 1 I-I CRITICAL DESIGN -PART II SPECS I 8 I f I 'BUILD TO' I - PRELIM. PROG. MANUAL 8 I -TEST PLAN I-I 1--I DEVELOPMENT 6 I - CODE 8. TEST I B I - INT. 2 TEST CPC TEST 8 I -UNIT TEST , I 6 -DEV. TEST PROC. I-A 8 I I - SUPPORT T It V 8 I -PREPARE REPCRTS 1---1 I-I DOCLMENTATION I - IIPUTS TO USER. I-I OPS It D.B. ADMIN. MANUALS I - CPCI LISTINGS Ell4 1-----1 'AS BUILT' - PROCRAIAER MANUAL EJL4 I - TRAINING MANUAL I-I INPUTS I - PART II SPECS 1-----1 'AS BUILT' Approved For Release 2007/06/18: CIA-RDP84T00037R000500060001-0 ? FIGURE 9. CPCI DEVELOPMENT SCHEDULE ssv oN n ISSV1ON11 ? Approved For Release 2007/06/18: CIA-RDP84T00037R000500060001-0 BAPPLS 82 83 84 85 AMJJASONDJFNAMASONDJFmAMJJAS0NDJFNAMJJASOND PRELIM. DESIGN - PART I SPECS - DATA DICT - PART II SPECS - TEST PLAN CRITICAL DESIGN - PART II SPECS 'BUILD TO' - PRELIM. PROG. MANUAL - TEST PLAN DEVELOPNENT - CODE a TEST - INT. & TEST CPC TEST -UNIT TEST -DEV. TEST PROC. - SUPPORT T JI v -PREPARE REPORTS DOCUNENTAT ION - INPUTS TO USER. OPS a D.B. ADMIN. MANUALS - CPCI LISTINGS 'AS BUILT' - PROGRAMER MANUAL - TRAINING MANUAL INPUTS - PART II SPECS 'AS BUILT' 6 B I 1--1 I I I I I I 6 6 6 6 I?I I 6 E--1 B I I I B I I?I I 6 I I B I I 6 I I I?I I II ' 6 I-1 1-5-1 B II 6 1---1 F5?I II3-1 I I?I I I?I I I-1 I /--I I I?I I-1-4 Approved For Release 2007/06/18: CIA-RDP84T00037R000500060001-0 ? FIGURE 10 CPCI DEVELOPMENT SCHEDULE issvioNn ISSV1DNII ? Approved For Release 2007/06/18: CIA-RDP84T00037R000500060001-0 ? BDMAPS 82 83 84 85 AMJJASONDJFMAMJJASONDJFMANJJASONDJFMAMJJASOND PRELIM. DESIGN - PART I SPECS - DATA DICT -PART II SPECS - TEST PLAN CRITICAL DESIGN - PART II SPECS 'BUILD to. - PRELIM. PROG. 14AAAJAL - TEST PLAN . DEVELOPIENT - CODE .1 TEST - INT. At TEST CPC TEST -UNIT TEST -DEV. TEST PROC - SUPPORT T /I V -PREPARE REPORTS DOCUMENTATION - INPUTS TO USER, OPS & D.B. ADMIN. MANUALS - CPCI LISTINGS 'AS BUILT' - PROGRAMER MANUAL - TRAINING MANUAL IMDUTS - PART II SPECS 'AS BUILT' 8 B I I?I I I 1 I I I 13 . . r? ---i .. B-1 1 OA 6 I?B?I I?I I I B I I-1 I 1 6 1 I I I B I i----1-1 B 1 B I-I OA 1-B I I I-I I I?I I I /--I I 1-1 Approved For Release 2007/06/18: CIA-RDP84T00037R000500060001-0 FIGURE 11 CPCI DEVELOPMENT SCHEDULE issvioNn 0 031d ISSV1ON11 ? Approved For Release 2007/06/18: CIA-RDP84T00037R000500060001-0 BTTDEV 82 83 _ 84 65 ?MJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASOND PRELIM. DESIGN - PART I SPECS - DATA DICT - PART II SPECS - TEST PLAN CRITICAL DESIGN - PART II SPECS 'BUILD TO' - PRELIM. PROG. MANUAL - TEST PLAN DEVELOPMENT ' - CODE .1 TEST - INT. & TEST CPC TEST - UN TEST - DEV. TEST PROCEDLRES - SUPPORT T & V - PREPARE REPORTS DOWENTAT ION - INPUTS TO USER. OPS 6 D.B. ADMIN. MANUALS - CPCI LISTINGS 'AS BUILT' - PROGRAMER MANUAL - TRAINING MANUAL i tIRJTS - PART I I SPECS 'AS BUILT' 8 1 I-1 I I FI I F I-1 F I-I I e I 8 e liLl B , B , 6 I F I I-1 r-t B B r 6 I-1 I 13 ------t 1IT 1--I F 12-II I?LI Et F?I FILII 1-1 F-6 I F-B-II }-I F?II F I-I F F--1 I?I F I-1 I?I r-------1 Approved For Release 2007/06/18: CIA-RDP84T00037R000500060001-0 ? FIGURE 12. CPCI DEVELOPMENT SCHEDULE issvloNn 031d ISSV13Nfl ? Approved For Release 2007/06/18: CIA-RDP84T00037R000500060001-0 WAPPLS 82 83 84 85 AMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASOND PRELIM. DESIGN - PART I SPECS - DATA DICT - PART II SPECS - TEST PLAN CRITICAL DESIGN - PART II SPECS 'BUILD TO - PRELIM. PROG. MANUAL - TEST PLAN M-VELCPMENT . - CODE It TEST - INT. /I TEST CPC TEST - UNIT TEST - DEV. TEST PROCEDURES - SUPPCRT T /1 V - PREPARE REPORTS DOCUMENTATION - INPUTS TO USER. OPS it D.B. ADMIN. MANUALS - CPCI LISTINGS 'AS BUILT' - PROGRAMER MANUAL - TRAINING MANUAL INPUTS - PART II SPECS 'AS BUILT' . B B 1 I-1 I I I B I I 1 8 I-B I I I I 1 . .