AIRFIELD RECONSTRUCTION HSI-AN/LIN-TUNG AIRFIELD, CHINA

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP84T00864R000100590011-7
Release Decision: 
RIPPUB
Original Classification: 
T
Document Page Count: 
3
Document Creation Date: 
December 28, 2016
Document Release Date: 
September 8, 2011
Sequence Number: 
11
Case Number: 
Publication Date: 
June 20, 1967
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP84T00864R000100590011-7.pdf341.03 KB
Body: 
Sanitized Copy Approved for Release 2011/09/08: CIA-RDP84T00864R000100590011-7 REFERENCE:I AIRFIELD RECONSTRUCTION TOP SECRET RUFF HST-AN LIN-TUNG AIRFIELD, CHINA 1. SIGNIFICANCE: THE ENTIRE AIRFIELD IS IN THE EARLY STAGES 2. LOCATION: 4.8 NM WEST OF LIN-TUNG AT 342318N-1090757E. THIS AIRFIELD WAS CONSTRUCTED BY THE CHINESE COMMUNISTS PRIOR TO 1953 AND HAS BEEN USED 5. FIRST IDENTIFICATION: 6. NEGATION DATE: 7. SUBSEQUENT COVERAGE: 14 KH-4, 2 KH-7, These notes have been prepared for briefing purposes only and should not be used for detailed analytical work. Their use should be restricted to the particular briefing board(s) they were prepared for and must be considered valid only for the re- porting period as indicated by the date of issue. For information concerning these notes contact Chief, Collateral Support Division, NPIC. GROUP I E. dod.d bom.umm.. d.. -d~~...d d.d..,ir.~~. TOP SECRET RUFF Sanitized Copy Approved for Release 2011/09/08: CIA-RDP84T00864R000100590011-7 Sanitized Copy Approved for Release 2011/09/08: CIA-RDP84T00864R000100590011-7 TOP SECRET RUFF 20 June 196-7 Page 2 8. DIMENSIONS/ SPECIFICATIONS: OLD: RUNWAY--5,835 x 170 FT NE/SW ASPHALT. NEW: RUNWAY--LENGTH 7,655 FT NE/SW UNDER CONSTRUCTION. WIDTH UNDETERMINED. 9. MISSION READOUT: (REVEALS THAT THE LORI ENTIRE AIRFIELD IS IN THE EARLY STAGES OF CONSTRUCTION. THE RUNWAY, TAXIWAY, PARKING APRONS, AND HARD STANDS APPEAR TO BE BROKEN UP. THE RUNWAY AND TAXIWAY ARE BEING EXTENDED TO A LENGTH OF 7,655 FT, A RAIL SPUR HAS BEEN CONSTRUCTED ACROSS THE SW DISPERSAL AREA TO THE CENTER OF THE FIELD. These notes have been prepared for briefing purposes only and should not be used for detailed analytical work. Their use should be restricted to the particular briefing board(s) they were prepared for and must be considered valid only for the re- porting period as indicated by the date of issue. For information concerning these notes contact Chief, Collateral Support Division, NPIC. TOP SECRET RUFF Sanitized Copy Approved for Release 2011/09/08: CIA-RDP84T00864R000100590011-7 25X1 25X1 Sanitized Copy Approved for Release 2011/09/08: CIA-RDP84T00864R000100590011-7 AIRFIELD RECONSTRUCTION HSI-AN/LIN-TUNG, CHINA 34-23N 109-07E Sanitized Copy Approved for Release 2011/09/08: CIA-RDP84T00864R000100590011-7 k3lu TOP SECRET RUFF 25X1