REPAIR TICKETS

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP85-00988R000100090052-6
Release Decision: 
RIPPUB
Original Classification: 
K
Document Page Count: 
3
Document Creation Date: 
December 16, 2016
Document Release Date: 
October 30, 1998
Sequence Number: 
52
Case Number: 
Content Type: 
LIST
File: 
AttachmentSize
PDF icon CIA-RDP85-00988R000100090052-6.pdf76.37 KB
Body: 
Approved For Reuse 2005/08/15 : CIA-RDP85-00988 RO 00090052-6 Repair Tickets DATE: 1980 2/1 6th floor mechanical room AHU #8 outside -dampers 3/7 - 5/6 Duct shafts 1,2,3,4 (air exhaust) Patch walls 2/6 6th floor mechanical room Maximum outside air dampers AHU #6 2/6 6th floor mechanical room Check reheats on AHU #6 & #7 2/10 Replace steam valve on Photo Lab converter 7/23 Adj linkage on cooling tower #4. Adj controller on mixing valve tower N. 3/8 Unclog condensate line from reheat coil 2/14 Repair volume damper on cold duct system 5/5 1 N707 Clean mixing box 4/17 6th floor mechanical room Repair steam leak 4/21 M/G Set Annex Adj three-way valves because house chill water is leaking into special chilled water system 2/15 6th floor roof Expansion tank overflowing 6/27 4th floor roof Condensers clean coil fins 6/27 AHU #1 Open minimum outside air dampers 7/25 ANNEX Check sprays AHU #1,2,3 7/25 ANNEX Spray pump and float on AHU #5 6/19 6N504 Branch line from stat leaking 4/25 4th floor wire closet Replace defective busway switch 8/13 6th floor mechanical room Repair leaking chill water valve Approved For Release 2005/08/15 : CIA-RDP85-00988R000100090052-6 Approved For Ref se 2005/08/15: CIA-RDP85-00988R0 0,00090052-6 SUBJECT: Repair Tickets (Cont'd) DATE: 1980 8/13 4th floor roof 8/25 ANNEX 8/25 ANNEX 8/25 AHU #4 9/15 6th floor mechanical room July ANNEX 8/8 ANNEX 1978 ANNEX August 6th floor mechanical room Check freon level on comparator DX Units Control air compressors low pressure Automatic drain leaking on control air compressor Main air stays on outside air controller when AHU is off Repair thermometer on AHU F1 Inspect and replace rusted out extractors.& (All air handler) Repair return fan 21 Repair return fan 13 Roll filters Approved For Release 2005/08j15 : CIA-RDP85-00988R000100090052-6 Approved For Reelease 2005/08/15: CIA-RDP85-00988R00100090052-6 ATTACHMENT C A. The GSA Contractor has failed to remove residue as needed. There are presently 10,000 lb's of waste ac up and the problem has existed for the past 90 days. This creates a extreme fire-hazard. See Memo 21 Aug 80, Chief of Supply, NPIC. B. Perimeter fence is in disrepair in numerous areas. In some areas persons enter compound through large holes and bypass FPO control points. STAT C. I gate inoperative due to faulty motor for 5 weeks. Gate cannot sed in accordance with standard operating procedures. D. There has been a fire alarm survey every two months and a fire drill on July 1980 revealed significant defects which have not been repaired. E. For 5 months there have been two (2) skylights broken over the loading dock. Rain damages is causing safety problems at the loading dock area. Approved For Release 2005/08/15 : CIA-RDP85-00988R000100090052-6