___B___. i I I I 13 . I r----i B 1 B I I B I 1 13 I 1 I 1 -i 8 FE-1 B I 1--1 I-1 I I-I I-1 I-I 13-1I r----1 1--8 I I--B-1I Approved For Release 2007/06/18: CIA-RDP84T00037R000500060001-0 FIGURE 13. CPCI DEVELOPMENT SCHEDULE issvioNn ISSV1ON11 ? Approved For Release 2007/06/18: CIA-RDP84T00037R000500060001-0 BSYSM 82 83 _ 84 85 AMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASOND PRELIM. DESIGN - PART I SPECS B - DATA DICT - PART II SPECS - TEST PLAN CRITICAL DESIGN - PART II SPECS 'BUILD TO' - PRELIM. PROG. ' MANUAL DEVELOPMENT - CODE & TEST - INT. it TEST CPC TEST - SUPPORT T 4 V DOCUMENTATION - INPUTS TO USER. OPS & 0.8. ADMIN. MANUALS - CPCI LISTINGS 'AS BUILT' - PROGRAMER MANUAL - TRAINING MANUAL INPUTS - PART II SPECS 'AS BUILT' _ Approved For Release 2007/06/18: CIA-RDP84T00037R000500060001-0 , FIGURE 14. CPCI DEVELOPMENT SCHEDULE IssvioNn 0 SSV1ONfl Approved For Release 2007/06/18: CIA-RDP84T00037R000500060001-0 IIP BDDMS1 82 63 84 85 AMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASOND PRELIM. DESIGN - PART / SPECS B - DATA DICT - PART II SPECS - TEST PLAN CRITICAL DESIGN - PART II SPECS 'BUILD TO' - PRELIM. PKG.. MANUAL DEVELOPMENT - CODE & TEST - INT. A TEST CPC TEST - SUPPORT T II V DOCUMENTATION - INPUTS TO USER. OPS & D.B. ADMIN. MANUALS - CPCI LISTINGS 'AS BUILT' - PRoGRAteER MANUAL - TRAINING MANUAL INPUTS - PART II SPECS 'AS BUILT' Approved For Release 2007/06/18: CIA-RDP84T00037R000500060001-0 ? FIGURE 15. CPCI DEVELOPMENT SCHEDULE C13 Id issviaNn ISSV1ON11 Approved For Release 2007/06/18: CIA-RDP84T00037R000500060001-0 FSYSTM ? 82 83 64 85 AMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASOND PRELIM. DESIGN - PART I SPECS - DATA DICT - PART II SPECS - TEST PLAN CRITICAL DESIGN - PART II SPECS 'BUILD TO' - PRELIM..PROG. MANUAL DEVELOPNENT - CODE il TEST - INT. A TEST CPC TEST - SUPPORT T it V DOCUMENTATION - INNJTS TO USER. CPS A D.B. ADMIN. MANUALS - CPCI LISTINGS 'AS BUILT' - PROCiRAMMER MANUAL - TRAINING MANUAL INPUTS - PART II SPECS 'AS BUILT' 0 Approved For Release 2007/06/18: CIA-RDP84T00037R000500060001-0 FIGURE 16. CPCI DEVELOPMENT SCHEDULE issvioNn rn 0 031d ISSV13Nfl ? Approved For Release 2007/06/18: CIA-RDP84T00037R000500060001-0 WSYSTM 82 83 84 85 AMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASOND PRELIM. DESIGN e - PART I SPECS I - DATA DICT PART II SPECS - TEST PLAN CRITICAL DESIGN - PART II SPECS 'BUILD TO' - PRELIM. PROG. MANUAL DEVELOPMENT - CODE IL TEST - INT. 2 TEST CPC TEST - SUPPORT T it V DOCUMENTATION - INPUTS TO U. CPS 2 D.B. ADMIN. MANUALS - CPCI LISTINGS ,As BUILT' - PROGIAMER MANUAL - TRAINING MANUAL INPUTS - PART II SPECS 'AS BUILT' Approved For Release 2007/06/18: CIA-RDP84T00037R000500060001-0 ? FIGURE 17. CPU DEVELOPMENT SCK1DULE IssvioNn rn 0 Approved For Release 2007/06/18: CIA-RDP84T00037R000500060001-0 UNCLASSIFIED 82 63 04 85 86 ANJJASONDJFMAMJJAS0110J0111AMJJASONDJFMAMJJASONDJ MAMJJASOND NPIC SYSTEM MILESTONES Illggalg002! 44I/0 ()wows foc 4/414 5le4 10/84 OC AILI 7/65 11;64' (BOC) MILESTONES F 1) CONTRACT START F 2) SBR (TOTAL SEGMENT) F 3) INTERNAL DESIGN REVIEW F 4) PDR (TOTAL SEGMENT) F 5) INTERNAL DESIGN REVIEW F 6) CDR F 7) INTERNAL DESIGN REVIEW F 8) PQT F 9) FOT F 10) INS A/N INTEGRATION TESTING F 11) SEGMENT INTEGRATION TESTING F 12) FACTORY ACCEPTANCE TESTING F 13) SHIP S 14) INSTALL 278 BASIC A/N S 15) HAI ADPE INSTALL a C/O TEST S 16) S/W INSTALL I C/O TEST S 17) SITE SEGMENT TEST S 18) SEGMENT ACCEPTANCE S 19) SITE INTER SEGMENT DEMOS S 20) SITE INTER PROGRAM DEMOS S 21) DOC TRAINING S 22) INTERFACE OPERATIONAL S 23) SEGMENT BOC S 24) SYSTEM DOC S 24) DOC 0 i M Ak7/1 AL8/15 9/1 A__I__I-_,A AL12/15 I/1 2/1 4/1 411-1-4?A ?4/I 401/1 4,1011 IZI ? 211 III 2/ IA_A3/1 47/15 A8/I 411/1 WI A 410/141, 12/ I ? 12/61/1 461/1 461/1 ALS/1 1 gel 2116A3ii 4/3/1 1113/111 AS/1S 44/1 4,9/I Avi 4I05 3/1 S/I AS/ IS A45/15 A,10/15 aI0/I5 10C MILESTONES F 1) PDR IOC UPDATE 2) INTERNAL DESIGN REVIEW F 3) CDR F 4) INTERNAL DESIGN REVIEW F 5) PQT F 6) FRT F 7) INS CID INTEG TESTING F 8) SEGMENT INTEG. TESTING F 9) FACTORY ACCEPTANCE TESTING F 10) SHIP 4111513/1 A8/'F A 17/1 ? szt 414/I A10/1 Ae/t _A2/1 2/1 3/1 A__A 43/1 AilI 412/1 AL1,,, 68/1 Figure 18. Master Schedule (Sheet 1 of 2) 31 Approved For Release 2007/06/18: CIA-RDP84T00037R000500060001-0 UNCLASSIFIED Approved For Release 2007/06/18 : CIA-RDP84T00037R000500060001-0 UNCLASSIFIED 82 83 84 85 86 ANJJASONDJFNAMJJASONDJFMANJJASONDJFMANJJASOND FNAMJJ?ASOND NPIC SYSTEM MILESTONES /NTERPROGRAN I/F CHANGES BOC DEW ? ? ? 4/84 5/84 10/84 AlCC 7/85 FOC17374' S 11) INSTALL 82 BASIC A/N 8 296 EXPANDED A/N 11 100 IMAGERY S 12) H/11 ADPE INSTALL 4 C/O TEST S 13) S/W INSTALL I C/O TEST S 14) SITE SEGMENT TEST S 15) SEGMENT ACCEPTANCE S 16) SITE INTER SEGMENT DEMOS S 17) SITE INTER PROGRAM DEMOS S 18) IOC TRAINING S 19) SEGMENT IOC S 20) SYSTEM IOC S21) IOC 0 4, M & 1/1 411:6/1 9/30 A 3/1 4/1 A_A 3/1 4/1 A-A 4/1 &JO/15 A5/15 ?5/1 -...