MONTHLY REPORT--LONDON BUREAU--MARCH 1983

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP86-00040R000100250004-4
Release Decision: 
RIPPUB
Original Classification: 
K
Document Page Count: 
2
Document Creation Date: 
December 21, 2016
Document Release Date: 
April 1, 2008
Sequence Number: 
4
Case Number: 
Publication Date: 
April 6, 1983
Content Type: 
MEMO
File: 
AttachmentSize
PDF icon CIA-RDP86-00040R000100250004-4.pdf77.8 KB
Body: 
6 April 1983 MLD-3015 1ti o toll" anotner modirinnt of the pressfax equipment, bureau engineers and . - STAT _ _ page comp about two and a quarter inches which had made it difficult to distinguish certain Russian characters. The facsimile pages are now the same size as the newsprint version and PMU's Russian team is no longer distinctive for its collective squint-eyed appearance. B. Communications 1. Bureau circuits and traffic were heavily affected by a European exercise--later an official MINIMIZE--early in the month. Some traffic was delayed over 48 hours and, judging by confusing and sometimes contradictory information from Croughton Switch, our circuits were apparently preempted several times. MEMORANDUM FOR: Director, FBIS FROM: Chief, London Bureau THROUGH: Chief, Operations Group SUBJECT: Monthly Report -- London Bureau -- March 1983 I. GENERAL 14 Approved For Release 2008/04/01 : CIA-RDP86-00040R000100250004-4 At month's end the construction of the cable duct between the ROSET site and the cubicles building was nearly completed. Computer flooring has been installed in the "Dish Control Room" and equipment racks moved up from the Portakabin to the control room. The project has come to a halt for the moment while we await arrival of the control and RF cables and while the BBC gets its installers on the scene to wire up the equipment racks. Meanwhile, at Crowsley, the BBC has put up a 4.8 meter dish for experimental purposes and is pursuing an expansion of its cable link between Crowsley and Caversham to handle the new equipment. British Telecom's quotation for new cable is causing heartburn so the notion of a microwave link between the two sites is once again on the front burner. II. OPERATIONS Approved For Release 2008/04/01 : CIA-RDP86-00040R000100250004-4 Approved For Release 2008/04/01: CIA-RDP86-00040R000100250004-4 2. During a 19 March-1 April outage of Nicosia Bureau's normal outgoing traffic path, Nicosia traffic--a total of 1,333 messages-- was handled via the standby Nicosia-London circuit. III. ADMINISTRATION 1. Three employees received service awards re 60 years with FBIS. Teletypists STAT were presented with 15-year and -year certificates, respectively. STAT whose record with FBIS originated with the Cairo Bureau, was presented with his 35-year certificate in the presence of all the long-time employees we could muster together. STAT IV. VISITS transferred from a BBC Russian monitorial on to MU on 7 March. Bureau Chief Islamabad Un e with Pakistani ' Chief FEB si te enginee 121-25 March; to Karachi 9-1 A March fny, i4____ STAT STAT STAT STAT SIAI STAT Attachments cc: Chief. Austrian nirr u unierg z awa Bureau STAT Approved For Release 2008/04/01: CIA-RDP86-00040R000100250004-4