LAUNCH COMPLEX "J" TYURATAM MISSILE TEST CENTER, USSR

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP84T00864R000100030001-9
Release Decision: 
RIPPUB
Original Classification: 
T
Document Page Count: 
4
Document Creation Date: 
December 28, 2016
Document Release Date: 
June 12, 2009
Sequence Number: 
1
Case Number: 
Publication Date: 
August 30, 1965
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP84T00864R000100030001-9.pdf434.74 KB
Body: 
Approved For Release 2009/06/12 : CIA-RDP84T00864R000100030001-9 DDR - Dupe 30 August . LAUNCH COMPLEX "J" TYURATAM MISSILE TEST CENTER, USSR Page 1. REVEALED A NEW AREA OF UNIDENTIFIED ACTIVITY BETWEEN LAUNCH COMPLEXES "At' AND "E" AT THE TTMTC. THIS AREA, WHICH WAS RAIL AND ROAD SERVED, WAS LATER DESIGNATED COMPLEX "J' SUBSEQUENT COVERAGE BY 16 KH MISSIONS SHOWED CONTINUED EXPANSION OF THE FACILITIES, INCLUDING A LARGE HEXAGONALLY-SHAPED EXCAVATION LO- CATED APPROXIMATELY 3 NM NNW OF LAUNCH PAD Al (LAUNCH COMPLEX "A"), AND A MASSIVE RAIL-SERVED BUILDING UNDER CONSTRUCTION. THIS BUILDING.. MEASURED APPROXIMATELY 800 X 615 FT AND HAD 2 SECTIONS: THE LARGER AT LEAST 175 FT HIGH AND THE SMALLER AT LEAST 120 FT IN HEIGHT. OTHER FACILITIES WITHIN COMPLEX "J" INCLUDED A ROAD AND RAIL LINE UNDER CONSTRUCTION WHICH EXTENDED FROM THE SUPPORT AREA TOWARD THE LARGE EXCAVATION, A HOUSING AREA, AND A CONSTRUCTION SUPPORT AREA. 2. REVEALED PROGRESS ON A SECOND LARGE EXCAVATION LO- CATED APPROXIMATELY 1,700 FT WT,-4 OF THE ORIGIONAL LARGE EXCA~ '_= ::N. WO BUILDINGS HAD BEEN CONSTRUCTED BETWEEN THE EXCAVATIONS :) uVERAL S.y:AL7 OW RECTANGULAR EXCAVATIONS '.ti+ERE NOTED NEAR BY. THE RAIL LINE HAD BEEN EXTENDED TO FORM A WISHBONE CONFIGURATION TERMINATING N THE 2 LARGE EXCAVATIONS. THIS AREA OF CONSTRUCTION ACTIVITY APPTAi.R;1) SIMI- LAR TO THAT OBSERVED AT LAU TC" : REA G3-G4 (LAUNCH COMPLEX "C'") WHEN THAT These notes have been prepared for briefing pt,cposes only and should not be used for detailed arc!?.? ca; work. Their use should be restricted to the particular br;ee ,ng board(s) they were prepared for and must be c:-sr, ci valid only for the reporting period as indicated by the date of issue. EME7 GROU? Tfl P T DH C Approved For Release 2009/06/12 : CIA-RDP84TOO864R000100030001-9 Approved For Release 2009/06/12 : CIA-RDP84T00864R000100030001-9 I W1 ULU11LI fWjrf LAUNCH AREA WAS IN AN EARLY STAGE OF CONSTRUCTION. THE 2 LAd G; EXCAVA- TIONS, CONSIDERED TO BE LAUNCH PADS UNDER CONSTRUCTION, WERE DI" IGNATED J1 AND J2. THE MASSIVE BUILDING, APPEARING COMPLETED, WAS DESIGNATED 1E+ ASSEMBLY/CHECKOUT BUILDING. TWO PARALLEL SCARS, POSSIBLY GANTRY TRACKS UNDER CONSTRUCTION AND APPROXIMATELY 60 FT APART, EXTENDED FROM THE ASSEMBLY/CHECKOUT BUILDING IN THE DIRECTION OF THE LARGE EXCAVATIONS.. 3. THIS MISSION REVEALS CONTINUING CONSTRUCTION AT THE COMPLEX. TIC EXCAVATION AT J2 APPEARS TO BE AT APPROXIMATELY THE SAME DEPTH AS. THE ONE AT J1. A RECTANGULAR STRUCTURE WITH A CIRCULAR C01 IG'JRA.- TION IN ITS CENTER IS UNDER CONSTRUCTION IN THE BOTTOM OF . _-1ERE .ARE NOW 9 BUILDINGS BETWEEN J1 AND J2 AND FOOTINGS FOR SEVERAL MORE. THE RIGHT FORK OF THE RAIL HAS BEEN EXTENDED TO A POINT NE OF J1. AN AREA OF UNIDENTIFIED CONSTRUCTION IS LOCATED APPROXIMATELY '.2 NM SSW OF THE ASSEMBLY/CHECKOUT BUILDING. DITCHING CONNECTS COYfl EX J AND THIS UNIDENTIFIED CONSTRUCTION. These notes have been prepared for briefing purposes only and should not be used for detailed analytical work. Their use should be restricted to the particular briefing board(s) they were. prepared for and must be considercd valid only for the reporting period as indicated by the date of issue. 25X1 TO UP= 091rr Approved For Release 2009/06/12 : CIA-RDP84T00864R000100030001-9 Approved For Release 2009/06/12 : CIA-RDP84T00864R000100030001 .. ~ ti :-LAUNCH COMPLEX J _,t-'r',' TYURATAM MISSILE TEST 'CENTER, USSR 45-55N i63-16F r 25X1 5X1 5X1 Approved For Release 2009/06/12 : CIA-RDP84T00864R000100030001-9 REPRODUCTION OF THIS DOCUMENT IN WHOLE OR IN PART IS PROHIBITED EXCEPT WITH THE PERMISSION QE THU C'FICE OP ORIGIN.