-A6/15 6/1 7/15 &L--? 6/1 7/15 3/15 ? 4/1-....-? ?-...-? 40/15 7/15 A 7/15 ? FOC MILESTONES F 1) POR FOC UPDATE F 2) INTERNAL DESIGN REVIEW F 3) CDR F 4) INTERNAL DESIGN REVIEW F 5) POT F 6) FQT F 7) SEGMENT INTEG TESTING F 8) FACTORY ACCEPTANCE TESTING F 9) SHIP S 10) INSTALL 244 IMAGERY S 11) INSTALL 4 C/O TEST S 12) SITE SEGMENT TEST S 13) SEGMENT ACCEPTANCE S 14) SITE INTER SEGMENT DEMOS S 15) SITE INTER PROGRAM DEMOS S 16) FOC TRAINING S 17) SEGMENT FOC S 18) SYSTEM FOC S 19) FOC 0 & M 4/1 5/1 A-A i9/15 11/1 II 1/1 A3/1 ?7/1 INSTALLATION THROUGH 7/87 --...---.....?10/1 A9/1 Ae2/I 12/14&---A2/1 A2/1 --_A3/1 A3/I 6/1 ? 7/15 SUPPORT AS REQUIRED THROUGH 7/87 3. S&PP0RT AS REQUIRED THROUGH 7/47 a JULY 1987 10/1 THROUGH 7/88 -A 8/15 9/15A_A A9/15 el TEST A TEST 8/1A1.---AL9/15 40/15 F = FIELD S . SITE Approved For Release 2007/06/18: CIA-RDP84T00037R000500060001-0 IPIC1 0101 .IPIC Figure 18. Master Schedule (Sheet 2 of 2) 32 UNCLASSIFIED Approved For Release 2007/06/18: CIA-RDP84T00037R000500060001-0 UNCLASSIFIED PLANNED BY DATE LOCATION PAGE 1 OF 1 SHEET 1 OF 1 NETWORK NPIC 15118NET SYSENG 5YMBOLS NPIC PROGRAM DATE EARLY START OR FINISH A SYSTEM ENGINEERING ACTUAL START OR FINISH ? RUN DATE 18FE882 FFRTR DATE LATE FINISH V NPIC SYSTEM ENGINEERING SCHEDULE DURATION (NON-CRITICAL) DURATION (CRITICAL) TOTAL FLOAT - - - - _ I NODE J NODE DESCRIPT ION NH RESP EARLY START EARLY FINISH LATE START LATE FINISH COAL 82 11 IM IJIJ IR IS IC IN I 0 83 J 'FIN IR IM IJIJ1R I 5 I CI IN 10 84 J IF Iti-111 FH I II I IA F9 III IN TD BS I IFIM IR )14 / 1 I I RFS 1n r-N rn 86 i IFIN rn TI4-1 I I IR FIFA 1)' 11 87 -)18060 -11C2S0 -RC300 (411009 RADIO RA020 RA030 RA040 ARM RA060 RADIO A8009 R8010 R8020 A8030 R8040 R8050 R8070 R8080 R8090 R8100 R8110 R8120 R8130 A8140 A8150 A8160 R8I70 R8190 R5200 R8210 R8220 R8230 A8240 AC249 RC260 RC270 AC280 AC290 ...---I0C AC310 RC320 AC330 RC340 -RC350 PC360 RC362 AC364 AC370 _---BOC -AC380 RC390 SYSTEM ENGRG MANAGEMENT ---BOC TECH MANAGEMENT ---ICC TECH MANAGEMENT ---FOC TECH MANAGEMENT ---80C H/5/0 IF SIDS ---I0C H/5/0 IF STDS ---FOC H/S/0 IF STOS ---SEGMENT DEVLOPMENT PLAN SYSTEM ENGNRING ANALYSIS ---BOC ROMNTS ANAL 8. TRACE --IOC ROMNTS ANAL & TRACE ---FOC ROMNTS ANAL & TRACE ---BOC PERF ANALYSIS ---IOC PERF ANALYSIS ---FOC PERF ANALYSIS ---BOC AMA ANALYSIS ---IOC AMA ANALYSIS ---FOC AMA ANALYSIS ---BOC SEG DESIGN ANAL RPT ---10C SEG DESIGN ANAL RPT ---FOC SEG DESIGN ANAL RPT ---BOC TRADE STUDIES ---10C TRADE STUDIES ---FOC TRADE STUDIES ---BOC ENGRG SPECIALTIES ---ICC ENGRG SPECIALTIES ---80C SUP INTRSEG IF ROMT ---ICC SUP INTRSEG IF ROT ---FOC SUP INTRSEG IF ROMT ---BOC ENGRG TECH NOTES ---ICC ENGRG TECH NOTES ---FOC ENGRG TECH NOTES SE OPERATIONS ENGR & OEV- ---BOC SEG OPS CNCEPT.P.S. ---ICC SEG OPS CNCEPT.P.S. ---FOC SEG OPS CNCEPT.P.S. ---BOC USER MANUAL USER MANUAL ---FOC USER MANUAL ---BOC SEG/SYS OPS MANUALS ---ICC SEG/SYS OPS MANUALS ---FOC SEG/SYS OPS MANUALS ---BOC PROD ENHANC STUDIES - ---ICC PROD ENHANC STUDIES ---FOC PROD ENHANC STUDIES ---80C 0 6 M PLAN ---ICC 0 4 N PLAN MRINT & LOGIST PLAN ---ICC MAINT & LOGIST PLAN ---FOC MRINT 4 LOGIST PLAN 0.00 130.40 39.00 8.80 130.40.1, 30.20 S2.00 8.60 0.00 91.20 48.00 34.80 91.20 83.00- 39.00 34.40 4.20 4.20 21.80 4.20 4.20 47.60 8.80 165.20_ 34.40 99.80 21.80 43.60 4.20- 4.20 4.60 4.40 t 0.00 126.20 21.60 4.20 21.80 39.00 4.20 108.60 17.20 4.20 108.80 21.40 4.60 48.00 17.40 108.60 78.60 43.20 30RPR82 30RPR82 300CT84 30JUL85 30RPR82 30NOV84 01JUL85 30RPR82 30APR82 30APR82 30JAN84 31DEC84 30APR82 30MAY83 31DEC84 30SEP82 01AUG83 30SEP83 30JUL82 - 01AUG83 30SEP83 30APR82 0IRUG83 30SEP83 30NOV84 30AUG85 30APR82 300CT84 30AUG85 30JUL82 30AUG83 30NOV83 30APR82 30APR82 310EC84 30AUG85 30MAY84 010CT84 01JUL85 30JUN82 0IRPR85 01JUL85 30JUL82 30NOV84 30JUL85 31MAY82 30AUG84 30APR82 30MAY84 020EC85 30RPR82 300CT84 30JUL85 30SEP85 300CT84 01JUL85 30JUN86 30JUN82 30APR82 30JRN84 310EC84 30AUG85 30JRN84 310EC84 30SEP85 30MAY83 30AUG83 310CT83 300EC82 30AUG83 310CT83 30MAR83 30SEP83 010EC86 30JUL85 30JUL87 30SEP82 30AUG85 305EP85 30AUG82 30SEP83 30DEC83 30APR82 010CT84 30MAY85 30SEP85 300CT84 01JUL85 30JUL85 30JUL84 30JUL85 30JUL85 30AUG84 30APR85 30AUG85 02MAY83 310EC84 30MAY84 020EC85 30SEP86 I A ... ITTIMr11-111/111 - - - 118 ? 