FEASIBILITY STUDY OF AIR CONDITIONING(Sanitized)

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP86-00800R000100240058-9
Release Decision: 
RIPPUB
Original Classification: 
C
Document Page Count: 
2
Document Creation Date: 
December 12, 2016
Document Release Date: 
August 31, 2001
Sequence Number: 
58
Case Number: 
Publication Date: 
January 11, 1978
Content Type: 
MF
File: 
AttachmentSize
PDF icon CIA-RDP86-00800R000100240058-9.pdf128.69 KB
Body: 
Approved For R&ease 2001/11/08 : CIA-RDP86-00800R4Q0100240058-9 11 JAN 1978 aoanrm FOR: Chief, Communications Engineering 25X1A ti SUBJECT: on Chief, Real Estate and Construc Division, OL asibilit Study of Air Conditioning at 25X1A (C) 25X1A Ei E CES: (a) Memo dtd le ,Nov-77`to3C/Eng D iv, 25X1A Condition Study (OCE-1177-453; CL 7 5286) h(b) f 9 Dec 77 between 25X1A (C) Reference_ (a) indicated a determination to use -g #%vL?i nn of ---- f discuss taper the or this procedure was ference {b} , r 5. Dur re ir< 4 with the recommendation that it not be followed h sicn o ini IBGTI t ~ aca~?~ %-" - - .- Iittle of the duct work in the existing mech.an- A.V very ld aiva Ad for reuse if the mechanical s 15 rou CUu 8 pment were td be relocated. Additional mechanical room .---I ~1.:.. ...~,Y .,.ft., he* arr c ificailx 25X1A spar's may rs xaw v'P . ~ {.... dei nod if necessary. This concept was agreed to by 2. C The problem of our consultant being able to proceed in his feasibility study without data regarding planned future expansion and attendant heat load/air- Approved For Release 2001/11/08: CIA-RDP86- e a he more economical advantage of leaving t perdtional facilities can be provided by designed to ifi ll ca y building with space spec MWMWWA~-q OZ 7 S2tt O" Approved For R ase 2001/11J ;,616- P86-00800RM100240058-9 i t C) This information has been relayed to the his use with respect to the consultant. requested that the above design requirements be made CT: Feasibil=ity Study of Air Conditioning C) conditioning requirements was also surfaced. advised that planning and programming is underway at the Headquarters level and that the information was not yet available from OC either at Headquarters or in the field. He rero nized_that the consultant cannot effectively con- tinue with the feasibility study until this information is made available. available as soon `as possible so that the desired wort on this project may proceed and be accomplished within a reasonabie tire frame. Att C/OC'= Distribution: Orig. - Addressee, w/att 1 - OL/RECD Official, w/att 1 - OL/RECD/FEB Chrono, w/o att 1 - OL Reader, w/att OL/RECD/FEB/-:rfb (10 Jan 77) ~ F IDE h ! AL Approved For Release 2001/11/08 : CIA-RDP86-00800R000100240058-9