INSTALLATION OF FIRST SC-3 SATELLITE TERMINAL AT (Sanitized) (C)
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP86-00800R000100160028-1
Release Decision:
RIPPUB
Original Classification:
C
Document Page Count:
1
Document Creation Date:
December 12, 2016
Document Release Date:
June 22, 2001
Sequence Number:
28
Case Number:
Publication Date:
March 30, 1978
Content Type:
MEMO
File:
Attachment | Size |
---|---|
![]() | 52.97 KB |
Body:
M NO M
GSA 1R) AY 19MR~RCFo v'edaFor RBI ,ase 200 $11 "* C1 e 86-00800RQ~100160028-1
UNITED STATES GOVERNMENT
Memorandum
0CE-M78 - h2 Z
Chief, Real Estate & Construction DATE: 30 MAR 1973
Division, OL
25X1-A FROM :
25X1A
Chief, Communications Engineering
SUBJECT: Installation of First SC-3 Satellite Terminal at
(C)
OCE-M76-473, dated 1 November 1976
1. (C) As a result of discussions between members of
our staffs on the possibility of using a 2.5 meter antenna
reflector with small satellite field terminals'. PDSC-31,
the specification for a new, small, field terminal incorporated
such an antenna size. Your input and comments on this
specification, transmitted by the reference, and your response
to subsequent evaluations and reviews.have been appreciated.
2. (C) The first terminal, available for installation
in July 1978, will be subjected to intensive testing prior
to giving approval for production of the remaining terminals.
This approval is required contractually within four months
followin
completion letion of the in-plant acceptance testing.
25X1A
The
has been chosen
to
receive
is ermina , and your support is needed to
help
plan and supervise the construction details for this
lation in the limited time available.
instal-
25X1A
25X1A
3. (C) Please advise the name of a point of contact
for this installation so that necessary action can be
undertaken soonest. For additional information, please
contact of my staff on
SA
C/REB
ED
.,Z,C/FEngB
PE
C/HEB
! 8 1448
PE
3 F!pFor R61646 20 7fl OIiQ=RgP86-00800800010016002 1
uy U.S. Savings Bonds Regularly on the Payroll Savings Plan