118 118. - - 104 119 A----A A 119 119 155 155 155 122 ts--A 6.--d A--A 6--A 127 722 6-----A - A--A - ... - - - - A - 120 A--8 - 120 120 _ A 116M33 t, A - 116/133 116/133 135 135_ 135 - 136 A A . A--A A A . - 136 136 A - - - 123 - 123 124 A A 124 - 124 Figure 19. Systems Engineering Schedule (Sheet 1 of 2) 33 UNCLASSIFIED Approved For Release 2007/06/18: CIA-RDP84T00037R000500060001-0 STAT STAT STAT Approved For Release 2007/06/18: CIA-RDP84T00037R000500060001-0 UNCLASSIFIED PLANNED BY DATE LOCATION PAGE 1 OF 1 SHEET I OF 1 NETWORK NPIC ISUBNET SYSENG 5YMBOLS NPIC PROGRAM DATE EARLY START OR FINISH A A SYSTEM ENGINEERING ACTUAL START OR FINISH LATE FINISH V RUN DATE 18FEB82 IORTA DATE NPIC SYSTEM ENGINEERING SCHEDULE 4 DURATION (NON-CRITICAL) DURATION (CRITICAL) mommimmommmm TOTAL FLOAT I J EARLY EARLY LATE LATE 82 83 134 85 86 87 NODE NODE DESCRIPTION OUR RESP START FINISH START FINISH COAL R IM IJIJ IR 1510 IN ID JIEIMjPIMiJIJIAISIOJNfD JIF1M IAIM IJ IJIA1S 101N10 JIF IM IA IM IJIJIA ISIOINID IFI 114114 IJ LJ 141SISIJNIQ JIF IMIRI IJIJ AD399 SYSTEM ENGRG DESIGN j 0.00 30APR82 30APR82 A ..- - - - - _ A0400 -A0410 ---80C SEGMENT OESGN SPECS 82.60 _ 30APR82 30NOV83 117 - ---BOC DATA BASE SPECS 34.80 30APR82 30DEC82 725 A P0420 A0430 A0432 A0436 ---BOC ENGRG SPEC DESIGN --IOC ENGRG SPEC OESIGN --FOC ENGRG SPEC DESIGN INTERFACE SPEC 69.40 43.80 43.80 104.20 30APR82 28FE883 28FEB83 30AUG83 300EC83 300EC83 A -R0437 A0438 AE342 RE372 --BOC ---IC INTERFACE SPEC ---FOC INTERFACE SPEC SE TRANS 4 INTEG PLANNING SEG TERNS 4 INTEG PLAN _ 39.00 8.80 0.00 0INOV82 3000784 30JUL85 30SEP82 300CT84 30JUL85 30SEP85 30SEP82 126129 126129 126-129 A - IFIE380 RE390 AE470 ---80C ---IOC SEG TRANS & INTEG PLAN ---FOC SEG TRANS 4 INTEG PLAN ---BOC SUP FRC PLNG 4 ICC 113.00 39.00 8.80 78.20 31MAY82 300CT84 30JUL85 30JUL84 30JUL85 30SEP85 _ 115 115 115 - RE480 AE490 AE500 ---IOC SUP FRC PLNG & ICC --FOC SUP FAC PLNG & ICC - ---BOC SUP NEW CAP OPR ENV 8.60 4.60 - 108.60 30SEP82 310EC84 30JUL85 30SEP82 30MAR84 28FE885 30RUG85 - - RE510 AE520 AF529 AF530 -IOC SUP NEW CRP OPR ENV ---FOC SUP NEW CAP OPA ENV SE TEST SUPPORT _ ---80C SEGMENT VERIF PLAN 39.00 8.80 0.00 13.00 300CT84 30JUL85 30APR82 30RPR82 300CTE4 30JUL85 30SEP85 30APR82 _ _ a _ _ . AF540 AF550 AF560 ---IOC SEGMENT VERIF PLAN ---FOC SEGMENT VERIF PLAN ---80C SEGMENT TEST PLAN 12.80 12.80 13.00 30DEC82 30DEC82 30SEP82 30JUL82 30MAR83 30MAR83 30DEC82 I 121 A 121 121 A AF570 - RF580 AF590 AF600 RF610 AG619 -SE AG620 --IOC SEGMENT TEST PLAN- ---FOC SEGMENT TEST PLAN ---BOC SUPPORT TESTING ---IOC SUPPORT TESTING ---FOC SUPPORT TESTING CONFIGURATION MRNAGMNT - ---BOC CHG CONTROL PROCESS 6.60 13.20 91.20 39.00 61.00 0.00 100.00 02MAY83 30JUN83 31JAN83 300CT84 30JUL85 30NOV82 30NOV82 30JUN83 - 30SEP83 3000784 30JUL85 305EP86 - 30NOV82 300CT84 - 130 130_ - 130 - A - 4-----A A A - A . . . - RG630 AG640 -RH049 -SE AH050 ---IOC CHG CONTROL PROCESS ---FOC CHG CONTROL PROCESS - TECH REVIEWS ---80C POR 39.00 47.80 0.00 13.20 300CT84 30JUL85 30AUG82 30AUG82 30JUL85 30JUN86 - 30AUG82 30NOV82 - - A _ _ Cr-A . - - - - ??? AH070 AHI50 AH160 _ RH170 PHI80 A6680 ---IOC FOR ----80C CDR ---IOC COR _ ---FOC CDR ---80C SBR ---80C TECH AUDITS/MISC REV 4.60 12.80 17.40 8.80 4.40 82.80 30MAR83 30DEC82 30JUN83 310CT83 30JUN82 31MRY82 02MAY83 30MAR83 310CT83 _ 300EC83 30JUL82 300EC83 _ A _ - A--6 A A A9690 A9700 - IOC TECH AUDITS/MISC REV ---FOC TECH AUDITS/MISC REV - 21.80 21.40 T T 30MAR84 30NOV84 T 30AUG84 30APR85 - - A - _ - A A- - .i SON' ? J H J 1 i J ? M J J ? 1 j ? ii? 0 N ? J L 11 I, ? 82 83 84 85 86 87 Figure 19. Systems Engineering Schedule (Sheet 2 of 2) 34 Approved For Release 2007/06/18: CIA-RDP84T00037R000500060001-0 UNCLASSIFIED STAT STAT STAT Approved For Release 2007/06/18: CIA-RDP84T00037R000500060001-0 UNCLASSIFIED LANNED BY NETWORK NPIC NPIC PROGRAM SUBNET SOFTWARE DATE DATE SOFTWARE RUN DATE 17FEB82 DATA DATE NPIC PROGRAMMING SCHEDULE NODE NODE LOCATION PAGE 1 OF I SHEET 1 OF 1 SYMBOLS EARLY START OR FINISH ACTUAL START OR FINISH LATE FINISH DURATION (NON-CRITICAL) DURATION (CRITICAL) TOTAL FLOAT ? V STAT STAT STAT DESCRIPTION EARLY EARLY OUR RESP START FINISH LATE LATE 82 83 84 START FINISH COAL CHM1J 1J IR IS 10 IN ID JIFIM (RIM IJ Li IA 1510 IN ID J iF 85 DA009 DA010 DA020 DA030 