OSP-NPIC SITE SELECTION PLAN OF ACTION (APPLY GUIDANCE RECEIVED BY EX. DIR.-COMP., DD/S, DD/L, DD/S&T, AND AD/PPB DURING MEETING WITH THE DCI, 6 MARCH 71)

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP86-00244R000200430012-5
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
2
Document Creation Date: 
December 15, 2016
Document Release Date: 
September 2, 2003
Sequence Number: 
12
Case Number: 
Publication Date: 
March 12, 1971
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP86-00244R000200430012-5.pdf75.37 KB
Body: 
12 Marcn 1'i1 role ror r(eieaseTLuu )iILi i : t iM-r(uraommuL44muuuzuu43UUlL-o OSP-NPIC SITE SELECTION PLAN OF ACTION (Apply guidance received by Ex. Dir. -Compt. , DD/S, DD/I, DD/S&T, and AD/PPB during meeting with the DCI, 6 March 71) Supporting Action Steps to be Taken by the Site Selection Group Convene the Group 1. Establish study group - representatives of DD/I, DD/S&T, and DD/S. 2. List all conceivable sites identifiable by Study Group. identify Require- 3. Establish a set of broad requirements for an acceptable ments of Each site. Directorate Proposed set of requirements for discussion purposes: Electric Power Water Supply Sanitary Sewerage Steam Air Conditioning Communications Document Waste Disposal Cafeteria - Food Service Local Housing On and Off Post Effect of increase on the local economy; i. e. , schools, police, shopping facilities. Capability of road network in vicinity and transportation facilities Labor market; i.e., clerical, messenger, Jr. professional 25X1 4. Identify and analyze specific or unique requirements and limitations Approach I Approval to 5. Acquire from descriptive information on each site of b 3 ove. a possible interest, including details on items in 6. Shake down the site options on a cross grid system. 7. Select the best five and list pros and cons of each, based upon the above paper research and analysis. Approved For Release 2003/1 0200430012-5 daalas: !cs:.on 25X1 25X1 ~ tp t Approved For Release 2003/1 2/1t: Q:1iL DP86-00244R000200430012-5 25X1 25X1 Approval to Divulge S. Obtain 0 permission for site surveys, and make surveys. Site Interests Approval to Contact 9. Verify, with public utilities where necessary, the capabilities the Local Utility Companies to meet the demands of the two activities. 10. Consider the interfacing between the OSP Project (P & O/C as ects) a d NPIC a d th t th f th t i d d p n n ascer a n a eman s o e e systems and procedures can be met. Canvass Other 11. Consider relationships with Headquarters and other organiza- Interested tions and ascertain that requirements for Agency support Components can be met. 12. Prepare paper on best site for Directorate concurrences. Obtain Ex. Dir. - 13. Obtain tentative agreement 25X1 Compt. Support and Assist if Necessary DCI Approval 14. Prepare final justification of selected site and submit to DCI for approval. 2 Approved For Release 2003/12/1SECWIDP86-00244R000200430012-5