YOUR MEMO OF 7 MARCH 1983, IS CORRECT. I RECHECKED WITH JUDY STRANSKI
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP85B01152R000700930008-3
Release Decision:
RIPPUB
Original Classification:
K
Document Page Count:
2
Document Creation Date:
December 20, 2016
Document Release Date:
November 1, 2007
Sequence Number:
8
Case Number:
Publication Date:
March 15, 1983
Content Type:
LETTER
File:
Attachment | Size |
---|---|
![]() | 135.94 KB |
Body:
Approved For Release 2007/11/01: CIA-RDP85B01152R000700930008-3
OUTING AND =TRANSMITTUP
Phone. No.
ML FORM 41 (Rev. 7 _76)-
'
GSA
rrescn byY
FPMR (41 CFA) 101-11.206
Approved For Release 2007/11/01 : CIA-RDP85B01152R000700930008-3
FROM: (Name,"org. symbol, Agency/Post).
1 5 MAR 1983
Your mero of 7 March 1983, is correct. I rechecked with
and OP does have all equipment they have ordered from WANG WP. They are using
it as they (OP) they see fit. They do not necessarily have all WANG equipment
they need--but they have not budgeted for it and are playing with "84 unfunded"
and "85 initiative" money games.
I checked with the OP ADP control officer. Same story with
the additional factor that the move is causing them
to "rethink" what they really need. ODP and OC are planning to support OP at
Approved For Release 2007/11/01: CIA-RDP85BOl152R000700930008-3
with up to two Alliances with up to 40 work stations. This means
that wires will be pulled and electricity in place but no actual hardware.
25X1
25X1
25X1
25X1
Checked wit ODP). OP had some outstanding old requirements 25X1
for VM terminals to use on PERSIGN. These are currently being filled (four
terminals were hooked-up circa 1 March) and OP's VM/GIM access needs are
essentially complete.
is currently writing a paper for on projected OP WP and
Checked with - same story.
The DA (ODP, OC, LOG, etc.) is "clean" with respect to OP.