DA040 DA060 DA070 0A080 DA090 DA100 DAM DA120 DA130 DA140 DA142 DA143 DA144 DA151 DR152 DA153 DA160 DA170 DA180 DA190 DA200 DA210 08213 08220 08230 08240 08242 08244 08246 DC245 0C250 DC 260 0C270 DC280 0C290 0C300 0C310 0C320 10C330 MANAGEMENT ---BOC ---FOC ---80C ---BOC ---FOC ---BOC ---FOC ---80C ---80C ---'DC ---BOC ---FOC ---80C ---FOC ---BOC ---IC ---FOC -- --FOC MANAGE MANAGE MANAGE TOOL DEVELOPMENT ENG ARCH ENG ARCH ENG ARCH TRADE STUDIES TRADE STUDIES TRADE STUDIES SEGMENT PPS 4 C COBOL CONVERSION COBOL CONVERSION LIBRARY LIBRARY LIBRARY BUILD & RELEASE BUILD 4 RELEASE BUILD 8, RELEASE INPUT SEG OEV PLAN INPUT SEG BEV PLAN INPUT SEG DEV PLAN DATA BASE DATA BASE DATA BASE PRELIMINARY ---BOC PART ---BOC DATA ---BOC PART ---BOC PREL - PREL ---FOC PREL DESIGN I SPECS DICT II SPECS TEST PLAN TEST PLAN TEST PLAN -CRITICAL DESIGN ---BOC PART II SPECS --IOC PART II SPECS ---FOC PART II SPECS ---BOC ---FOC ---80C ---FOC PRELIM PROG MANUAL PRELIM FROG MANUAL PRELIM PROG MANUAL FINAL TEST PLAN FINAL TEST PLAN FINAL TEST PLAN 0.00 108.60 60.80 8.80 48.00 -104.20 60.80 30.40 104.20 91.60 30.40 74.00 30.40 47.80 69.40 65.20 8.80 69.40 48.00 21.80 Si-Dot 43.60 26.20 30.40 104.60 17.40 0.00 30.40 26.20 30.40 17.60 26.40 17.40 0.00 39.00 39.40 17.40 26.20 34.60 43.80 30.40 0.00 8.60 30APR82 30APR82 30MAY84 30JUL85 31MAY82 30RPR82 30DEC83 28FEB85 30APR82 30MRY83 28FEB85 30RPR82 300EC82 30AUG83 30DEC82 30APR84 30JUL85 300EC82 30APR84 01APR85 31MAY82 30APR84 28FEB85 30RPR82 30MAY83 30MAY85 30APR82 30APR82 30APR82 30APR82 30JUNB2 30MAR83 010CT84 30APR82 30JUN82 30MAR83 30NOV83 31MAY82 300EC82 28FE884 30RUG82 30MAR83 30JRN85 IN 1J IJ IA IS IOINID J (FIN (FIFA 1JI-J111 151.0 IN ID 30APR82 30.MAY84 30JUL85 30SEP85 02MAY83 30APR84 28FEB85 30SEP85 30RPR84 28FEB85 30SEP85 30SEP83 132 01AUG83 30JUL84 30APR84 30JUL85 30SEP85 30APR84 01APR85 30RUG85 30JAN84 28FEB85 30RUG85 30NOV82 151 A 30MAY85 151 30SEP85 151 30APR82 30NOV82 141* A 01NOV82 145* A 30NOV82 142'- A 01NOV82 131* 30SEP83 131* 30JAN85 i 131* 30APR82 30MAR83 142 300EC83 142 30MAR84 142 A 30NOV82 - 138* 30AUG83 138* 31DEC84 138* 30MAR83 131* 30MAR83 131* 01APR85 t 131* Approved For Release 2007/06/18: CIA-RDP84T00037R000500060001-0 hr-A a tr-A A Figure 20. Software Development Schedule (Sheet 1 of 2) 35 UNCLASSIFIED Approved For Release 2007/06/18: CIA-RDP84T00037R000500060001-0 UNCLASSIFIED PLANNED BY DATE LOCATION PAGE I OF I ? SHEET 1 OF 1 NETWORK NPIC ISUONET SOFTWARE SYMBOLS NPIC PROGRAM DATE EARLY START OR FINISH A SOFTWARE . ACTUAL START OR FINISH A RUN DATE 17FEB82 DATA DATE LATE FINISH V NPIC PROGRAMMING SCHEDULE DURATION (NON-CRITICAL) DURATION (CRITICAL) I TOTAL FLOAT I NODE J NODE DESCRIPTION DUR RESP EARLY START EARLY FINISH LATE START LATE FINISH CDRL 82 83 84 85 AIM LJIJ IA1_5 ID INID J IFIM IR IIIIJIJIAIS TO INID JIFIM-IAIM JIJ IAISIOINID JIF IM IRIMIJIJ TA NFIN ID ' -0E460 -0F540 00002 00340 00350 00360 00370 00380 00390 DE399 DE410 0E430 DE432 0E440 0E450 0E470 0E480 0E490 0E500 -0E510 0E520 0F529 0F530 0F550 0F560 0F570 0F580 -0F590 0F600 OF610 0F620 OF630 -0F650 0F660 0F670 DEVELOPMENT ---BOC CODE AND TEST --IOC CODE ANO TEST ---FOC PROD AND TEST - ---BOC INT & TEST 4 CPC --IOC INT & TEST 4 CPC ---FOC INT & TEST 4 CPC TEST - _ ---BOC UNIT TEST ---IOC UNIT TEST ---FOC UNIT TEST ---BOC DEV TEST PROCEDURES --IOC DEV TEST PROCEDURES - ---FOC DEV TEST PROCEDURES ---80C SUPPORT T & V --IOC SUPPORT T & V ---FOC SUPPORT T & V ---BOC PREPARE REPORTS_ _ --IOC PREPARE REPORTS ---FOC PREPARE REPORTS DOCUMENTATION ---BOC INPUTS TO USERS_ _ --IOC INPUTS TO USERS ---FOC INPUTS TO USERS ---80C CPCI LISTINGS ---IC CPCI LISTINGS ---FOC CPCI LISTINGS- _ ---80C PROGRAMMER MANUAL --IOC PROGRAMMER MANUAL ---FOC PROGRAMMER MANUAL ---80C TRNG MANS INPUTS --IOC TRNG MANS INPUTS_ - ---BOC PART II SPECS ---IOC PART II SPECS ---FOC PART II SPECS 0.00 43.60 39.20 30.80 39.00 39.20 35.00 0.00 48.00 35.00 22.00 69.40 57.00 13.00 56.60 65.20 8.80 30.60 35.00 17.20 0.00 26.00 13.00 4.20 8.80 21.80 4.20 56.60 30.40 4.20 17.20 26.00 30.20 17.40 8.80 _ _ _ _ - - - 30APR82 30NOV82 30SEP83 _ 28FEB84 31JAN83 30NOV83 30MAR84 31MAY82 28FE883 28FEB84 01JUL85 30SEP82 30MRY83 - 01JUL85 30MAR83 30APR84 30JUL85 _ 30RUG83 30MAR84 30AUG85 30SEP83 _ 30SEP83 31DEC84 01JUL85 28FEB84 30RPR85 _ 30AUG85 300EC83 30JAN85 30AUG85 