'HEALTH EXERCISE' FACILITY, AMES BUILDING

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP86-00244R000200350007-0
Release Decision: 
RIPPUB
Original Classification: 
K
Document Page Count: 
2
Document Creation Date: 
December 9, 2016
Document Release Date: 
August 16, 2001
Sequence Number: 
7
Case Number: 
Content Type: 
MF
File: 
AttachmentSize
PDF icon CIA-RDP86-00244R000200350007-0.pdf117.24 KB
Body: 
Approved For Release 2001/09/04: CIA-RDP86-00244R000200350007-0~' HHHOPJ NDUM FOR: Chief, Logistics Services Division, OL SUBJECT : "Health Exercise" Facility, Ames Building RE RENCE : Savo cite li Sept 72 to C/RECD/CL fm C/LSD/OL, same subject 1. Per your requests as outlined in the referenced memorandum, we are hereby submitting a conceptual sketch Attachment 1), project work outline (Attachment 2) and cost projects Attachment 3) for a proposed gymnasium and shower/locker room facility to be located on the "cellar" level of the Ames Building. 2. Copies of Attachments I and 2 have been sent to the Ames Building Engineer! for his review, comments and pos- sible coat estimate. 3. With regard to the conceptual sketch submitted by this office, the following points should be made clear: a. Review of Ames Building working drawings by FE23/RECD and B/CU engineers and architects indicates that the location of a shower facility in the area noted an the sketch should pose no major problems. It must be kept in mind that the shower facility is located on the eellar level directly above the main building waste line (8-inch diameter) which runs to a sewer con- tion on Fort Myer Drive. The existing fall from finished slab elevation to main waste Lino elevation should be adequate to bandle the projected usage. der, until the exact location and elevation of this *"to line is determined by breaking into the slab, a positive determination as to the feasibility of the attached concepts cannot be made. b. Certain exercise activities would have to be omitted rem any gymnasium pla* for the Amos Building due to ceiling height restrictions. These activities might include weight lifting, chinning, rope climbing, etc.. c. The auxil.laary chiller located on the cellar level does have adequate year-round chilled water reserve capacity to handle cooling loads in the proposed area. Approved For Release 2001/09/04: CIA-RDP86-00244R000200350007-0 Approved For Release 2001/09/04: CIA-RDP86-00244R000200350007-0 SUBJECT' "Health Exercise'' Facility, Ames Building 2541A 5X ! Real Estate and Construction Division, OL d. The GSA Guard Force locker rum should be relocated to the far and of the cellar level as indicated on the sketch. Ideally, if this element could be relocated back to the space previously occupied on the third floor of Ames Building, additional storage space for BSP could be created in the area presently ear- marked for the Guard Force. If the Guard Force need be kept on the cellar level, efforts should be taken to extend the air con- ditioning capability to include the Guard Force area. 4. Please feel free to contact the Building Planning Staff Architect, :fir for any information concerning this project. Distribution: Orig - Adse w/atts 1 - OL/RECD Official v/atts tY - OL/RECD/BPS Files Watts 1 - OL/RECD/BPS Chrono w/o atts 1 - OL Reader w/o atts 1 - Ames Building Engineer w/atts 1 & 2 OL/RECD/BP (26 September 1972) Approved For Release 2001/09/04 2CIA-RDP86-00244R000200350007-0