OC SPACE REQUIREMENTS

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP85B01152R000600720013-1
Release Decision: 
RIPPUB
Original Classification: 
C
Document Page Count: 
4
Document Creation Date: 
December 21, 2016
Document Release Date: 
June 25, 2008
Sequence Number: 
13
Case Number: 
Publication Date: 
May 31, 1983
Content Type: 
MEMO
File: 
AttachmentSize
PDF icon CIA-RDP85B01152R000600720013-1.pdf121.29 KB
Body: 
Approved For Release 2008/06/25: CIA-RDP85B01152R000600720013-1 ROUTING AND RECORD SHEET FROM: Director of Communications _1 I 31 May 198 TO: (Officer designation, room number, and building) 1. Q~ DDA ~~ vv 7D24 HQS. 16 QQ AD 40 'Olt 4 JUN N19$ FFlaa S INMALS W COMMENTS (Number each comnsnt to show from whom to whom. Draw a line across column after each comment.) Stated simply, what we aim to do as described in our memorandum to OL is to~ We would also house there the con- tractors working on these two projects as well as consolidate Rome other activities at This would free up ft. at Headquarters which is inadequate for our pur- poses because we need about In FY84, we have ~ to refurbish space at Headquarters The logic behind this move hold be clear. Attachment: Memo to OL Harry--I've asked OL to find out how much space OC wants in total, whether is still available and how man s ft an h y q wet er t ey would ho.d .. 15. until 1 Oct on the basis that it would take until then for us to do renovation design and them to quote costs for modifying. Since OC's requirement ORM t'isvious F 610 uN 1-79 OR .not+s is temporary or until new building is available, ODP could use subsequently for CAMS back-up or other computer back-up center. Approved For Release 2008/06/25: CIA-RDP85BO1152R000600720013-1 Approved For Release 2008/06/25: CIA-RDP85B01152R000600720013-1 C 0 N F I DE-1 N TI AL OC-M83- 4 00 MEMORANDUM FOR: Director of Logistics FROM: William F. Donnelly Director of Communications SUBJECT: OC Space Requirements 1. The Office of Logistics (OL) is requested to assist the Office of Communications (OC) in determining if the Building is suitable for the requirement outlined in the attach- ment. We believe that acquisition of such space is the best way to meet Agency communications requirements until the new Head- quarters Building is fully occupied. lowever, OC is allso_ nriepared to consider other alternatives in cooperation with OL. 2. After reviewing the projected space available within the Headquarters Building with members of your staff, it has become apparent that 4,000 square feet identified will not be adequate. 3. We are planning to complete the development of our new Communication Switching and Message Handling Systems "inhouse" in parallel operation with the present systems. This arrangement will be of a temporary nature until we move into the new Headquarters Building. To reduce costs, it is our intention to minimize renovations of the temporary facilities to the extent possible and use old furniture presently available. There will be a need for security alarms, authorization for external antenna mountings, uninterrupted power service, as well as a guard service. We will P install all the communications services with our own resources. 4. From the information available, it appears to he impractical to even attempt to install these systems at Headquarters- therefore, Building will be necessary. One advantage of this arrangement is Approved For Release 2008/06/25: CIA-RDP85B01152R000600720013-1 Approved For Release 2008/06/25: CIA-RDP85B01152R000600720013-1 CONFIDENTIAL SUBJECT: CC Space Requirements that it will free up the space allocated for other use. In view of the comuellinst nature of this matter, it is requested that your Division, to explore the suitability of the 25X1 William F. Donnelly Attachment: As Stated Approved For Release 2008/06/25: CIA-RDP85B01152R000600720013-1 Approved For Release 2008/06/25: CIA-RDP85B01152R000600720013-1 Next 1 Page(s) In Document Denied Iq Approved For Release 2008/06/25: CIA-RDP85B01152R000600720013-1