310CT83 31DEC84 30SEP83 30MRY85 30JUL85 30RPR82 30SEP83 02JUL84 _ 010CT84 310CT83 30AUG84 30NOV84 31MAY82 - 30JRN84 3000.84 020EC85 30JAN84 02JUL84 - 30SEP85 30APR84 30JUL85 30SEP85 _ 30MAR84 30NOV84 30DEC85 30SEP83 _ 30MAR84 011:1PR85 30JUL85 30RPR84 30SEP85 30SEP85 - 30JAN85 30AUG85 30SEP85 28FEB84 01JUL85 30RPR84 30SEP85 30SEP85 - - - _ - - - - _ - - _ - _ - _ - - _ _ 137 137 137 150* 150* 150* 138 138 138 _ 142 142 142 A _ A - - A A - A - _ / A _ - - _ AMJJFISONDJFMAMJJFISONDJF _ - - A A . A---li _ A _ - A - _ _ A--A A---A _ A - A--6 A 8-A - - . A A A MAMJJ'SONDJ ---A NM JLRSON' ONE PER CPU 82 83 84 85 Figure 20. Software Development Schedule (Sheet 2 of 2) 36 UNCLASSIFIED Approved For Release 2007/06/18: CIA-RDP84T00037R000500060001-0 STAT STAT STAT Approved For Release 2007/06/18: CIA-RDP84T00037R000500060001-0 ? UNCLASSIFIED ? ORTE LOCATION PAGE I OF I SHEET 1 OF I NETWORK NPIC ISUBNET HARDWARE $YMBOLS NPIC PROGRAM APPROVED BY DATE EARLY START OR FINISH A HARDWARE ACTUAL START OR FINISH ? RUN DATE 18FEB82 IDATR DATE LATE FINISH V WIC HARDWARE SCHEDULE DURATION INON-CRITICALI DURATION (CRITICAL) TOTAL FLOAT I NODE J NODE DESCRIPTION OUR RESP EARLY START EARLY FINISH LATE START LATE FINISH 82 83 84 85 86 87 CDRL A w FISOND FRAMJJASONDJFMAM 1 J AFRAM 111111.:111:111011111110110111.11 -EE450 _ - -EF620 ER009 ER039 EA041 ER042 EA051 - E8101 E8I10 E8120 EB130 - E8140 E8I50 E8170 E6180 1 EC246 EC247 EC250 EC260 EC280 EC299 EC301 EC308 EC3I0 EC320 - EC340 EC350 EC360 EC370 -EC380 EC390 EC392 EC393 EC394 + EE399 EE400 EE420 EE430 EE440 EE460 EE470 EE480 EE490 EF529 EF530 EF540 EF550 EF560 EF570 EF580 EF590 EF600 MANAGEMENT ---BOC SET 6 MAINT 0/FIT ---IOC SET & MAINT 0/FIT --FTC SET A MAINT 0/FIT ---80C INPUTS TO SEG OEV PRELIMINARY DESIGN ---BOC DES 6 RUNTS ANAL ---80C SPECS A INTERNAL DES RE ---IOC SPECS 0 INTERNAL DES RE ---FOC SPECS 4 INTERNAL DES RE ---80C COMM PROD DES MODS ---IC COMM PROD DES MODS ---FOC COMM PROD DES MODS CRITICAL DESIGN ---BOC DETAIL DESIGN ---IC DETAIL DESIGN ---FOC DETAIL DESIGN ---80C BUILD TO SPECS ---I 0C BUILD TO SPECS ---FOC BUILO TO SPECS ---80C COMM PROD MOOS DESIGN ---IC COMM PROD MODS DESIGN --FOC COMM PROD MOOS DESIGN ---80C HARDWARE FABRICATION ---I0C HARDWARE FABRICATION ---FOC HARDWARE FABRICATION ---BOC COMM HARDWARE MODS ---IOC COMM HARDWARE MOOS ---FOC COMM HARDWARE MOOS ---BOC PREPARE AS BUILT SPECS ---IC PREPARE AS BUILT SPECS --IOC PREPARE AS BUILT SPECS TEST ---80C PREPARE PROCEDURES ---IOC PREPARE PROCEDURES ---FOC PREPARE PROCEDURES -BOG TEST HARDWARE ---IOC TEST HARDWARE ---FOC TEST HARDWARE ---BOC SUPPORT I & V ---IC SUPPORT T 0 V ---80CSUPPORT T & V DOCUMENTATION ---80C EOM MANUALS ---IOC EOM MANUALS FOC EOM MANUALS ---80C INPUTS TO SEG/SYS OPS ---ITT INPUTS TO SEG/SYS OPS ---FOC INPUTS TO SEG/SYS OPS ---80C TRAINING MANUALS INPUT ---IC TRAINING MANUALS INPUT ---FOC TRAINING MANUALS INPUT 0.00 130.40 126.20 230.60 4.20 0.00 13.00 13.00 12.80 12.80 17.60 25.80 25.801 t 0.00 35.00 39.40 48.00 30.20 35.00 57.00 21.80 43.40 21.60 30.80 35.00 99.80 26.20 61.00.,_ 104.20 57.00 52.00 34.80 0.00+ 13.20 47.60 39.20 13.20 22.00 22.00 43.60 52.40 21.60 0.00 13.20 52.20 39.20 17.60 52.00 39.00 17.60 8.8001AUG83 - 4.20 _ 1- _ _ _ _ 30APR82 30APR82 28FE883 28FEB83 30APR82 30APR82 30APR82 30APR82 30N0V82 30NOV82 30JUN82 30SEP82 30SEP82 31MAY82 31MAY82 30MAR83 30MAY83 30JUL82 28FEB83 30MAY83 30JUL82 300EC82 , 30NOV83, t t 28FEB83 28FE884 30JAN85 28FEB83 30AUG83 30NOV84 30MAY83 02JUL84 OIJUL85 30JUN82 30JUN82 30SEP82 30AUG83 30AUG83 30JUL84 30JUL84 30MAR83 30JAN84 30JAN85 30JUN82 30JUN82 30SEP82 30SEP83 30JUN82 0INOV82 310CT83 31MAY82 30JAN85 30APR82 300CT84 30JUL85 30JUL87 31MAY82 30APR82 30JUL82 30JUL82 28FE883 28FEB83 0INOV82 30MAR83 30MAR83 31MAY82 31JAN83 300EC83 30APR84 28FE883144 310CT83 02JUL84 300EC82 310CT83 30APR84 30SEP83 300CT84 300EC86 30AUG83 300CT84 010EC86 02JUL84 01JUL85 28FEB86 30JUN82 30SEP82 30AUG83 30MAY84 30NOV83 3IDEC84 310EC84 30JAN84 30JAN85 01JUL85 30JUN82 30SEP82 30SEP83 02JUL84 - 0INOV82 310CT83 30JUL84 30SEP82 30SEP83 _ 28FE1385 T A , ? A 6-6 A ? . I A A 143 A I A A a A 144 A A a ? - 144 A -4---61 6. A A 6 A 1 A 4. A t ? A A A A ? A A a 144 A - 144 A - . t A A ? a ? . ? _ A . A 148 148 A A 148 , _ A A A - A IN IJIJ IR IS 10 IN ID JIFIM IAINIJIJIRISIU IN Il; JIF IH [A IN IJIJ I_AIS 111 IN ID_ JIFIM IA Ill IJIJ FR [-SIC IN ID 1IFInIN_Lm 1.