MANAGEMENT OF INCORMATION PROCESSING
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP85B00803R000200080062-7
Release Decision:
RIPPUB
Original Classification:
K
Document Page Count:
3
Document Creation Date:
December 15, 2016
Document Release Date:
December 16, 2003
Sequence Number:
62
Case Number:
Publication Date:
September 12, 1969
Content Type:
BRIEF
File:
Attachment | Size |
---|---|
![]() | 45.84 KB |
Body:
Approved For Release 2004/05/05 : CIA-RDP85B00803R000200080062-7
12 September 1969
ExDir-Compt circulated a draft memorandum on the
subject of bxfox management of information processing
in carrying out a request by the DCI that he take steps
to strengthen the coordination and mgmt of information
processing activities.
It called for various studies to clarify roles and responsi-
bilities for ADP support to production, to investigate
cost effectiveness, and revision, if necessary, of the
IPC mechanism to strengthen the ADP coordination procedures.
The PPB, assisted by the Information Processing Staff,
was made responsible for these matters by the ExDir/Compt.
App d%? R61eape ~1~~ /09/ 1 +~R5?~0> l lowing 6a2-briefing on
~~?@Pj
gency DP given o e
Approved For Release 2004/05/05 : CIA-RDP85B00803R000200080062-7
Users' Group for OCS Interactive Services
On 6 Oct 69 OCS Interactive System scheduled to
offer on-line services as a production service (rather
than as the previous Test mode).
A bi-weekly forum was condhcted prior to readiness date
for users/to discuss problems for mutual benefit.
of batch services
19 Sept 1969 the forum was opened to include interactive
system users at meeting of 15 Oct 1969.
Assignment of hardware resources was to be managed by the
Interactive Systems Administrator, Opns Div., OCS
Approved For Release 2004/05/05 : CIA-RDP85B00803R000200080062-7
STAT Approved For Release 2004/05/05 : CIA-RDP85B00803R000200080062-7
Approved For Release 2004/05/05 : CIA-RDP85B00803R000200080062-7