ODP REPORT FOR WEEK ENDING 23 SEPTEMBER 1983
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP85-00142R000300210011-6
Release Decision:
RIPPUB
Original Classification:
C
Document Page Count:
3
Document Creation Date:
December 22, 2016
Document Release Date:
April 30, 2010
Sequence Number:
11
Case Number:
Publication Date:
September 22, 1983
Content Type:
MEMO
File:
Attachment | Size |
---|---|
![]() | 112.42 KB |
Body:
Sanitized Copy Approved for Release 2010/04/30: CIA-RDP85-001428000300210011-6
~,~F_-~.~"t l.c.r""
ODP 83-1389
22 September 1983
MEMORANDUM FORS Deputy Director for Administration
D rector of Data Processing
SUBJECT: ODP Report for Week Ending 23 September 1983
1. External Procurement
The Office of Data Processing (ODP) concurred, as per
in the following external procurement requests:
DDS&T/ - Acquisition of a Radio Shack TRS-80, Model 100
OTS computer for test and evaluation purposes.
DDI/ - Acquisition of three Xerox 1100 Scientific
ASG & Information Processors with peripherals
SOVA (two actions).
DDI/ - Acquisition of an additional DEC VAX 11-780 in
OCPAS support of the Cartography and Design Group's
Interactive Carto-Graphic Analyst Design and
Drafting System (ICADDS). The system will
provide redundancy and improve turnaround time
for map/graphic requirements.
2. Defense Intelligence Agency (DIA) SAFE
Seven additional Delta Data terminals were delivered to
the SAFE-D Customer Support Group on 16 September. These
terminals plus the three already installed will allow DIA to
perform their own SAFE training starting in October 1983. This.
will obviate the need for any additional training to be given by
the Office of Training and Education (OT&E) to DIA personnel.
25X1
25X1
Sanitized Copy Approved for Release 2010/04/30: CIA-RDP85-001428000300210011-6
Sanitized Copy Approved for Release 2010/04/30: CIA-RDP85-001428000300210011-6
SUBJECT: ODP Report for Week Ending 23 September 1983
A move concept was developed by ODP's Engineering (ED)
and Systems Programming Divisions (SPD) on 20 September to
relocate the SAFE-D computer system from the Northside Computer
Center to DIA at Bolling Air Force Base.
3. CIA SAFE Center Construction
The Northside Computer Center Phase II construction is
still on schedule for completion on 23 October. The raised
flooring will be completed on 23 September. The chilled water
backup lines are almost complete. The conduit for emergency
electrical power has been installed but the electrical cable has
not been pulled. Work on the ceiling started on 20 September.
4. CAMS II Interfaces
Demonstration 108, a formal intersystem verification of
operational CAMS2 Processing Segment (P/S) ADP interfaces, will
occur during April and May 1984. CAMS Project personnel met with
representatives of the National Programs and Intelligence
Community components on 13 September to establish detailed plans
for the demonstration. The draft planning document will be
distributed in October and finalized in December.
5. DESIST Review
The DESIST Phase I preliminary design was reviewed from
the user perspective. The review went well, resulting in no
major action items.
6. Su port to the Office of Finance (OF)
A meeting was held with representatives from the Office
of the Comptroller (O/COMPT) and OF to discuss requirements for
the revised Financial Resources System (FRS) online query
capability. A questionnaire soliciting comments and suggestions
has been prepared and sent to all FRS users. OF and O/COMPT will
screen the questionnaires and send ODP a draft list of
preliminary requirements by early October.
Sanitized Copy Approved for Release 2010/04/30: CIA-RDP85-001428000300210011-6
Sanitized Copy Approved for Release 2010/04/30: CIA-RDP85-001428000300210011-6
SUBJECT: ODP Report for Week Ending 23 September 1983
7. Dual GIMS System Test
ODP's Production Division and Operations Division
performed a final test of the dual GIMS Production Systems in the
Center on 17 September. The new GIMS System, GIMPROD2,
wade a Production System on 19 September. SPD/ODP will be
monitoring GIMS performance in the next couple of weeks and
tuning the systems for improved performance.
8. Significant Events During Coming Weeks
The SAFE Delivery 2 Preliminary Design Review will be
held at TRW's W-1 Building in Tysons Corner, Virginia, from
26 through 29 September. Approximately 110 individuals have
responded to the invitations for attendance.
(22 September 1983)