-1 L.1 IA I 5_1 0 IN LU 1-In LA IN LH.) 82 83 84 85 86 _J_I 87 Figure 21. Hardware Development Schedule 37 Approved For Release 2007/06/18: CIA-RDP84T00037R000500060001-0 UNCLASSIFIED STAT STAT STAT Approved For Release 2007/06/18: CIA-RDP84T00037R000500060001-0 UNCLASSIFIED ORTE LOCATION PAGE 1 OF 1 SHEET I OF I SYMBOLS NETWORK NPIC ISUBNET INTEGTST EARLY START OR FINISH A ACTUAL START OR FINISH ? LATE FINISH V NPIC PROGRAM APPROVED BY DATE INTEGRATION TEST AND TRANSITION RUN DATE 17FE882 IDATA DATE DURATION INON-CRITICAL) NPIC INTEGRATION TEST ANY TRANSITION srHpninF DURATION 1CRITICAL) sm....B... TOTAL FLOAT I NODE J NOOE DESCRIPTION OUR RESP EARLY START EARLY FINISH LATE START LATE FINISH CDRL 82 83 7177-1M IA IMIJ IJ TA IS 10 IN ID 84 J I IMAAflairl Limy 1 q-ru -INFO 8586 J-TFIK-IDFMIJI-JIR-FSAOFNFD JFFIMIAIMIJIJFAISIOINID 87 JFF1MFAF14 TJ IJ R IM IJIJ IA IS 10 IN ID -00461 -00501 -CES70 -CE690 CR006 CA009 CR010 CR021 fA031 CA041 CR051 CA053 CA061 CR071 CR073 CA081 C6009 C8010 C6030 C6050 CC249 _ CC250 CC261 CC263 CC281 CC291 00293 -CC399 CC411 C0440 CC451 C0470 CD481 C0483 00490 00503 CE410 CE430 CE611 CE630 CE650 CE670 TEST 4 VERIFICATION MANAGEMENT ---BOC MGMT SEG TEST ACT ---IC MCMI SEG TEST ACT ---FOC MGMT SEG TEST ACT ---BOC TEST PLANS ---IC TEST PLANS ---FOC TEST PLANS ---BOC TEST PROCEDURES ---I0C TEST PROCEDURES ---FOC TEST PROCEDURES ---BOC GFE TEST PLAN TEST SUPPORT ---BOC SW HW 4 ORT FOR TESTNG --IOC SW HW & OAT FOR TESTNG ---FOC SW HW & OAT FOR TESTNG INTEGRATION TEST ---BOC INTER-CPCI4.60 --IOC INTER-CPCI --FOC INTER-CPCI ---80C INTER CI --IOC INTER CI ---FOC INTER CI ---BOC INTEGRATED CPCl/CI --IOC INTEGRATED CPCl/CI ---80C REPORTS --IOC REPORTS FACTORY PRESHIP TEST ---BOC FORMAL PRESHIP ---IOC FORMAL PRESHIP ---FOC FORMAL PRESHIP ---80C REPORTS ---I0C REPORTS ---FOC REPORTS INSTALLATION CHECKOUT 4 TEST FACILITY PLANNING ---BOC FACILITY PLANNING ---IOC FACILITY PLANNING ---FOC FACILITY PLANNING ---80C IDA'S ---IOC IDA 'S _ ---FOC IDR'S 0.00 0.00 87.00 126.20 230.20 17.40 13.20 21.80 13.00 13.20 26.40 13.00 0.00 13.20 8.60 4.60 0.00 4.60 4.40 4.60 4.60 4.40 13.00 21.80 4.20 4.40 0.00 8.80 4.20 4.20 4.20 4.40 4.40 0.00 0.00 65.20 74.00 82.80 65.20 74.00 82.80t - - _ - 30APR82 30RPR82 30APR82 28FE883 31JRN83 30JUL82 30MAR83 30APR85 0INOV82 30MAY83 30MAY85 28FE883 30MAY83 _ 30MAY83 30MRY84 3000785 30AUG83 - 30AUG83 30JUL84 30NOV83 30AUG83 30JUL84 _ 30NOV83 30SEP83 30AUG84 300EC83 28FE885 310CT83 310CT83 30JRN85 30JRN85 300EC63 28FE885 28FE885 30RPR82 30APR82 - 30APR82 28FE883 30MAR83 30RPR82 28FE883 _ 30MAR83 30APR82 30APR82 300EC83 30JUL85 30JUN87_ 30NOV82 30JUN83 30SEP85 31JAN83 30AUG83-A 02DEC85 30MAY83 30MAY83 _ 30AUG83 30JUL84 020ECEI5 30AUG83 30SEPB3 30AUG84 300EC83 30SEP83 30AUG84 30DEC83 300EC83 30JAN85 30JAN84 01APR85 _ 310CT83 300EC83 28FEB85 28FE885 30JRN84 - 01APR85 01APR85 30RPR82 30APR82- _ 01AUG83 30JUL84 300CT84 01AUG83 30JUL84 - 300CT84 -- - - - 131 131 131 - - 139 139 139 A A A - _ - - - - - - _ - - - A A a -A A A A A - - A A--A A A - A A Ar-A 6-6 ts----A 6--A 6-6, A . A . 6--6 6-6 tr--A . . Figure 22. Integration and Test/Installation and Checkout Schedule (Sheet 1 of 2) 38 Approved For Release 2007/06/18: CIA-RDP84T00037R000500060001-0 UNCLASSIFIED STAT STAT Approved For Release 2007/06/18: CIA-RDP84T00037R000500060001-0 UNCLASSIFIED DATE NETWORK NPIC 1SUBNET INTEGTST NPIC PROGRAM INTEGRATION TEST AND TRANSITION RUN DATE 17FE882 I0RTR DATE APPROVED BY DATE NPIC INTEGRATION TEST AND TRANSITION SCHF0IIF NODE NODE DESCRIPTION OUR RESP EARLY START EARLY LATE LATE FINISH START FINISH CDRL CF601 INSTALLATION I, CHECKOUT CF620 ---BOC SEG SHIP PLAN CF640 --IOC SEG SHIP PLAN CF660 ---FOC SEG SHIP PLAN CF680 --BOC SEG INSTALLATION PLAN CF700 ---IC SEG INSTALLATION PLAN CF720 ---FOC SEG INSTALLATION PLAN CF760 --IOC CF780 ---FOC CF8I0 ---BOC CF82I ---IOC CF831 ---FOC SHIP. INSTALL 4 CHECKOU_ SHIP. INSTALL K CHECKOU SEG 1NTEG 4 TRANS SEG INTEG 4 TRANS SEG INTEG K TRANS 0.00 4.60 4.40_ 4.20 26.00 8.80 4.40 0.00 T 8.60 T 13.00 4.40 61.00 30AUG82 300CT84 30AUG82 30NOV84 31DEC84 30JAN85 01APR85 30APR85 30AUG82 28FE883 30AUG83 310CT83 310EC84 30JAN85 28FE885 28FE885_ 310EC84 28FE885 300EC83 30MAR84 28FE885 01APR85 01JUL85 01SEP86 _ - CG801 SITE