MISSILE DEVELOPMENT AND PRODUCTION CENTER (DMDPC) DNEPROPETROVSK, USSR

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP84T00864R000100610009-7
Release Decision: 
RIPPUB
Original Classification: 
T
Document Page Count: 
4
Document Creation Date: 
December 28, 2016
Document Release Date: 
July 19, 2010
Sequence Number: 
9
Case Number: 
Publication Date: 
July 6, 1967
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP84T00864R000100610009-7.pdf125.55 KB
Body: 
Sanitized Copy Approved for Release 2010/07/19: CIA-RDP84T00864R000100610009-7 TOP SECRET CHESS RUFF (c) NATIONAL PHOTOGRAPHIC INTERPRETATION CENTER July-1967 Page 1 Copy 1 25X1 25X1 MISSILE DEVELOPMENT AND PRODUCTION CENTER (DMDPC) 25X1 DNEPROPETROVSK, USSR PREVIOUSLY IDENTIFIED POSSIBLE TEST STAND UNDER CONSTRUCTION IS NOW CONFIRMED AS A MEDIUM-TO-LARGE TEST STAND IN THE FINAL STAGES OF CONSTRUCTION. A ROCKET ENGINE TEST FIRING IS OBSERVED (1ST ON KH PHOTOGRAPHY) AND CONSTRUCTION CONTINUES THROUGHOUT THE DMDPC COMPLEX. 2. LOCATION: ON THE SOUTH EDGE OF DNEPROPETROVSK. 3. REMARKS: THE DMDPC IS THE LARGEST MISSILE PRODUCTION FACILITY IN THE WORLD AND IS DIVIDED INTO THREE SECTIONS: PLANT POST BOX 186, PLANT POST BOX 192, AND THE STATIC TEST AREA. THE MEDIUM-TO-LARGE TEST STAND AND ASSOCIATED FACILITIES WERE FIRST REPORTED UNDER CONSTRUCTION IN MAR 67. CONSTRUCTION OF THE DMDPC HAS BEEN CONDUCTED IN THREE MAJOR STAGES TO DATE: FROM 1945-53, FROM 1955-59 AND THE THIRD STAGE WHICH WAS INITIATED IN 1963 IS APPARENTLY BEING CONTINUED. These notes have been prepared for briefing purposes only and should not be used for detailed analytical work. Their use should be restricted to the particular briefing board(s) they were prepared for and must be considered valid only for the re- porting period as indicated by the date of issue. For information concerning these notes contact Chief, Collateral Support Division, NPIC. TOP SECRET CHESS RUFF Sanitized Copy Approved for Release 2010/07/19: CIA-RDP84T00864R000100610009-7 Sanitized Copy Approved for Release 2010/07/19: CIA-RDP84T00864R000100610009-7 V1 JL%.II\L I \.I 1LJJ II\UI F I (c) NATIONAL PHOTOGRAPHIC INTERPRETATION CENTER 6 July 1967 Page 2 THE DMDPC IS CURRENTLY PRODUCING ROCKET ENGINES, BALLISTIC MISSILE AIRFRAMES, POSSIBLY MISSILE GSE, BELARUS TRACTORS, DNEPER REFRIGERATORS AND POSSIBLY OTHER CIVILIAN PRODUCTS. 5. FIRST IDENTIFICATION: 7. SUBSEQUENT COVERAGE:. 15 KH-4, 2 KH-7 These notes have been prepared for briefing purposes only and should not be used for detailed analytical work. Their use should be restricted to the particular briefing board(s) they were prepared for and must be considered valid only for the re- porting period as indicated by the date of issue. For information concerning these notes contact Chief, Collateral Support Division, NPIC. TOP SECRET CHESS RUFF Sanitized Copy Approved for Release 2010/07/19: CIA-RDP84T00864R000100610009-7 Sanitized Copy Approved for Release 2010/07/19: CIA-RDP84T00864R000100610009-7 9. MISSION READOUT: IN THE TEST FACILITY, A CLOUD OF SMOKE/VAPOR FROM A ROCKET ENGINE TEST FIRING IS OBSERVED AT THE EAST POSITION OF THE 2-POSITION TEST STAND THREE SMALL SUPPORT TEST STRUCTURES ARE UNDER CON- STRUCTION ON THE SW SIDE OF THE FACILITY, A LARGE SEMIBURIED TANK IS NEARLY COMPLETE IN THE SOUTH-CENTRAL PART, A VERY LARGE TANK AND AN ASSOCIATED BUILDING ARE UNDER CONSTRUCTION IN THE NORTH-CENTRAL PART. THE NEW TEST AREA, IN THE SOUTHEAST PART OF THE TEST FACILITY, CONTAINS A MEDIUM-TO-LARGE SIZE TEST STAND, PROBABLY IN FINAL STAGES OF CONSTRUCTION. THIS AREA IS SERVED BY TWO PROBABLE PUMPHOUSES AND A SYSTEM OF LARGE DIAMETER OVERHEAD PIPES SIMILAR TO THOSE FOUND IN THE WEST AND SW PART OF THE TEST FACILITY. EXCEPT FOR THE TEST STAND, ALL OF THE BUILDINGS IN THE NEW TEST AREA APPEAR TO BE OUTWARDLY COMPLETE. IN PLANT 186, THE PREVIOUSLY REPORTED CONSTRUCTION IS IN MID-TO-LATE STAGES OF CONSTRUCTION WITH THE EXCEPTION OF ONE LARGE BUILDING FOR WHICH FOOTINGS ARE UNDER CONSTRUCTION. NUMEROUS LONG RAIL CARS ARE OBSERVED ON SPURS WITHIN THE PLANT AREA. IN PLANT 192, THE PREVIOUSLY REPORTED CONSTRUCTION HAS BEEN COMPLETED, WITH THE EXCEPTION OF THE ANNEX AREA WHERE CONSTRUCTION/RAZING ACTIVITY IS EVIDENT. These notes have been prepared for briefing purposes only and should not be used for detailed analytical work. Their use should be restricted to the particular briefing board(s) they were prepared for and must be considered valid only for the re- porting period as indicated by the date of issue. For information concerning these notes contact Chief, Collateral Support Division, NPIC. TOP SECRET CHESS RUFF Sanitized Copy Approved for Release 2010/07/19: CIA-RDP84T00864R000100610009-7 TOP SECRET CHESS RUFF 6 July 1967 Page 3 8. DIMENSIONS/ SPECIFICATIONS: NONE Sanitized Copy Approved for Release 2010/07/19: CIA-RDP84T00864R000100610009-7 Sanitized Copy Approved for Release 2010/07/19: CIA-RDP84T00864R000100610009-7