ODP REPORT FOR WEEK ENDING 23 SEPTEMBER 1983

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP85-00142R000300210011-6
Release Decision: 
RIPPUB
Original Classification: 
C
Document Page Count: 
3
Document Creation Date: 
December 22, 2016
Document Release Date: 
April 30, 2010
Sequence Number: 
11
Case Number: 
Publication Date: 
September 22, 1983
Content Type: 
MEMO
File: 
AttachmentSize
PDF icon CIA-RDP85-00142R000300210011-6.pdf112.42 KB
Body: 
Sanitized Copy Approved for Release 2010/04/30: CIA-RDP85-001428000300210011-6 ~,~F_-~.~"t l.c.r"" ODP 83-1389 22 September 1983 MEMORANDUM FORS Deputy Director for Administration D rector of Data Processing SUBJECT: ODP Report for Week Ending 23 September 1983 1. External Procurement The Office of Data Processing (ODP) concurred, as per in the following external procurement requests: DDS&T/ - Acquisition of a Radio Shack TRS-80, Model 100 OTS computer for test and evaluation purposes. DDI/ - Acquisition of three Xerox 1100 Scientific ASG & Information Processors with peripherals SOVA (two actions). DDI/ - Acquisition of an additional DEC VAX 11-780 in OCPAS support of the Cartography and Design Group's Interactive Carto-Graphic Analyst Design and Drafting System (ICADDS). The system will provide redundancy and improve turnaround time for map/graphic requirements. 2. Defense Intelligence Agency (DIA) SAFE Seven additional Delta Data terminals were delivered to the SAFE-D Customer Support Group on 16 September. These terminals plus the three already installed will allow DIA to perform their own SAFE training starting in October 1983. This. will obviate the need for any additional training to be given by the Office of Training and Education (OT&E) to DIA personnel. 25X1 25X1 Sanitized Copy Approved for Release 2010/04/30: CIA-RDP85-001428000300210011-6 Sanitized Copy Approved for Release 2010/04/30: CIA-RDP85-001428000300210011-6 SUBJECT: ODP Report for Week Ending 23 September 1983 A move concept was developed by ODP's Engineering (ED) and Systems Programming Divisions (SPD) on 20 September to relocate the SAFE-D computer system from the Northside Computer Center to DIA at Bolling Air Force Base. 3. CIA SAFE Center Construction The Northside Computer Center Phase II construction is still on schedule for completion on 23 October. The raised flooring will be completed on 23 September. The chilled water backup lines are almost complete. The conduit for emergency electrical power has been installed but the electrical cable has not been pulled. Work on the ceiling started on 20 September. 4. CAMS II Interfaces Demonstration 108, a formal intersystem verification of operational CAMS2 Processing Segment (P/S) ADP interfaces, will occur during April and May 1984. CAMS Project personnel met with representatives of the National Programs and Intelligence Community components on 13 September to establish detailed plans for the demonstration. The draft planning document will be distributed in October and finalized in December. 5. DESIST Review The DESIST Phase I preliminary design was reviewed from the user perspective. The review went well, resulting in no major action items. 6. Su port to the Office of Finance (OF) A meeting was held with representatives from the Office of the Comptroller (O/COMPT) and OF to discuss requirements for the revised Financial Resources System (FRS) online query capability. A questionnaire soliciting comments and suggestions has been prepared and sent to all FRS users. OF and O/COMPT will screen the questionnaires and send ODP a draft list of preliminary requirements by early October. Sanitized Copy Approved for Release 2010/04/30: CIA-RDP85-001428000300210011-6 Sanitized Copy Approved for Release 2010/04/30: CIA-RDP85-001428000300210011-6 SUBJECT: ODP Report for Week Ending 23 September 1983 7. Dual GIMS System Test ODP's Production Division and Operations Division performed a final test of the dual GIMS Production Systems in the Center on 17 September. The new GIMS System, GIMPROD2, wade a Production System on 19 September. SPD/ODP will be monitoring GIMS performance in the next couple of weeks and tuning the systems for improved performance. 8. Significant Events During Coming Weeks The SAFE Delivery 2 Preliminary Design Review will be held at TRW's W-1 Building in Tysons Corner, Virginia, from 26 through 29 September. Approximately 110 individuals have responded to the invitations for attendance. (22 September 1983) Original + 2 - Addressee ~- D/ODP 2 - ODP/Registry 1 - ODP/Package Sanitized Copy Approved for Release 2010/04/30: CIA-RDP85-001428000300210011-6