SEGMENT TEST 0.00- 30MAR84 CG850 ---BOC FORMAL 8.60 30MAR84 CG870 --IOC FORMAL 8.60 0IRPR85 CG890 ---FOC FORMAL 8.80 30JUL85 CG950 ---BOC REPORT 4.40_ 30APR84 - - _ CG970 --IOC REPORT 4.40 30APR85 C6990 ---FOC REPORT 4.20 30AUG85 CH801 SITE INTER SEG DEMOS 0.00 30JUN83 CH810 ---80C INPUTS TO SI 8.60 30JUN83 - - _ CH821 --IOC INPUTS TO SI 13.00 010CT84 CH831 ---FOC INPUTS TO SI 8.60 310EC84 CH840 ---80C ON SITE TESTING 13.20 30MAY84 CH860 --IOC ON SITE TESTING 13.20 30AUG84 CH880 ---FOC ON SITE TESTING 4.20 30AUG85 - - _ H940 ---BOC REPORT INPUT 4.20 010CT84 CH960 --IOC REPORT INPUT 4.20 01JUL85 CH980 ---FOC REPORT INPUT 4.20 30(111685 CI801 INTER PROGRAMS DEMOS- 0.00 30SEP83 - - CI810 ---80C INPUTS TO SI 13.00 _ 30SEP83 CI821 --IOC INPUTS TO SI 65.20 30NOV83 CI831 ---FOC INPUTS TO SI 8.60 28FEB85 CI850 ---80C TEST SUPPORT 21.80 30MAY84 CI870 --IOC TEST SUPPORT 8.60 30MAY85 _ I - - _ CI890 ---FOC TEST SUPPORT 99.80 30AUG85 CI950 ---BOC REPORT INPUT 4.20 010CT84 CI970 ---IC REPORT INPUT 4.20 01JUL85 30MAR84 30MAY84 30MAY85 30SEP85 30MAY84_ 154 30MAY85 154 30SEP85 154 147 147 147 134 134 134 30JUN83 30AUG83_ 310EC84 28FE885 30AUG84 30NOV84 30SEP85_, 3000784 30JUL85 30SEP85 30SEP83_ 300EC83 28FE885 30APR85 300CT84 30JUL85_ 30JUL87 3000784 30JUL85 -^ 153 153 153 82 83 84 NIIIIP11111116 SMILIIIIMMBSIraffillEMIP111111C1111;SIMIKIIIIIIMMILMIMMILMIll A A A-A 435 M J Jni171-07-71:4-,N A-A A-A A Ii1JIJIA 15101,11D JIFIM IR I H IJI_J (F1 IS I 0 iN ID J (FIN If) IM IJIJIA I 5 10 -I Ni 0 J 1F1 M IA 82 83 E44 Approved For Release 2007/06/18: CIA-RDP84T00037R000500060001-0 BS 86 LOCATION PAGE I OF 1 SHEET 1 OF I SYMBOLS EARLY START OR FINISH ACTUAL START OR FINISH LATE FINISH DURATION (NON-CRITICAL) DURATION (CRITICAL) TOTAL FLOAT 87 A A ? V 1=11111111.M F 1M IA IM IJ 1.1 86 87 Figure 22. 31? Integration and Test/Installation and Checkout Schedule (Sheet 2 of 2) UNCLASSIFIED STAT STAT J I /-k I Approved For Release 2007/06/18: CIA-RDP84T00037R000500060001-0 UNCLASSIFIED NETWORK NPIC SUBNET TRAINING DATE NPIC PROGRAM TRAINING RUN DATE 17FEB82 I DATA DATE APPROVED BY NPIC TRAINING SCHEDULE DATE 1.0CATION PAGE I OF I SHEET I OF I SYMBOLS EARLY START OR FINISH ACTUAL START OR FINISH LATE FINISH DURATION (NON-CRITICAL) DURATION (CRITICAL) TOTAL FLOAT STAT ? NODE NODE DESCRIPTION OUR EARLY EARLY LATE LATE RESP START FINISH START FINISH CDRL 82 83 84 85 STAT STAT AIM IJ1 J ill 15 10 IN ID J IFIM IA IM IJ IJ IA 1510 IN ID J IF 111 1 IM IJ IJ IA IS TO IN ID J IFIM IRIM1JIJ111 IS BROO9 TRAINING MANAGEMENT 0.00 30APR82 30APR82 BA010 ---80C MANAGE 106.60 30APR82 30MRY84 BRO20 ---IC MANAGE 60.80 30MAY84 30JUL85 BA030 ---FOC MANAGE 6.80 30JUL85 30SEP85 BRO40 ---BOC SEG TRNG PLAN 26.20 30APR82 01NOV82 140 8A051 ---IOC SEG TRNG PLAN 30.80 28FE883 305EP83 140 A BR061 ---FOC SEG TRNG PLAN 17.40 300CT84 28FEB85 BB009 USER TRAINING 0.00 01NOV82 0INOV82 BB010 ---BOC PREPARE MATERIALS 69.20 01NOV82 28FEB84 146 BB020 ---IOC PREPARE MATERIALS 74.00 28FEB84 30JUL85 146 BB030 ---FOC PREPARE MATERIALS 8.80 30JUL85 30SEP85 146 BB040 ---BOC INPTS TO USR/OPS MTS 69.20 01NOV82 28FEB84 BB050 ---IOC INPTS TO USR/OPS MTS 74.00 28FEB84 30JUL85 B8060 ---FOC INPTS TO USR/OPS MTS 8.80 30JUL85 30SEP85 88071 ---80C TRAIN USRS & INSTRUCTOR 17.80 28FEB84 02JUL84 BB081 TRAIN USRS & INSTRUCTOR 21.60 28FEB85 30JUL85 88090 ---FOC TRAIN USRS & INSTRUCTOR 8.80 30JUL85 30SEP85 8C249 SE OPERATOR TRAINING 0.00 310CT83 310CT83 BC250 ---80C PREPARE MATERIALS 21.80 310CT83 30MAR84 146 BC261 PREPARE MATERIALS 39.00 30RUG84 30MAY85 146 8C270 ---FOC PREPARE MATERIALS 8.60 30MAY85 30JUL85 146 8C281 ---BOC TRAIN OPS & MGMT PERSN 30.60 30NOV83 02JUL84 _8C291 TRAIN OPS & MGMT PERSN 21.60 28FEB85 30JUL85 BC 300 ---FOC TRAIN OPS & MGMT PERSN 8.80 30JUL85 30SEP85 80399 MAINTENANCE TRAINING 0.00 310CT83 310CT83 B0400 ---BOC PREPARE MATERIALS 21.80 310CT83 30MAR84 146 _80411 ---ICC PREPARE MATERIALS 39.00 30AUG84 30MAY85 146 80420 ---FOC PREPARE MATERIALS 8.60 30MAY85 30JUL85 146 80440 --80C TRAIN MAINT PERSONNEL 21.60 30NOV83 3ORPR84 80451 --IOC TRAIN MAINT PERSONNEL 21.60 28FEB85 30JUL85 BD460 --FOC TRAIN MAINT PERSONNEL 8.80 30JUL85 30SEP85 A A AMJJ SONDJFM AMJJ SONO J F M MJJASOND JFM AMJJ A 82 83 84 85 Approved For Release 2007/06/18: CIA-RDP84T00037R000500060001-0 Figure 23. 40 Training Schedule UNCLASSIFIED